Update on Power Supplies and GTK carrier M.Morel 01 .04.2014

16
Update on Power Supplies and GTK carrier M.Morel 01.04.2014

description

Update on Power Supplies and GTK carrier M.Morel 01 .04.2014. Power Supplies Cables GTK_carrier Probe tester. Power Supplies Cables GTK_carrier Probe tester. Low Voltage A3009 and A3009K modules. 1 x 2V5 Dig 1 x 3V3 Dig 1 x 5V Dig. 1V2 Dig x 10 ch. 1V2 A X 10 ch. - PowerPoint PPT Presentation

Transcript of Update on Power Supplies and GTK carrier M.Morel 01 .04.2014

Page 1: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK carrier

M.Morel01.04.2014

Page 2: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 2

1. Power Supplies2. Cables3. GTK_carrier4. Probe tester

01/04/2014

Page 3: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 301/04/2014

1. Power Supplies2. Cables3. GTK_carrier4. Probe tester

Page 4: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 401/04/2014

1V2 Digx 10 ch

1V2 AX 10 ch

1 x 2V5 Dig1 x 3V3 Dig1 x 5V Dig 3 x 5V3 Dig

3 modules in each EASY crateInterlocked with Temperature(OR of cooling and TDCpix)

Common to the 3 stations.Supplies the Temp logic(VDD_temp and 3V3_NI)

Low Voltage A3009 and A3009K modules

2 x A3009K + 1 x A3009

1 x A3009

Page 5: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 5

- 3 x EASY CRATES 3000 - 6 x 3009K 3 x Analog and 3 x Digital 1V2- 1 x 3009K (prototype module) - 3 x 3009 2V5, 3V3, 5V- 1 x 3009 5V3 non interlocked*- 1 A3486 48V power supply

- 1 mainframe SY2527: 80CHF/month- 1 branch controller A1676A: 40CHF/m- 1 HV module A1821: 38CHF/m

- 1 SY4527: 5862 euros (profitable after 7 years)- 1 A1676A: 1800 euros (profitable 5 years)- 1 A1821: 5260 euros (profitable after 14 years)

* 5V3 non interlocked is connected to rad hard voltage regulatorswhich provide VDD_temp (1V2) and temp_logic (3V3)

What do we need?

Bought

Rented

Bought

01/04/2014

Page 6: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 6

1. Power Supplies2. Cables3. GTK_carrier4. Probe tester

01/04/2014

Page 7: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 701/04/2014

TCC8

Page 8: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier

Each Patch Panel:10 x 1.2V Digital10 x 1.2V Analog1 x 3.3V Dig1 x 2.5V Dig1 x 5V Dig1 x Analog senses1 x digital senses1 x 5.3V dig (NON interlocked)1 x Bias (~500 to 1000V)1 x 10 temperature interlocks

PatchPanel3

PatchPanel2

PatchPanel1

GTKStation 1

GTKStation 2

GTKStation 3

Electronic

Rack 2

Electronic

Rack 1

Electronic

Rack 3

Electrical cables routing scheme

8

4m

4m

4m

01/04/2014

18m9m20m

Page 9: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 901/04/2014

• All the cables have been ordered• All the connectors and accessories have also been ordered• The company CONFECTRONIC (Yvonand) will assemble the connectors (318 cables)

Page 10: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 1001/04/2014

1. Power Supplies2. Cables3. GTK_carrier4. Probe tester

Page 11: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 1101/04/2014

GTK_CARRIER

Page 12: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 12

Due to the complexity of the PCB, we would select a company capable to work with special techniques as:

• Small pitch• Blind and burried vias• Controlled impedance• Filled and capped vias• Nelco 4203-13• Ni/Au on the edges of the board• countersink

1. CERN.

2. GS Swiss PCB. KÜSSNACHT (CH) www.swisspcb.ch

3. ELTOS SAN ZENO Arezzo (IT) www.eltos.it

4. STEVENAGE circuits www.stevenagecircuits.co.uk

01/04/2014

PCB production

Page 13: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 1301/04/2014

1. CERN. 2 x 2866CHF + tooling 1039CHF

2. GS Swiss PCB. 3 x 6103CHF + 2935CHF

3. ELTOS SAN ZENO 3 x 1485CHF + 1500CHF

4. STEVENAGE circuitsno answer

5 boards will be produce: expected delivered time: mid May

GTK_CARRIER production

Page 14: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 1401/04/2014

1. Power Supplies2. Cables3. GTK_carrier4. Probe tester

Page 15: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 1501/04/2014

Wentworth Prober

Missing part: small vacuum pumpNeeds modification of the carrier support

Page 16: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 1601/04/2014

Conclusion

1. Status of the Power Supplies: ordered2. Status of the Cables: ordered3. Status of the GTK_carriers: ordered4. Prober: needs small modifications