Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task...

14
Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group 17078

Transcript of Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task...

Page 1: Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group 17078.

Update on ISO 17078 Standards

Wayne Mabry

Coordinator - Gas Lift Manufacturing

Leader of ISO Task Group 17078

Page 2: Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group 17078.

2 WJM

Objectives

• Review situation of ISO 17078.1– Side Pocket Mandrels Specification

• Review situation of ISO 17078.2– Flow control devices

• Review situation of ISO 17078.3– Latches and KOT Specification

• Time Line

Page 3: Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group 17078.

3 WJM

ISO 17078-1

     

  

  

ISO/WD 17078‑1Petroleum and Natural Gas Industries 

Down hole equipment Part 1: Side Pocket Mandrels

Page 4: Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group 17078.

4 WJM

Environmental Service GradeEnvironmental service grades

Table A-1

Grade El -- Standard service Non-sour service

Grade E2 -- Stress corrosion cracking service

H2S (sour) service1

Grade E3 -- CO2 service CO2 service2

Grade E4 -- Special service Special service requirements defined by the user/purchaser

Environmental servicegrades

Characteristics

____________________

1Per NACE MR-01-75 2There are no published international standards for CO2 service. Each individual situation shall be evaluated on a case-by-case basis.

Page 5: Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group 17078.

5 WJM

Design Verification Grade

D1 D2 D3 Documentation Hist. Record Required Required

See B.1 -- 1 See B.2 -- 1 See B.3 – 1

 Design review (burst, Required Required Requiredcollapse, tolerance) See B.1 -- 2 See B.2 -- 2 See B.3 – 2 Burst & collapse pressure Not required Burst & collapse Not requiredtest to destruction @ See B.1 -- 3 See B.2 -- 3 See B.3 – 3 ambient temperature Pressure testing @ rated Required Required Requiredtemperature See B.1 -- 4 See B.2 -- 4 See B.3 – 4 Internal pressure cycles Not required 10 cycles 10 cycles

See B.1 -- 5 See B.2 -- 5 See B.3 – 5 Finite element analysis / Not required Not required Burst & collapsestrain gauge See B.1 – 6 See B.2 -- 6 See B.3 – 6 Flow control – install/pull @ 12 o'clock @ 12,3,6 o'clock @ 12,3,6 o'clockwith kick-over tool See B.1 -- 7 See B.2 -- 7 See B.3 – 7 Slick line operational test Not required Not required Requiredwith kick-over tool See B.1 -- 8 See B.2 -- 8 See B.4 - 8 

Table B-1

Page 6: Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group 17078.

6 WJM

Product Validation Grade

V1 V2 V3 Internal pressure test 100% 100% 100%

See C.1 -- 1 See C.2 -- 1 See C.3 -- 1 External pressure test 0% 5% 100%

See C.1 -- 2 See C.2 -- 2 See C.2 -- 2 Internal diameter drift test 100% 100% 100%

See C.1 -- 3 See C.2 -- 3 See C.2 -- 3 External diameter drift test 100% 100% 100%

See C.1 -- 4 See C.2 -- 4 See C.2 -- 4 Installation/removal method – 0% 5% 100%kick-over tool See C.1 -- 5 See C.2 -- 5 See C.2 -- 5

Table C-1

Page 7: Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group 17078.

7 WJM

Quality Control Grade

Q1 Q2 Q3 Hardness testing 100% 100% 100%

See D.1 -- 1 See D.2 -- 1 See D.3 -- 1 Non-destructive examination Not required 5% 100%

See D.1 -- 2 See D.2 -- 2 See D.3 -- 2 For Q2, select one preferred method from the four listed methods of non-destructive testing.For Q3, radiographic examination is required.

Surface magnetic particle examination. Liquid penetrant examination.

Radiographic examination. Ultrasonic examination.

 Documentation 100% coc 100% coc plus 100% coc plus

See D.1 -- 3 See D.2 -- 3 See D.3 -- 3 

Table D-1

Page 8: Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group 17078.

8 WJM

ISO 17078-2

     

  

ISO/WD 17078‑2Petroleum and Natural Gas Industries

Down hole equipmentPart 2: Flow control devices

Page 9: Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group 17078.

9 WJM

Environmental Service GradeEnvironmental service grades

Table A-1

Grade El -- Standard service Non-sour service

Grade E2 -- Stress corrosion cracking service

H2S (sour) service1

Grade E3 -- CO2 service CO2 service2

Grade E4 -- Special service Special service requirements defined by the user/purchaser

Environmental servicegrades

Characteristics

____________________

1Per NACE MR-01-75 2There are no published international standards for CO2 service. Each individual situation shall be evaluated on a case-by-case basis.

Page 10: Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group 17078.

10 WJM

Design Verification TestsProbe or Close or

Valve Compatibility Insertion Travel* Load Life Flow Back Check Open* Validation Erosion Shelf

Types Test Test Test Rate Cycle Test Test Test Test Test Test

PPO Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

PPO w ck Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

IPO Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

IPO w ck Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

Pilot Yes Yes Yes --- Yes Yes Yes Yes Yes Yes Yes

Differential Yes Yes Yes --- Yes Yes Yes Yes Yes Yes Yes

Constant F Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

SC – Hyd Yes Yes Yes* --- Yes Yes Yes Yes Yes Yes ---

SC – Elect Yes Yes Yes* --- Yes Yes Yes Yes Yes Yes Yes

Smart Yes Yes Yes* --- Yes Yes Yes Yes Yes Yes Yes

Orifice Yes --- --- --- --- Yes Yes --- Yes Yes ---

Nozzle Vent Yes --- --- --- --- Yes Yes --- Yes Yes ---

Shear Orif Yes Yes --- --- --- Yes Yes Yes* Yes Yes ---

Chem Inj Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

Chem j w/o Yes Yes --- --- Yes Yes Yes Yes Yes Yes ---

Dump/Kill Yes Yes --- --- --- Yes Yes Yes* Yes Yes ---

Water Inject Yes Yes --- --- Yes Yes Yes --- Yes Yes ---

Dummy Yes --- --- --- --- --- --- --- Yes --- ---

Page 11: Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group 17078.

11 WJM

Design Verification TestsProbe or

Valve Travel* Load Flow Back Check Open Close Leakage Shelf

Types Test Rate Cv Test Leak Test Test Test Rate Test

PPO Yes Yes Yes Yes Yes Yes Yes Yes

PPO w ck Yes Yes Yes Yes Yes Yes Yes Yes

IPO Yes Yes Yes Yes Yes Yes Yes Yes

IPO w ck Yes Yes Yes Yes Yes Yes Yes Yes

Pilot Yes --- Yes Yes Yes Yes Yes Yes

Differential Yes --- Yes Yes Yes Yes Yes Yes

Constant F Yes Yes Yes Yes Yes Yes Yes Yes

SC – Hyd Yes* --- Yes Yes Yes Yes Yes ---

SC – Elect Yes* --- Yes Yes Yes Yes Yes Yes

Smart Yes* --- Yes Yes Yes Yes Yes Yes

Orifice --- --- Yes Yes --- --- --- ---

Nozzle Vent --- --- Yes Yes --- --- --- ---

Shear Orif --- --- Yes Yes Yes* --- Yes ---

Chem Inj Yes Yes Yes Yes Yes Yes Yes Yes

Chem j w/o --- --- Yes Yes Yes Yes Yes ---

Dump/Kill --- --- Yes Yes Yes* --- Yes ---

Water Inject --- --- Yes Yes --- --- --- ---

Dummy --- --- --- --- --- --- --- ---

Page 12: Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group 17078.

12 WJM

ISO 17078.3

     

  

ISO/WD 17078‑3Petroleum and Natural Gas Industries

Down hole equipmentPart 3: Latches and KOT’s

Page 13: Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group 17078.

13 WJM

ISO 17078-3

Page 14: Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group 17078.

14 WJM

ISO Gas-Lift Standard Meeting Schedule

Time Line1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Meeting Topics to be AddressedNo. Location Date Host General 17078.1 17078.2 17078.1

1 Houston, TX 02/05/98 Camco Organize ISO Gas-Lift Committee2 Houston, TX 05/04/98 Camco Draft Outline for ISO Gas-Lift Standard Document

3 Houston, TX 05/10/99 Shell Review Plan for ISO Gas-Lift Documents4 Houston, TX 11/15/99 Shell Review Plan for ISO Gas-Lift Documents

5 Houston, TX 03/01/00 Shell Review Plan for ISO Gas-Lift Documents6 Houston, TX 05/02/00 Shell Review Plan for ISO Gas-Lift Documents7 Atlanta, GA 07/25/00 Decker Tech Review ISO 17078.1 Clauses 3 - 58 Dallas, TX 10/06/00 Decker Tech Review ISO 17078.1 Clauses 6 & 7

9 Houston, TX 02/08-09/01 Weatherford Review Entire ISO 17078.111 Houston, TX 05/22-24/01 Schlumberger Complete (Almost) ISO 17078.1, Begin Work on ISO 17078.212 Houston, TX 07/18/01 Chevron Complete 1st Draft of ISO 17078.1 for WG #4 Review13 Austin, TX 09/04/01 OAC Prepare 1st Draft of ISO 17078.1 for Delivery to WG #414 Austin, TX 10/08-09/01 Univ. of Texas Review 1st Draft of ISO 17078.214 Aberdeen, UK 11/14-15/01 Shell EXPRO Continue Review of ISO 17078.2

15 Houston, TX 2/07-08/02 Prod. Assoc. Continue Review of ISO 17078.2 , Address WG #4 Comments on 17078.1

16 Houston, TX 5/09-10/02 BP Complete 1st Draft of ISO 17078.2 for WG #4 Review, Review ISO 17078.3

17 San Antonio, TX 10/03-04/02 SwRI Continue Review of ISO 17078.3

18 Houston, TX TBD TBD19 Houston, TX TBD TBD20 TBD TBD TBD

1998 1999 2000 2001 2002 2003

Blue CompletedRust ScheduledBlack To Be Scheduled