Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader [email protected] www.edg.org

Transcript of Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader...

Page 1: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

Update on EU DataGrid progress and plans for

EGEE

Fabrizio Gagliardi

EU DataGrid Project Leader

[email protected]

www.edg.org

Page 2: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 2

Overview

Project Outline

Atlas task force

CMS stress test

Tutorials

Relationships with other grid projects

Future Directions (EGEE)

Summary

Page 3: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 3

The Project 9.8 M Euros EU funding over 3 years

90% for middleware and applications (HEP, Earth Obs. and Bio Med.)

Three year phased developments & demos (2001-2003)

Total of 21 partners Research and Academic institutes as well as industrial companies

Related projects and activities: DataTAG (2002-2003)

CrossGrid (2002-2004)

GRIDSTART (2002-2004)

Grace (2002-2004)

Page 4: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 4

DataGRID project priorities

Quality Policy Statement published

http://eu-datagrid.web.cern.ch/eu-datagrid/WP12/default.htm

List of priorities defined at the project retreat

http://documents.cern.ch/age?a021130

Followed-up at project conference

http://www.tomiexpress.hu/datagrid/

Show-stoppers found by users on the application testbed are the highest priority

Incremental improvements to current release driven by the needs of the applications (HEPCAL)

After initial middleware development and testbed deployment effort has been refocused on quality and stability

Page 5: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 5

ATLAS is eager to use Grid tools for the Data Challenges ATLAS Data Challenges are already on the Grid (NorduGrid, USA) The DC1/phase2 (to start in October) is expected to be done using

the Grid tools to a bigger extent

ATLAS-EDG Task Force was put together in August with the aims: To assess the usability of the EDG testbed for the immediate

production tasks To introduce the Grid awareness to the ATLAS collaboration

The Task Force has representatives both from ATLAS and EDG: 40 members (!) on the mailing list, ca 10 of them working nearly full-time

The initial task: to process 5 input partitions of the Dataset 2000 at the EDG Testbed + one non-EDG site (Karlsruhe); if this works, continue with other datasets

ATLAS-EDG Task Force (by Oxana Smirnova)

Page 6: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 6

Achievements (by Oxana Smirnova):

A team of hard-working people across the Europe

ATLAS software (release 3.2.1) is packaged into relocatable RPMs, distributed and validated elsewhere

DC1 production script is “gridified”, submission script is produced

User-friendly testbed status monitor deployed

5 Dataset 2000 input files are replicated to 5 sites (2 @ each)

After fixing the “long jobs” problem, 50% of the planned challenge is performed (5 researchers × 10 jobs) – unfortunately, only CERN testbed was fully available

With the rest of the testbed being fixed, jobs are getting scheduled and executed elsewhere

Second test: 4 input files (ca 400 MB each) replicated to 4 sites; 250 jobs submitted, adjusted to run ca 4 hours each. The jobs were distributed across all the testbed by the Resource Broker

Page 7: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 7

Summary (by Oxana Smirnova)

Advantages of the Grid: Possibility to execute tasks and move files over a distributed computing

infrastructure by using one single personal certificate (no need to memorize dozens of passwords)

Possibility do distribute the workload adequately and automatically, without logging in explicitly to each remote system

Possibility to do worldwide production in a perfectly coordinated way, using identical software (RPMs), scripts and databases

Where we are now: Several Grid toolkits are on the market EDG – probably the most elaborated, but still in development This development goes way faster with the help of the users running real

applications Common efforts of the ATLAS-EDG Task Force proved that it is possible

to execute real tasks on the EDG Testbed already now

Thanks all the members for the efforts so far, but there’s more to be done!

Page 8: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

CMS/EDG stress test statusAndrea Sciabà

on behalf of

CMS & EDG collaboration

CCS general meeting

December 3, 2002

Page 9: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 9

Sites and resources

Site CE No. of CPU SE Disk space (GB)

CERN lxshare0227 122 lxshare0393

lxshare0384

100

1000(=10010)

CNAF testbed008 40 grid007g 1000

RAL gppce05 12 gppse05 360

(NIKHEF) tbn09 20 tbn03 35

Lyon ccgridli03

ccgridli08

120 (shared)

400

ccgridli07 200

Legnaro cmsgrid001 48 cmsgrid002 513(+513)

Total 762 3721

Page 10: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 10

CMSIM events vs. time

Page 11: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 11

Current issues

The biggest problems related to the Information System: Symptom: no resources are found

Cause: instability of the MDS when it is overloaded Solution: submitting jobs at a lower rate improves the chances of success Symptom: the RB gets stuck (no job ever starts)

Cause: investigating... Symptom: grid elements disappear from the II

Cause: services on some machines stopped workingSolution: restart the services

Symptom: timeouts when copying the input sandbox Symptom: log file lost (“Stdout does not contain useful data”)

Cause: several (no free files/inodes, broken connect. between CE & RB, …)

Problems related to the replica manager: Symptom: file registration in the RC fails from time to time

Page 12: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 12

Current issues

None of these problems is a show-stopper and they happen just in a fraction of the jobs!

Fixes are already there for some of them (but not yet deployed)

Page 13: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 13

Conclusions

50000 events (FZ files) produced in ~ 2 days!

The CMS Task Force has made impressive progress and the first results are promising. A few issues have been identified and solutions are being worked out/applied

The entire task force shows a fruitful cooperation between CMS and EDG!

Page 14: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 14

Tutorials

DAY1

Introduction to Grid computing and overview of the DataGrid project

Security

Testbed overview

Job Submission

lunch

hands-on exercises: job submission

DAY2 Data Management

LCFG, fabric mgmt & sw distribution & installation

Applications and Use cases

Future Directions

lunch

hands-on exercises: data mgmt

The tutorials are aimed at users wishing to "gridify" their applications using EDG software and are organized over 2 full consecutive days.Approx. 100 people have followed the tutorial since August.

October:3 & 4 – CERN31 & Nov 1 - CERN

December2 & 3 – Edinburgh5 & 6 - Italy 9 & 10 – NIKHEF12 - Cracow

More sessions will be organised in the future

http://hep-proj-grid-tutorials.web.cern.ch/hep-proj-grid-tutorials/

Page 15: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 15

Through links with sister projects, there is thepotential for a truely global scientific applications grid

Related Grid projects

Page 16: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 16

Interaction with sister projects CrossGrid

Using the same security certs. Testbed sites install EDG software

Extending it for needs of intensive interactive applications

Participating in the EDG testing activities

Representatives in each projects architecture & management groups

DataTAG (EDT) EDT is deploying EDG sw to investigate

inter-operability with US projects (iVDGL, GriPhyN, PPDG)

Results feedback into EDG software releases

(e.g. GLUE compatible information providers/consumers)

NorduGrid Using the same security certs. Involved in EDG architecture work

Good ideas for gatekeeper and MDS configuration

Helped develop GDMP and GSI extensions for Replica Catalog

Involved in Glue schema work Security policy

Mware testing Working in WP8 (HEP applications)

iVDGL/GriPhyN/PPDG US members in EDG architecture

group Looking for common packaging and

toolkit usage solutions

No strict boundaries with a large cross-fertilization of ideas, software and peopleDataGRID is learning from the experiences in these projects

Page 17: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 17

Plans for the future

Further development in 2003 Further iterative improvements to middleware driven by LCG and users needs More extensive testbeds providing more computing resources Prepare EDG software for future migration to Open Grid Services Architecture

Interaction with LCG LCG intends to make use of the DataGRID middleware LCG is contributing to DataGRID

Testbed support and infrastructure Get access to more computing resources in HEP computing centres

Testing and verification Reinforce the testing group and maintain a certification testbed

Fabric management and middleware development

New EU project (EGEE) Make plans to preserve current major asset of the project: probably the largest Grid

development team in the world EoI for FP6 ( www.cern.ch/egee-ei )

Page 18: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 18

EGEE vision Enabling Grids for E-science in Europe

Goal create a general European Grid production quality infrastructure on top of present and future EU RN infrastructure

Build on EU and EU member states major investment in Grid Technology

Several pioneering prototype results

Largest Grid development team in the world

Goal can be achieved for about €100m/4 years on top of the national and regional initiatives

Approach Leverage current and planned national and regional Grid programmes (e.g. LCG)

Work closely with relevant industrial Grid developers, NRNs and US

 

EGEE

applications

Geant network

Page 19: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 19

Work done so far

EoI for FP6: www.cern.ch/egee-ei submitted on June 7th

Several follow up meetings

An editorial board and an Interim Task Force established to prepare a position paper and a presentation for a EU Grid workshop in Brussels on October 3-4

Both bodies extended to follow-up with the EU (IST02, ER02, individual contacts)

Page 20: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 20

GRIDs useGÉANT infrastructure

GÉANT profits from technological innovation

GRIDs empowered GÉANT

International dimension

GÉANT networkGÉANT network

GRIDs platformsGRIDs platforms

Application areasApplication areas

GÉANT and GRIDs: The model

R&

D o

n G

RID

sR

&D

on

GR

IDs

Page 21: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 21

IST Programme

Structuring the ERA

Programme

ResearchInfrastructures

GÉANT, GRIDs, GÉANT, GRIDs,

other ICT-RIother ICT-RI

100 + 200 M Euro100 + 200 M Euro

665 M Euro

3.825 M Euro2.655 M Euro

•Integrated Projects•Networks of Excellence•Specific Targeted Projects•Coordinated actions•Support actions

•Integrated Infrastructure Initiatives

•Coordinated actions

•Support actions•More info on: http://www.cordis.lu/ist/fp6/activities.htm

Separate calls for proposals!

InstrumentsK

. Baxevan

idis E

U

Page 22: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 22

Communication Network Development Call

45-47 Million Euros available in the first EU call (Dec 17th, 2002)

Hard to get the whole budget, we will need to share with one, two, more projects and a lot of competition to be expected (1200 EoIs received in this area!)

Focus on support and integration of already established Grid infrastructures

Build a Grid production layer on top of the EU RN infrastructure

No major funds for H/W, CS research or application development (in a first approximation)

Page 23: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 23

Integrated Infrastructure Initiative (I3)

Three lines of funding supported (with possible budget breakdown):

Networking activities (nothing to do with networks…): This is the overhead: management, coordination, dissemination

and outreach (7-10% of the total funding)

Specific service activities: Provision and procurement of Grid services (60% of total funding)

Joint research activity Engineering development to improve the services provided by the

Grid infrastructure (20% of total funding) Application support and focused R&D (10% of total funding)

Page 24: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 24

Networking activities

Coordination and management of the participating Grid infrastructures

Management structure to be defined

Dissemination, training and outreach Leverage EDG and other project tutorials

Proposal from Terena received

User clubs, industry forum etc.

Page 25: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 25

Specific service activities

Integration of major national and international Grid infrastructures

Two tier structure: 1st Tier: Major Grid centres (6-8). Must satisfy minimum level of

Grid resources and staffing

2nd Tier: POPs in all other Geant supported countries

EU resources for doubling the 1st tier centres Grid support staff, a central operation centre and a distributed call and support centre

Interface to Geant follow-on project

Mostly staff and overhead (computer fabrics and storage provided by the partners)

Page 26: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 26

Joint research activity

Focus on hardening and re-engineering of Middleware

Leverage current EU Grid projects and international Grid technology developers (large and established M/W development community)

8-10 WPs with critical mass in a single geographical center, dedicated WP managers hired by the project and reporting to the project technical management (possible international and industrial participation)

Quality assurance group, integration, certification and distribution group with industrial quality

International senior advisory group for project review, long term technology development and direction

Page 27: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 27

Additional activities

Application support: high level interface and portals

user requirements (a la HEPCAL)

CS focused activity: Long term CS issues for production quality Grids

Page 28: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 28

Distribution of responsibilities

Motivation: provide transparent, effective process for proposal preparation

EGEE Executive Committee: Responsible for defining Work Packages and setting up Task Forces to

deliver technical content for proposal. Max ~10 persons for effective process

Should represent stakeholders with major, proven computer and human resources to contribute to EGEE

US has observer status (Ian Foster)

EGEE technical advisory board: Advise the Executive Committee on the overall architecture and specific

technical issues US participation being investigated

Page 29: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 29

Distribution of responsibilities

EGEE Editorial board: Responsible for gathering input from taskforces, overall editing of

proposal, filling out administrative forms and maintaining timeline

EGEE National Partners board: Responsible for coordination and communicating with interested parties

on national/regional level. Ideally one person per country/region Consulted by Executive Committee during preparation of proposal, to

ensure adequate transparency – must be seen as impartial

EGEE interest group: All institutes, companies, organisations interested to remain informed

about progress of EGEE proposal. Includes potential subcontractors for different workpackages

Page 30: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 30

EGEE proposal timeline

Tentative Schedule (continued)

• EU call out on Dec 17th

• Draft 1: overall project structure end of February 2003

• Draft 2: with detailed workpackages end of March 2003

• Final proposal including admin and management end of April 2003

• Submission by May 6th 2003

• First feedback from EU in June-July

• Contract negotiation late summer, fall ’03

• Contract signature by the end of ’03

• Start of project Q1-Q2 ‘04

Page 31: Update on EU DataGrid progress and plans for EGEE Fabrizio Gagliardi EU DataGrid Project Leader Fabrizio.Gagliardi@cern.ch .

California 14 January 2003 EDG/EGEE status 31

Summary

ATLAS/DataGRID task force has been a successful experience for EDG

CMS stress test still on-going is a major advance on production quality performance in view of next EU EDG review on February 4-5

Collaboration with LCG and other Grid projects (EU and US) enhanced

Deployment of a very large production Grid testbed being explored with the EU (EGEE) in close collaboration with LCG and the US Grid developers

Need to define a common EU-US roadmap for EGEE

This meeting is a good place to progress