Update from the Subcommittee on Ground Water

6
Update from the Subcommittee on Ground Water ACWI WebEx Meeting June 14, 2011 William L. Cunningham and Robert P. Schreiber Co-Chairs, SOGW Christine Reimer, Executive Secretary, SOGW

description

Update from the Subcommittee on Ground Water. ACWI WebEx Meeting June 14, 2011 William L. Cunningham and Robert P. Schreiber Co-Chairs, SOGW Christine Reimer, Executive Secretary, SOGW. Brief SOGW History. 2007 SOGW formed 2009 NGWMN Framework Document approved by the ACWI - PowerPoint PPT Presentation

Transcript of Update from the Subcommittee on Ground Water

Page 1: Update from the  Subcommittee on Ground Water

Update from the Subcommittee on Ground Water

ACWI WebEx MeetingJune 14, 2011

William L. Cunningham and Robert P. SchreiberCo-Chairs, SOGW

Christine Reimer, Executive Secretary, SOGW

Page 2: Update from the  Subcommittee on Ground Water

Brief SOGW History

• 2007 SOGW formed• 2009 NGWMN Framework Document

approved by the ACWI• Evaluated status of Nation’s ground-water

monitoring• Proposed minimum standards and a network

design• Proposed plan for implementation

• 2010 Five pilot studies initiated

Page 3: Update from the  Subcommittee on Ground Water

National Ground Water Monitoring Network Pilot Projects

Page 4: Update from the  Subcommittee on Ground Water

Summary of Pilot Tasks• Evaluate the network within the concepts in “Framework for a

Nationwide Ground Water Monitoring Network”

– Select aquifers, well characteristics, frequency, analytes, “tagging”, spatial distribution

• Evaluate field practices, data elements stored in the GW database, and data management procedures and their documentation,

• Identify network gaps

• Evaluate ability to transmit data to the data portal

• Identify all costs of potential participation in the NGWMN

• Recommend changes/improvements to the Framework Document”

Page 5: Update from the  Subcommittee on Ground Water

NGWMN Pilot Portal

Page 6: Update from the  Subcommittee on Ground Water

Expectations for the ACWI Meeting

• NGWMN Pilot study reports will be available for your information prior to the ACWI meeting.

• A report on the NGWMN data portal will be available for your information prior to the ACWI meeting. We expect to make the portal available to the public after the meeting.

• The pilot study summary report will be provided to the ACWI prior to the meeting for your review and comment. SOGW will request report approval at the July ACWI meeting.

• The SOGW will provide an update at the ACWI meeting on potential next steps for implementation of a National GW Monitoring Network.

• The SOGW is acting on the pilot study recommendations for changes to the Framework Document. SOGW will report on progress at the ACWI meeting.