1 UPDATE AUGUST 2014 We Would like to thank you for committing to the purchase of an apartment in mosaic property group’s exciting neW boutique project in neWmarket. the project is fully sold out and construction has commenced. Over the course of the construction, we will send you regular updates with photos and a short blurb on progress, so that you are able to share in the excitement of the project’s development first hand. It also gives us an opportunity to provide you with any reminders or general updates regarding your purchase, to ensure that everything flows as smoothly as possible from construction through to settlement. WELCOME TO THE FIRST CONSTRUCTION UPDATE FOR EST ON FOSTER, NEWMARKET 1 / Early in the construction phase, rear of site looking towards the street. Strip and pad footings have been poured with starter bars for walls and columns in place. / Slab for two rear ground floor units, with blockwork walls in place. Concrete columns located in the car park have also been poured.

Transcript of UPDATE 1 AUGUST 2014 - Mosaic · Mosaic Property Group Pty Ltd 84 Latrobe Tce, Paddington Q 4064,...

Page 1: UPDATE 1 AUGUST 2014 - Mosaic · Mosaic Property Group Pty Ltd 84 Latrobe Tce, Paddington Q 4064, PO Box 526, Paddington Q 4064 p 07 3171 2270 f 07 3171 2217 e info@mosaicproperty.com.au

1

UPDATE AUGUST 2014

We Would like to thank you for committing to the purchase of an apartment in mosaic property group’s exciting neW boutique project in neWmarket. the project is fully sold out and construction has commenced.

Over the course of the construction, we will send you regular updates with photos and a short blurb on progress, so that you are able to share in the excitement of the project’s development first hand. It also gives us an opportunity to provide you with any reminders or general updates regarding your purchase, to ensure that everything flows as smoothly as possible from construction through to settlement.

WElcomE To ThE firST conSTrUcTion UPDATE for EST on foSTEr, nEWmArkET

date 28/4/14 Mosaic Est. on Foster - logo_FINAL sharka designs

1

/ Early in the construction phase, rear of site looking towards the street. Strip and pad footings have been poured with starter bars for walls and columns in place.

/ Slab for two rear ground floor units, with blockwork walls in place. Concrete columns located in the car park have also been poured.

date 28/4/14 Mosaic Est. on Foster - logo_FINAL sharka designs

Page 2: UPDATE 1 AUGUST 2014 - Mosaic · Mosaic Property Group Pty Ltd 84 Latrobe Tce, Paddington Q 4064, PO Box 526, Paddington Q 4064 p 07 3171 2270 f 07 3171 2217 e info@mosaicproperty.com.au

Developed by...

Mosaic Property Group Pty Ltd 84 Latrobe Tce, Paddington Q 4064, PO Box 526, Paddington Q 4064 p 07 3171 2270 f 07 3171 2217 e [email protected] w mosaicproperty.com.au

2

date 28/4/14 Mosaic Est. on Foster - logo_FINAL sharka designs

Work commenced on the Foster Street project in mid-June and already we are well ahead of our initial construction schedule. We’ve gone from an empty block to the start of a building in no time at all. Site preliminaries were established including boundaries pegged out, site fencing installed, water and temporary builder’s power connected, and temporary fencing erected. The site was then levelled and excess soil removed. The structural piles that support the building footings were driven into the earth and the civil stormwater drainage and wastewater lines run throughout the site. Pier caps and ground floor slab footings were excavated and poured. Under-slab conduits for telecommunications and electricity were run from the property boundary to the eventual location of the mainframe and meter board.

The ground floor slabs were formed and poured, followed by the concrete columns, which support the upper floors. Structural block work walls were completed, filled with concrete and the form work for the first level slab was erected and steel fixing commenced.

It’s onwards and upwards from here, as the steel fixing, together with the plumbing and electrical rough-in for the first level slab are completed prior to pouring the slab. The structural blockwork walls for the second level will then be laid and core-filled. Following this will be the structural columns that support the second level slab poured and the construction of the form work for the second level slab.

The team on site is off to a great start, with progress slightly ahead of schedule. At this stage, we are aiming for a Practical Completion date of early February.

oThEr nEWS

We are particularly excited about this project, as it is our first development built under the new construction arm of Mosaic Property Group. Mosaic Construction brings 18 years of building experience and in-depth industry knowledge to our developments and by managing multidisciplinary teams efficiently and effectively, it will ensure all our developments run smoothly, on time and on budget. The key focus points for Mosaic Construction are construction method, high levels of finish, consistency of quality workmanship, high expectation management, value adding, and maintaining quality relationships with our suppliers and contractors to ensure we continue to deliver on our mandate for quality construction services.

Our next update will be in about 4 weeks’ time. Of course, if you have any questions at all in the meantime, please feel free to contact our office on 1300 336 989.

/ Slab for two rear ground floor units, with blockwork walls in place. Concrete columns located in the car park have also been poured.

/ Front of building, with all ground floor block walls now complete. Construction of formwork for the first level slab has just commenced.

/ First level deck, showing the steel fixing underway.