Page 1: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

UPCOMING DESIGN & CONSTRUCTION PROJECTS2nd Quarter 2020

(Project & Construction Management)

Page 2: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

DESIGN PHASE PROJECTS

Page 3: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

BCT - C3N Reconstruction

The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted concrete) for storage of containers as well as traffic lanes to maintain traffic flow into and around storage areas.

Design Time Frame NIGP Codes Small Business Opportunities PHA Contact

3rd Qtr. 2020 – 4th Qtr. 2020 Consultants9253396258

Contractors913609132790976

• Demolition• Concrete• Grading• Excavation

Derek [email protected]

Page 4: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

Bayport – Construct Wharf 7 and Optional Wharf 1

Design of Wharf 7 and Optional Wharf 1 at Bayport Terminal

Design Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd Qtr. 2020 – 3rd Qtr. 2021 Consultants9625892533

Contractors90976912239143091438914849050591572

• Structural Concrete Repair• Steel Rebar• Concrete forming• Striping• Photography

Harvey [email protected]

Page 5: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

CONSTRUCTION PHASE PROJECTS

Page 6: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

BCT - Construct Maintenance Complex at BCT

Construction of a new Maintenance Complex at Barbours Cut Container Terminal including an approximate 128,000 sf maintenance building, fuel and wash areas, associated utilities, and parking.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

4th Qtr. 2020 – 2nd Qtr. 2022 90924 9143890976 9145091316 9146891360 9050591430 91572

• Utility Systems• Electrical Work• Plumbing• HVAC• Building Fixtures & Finishes • Photography

Jessica [email protected]

EXISTING BCT M&R BUILDING

BAYPORT M&R BUILDING

Page 7: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

Barbours Cut - Demolition of Wharf cranes 7 and 8 and RTG Cranes P and S

This project will demolish 2 STS (Ship to Shore Cranes 7 and 8) and 2 RTG (Rubber Tire Gantry Cranes P and S)

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd Qtr. 2020 - 3rd Qtr. 2020 9124096238

• Demolition Harvey [email protected]

Page 8: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

Bayport - Port Road Expansion and Drainage

This project will add 1 additional lane to both the inbound and outbound lanes of existing Port Road. This project will also include installing new re-enforced concrete boxes under Port Road and in existing Ditch ‘D’ to drain 95.5 acre U shaped Port property.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd Qtr. 2020 – 2nd Qtr. 2022 918329184692533

• Concrete reinforcement• Demolition• Earthwork

Harvey [email protected]

Page 9: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

Land Development Preparation South of Port Road At Bayport Terminal

The project scope includes surveying, clearing, grubbing, grading, excavation, fill placement, drainage features, trench safety, concrete culvert installation, placement of topsoil and seeding. This is primarily an earth moving job with an aggressive schedule that needs to start quickly after ward.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

3rd Qtr. 2020 - 4th Qtr. 2020909769625290738

• Trucking• Storm Water Erosion

Protection• Trench Safety• Surveying

Brenda [email protected]

Page 10: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

Bayport - Construct Container Yard 2 South at Bayport (CY2S)

Construction of approximately 18 acres of container yard (18” roller compacted concrete) and associated work at Bayport Container Terminal.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd Qtr. 2020 - 4th Qtr. 2021 909769122391360914309143891276

96861925869050591572

• Material Testing• Surveying• Security• Electrical• Signs and striping• Photography

Jessica [email protected]

Page 11: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

Bayport - Trench Drain Repairs

Repair of approximately 250 LF of trench drain at Bayport Container Terminal.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd Qtr. 2020 – 4th Qtr. 2020 9122391430

• Concrete• Surveying

Jessica [email protected]

Page 12: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

BCT - Fire Suppression System

The project consists of the preparation of detailed design of a water tank based fire suppression system at the Barbours Cut Terminal.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

1st Qtr. 2021 – 3rd Qtr. 2021 7202783034830739254292539

• Concrete Foundation• Plumbing Work• Electrical Installation• Pump House Repairs• Steel Tank Repairs

Bill Aguirre [email protected]

Page 13: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

Bayport - Rehabilitation of Wharves 4 and 5

This project consists of strengthening the wharves 4 and 5 to accommodate taller cranes.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd Qtr. 2020 - 2nd Qtr. 2021 91223914389097691430914009599095935

• Structural Concrete Repair• Pile Driving• Steel Rebar• Concrete forming• Striping• Photography

Eddy Kharrazi [email protected]

Page 14: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

Bayport - Construct Wharf 6, SSB #4 and Power

Construct new wharf, stevedore building and electrical infrastructure at Bayport Terminal Wharf 6 (approximately 600 linear feet).

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

4th Qtr. 2020 – 1st Qtr. 2023 9122390976912239136091316914509146890924

• Concrete• Plumbing• HVAC• Electrical

Derek [email protected]

Page 15: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

Bayport - Container Yard 7 and TLT Yard Security

Provide security cameras, fiber optic cables, UPS, and network switches.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd Qtr. 2020 – 4th Qtr. 2020 91316990002850091438

• Security cameras• Fiber optic cable• Network switches• Electrical

Bill Aguirre [email protected]

Page 16: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

Bayport and Barbours Cut - Annual Wharf Crane & RTG Crane Painting - 2020

This project will consist of blasting, priming and painting the wharf cranes and RTG cranes on an "as needed" basis.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd Qtr. 2020 – 4th Qtr. 2020 914849146192900

• Photography• Fuel Supplier• Portable Toilets

Derek [email protected]

Page 17: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

Industrial Park East - Annual Pavement, Drainage and Dust Control 2020

Paving and repair of asphalt roads, ditch irrigation and spraying to off roads for dust control purposes.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd Qtr. 2020 - 4th Qtr. 2020 9097691327

• Paving• Asphalt• Drainage

Derek [email protected]

Page 18: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

Manchester - Rehabilitation and Repair of Wharf 2

Rehabilitating and repairing of Wharf M2 of approximately 600ft. to address issues in regards to slope stability, the structural decay and also to include the fender replacement.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

3rd Qtr. 2020 - 3rd Qtr. 2021 9148491223914389097691430

• Structural Concrete Repair• Fender Replacement• Pile Driving• Steel Rebar• Concrete forming• Striping• Photography

Eddy Kharrazi [email protected]

Page 19: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

Turning Basin North - Restrooms Restoration

Demolition and replacement of new restroom facilities at Northside Turning Basin including associated utility work.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

3rd Qtr. 2020 – 3rd Qtr. 2021 90924 9136091438 9143090976 9145091316 91468

• Electrical Work• Plumbing• HVAC• Building Fixtures & Finishes

Jessica [email protected]

Page 20: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

Splash Zone Painting 2020

Painting and resurfacing of Steel Bulkhead walls to prevent corrosion and structural damage at Turning Basin North, South, and CARE Terminals

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd Qtr. 2020 - 4th Qtr. 2020 91461914848100063159

• Painting • Steel Repair• Water blasting• Painting• Sandblasting

Derek [email protected]

Page 21: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

Turning Basin North - Guardhouse and Arms Change (RR8 Speed Gate)

This project will remove existing Speed Gates and replace them with a Manned Guardhouse with Gate arms

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

4th Qtr. 2020 - 2nd Qtr. 2021 Contractors914739097692678

• Electrical • Fiber Optics• Demolition• Paving

Harvey [email protected]

Page 22: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

Turning Basin - Transit Sheds 30-31 - Roof Repair

Roof repair at Transit Sheds 30/31.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

3rd Qtr. 2020 - 4th Qtr. 2020Contractors914739097692678

• Roofing Repair• Surveying

Harvey [email protected]

Page 23: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

Turning Basin - Rehabilitation of Wharf 8

Rehabilitation of Wharf 8 at Turning Basin Terminal will consist of structural concrete repair and fender replacement.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

1st Qtr. 2021 – 3rd Qtr. 2021 Contractors90976912239143091438914849050591572

• Structural Concrete Repair• Fender Replacement• Pile Driving• Steel Rebar• Concrete forming• Striping• Photography

Eddy Kharrazi [email protected]

Page 24: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

Turning Basin South - City Dock 1 West Fender System

Designing a freestanding fender for City Dock 1 West of approximately 600ft.

Design Time Frame NIGP Codes Small Business Opportunities PHA Contact

1st Qtr. 2021 – 3rd Qtr. 2021 Contractors90976912239143091438914849050591572

• Structural Concrete Repair• Fender Replacement• Pile Driving• Steel Rebar• Concrete forming• Striping• Photography

Eddy Kharrazi [email protected]

Page 25: UPCOMING DESIGN & CONSTRUCTION PROJECTS 2nd Quarter … · The scope of work includes the design and construction of approximately 25 acres of concrete pavement (18” roller compacted

Turning Basin North – In-Depth Structural Assessment and Repair Design of Wharves 20, 21, 24, 25 and 26

Using information from FICAP to conduct in-depth inspection and then repair design of the wharves.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

1st Qtr. 2021 – 3rd Qtr. 2021 Contractors90976912239143091438914849050591572

• Structural Concrete Repair• Fender Replacement• Pile Driving• Steel Rebar• Concrete forming• Striping• Photography

Eddy Kharrazi [email protected]