U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres/
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher
2.03 Primary teachers for schools sanctioned in previous years Teacher 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 52 40.56000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 26 22.07400 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 6 Months
(a) Science and Mathematics
(b) Social Studies
(c) Languages
2.06 Subject specific Upper Primary Teachers (Contract) Teacher
(a) Science and Mathematics
(b) Social Studies
(c) Languages
2.07 UP Teachers for upgraded UPS in previous years
2.08 UP teachers for integration of Class VIII
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)
(a) Art Education 6 Months
(b) Health and Physical Education 6 Months
(c) Work Education 6 Months
Sub Total (2.01 to 2.10) 78 62.63400
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher
2.13Head Teacher for primary (if the number of children
exceeds 150 in a school)6 Months
2.14 Subject specific New Additional Teachers-UPS (Regular) Teacher 6 Months
2.15 (a) Science and Mathematics
(b) Social Studies
(c) Languages
2.16 Subject specific New Additional Teachers - UPS (Contract) Teacher
(a) Science and Mathematics
(b) Social Studies
(c) Languages
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)
(a) Art Education Teacher 6 Months
(b) Health and Physical Education Teacher 6 Months
(c) Work Education Teacher 6 Months
Sub Total (2.11 to 2.18)
Total (New Teacher's Salary-2.01 to 2.18) 78 62.63400
Teachers Salary (Recurring)
Primary teachers 156673
2.19 Primary Teachers ( Assistant Regular)-Existing Teacher 0.23000 6400 17664.00000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 15679 6036.41500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 14427 9954.63000
2.21 Primary Teachers (Vacant) Teacher 0.23000 162 372.60000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 16480 51417.60000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 140994 54282.69000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 102335 70611.15000 6 Months
2.26 Additional Teachers - PS (Vacant) 0.23000
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 44953 140253.36000 12 Months
2.28 UP Teachers (Contract)-Existing
2.29 UP Teachers (Vacant) Teacher 0.26000 12061 31358.60000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 23941 80441.76000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 4512 12633.60000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular)
(a) Science and Mathematics
(b) Social Studies
(c) Languages
2.32 Subject specific Upper Primary Teachers (Contract)
(a) Science and Mathematics
(b) Social Studies
(c) Languages
2.33 Additional Teachers - UPS (Regular) 0.26000 12 Months
2.34 Additional Teachers - UPS (Contract)
2.35 Additional Teachers - UPS (Vacant) 0.26000 17000 13260.00000 6 Months
2.36 Others
2.37 Subject specific Additional Teachers-UPS (Regular)
(a) Science and Mathematics
S. No.
Approved for the year 2011-12
(Rs. In Lakhs)
Physical
Unit
State Consolidate : Uttar Pradesh
Fresh
Activity Remarks
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):Consolidate:07-06-11 1/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
S. No.
Approved for the year 2011-12
(Rs. In Lakhs)
Physical
Unit
State Consolidate : Uttar Pradesh
Fresh
Activity Remarks
(b) Social Studies
(c) Languages
2.38 Subject specific Additional Teachers - UPS (Contract)
(a) Science and Mathematics
(b) Social Studies
(c) Languages
2.39Part Time Instructors (if the number of children exceeds
100)
(a) Art Education 0.07000 13769 2891.49000 6 Months
(b) Health and Physical Education 0.07000 13769 2891.49000 6 Months
(c) Work Education 0.07000 13769 2891.49000 6 Months
Sub Total (2.19 to 2.38) 440251 496960.87500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
440329 497023.50900
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 370039 1850.19500
3.02 Upper Primary Teachers Teacher 0.00500 121534 607.67000
Sub Total 491573 2457.86500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP
4.01b Salary of Resource Persons (Asstt. Coordinator) RP
(a) 6 Resource Persons at BRC for subject specific training RP 0.35000 2823 11856.60000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 1760 3484.80000 9 Months
4.02 1 MIS Coordinator RP 0.15500 880 1227.60000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 880 1148.40000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 880 792.00000 9 Months
4.05 Furniture Grant BRC/ URC
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC
4.07 Contingency Grant BRC/ URC 0.50000 880 440.00000
4.08 Meeting, TA BRC/ URC 0.30000 880 264.00000
4.09 TLM Grant BRC/ URC 0.10000 880 88.00000
4.10 Maintenance Grant BRC/ URC 0.10000 880 88.00000
Sub Total 880 19389.40000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 229 961.80000 12 Months
5.02 Furniture Grant CRC/ UERC
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC
5.04 Contingency Grant CRC/UERC 0.10000 8249 824.90000
5.05 Meeting, TA CRC/UERC 0.12000 8249 989.88000
5.06 TLM Grant CRC/UERC 0.03000 8249 247.47000
5.07 Maintenance Grant CRC/UERC 0.02000 8249 164.98000
Sub Total 8249 3189.03000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 491573 5898.87600
Actual Calculated
Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 491573 4915.73000Actual Calculated
Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 880 2794.00000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 15177 91.06200Actual Calculated
Amt.
Sub Total 507630 13699.66800
7 Interventions for out of School Children (2009-10)
EGS7.01 EGS Centre (P) Centre
7.02 EGS Centre (UP) Centre
AIE7.3 Bridge couse Residential (12 months) Centre
7.4 Brdige Course Residential (9 months) Centre
7.5 Bridge course - Resdn. (6 months)
7.6 Bridge course - Resdn. (3 months)
7.7 Bridge course - Resi-(2 months)
7.8
7.9 Bridge course - Non-resi (less than 12 months)
7.10 Mobile School
7.11 Tent school
7.12 Platform School
7.13 Home based education
7.14 Innovative Education
7.15 Education of Urban Deprived Children
7.16 Back to school camp
7.17 Seasonal Hostel/Residential Care Centre
7.18 Seasonal Centres for Migrated Children
7.19 AIE Center
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 25 children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 25 children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 2030 645.54000 25 children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 1552 562.60000 25 children/centre
Sub Total 3582 1208.14000
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):Consolidate:07-06-11 2/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
S. No.
Approved for the year 2011-12
(Rs. In Lakhs)
Physical
Unit
State Consolidate : Uttar Pradesh
Fresh
Activity Remarks
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child
(a) Residential (b) Non-Residential
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5)Centre 0.15000 4573 685.95000
10 children per
center, '6 Months
(ii)Special Training (by Special Instructors-NRBC)-6 months (6-
8)0.15000 2249 337.35000
10 children per
center, '6 Months
Sub Total 6822 1023.30000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 10417390 5208.69500
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 3921041 6273.66560
9.03 Free Brail Books (PS) Set 0.00150 7435 11.15250
9.04 Free Brail Books (UPS) Set 0.00250 1738 4.34500
Sub Total 14347604 11497.85810
102 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child
10.02 SC Boys Child
10.03 ST Boys Child
10.04 BPL Boys Child
Sub Total
11 Interventions for CWSN (IED)
11.01 Inclusive Education Child 0.01518 397511 8739.17369 8653.74
Interventions for CWSN (IE) 397511 8739.17369
12 Civil Works
12.01 BRC Building
12.02 CRC Building
12.03 Primary School (Plain) (New) School 5000
12.04 Primary School (Hilly/Rocky) (New) School
12.05 Upper Primary (Plain) (New) School 890
12.06 Upper Primary School (Hilly/Rocky) (New) School
12.06a Composite Schools for Urban Areas (Class I-VIII) School
12.07 ACR in lieu of upgraded Upper Primary School Rooms
12.08 Building Less (Pry) (for spill over only) School
12.09 Building Less (UP)(for spill over only) School
12.10 Dilapidated Building (Pry) (for spill over only) School
12.11 Dilapidated Building (UP) (for spill over only) School
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 19335 38863.35000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000
12.13 Additional Class Room (Urban) 2.01000
12.14 Additional Class Room (Hill Area) 2.01000
12.15 Additional class rooms for adding Class V
12.16 Additional class rooms for adding Class VIII
12.17 Toilet/Urinals (PS & UPS) School
12.18 Separate Girls Toilet
12.19 Drinking Water Facility (Plain PS & UPS) School
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School
12.20 Boundary Wall PS (Total in Meters x .01105)
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School
12.20b Boundary Wall UPS (Total in Meters x .01105)
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School
12.21 Separation Wall
12.22 Electrification in P.S. School
12.22a Electrification in U. P.S. School
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms
12.25 Augumentation of training facility in BRC (one time) BRC/ URC
12.26 Child friendly Elements
12.27 Kitchen Shed
12.28 Residential Schools for specific category of children Building
(a) Construction of Building
(b) Boundary Wall
(c) Boring/Handpump
(d) Electricity/water charges
12.29 Construction of Hostel in existing Govt UPS
12.30 Barrier Free Elements
12.31 Fire Extinguisher in schools
12.32 Furniture -No. of Children) Children 0.00500 28346 141.73000
12.33Infrastructure for setting school libraries including
books
(a) Primary School (per school) School
(b) Upper Primary School (per school) School
12.34 Major Repairs
(a) Primary School School
(b) Upper Primary School School
12.35 Others (Overhead Tank PS) School 0.12000 3932 471.84000
12.35a Others (Overhead Tank UPS) School 0.12000 1688 202.56000
Sub Total (Civil WOrks) 39679.48000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000
13.02 TLE - New Upper Primary School 0.50000
13.03 TLE for integration of Class V
13.04 TLE for integration of Class VIII
13.05 Others (for spill over of uncovered OBB schools)
Sub Total
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 40833 2830.40000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 106847 8130.80000
Sub Total 147680 10961.20000
15 School Grant
15.01 Primary School School 0.05000 104784 5239.20000
15.02 Upper Primary School School 0.07000 50948 3566.36000
Sub Total 155732 8805.56000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 155732 1557.32000
Sub Total 155732 1557.32000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):Consolidate:07-06-11 3/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
S. No.
Approved for the year 2011-12
(Rs. In Lakhs)
Physical
Unit
State Consolidate : Uttar Pradesh
Fresh
Activity Remarks
(a) DPO (Salary, Contigency, Consumables, POL, TA &
Computer etc)District 72 6136.51810
(b) EMIS Cell District 72 866.54820
17.02 Community Mobilization up to 0.5% 72 61.85000
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 72 11542.15100
Sub Total 18607.06730
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 72 3600.00000
18.02 Balance 50% of funds for innovating projects
(a) Girls Education District 15.00000 72 1080.00000
(b) ECCE District
(c)Intervention for SC / ST children District 5.00000 72 360.00000
(d) Intervention for Minority children District 4.00000 22 88.00000
(e) Intervention for Urban Deprived children District
Sub Total 5128.00000
19 Community Training
19.01 VEC/SMC - 3 days residential Persons 0.00600 445200 2671.20000 3 days
19.02 VEC/SMC - 3 days non-residential Persons 0.00300 445200 1335.60000 3 days
19.03 Local Authority - 3 days residential Persons 0.00600 157911 947.46600 3 days
Sub Total 1048311 4954.26600
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable
20.02
Urban deprived children/children without adult protection in
urban areas where schools are not opened because
availability of land is a problem
District /
Children
Sub Total
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works)
21.02 Boundary Wall (Included in civil works)
21.03 Boring/Handpump (Included in civil works)
21.04 Electricity/water charges(Included in civil works)
21.05 Furniture / Equipment (including kitchen equipment)
21.06 TLM and equipment including library books
21.07 Bedding
Sub Total Non-recurring
Recurring
21.08 Maintenance per child per month @ Rs. 900/-
21.09 Stipend per child per month @ Rs.50/-
21.10Supplementary TLM, Stationery and other educational
material
21.11 Examination Fee
21.12 Salaries
21.13 Vocational training / specific skill training
21.14 Electricity / water charges
21.15 Medical care/contingencies @ Rs.750/- per child
21.16 Maintenance
21.17 Miscellaneous
21.18 Preparatory camps
21.19 P.T.A / school functions
21.20 Provision of Rent
21.21 Capacity Building
Sub Total Recurring
Total - Residential Schools
Total of SSA (Districs) 647920.83709
22 State Component
22.01 Management 2541.25000
22.02 REMS 0.005 155732 778.66000Rs. 50 per schools for
SCPCR
22.03 Support to Other Institutions 658.96000
Sub Total (State Component) 3978.87000
State SSA Grand Total 651899.70709
23 NPEGEL 11937.91890
24 KGBV Financial Provisions per school Hostel 41268.81500
STATE GRAND TOTAL (SSA+NPEGEL+KGBV) 705106.44099
Management & MIS Cost % 1.6%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.3%
Civil Work 6.1%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):Consolidate:07-06-11 4/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 4 3.12000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 2 1.69800 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 6.00 4.81800
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 6.00 4.81800
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 901 2486.76000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 148 56.98000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 137 94.53000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 8 18.40000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 148 461.76000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1427 549.39500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 567 391.23000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 324 1010.88000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 6 15.60000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 162 544.32000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
Physical
Unit
Fresh
Name of District : Varanasi -72
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):72-Varanasi (B):07-06-11 5/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Varanasi -72
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 274 213.72000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 214 44.94000 3 Months
(b) Health and Physical Education 0.07000 214 44.94000 3 Months
(c) Work Education 0.07000 214 44.94000 3 Months
Sub Total (2.19 to 2.38) 4744 5978.39500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
4750 5983.21300
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 5608 28.04000
3.02 Upper Primary Teachers Teacher 0.00500 1939 9.69500
Sub Total 7547 37.73500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 29 121.80000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 18 35.64000 9 Months
4.02 1 MIS Coordinator RP 0.15500 9 12.55500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 9 11.74500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 9 8.10000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 9 4.50000
4.08 Meeting, TA BRC/ URC 0.30000 9 2.70000
4.09 TLM Grant BRC/ URC 0.10000 9 0.90000
4.10 Maintenance Grant BRC/ URC 0.10000 9 0.90000
Sub Total 9 198.84000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 110 11.00000
5.05 Meeting, TA CRC/UERC 0.12000 110 13.20000
5.06 TLM Grant CRC/UERC 0.03000 110 3.30000
5.07 Maintenance Grant CRC/UERC 0.02000 110 2.20000
Sub Total 110 29.70000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 7547 90.56400
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 7547 75.47000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 9 28.57500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 182 1.09200Actual
Calculated Amt.
Sub Total 7738 195.70100
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 48 15.2640025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 9 3.26250
25
children/centre
Sub Total 57 18.52650
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 42 6.30000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):72-Varanasi (B):07-06-11 6/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Varanasi -72
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 21 3.15000
10 children per
center, '6
MonthsSub Total 63 9.45000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 159431 79.71550
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 84772 135.63520
9.03 Free Brail Books (PS) Set 0.00150 265 0.39750
9.04 Free Brail Books (UPS) Set 0.00250 69 0.17250
Sub Total 244537 215.92070
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.01518 7844 119.07192
Sub Total 7844 119.07192
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 522 1049.22000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 1049.22000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 243 18.22500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1142 85.65000
Sub Total 1385 103.87500
15 School Grant
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):72-Varanasi (B):07-06-11 7/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Varanasi -72
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.01 Primary School School 0.05000 1068 53.40000
15.02 Upper Primary School School 0.07000 561 39.27000
Sub Total 1629.00 92.67000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1629 16.29000
Sub Total 1629 16.29000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 83.88000
Actual
Calculated Amt.
(b) EMIS Cell District 1 8.91110Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.65000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 160.00000Actual
Calculated Amt.
Sub Total 253.44110
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 4155 24.93000 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 4155 12.46500 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2106 12.63600 3 days
Sub Total 10416.00 50.03100
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 8443.68522
Management Cost & MIS Cost % 1.1%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.9%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.0%
Civil Work 12.4%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):72-Varanasi (B):07-06-11 8/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
10 UPS Constructed by
Sam Vikas Yojana in
2008-09. Only teachers
& TLE proposed for
them.
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 19 52.44000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 300 115.50000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 233 160.77000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 319 995.28000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2925 1126.12500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1221 842.49000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 1040 3244.80000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 352 1182.72000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 168 470.40000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
Physical
Unit
Fresh
Name of District : Unnao -71
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):71-Unnao:07-06-11 9/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Unnao -71
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 182 141.96000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 246 51.66000 3 Months
(b) Health and Physical Education 0.07000 246 51.66000 3 Months
(c) Work Education 0.07000 246 51.66000 3 Months
Sub Total (2.19 to 2.38) 7497 8487.46500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
7497 8487.46500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 6380 31.90000
3.02 Upper Primary Teachers Teacher 0.00500 2071 10.35500
Sub Total 8451 42.25500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 53 222.60000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 34 67.32000 9 Months
4.02 1 MIS Coordinator RP 0.15500 17 23.71500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 17 22.18500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 17 15.30000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 17 8.50000
4.08 Meeting, TA BRC/ URC 0.30000 17 5.10000
4.09 TLM Grant BRC/ URC 0.10000 17 1.70000
4.10 Maintenance Grant BRC/ URC 0.10000 17 1.70000
Sub Total 17 368.12000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 175 17.50000
5.05 Meeting, TA CRC/UERC 0.12000 175 21.00000
5.06 TLM Grant CRC/UERC 0.03000 175 5.25000
5.07 Maintenance Grant CRC/UERC 0.02000 175 3.50000
Sub Total 175 47.25000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 8451 101.41200
Actual Calculated
Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 8451 84.51000Actual Calculated
Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 17 53.97500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 310 1.86000Actual Calculated
Amt.
Sub Total 8778 241.75700
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000 25 children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.00000 25 children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 89 28.30200 25 children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 26 9.42500 25 children/centre
Sub Total 115 37.72700
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):71-Unnao:07-06-11 10/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Unnao -71
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 13 1.9500010 children per
center, '6 Months
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 7 1.0500010 children per
center, '6 Months
Sub Total 20 3.00000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 165365 82.68250
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 58144 93.03040
9.03 Free Brail Books (PS) Set 0.00150 150 0.22500
9.04 Free Brail Books (UPS) Set 0.00250 10 0.02500
Sub Total 223669 175.96290
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02877 4967 142.90059
Sub Total 4967 142.90059
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 300 603.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 603.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 162 12.15000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 2635 197.62500
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):71-Unnao:07-06-11 11/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Unnao -71
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Sub Total 2797 209.77500
15 School Grant
15.01 Primary School School 0.05000 2042 102.10000
15.02 Upper Primary School School 0.07000 884 61.88000
Sub Total 2926.00 163.98000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2926 29.26000
Sub Total 2926 29.26000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 125.69500
Actual Calculated
Amt.
(b) EMIS Cell District 1 14.79620Actual Calculated
Amt.
17.02 Community Mobilization up to 0.5% 1 1.10000Actual Calculated
Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 200.00000Actual Calculated
Amt.
Sub Total 341.59120
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 8493 50.95800 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 8493 25.47900 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2862 17.17200 3 days
Sub Total 19848.00 93.60900
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 11057.65269
Management Cost & MIS Cost % 1.3%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.1%
Civil Work 5.5%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):71-Unnao:07-06-11 12/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 6 16.56000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 88 33.88000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 300 207.00000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 94 293.28000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1995 768.07500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1502 1036.38000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 876 2733.12000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 438 1471.68000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Sultanpur -70
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):70-Sultanpur:07-06-11 13/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Sultanpur -70
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 370 288.60000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 340 71.40000 3 Months
(b) Health and Physical Education 0.07000 340 71.40000 3 Months
(c) Work Education 0.07000 340 71.40000 3 Months
Sub Total (2.19 to 2.38) 6689 7062.77500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
6689 7062.77500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 5179 25.89500
3.02 Upper Primary Teachers Teacher 0.00500 2005 10.02500
Sub Total 7184 35.92000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 49 205.80000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 30 59.40000 9 Months
4.02 1 MIS Coordinator RP 0.15500 15 20.92500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 15 19.57500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 15 13.50000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 15 7.50000
4.08 Meeting, TA BRC/ URC 0.30000 15 4.50000
4.09 TLM Grant BRC/ URC 0.10000 15 1.50000
4.10 Maintenance Grant BRC/ URC 0.10000 15 1.50000
Sub Total 15 334.20000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 114 11.40000
5.05 Meeting, TA CRC/UERC 0.12000 114 13.68000
5.06 TLM Grant CRC/UERC 0.03000 114 3.42000
5.07 Maintenance Grant CRC/UERC 0.02000 114 2.28000
Sub Total 114 30.78000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 7184 86.20800
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 7184 71.84000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 15 47.62500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 234 1.40400Actual
Calculated Amt.
Sub Total 7433 207.07700
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 35 11.1300025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 3 1.08750
25
children/centre
Sub Total 38 12.21750
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 17 2.55000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):70-Sultanpur:07-06-11 14/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Sultanpur -70
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 9 1.35000
10 children per
center, '6
MonthsSub Total 26 3.90000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 148413 74.20650
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 86471 138.35360
9.03 Free Brail Books (PS) Set 0.00150 106 0.15900
9.04 Free Brail Books (UPS) Set 0.00250 34 0.08500
Sub Total 235024 212.80410
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02567 6635 170.32045
Sub Total 6635 170.32045
12 Civil Works
12.01 BRC Building 0.0000012.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 481 966.81000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 966.81000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 673 50.47500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1333 99.97500
Sub Total 2006 150.45000
15 School Grant
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):70-Sultanpur:07-06-11 15/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Sultanpur -70
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.01 Primary School School 0.05000 1441 72.05000
15.02 Upper Primary School School 0.07000 739 51.73000
Sub Total 2180.00 123.78000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2180 21.80000
Sub Total 2180 21.80000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 86.14300
Actual
Calculated Amt.
(b) EMIS Cell District 1 13.12460Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.00000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 190.00000Actual
Calculated Amt.
Sub Total 290.26760
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 6120 36.72000 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 6120 18.36000 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2580 15.48000 3 days
Sub Total 14820.00 70.56000
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 9763.66165
Management Cost & MIS Cost % 1.0%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.9%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.0%
Civil Work 9.9%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):70-Sultanpur:07-06-11 16/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 28 77.28000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 227 87.39500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 261 180.09000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 255 795.60000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 911 350.73500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 620 427.80000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 40 124.80000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 618 1606.80000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 308 1034.88000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 21 58.80000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Srawasti -69
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):69-Srawasti(A):07-06-11 17/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Srawasti -69
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 127 99.06000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 47 9.87000 3 Months
(b) Health and Physical Education 0.07000 47 9.87000 3 Months
(c) Work Education 0.07000 47 9.87000 3 Months
Sub Total (2.19 to 2.38) 3557 4872.85000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
3557 4872.85000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 2640 13.20000
3.02 Upper Primary Teachers Teacher 0.00500 470 2.35000
Sub Total 3110 15.55000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 15 63.00000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 10 19.80000 9 Months
4.02 1 MIS Coordinator RP 0.15500 5 6.97500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 5 6.52500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 5 4.50000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 5 2.50000
4.08 Meeting, TA BRC/ URC 0.30000 5 1.50000
4.09 TLM Grant BRC/ URC 0.10000 5 0.50000
4.10 Maintenance Grant BRC/ URC 0.10000 5 0.50000
Sub Total 5 105.80000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 54 5.40000
5.05 Meeting, TA CRC/UERC 0.12000 54 6.48000
5.06 TLM Grant CRC/UERC 0.03000 54 1.62000
5.07 Maintenance Grant CRC/UERC 0.02000 54 1.08000
Sub Total 54 14.58000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 3110 37.32000
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 3110 31.10000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 5 15.87500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 94 0.56400Actual
Calculated Amt.
Sub Total 3209 84.85900
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 5 1.5900025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 49 17.76250
25
children/centre
Sub Total 54 19.35250
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 42 6.30000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):69-Srawasti(A):07-06-11 18/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Srawasti -69
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 21 3.15000
10 children per
center, '6
MonthsSub Total 63 9.45000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 72060 36.03000
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 18185 29.09600
9.03 Free Brail Books (PS) Set 0.00150 103 0.15450
9.04 Free Brail Books (UPS) Set 0.00250 16 0.04000
Sub Total 90364 65.32050
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02965 3414 101.22510
Sub Total 3414 101.22510
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 140 281.40000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 281.40000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 307 23.02500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 901 67.57500
Sub Total 1208 90.60000
15 School Grant
15.01 Primary School School 0.05000 828 41.40000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):69-Srawasti(A):07-06-11 19/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Srawasti -69
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 406 28.42000
Sub Total 1234.00 69.82000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1234 12.34000
Sub Total 1234 12.34000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 90.31000
Actual
Calculated Amt.
(b) EMIS Cell District 1 6.62800Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.55000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 110.00000Actual
Calculated Amt.
Sub Total 207.48800
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 3651 21.90600 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 3651 10.95300 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1002 6.01200 3 days
Sub Total 8304.00 38.87100
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 6063.50610
Management Cost & MIS Cost % 1.6%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.4%
Civil Work 4.6%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):69-Srawasti(A):07-06-11 20/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.000 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.000 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.000 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 14 38.64000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 309 118.96500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 0 0.00000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 323 1007.76000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2373 913.60500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1810 1248.90000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 319 995.28000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 651 1692.60000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 382 1283.52000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 103 288.40000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Sonebhadra -68
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):68-Sonebhadra:07-06-11 21/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Sonebhadra -68
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 503 392.34000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 218 45.78000 3 Months
(b) Health and Physical Education 0.07000 218 45.78000 3 Months
(c) Work Education 0.07000 218 45.78000 3 Months
Sub Total (2.19 to 2.38) 7441 8117.35000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
7441 8117.35000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 4013 20.06500
3.02 Upper Primary Teachers Teacher 0.00500 937 4.68500
Sub Total 4950 24.75000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 24 100.80000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 16 31.68000 9 Months
4.02 1 MIS Coordinator RP 0.15500 8 11.16000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 8 10.44000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 8 7.20000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 8 4.00000
4.08 Meeting, TA BRC/ URC 0.30000 8 2.40000
4.09 TLM Grant BRC/ URC 0.10000 8 0.80000
4.10 Maintenance Grant BRC/ URC 0.10000 8 0.80000
Sub Total 8 169.28000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 68 6.80000
5.05 Meeting, TA CRC/UERC 0.12000 68 8.16000
5.06 TLM Grant CRC/UERC 0.03000 68 2.04000
5.07 Maintenance Grant CRC/UERC 0.02000 68 1.36000
Sub Total 68 18.36000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 4950 59.40000
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 4950 49.50000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 8 25.40000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 132 0.79200Actual
Calculated Amt.
Sub Total 5090 135.09200
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 12 3.8160025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 4 1.45000
25
children/centre
Sub Total 16 5.26600
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 272 40.80000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):68-Sonebhadra:07-06-11 22/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Sonebhadra -68
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 136 20.40000
10 children per
center, '6
MonthsSub Total 408 61.20000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 146087 73.04350
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 49832 79.73120
9.03 Free Brail Books (PS) Set 0.00150 27 0.04050
9.04 Free Brail Books (UPS) Set 0.00250 3 0.00750
Sub Total 195949 152.82270
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.000 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02991 2462 73.63842
Sub Total 2462 73.63842
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 300 603.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 603.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 654 49.05000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1220 91.50000
Sub Total 1874 140.55000
15 School Grant
15.01 Primary School School 0.05000 1336 66.80000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):68-Sonebhadra:07-06-11 23/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Sonebhadra -68
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 655 45.85000
Sub Total 1991.000 112.65000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1991 19.91000
Sub Total 1991 19.91000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 76.42800
Actual
Calculated Amt.
(b) EMIS Cell District 1 8.98350Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.65000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 190.00000Actual
Calculated Amt.
Sub Total 276.06150
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 5793 34.75800 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 5793 17.37900 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1467 8.80200 3 days
Sub Total 13053.000 60.93900
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 10040.86962
Management Cost & MIS Cost % 0.9%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.9%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.7%
Civil Work 6.0%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):68-Sonebhadra:07-06-11 24/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.000 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.000 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.000 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 327 902.52000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 345 132.82500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 362 249.78000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 380 1185.60000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2652 1021.02000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 5707 3937.83000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 702 2190.24000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 686 1783.60000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 694 2331.84000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Sitapur -67
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):67-Sitapur:07-06-11 25/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Sitapur -67
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 580 452.40000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 565 118.65000 3 Months
(b) Health and Physical Education 0.07000 565 118.65000 3 Months
(c) Work Education 0.07000 565 118.65000 3 Months
Sub Total (2.19 to 2.38) 14130 14543.60500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
14130 14543.60500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 9994 49.97000
3.02 Upper Primary Teachers Teacher 0.00500 2577 12.88500
Sub Total 12571 62.85500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 62 260.40000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 40 79.20000 9 Months
4.02 1 MIS Coordinator RP 0.15500 20 27.90000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 20 26.10000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 20 18.00000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 20 10.00000
4.08 Meeting, TA BRC/ URC 0.30000 20 6.00000
4.09 TLM Grant BRC/ URC 0.10000 20 2.00000
4.10 Maintenance Grant BRC/ URC 0.10000 20 2.00000
Sub Total 20 431.60000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 220 22.00000
5.05 Meeting, TA CRC/UERC 0.12000 220 26.40000
5.06 TLM Grant CRC/UERC 0.03000 220 6.60000
5.07 Maintenance Grant CRC/UERC 0.02000 220 4.40000
Sub Total 220 59.40000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 12571 150.85200
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 12571 125.71000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 20 63.50000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 380 2.28000Actual
Calculated Amt.
Sub Total 12971 342.34200
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 138 43.8840025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 42 15.22500
25
children/centre
Sub Total 180 59.10900
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 58 8.70000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):67-Sitapur:07-06-11 26/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Sitapur -67
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 29 4.35000
10 children per
center, '6
MonthsSub Total 87 13.05000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 373880 186.94000
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 114758 183.61280
9.03 Free Brail Books (PS) Set 0.00150 350 0.52500
9.04 Free Brail Books (UPS) Set 0.00250 50 0.12500
Sub Total 489038 371.20280
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.000 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.01517 12079 183.23843
Sub Total 12079 183.23843
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 200 402.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 402.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 63 4.72500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 3722 279.15000
Sub Total 3785 283.87500
15 School Grant
15.01 Primary School School 0.05000 2657 132.85000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):67-Sitapur:07-06-11 27/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Sitapur -67
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 1213 84.91000
Sub Total 3870.000 217.76000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 3870 38.70000
Sub Total 3870 38.70000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 96.55000
Actual
Calculated Amt.
(b) EMIS Cell District 1 17.61590Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.20000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 325.00000Actual
Calculated Amt.
Sub Total 440.36590
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 11355 68.13000 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 11355 34.06500 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 3783 22.69800 3 days
Sub Total 26493.000 124.89300
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 17643.99613
Management Cost & MIS Cost % 0.6%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.5%
Civil Work 2.3%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):67-Sitapur:07-06-11 28/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0.00 0.00000
(b) Head Teacher for Upper Primary Teacher 0.28300 0.00 0.00000
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000
(b) Health and Physical Education 0.00000
(c) Work Education 0.00000
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17 Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000
(b) Health and Physical Education Teacher 0.00000
(c) Work Education Teacher 0.00000
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 40.00 110.40000
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 315.00 121.27500
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 0.00 0.00000
2.21 Primary Teachers (Vacant) Teacher 0.23000 0.00 0.00000
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 355.00 1107.60000
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0.00 0.00000
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2134.00 821.59000
2.25 Additional Teachers - PS (Vacant) 0.23000 1992.00 1374.48000
2.26 Additional Teachers - PS (Vacant) 0.23000 0.00 0.00000
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 280.00 873.60000
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 678.00 1762.80000
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 376.00 1263.36000
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 103.00 288.40000
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0.00 0.00000
Physical
Unit
Fresh
Name of District : Siddharth Nagar -66
S. No. Activity
(Rs. In Lakhs)
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):66-SiddharthNAgar(A):07-06-11 29/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Siddharth Nagar -66
S. No. Activity
(Rs. In Lakhs)
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 102.00 79.56000
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 124.00 26.04000
(b) Health and Physical Education 0.07000 124.00 26.04000
(c) Work Education 0.07000 124.00 26.04000
Sub Total (2.19 to 2.38) 6747.00 7881.18500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
6747.00 7881.18500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 5197.00 25.98500
3.02 Upper Primary Teachers Teacher 0.00500 1210.00 6.05000
Sub Total 6407.00 32.03500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 44.00 184.80000
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 28.00 55.44000
4.02 1 MIS Coordinator RP 0.15500 14.00 19.53000
4.03 1 Datra Entry Operator RP 0.14500 14.00 18.27000
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 14.00 12.60000
4.05 Furniture Grant BRC/ URC 0.00000
4.06 Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 14.00 7.00000
4.08 Meeting, TA BRC/ URC 0.30000 14.00 4.20000
4.09 TLM Grant BRC/ URC 0.10000 14.00 1.40000
4.10 Maintenance Grant BRC/ URC 0.10000 14.00 1.40000
Sub Total 14.00 304.64000
5 Academic Support through Cluster Resource Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0.00 0.00000
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 154.00 15.40000
5.05 Meeting, TA CRC/UERC 0.12000 154.00 18.48000
5.06 TLM Grant CRC/UERC 0.03000 154.00 4.62000
5.07 Maintenance Grant CRC/UERC 0.02000 154.00 3.08000
Sub Total 154.00 41.58000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 6407.00 76.88400
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year at
CRC level - 10 days
Teacher 0.01000 6407.00 64.07000
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 14.00 44.45000
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):66-SiddharthNAgar(A):07-06-11 30/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Siddharth Nagar -66
S. No. Activity
(Rs. In Lakhs)
Approved for the year 2011-12
6.05Refresher Training for all Resource Persons,Master Trainers,
BRC & CRC faculty and Coordinators for 6 days each yearTeacher 0.00600 265.00 1.59000
Sub Total 6686.00 186.99400
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.00000
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 111.00 35.29800
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 0.00 0.00000
Sub Total 111.00 35.29800
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-5)
Centre 0.15000 102.00 15.30000
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8)0.15000 51.00 7.65000
Sub Total 153.00 22.95000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 160510.00 80.25500
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 36400.00 58.24000
9.03 Free Brail Books (PS) Set 0.00150 108.00 0.16200
9.04 Free Brail Books (UPS) Set 0.00250 36.00 0.09000
Sub Total 197054.00 138.74700
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.01578 9358.00 147.66924
Sub Total 9358.00 147.66924
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 656.00 1318.56000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):66-SiddharthNAgar(A):07-06-11 31/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Siddharth Nagar -66
S. No. Activity
(Rs. In Lakhs)
Approved for the year 2011-12
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0.00 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0.00 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0.00 0.00000
Sub Total (Civil WOrks) 1318.56000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 22.00 1.65000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 2223.00 166.72500
Sub Total 2245.00 168.37500
15 School Grant
15.01 Primary School School 0.05000 1544.00 77.20000
15.02 Upper Primary School School 0.07000 769.00 53.83000
Sub Total 2313.00 131.03000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2313.00 23.13000
Sub Total 2313.00 23.13000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1.00 71.18800
(b) EMIS Cell District 1.00 13.09680
17.02 Community Mobilization up to 0.5% 1.00 0.95000
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1.00 200.00000
Sub Total 285.23480
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1.00 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1.00 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1.00 5.00000
(d) Intervention for Minority Community children District 4.00000 1.00 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 6735.00 40.41000
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 6735.00 20.20500
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 3234.00 19.40400
Sub Total 16704.00 80.01900
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection in
urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0.00 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 10871.44704
Management Cost & MIS Cost % 0.8%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.6%
Civil Work 12.1%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):66-SiddharthNAgar(A):07-06-11 32/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.000 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.000 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.000 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 11 30.36000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 234 90.09000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 399 275.31000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 245 764.40000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 3214 1237.39000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 2545 1756.05000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 606 1890.72000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 562 1461.20000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 425 1428.00000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 159 445.20000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Shahjahanpur -65
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):65-Shahjahanpur (B):07-06-11 33/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Shahjahanpur -65
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 575 448.50000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 313 65.73000 3 Months
(b) Health and Physical Education 0.07000 313 65.73000 3 Months
(c) Work Education 0.07000 313 65.73000 3 Months
Sub Total (2.19 to 2.38) 9914 10024.41000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
9914 10024.41000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 6473 32.36500
3.02 Upper Primary Teachers Teacher 0.00500 1731 8.65500
Sub Total 8204 41.02000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 50 210.00000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 32 63.36000 9 Months
4.02 1 MIS Coordinator RP 0.15500 16 22.32000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 16 20.88000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 16 14.40000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 16 8.00000
4.08 Meeting, TA BRC/ URC 0.30000 16 4.80000
4.09 TLM Grant BRC/ URC 0.10000 16 1.60000
4.10 Maintenance Grant BRC/ URC 0.10000 16 1.60000
Sub Total 16 346.96000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 123 12.30000
5.05 Meeting, TA CRC/UERC 0.12000 123 14.76000
5.06 TLM Grant CRC/UERC 0.03000 123 3.69000
5.07 Maintenance Grant CRC/UERC 0.02000 123 2.46000
Sub Total 123 33.21000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 8204 98.44800
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 8204 82.04000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 16 50.80000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 251 1.50600Actual
Calculated Amt.
Sub Total 8471 232.79400
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 84 26.7120025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 9 3.26250
25
children/centre
Sub Total 93 29.97450
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 77 11.55000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):65-Shahjahanpur (B):07-06-11 34/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Shahjahanpur -65
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 38 5.70000
10 children per
center, '6
MonthsSub Total 115 17.25000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 183262 91.63100
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 66043 105.66880
9.03 Free Brail Books (PS) Set 0.00150 50 0.07500
9.04 Free Brail Books (UPS) Set 0.00250 15 0.03750
Sub Total 249370 197.41230
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.000 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.01788 7985 142.77180
Sub Total 7985 142.77180
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 600 1206.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 1206.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 1079 80.92500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1990 149.25000
Sub Total 3069 230.17500
15 School Grant
15.01 Primary School School 0.05000 2190 109.50000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):65-Shahjahanpur (B):07-06-11 35/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Shahjahanpur -65
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 968 67.76000
Sub Total 3158.000 177.26000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 3158 31.58000
Sub Total 3158 31.58000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 81.80800
Actual
Calculated Amt.
(b) EMIS Cell District 1 14.78000Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.05000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 240.00000Actual
Calculated Amt.
Sub Total 337.63800
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 9207 55.24200 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 9207 27.62100 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2772 16.63200 3 days
Sub Total 21186.000 99.49500
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 13221.95060
Management Cost & MIS Cost % 0.7%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.6%
Civil Work 9.1%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):65-Shahjahanpur (B):07-06-11 36/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.000 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.000 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.000 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 14 38.64000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 208 80.08000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 148 102.12000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 222 692.64000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1259 484.71500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 848 585.12000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 270 842.40000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 312 811.20000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 143 480.48000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 148 414.40000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : SK Nagar -64
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):64-SKNagar:07-06-11 37/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : SK Nagar -64
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 394 307.32000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 133 27.93000 3 Months
(b) Health and Physical Education 0.07000 133 27.93000 3 Months
(c) Work Education 0.07000 133 27.93000 3 Months
Sub Total (2.19 to 2.38) 4365 4922.90500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
4365 4922.90500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 3368 16.84000
3.02 Upper Primary Teachers Teacher 0.00500 835 4.17500
Sub Total 4203 21.01500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 27 113.40000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 18 35.64000 9 Months
4.02 1 MIS Coordinator RP 0.15500 9 12.55500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 9 11.74500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 9 8.10000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 9 4.50000
4.08 Meeting, TA BRC/ URC 0.30000 9 2.70000
4.09 TLM Grant BRC/ URC 0.10000 9 0.90000
4.10 Maintenance Grant BRC/ URC 0.10000 9 0.90000
Sub Total 9 190.44000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 85 8.50000
5.05 Meeting, TA CRC/UERC 0.12000 85 10.20000
5.06 TLM Grant CRC/UERC 0.03000 85 2.55000
5.07 Maintenance Grant CRC/UERC 0.02000 85 1.70000
Sub Total 85 22.95000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 4203 50.43600
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 4203 42.03000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 9 28.57500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 157 0.94200Actual
Calculated Amt.
Sub Total 4369 121.98300
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 21 6.6780025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 5 1.81250
25
children/centre
Sub Total 26 8.49050
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 26 3.90000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):64-SKNagar:07-06-11 38/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : SK Nagar -64
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 13 1.95000
10 children per
center, '6
MonthsSub Total 39 5.85000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 98884 49.44200
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 33668 53.86880
9.03 Free Brail Books (PS) Set 0.00150 115 0.17250
9.04 Free Brail Books (UPS) Set 0.00250 26 0.06500
Sub Total 132693 103.54830
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.000 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.01625 6921 112.46625
Sub Total 6921 112.46625
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 300 603.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 603.00000
13 TLE - New Upper Primary
13.01 TLE - New Primary School 0.20000 0.00000
13.02 School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 387 29.02500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1045 78.37500
Sub Total 1432 107.40000
15 School Grant
15.01 Primary School School 0.05000 1016 50.80000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):64-SKNagar:07-06-11 39/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : SK Nagar -64
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 476 33.32000
Sub Total 1492.000 84.12000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1492 14.92000
Sub Total 1492 14.92000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 76.99000
Actual
Calculated Amt.
(b) EMIS Cell District 1 9.08280Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.70000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 125.00000Actual
Calculated Amt.
Sub Total 211.77280
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 4374 26.24400 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 4374 13.12200 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1746 10.47600 3 days
Sub Total 10494.000 49.84200
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 6654.70285
Management Cost & MIS Cost % 1.3%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.9%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.2%
Civil Work 9.1%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):64-SKNagar:07-06-11 40/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 315 869.40000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 101 38.88500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 58 40.02000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 4 9.20000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 104 324.48000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2186 841.61000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 459 316.71000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 626 1953.12000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 6 15.60000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 313 1051.68000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Saharanpur -63
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):63-Saharanpur:07-06-11 41/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Saharanpur -63
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 161 125.58000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 156 32.76000 3 Months
(b) Health and Physical Education 0.07000 156 32.76000 3 Months
(c) Work Education 0.07000 156 32.76000 3 Months
Sub Total (2.19 to 2.38) 4801 5684.56500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
4801 5684.56500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 5708 28.54000
3.02 Upper Primary Teachers Teacher 0.00500 1934 9.67000
Sub Total 7642 38.21000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 38 159.60000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 24 47.52000 9 Months
4.02 1 MIS Coordinator RP 0.15500 12 16.74000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 12 15.66000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 12 10.80000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 12 6.00000
4.08 Meeting, TA BRC/ URC 0.30000 12 3.60000
4.09 TLM Grant BRC/ URC 0.10000 12 1.20000
4.10 Maintenance Grant BRC/ URC 0.10000 12 1.20000
Sub Total 12 262.32000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 115 11.50000
5.05 Meeting, TA CRC/UERC 0.12000 115 13.80000
5.06 TLM Grant CRC/UERC 0.03000 115 3.45000
5.07 Maintenance Grant CRC/UERC 0.02000 115 2.30000
Sub Total 115 31.05000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 7642 91.70400
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 7642 76.42000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 12 38.10000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 211 1.26600Actual
Calculated Amt.
Sub Total 7865 207.49000
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 5 1.5900025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 5 1.81250
25
children/centre
Sub Total 10 3.40250
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 102 15.30000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):63-Saharanpur:07-06-11 42/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Saharanpur -63
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 51 7.65000
10 children per
center, '6
MonthsSub Total 153 22.95000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 110566 55.28300
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 53597 85.75520
9.03 Free Brail Books (PS) Set 0.00150 76 0.11400
9.04 Free Brail Books (UPS) Set 0.00250 11 0.02750
Sub Total 164250 141.17970
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02979 4325 128.84175
Sub Total 4325 128.84175
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 90 180.90000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 180.90000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 694 52.05000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1147 86.02500
Sub Total 1841 138.07500
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):63-Saharanpur:07-06-11 43/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Saharanpur -63
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15 School Grant
15.01 Primary School School 0.05000 1331 66.55000
15.02 Upper Primary School School 0.07000 594 41.58000
Sub Total 1925.00 108.13000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1925 19.25000
Sub Total 1925 19.25000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 90.50000
Actual
Calculated Amt.
(b) EMIS Cell District 1 13.34030Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.85000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 135.00000Actual
Calculated Amt.
Sub Total 239.69030
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 5655 33.93000 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 5655 16.96500 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2346 14.07600 3 days
Sub Total 13656.00 64.97100
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 7345.02525
Management Cost & MIS Cost % 1.4%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.3%
Civil Work 2.5%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):63-Saharanpur:07-06-11 44/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.000 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.000 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.000 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 8 22.08000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 167 64.29500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 180 124.20000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 175 546.00000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1949 750.36500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1235 852.15000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 527 1644.24000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 177 460.20000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 352 1182.72000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Rampur -62
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):62-Rampur:07-06-11 45/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Rampur -62
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 290 226.20000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 177 37.17000 3 Months
(b) Health and Physical Education 0.07000 177 37.17000 3 Months
(c) Work Education 0.07000 177 37.17000 3 Months
Sub Total (2.19 to 2.38) 5591 5983.96000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
5591 5983.96000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 4576 22.88000
3.02 Upper Primary Teachers Teacher 0.00500 1354 6.77000
Sub Total 5930 29.65000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 23 96.60000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 14 27.72000 9 Months
4.02 1 MIS Coordinator RP 0.15500 7 9.76500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 7 9.13500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 7 6.30000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 7 3.50000
4.08 Meeting, TA BRC/ URC 0.30000 7 2.10000
4.09 TLM Grant BRC/ URC 0.10000 7 0.70000
4.10 Maintenance Grant BRC/ URC 0.10000 7 0.70000
Sub Total 7 156.52000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 76 7.60000
5.05 Meeting, TA CRC/UERC 0.12000 76 9.12000
5.06 TLM Grant CRC/UERC 0.03000 76 2.28000
5.07 Maintenance Grant CRC/UERC 0.02000 76 1.52000
Sub Total 76 20.52000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 5930 71.16000
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 5930 59.30000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 7 22.22500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 132 0.79200Actual
Calculated Amt.
Sub Total 6069 153.47700
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 8 2.5440025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 40 14.50000
25
children/centre
Sub Total 48 17.04400
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 85 12.75000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):62-Rampur:07-06-11 46/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Rampur -62
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 43 6.45000
10 children per
center, '6
MonthsSub Total 128 19.20000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 117664 58.83200
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 38388 61.42080
9.03 Free Brail Books (PS) Set 0.00150 25 0.03750
9.04 Free Brail Books (UPS) Set 0.00250 3 0.00750
Sub Total 156080 120.29780
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.000 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02394 4706 112.66164
Sub Total 4706 112.66164
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 0 0.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 0.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 835 62.62500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1084 81.30000
Sub Total 1919 143.92500
15 School Grant
15.01 Primary School School 0.05000 1299 64.95000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):62-Rampur:07-06-11 47/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Rampur -62
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 695 48.65000
Sub Total 1994.000 113.60000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1994 19.94000
Sub Total 1994 19.94000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 74.19000
Actual
Calculated Amt.
(b) EMIS Cell District 1 8.07590Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.60000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 125.00000Actual
Calculated Amt.
Sub Total 207.86590
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 5757 34.54200 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 5757 17.27100 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1740 10.44000 3 days
Sub Total 13254.000 62.25300
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 7234.91434
Management Cost & MIS Cost % 1.1%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.7%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.9%
Civil Work 0.0%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):62-Rampur:07-06-11 48/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 4 3.12000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 2 1.69800 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 6.000 4.81800
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.000 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 6.000 4.81800
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 6 16.56000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 226 87.01000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 112 77.28000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 4 9.20000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 232 723.84000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1859 715.71500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 949 654.81000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 728 2271.36000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 364 1223.04000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : RailBareilly -61
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):61-RaiBareilly(A):07-06-11 49/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : RailBareilly -61
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 248 193.44000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 276 57.96000 3 Months
(b) Health and Physical Education 0.07000 276 57.96000 3 Months
(c) Work Education 0.07000 276 57.96000 3 Months
Sub Total (2.19 to 2.38) 5556 6146.13500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
5562 6150.95300
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 4874 24.37000
3.02 Upper Primary Teachers Teacher 0.00500 1953 9.76500
Sub Total 6827 34.13500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 50 210.00000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 32 63.36000 9 Months
4.02 1 MIS Coordinator RP 0.15500 16 22.32000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 16 20.88000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 16 14.40000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 16 8.00000
4.08 Meeting, TA BRC/ URC 0.30000 16 4.80000
4.09 TLM Grant BRC/ URC 0.10000 16 1.60000
4.10 Maintenance Grant BRC/ URC 0.10000 16 1.60000
Sub Total 16 346.96000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 128 12.80000
5.05 Meeting, TA CRC/UERC 0.12000 128 15.36000
5.06 TLM Grant CRC/UERC 0.03000 128 3.84000
5.07 Maintenance Grant CRC/UERC 0.02000 128 2.56000
Sub Total 128 34.56000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 6827 81.92400
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 6827 68.27000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 16 50.80000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 256 1.53600Actual
Calculated Amt.
Sub Total 7099 202.53000
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 11 3.4980025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 3 1.08750
25
children/centre
Sub Total 14 4.58550
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 90 13.50000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):61-RaiBareilly(A):07-06-11 50/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : RailBareilly -61
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 45 6.75000
10 children per
center, '6
MonthsSub Total 135 20.25000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 139881 69.94050
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 65883 105.41280
9.03 Free Brail Books (PS) Set 0.00150 80 0.12000
9.04 Free Brail Books (UPS) Set 0.00250 0 0.00000
Sub Total 205844 175.47330
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.000 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02988 4083 122.00004
Sub Total 4083 122.00004
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 400 804.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 804.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.05000 1336 66.80000
14.01a Maintenance in School having more than 3 Classrooms School 0.10000 540 54.00000
Sub Total 1876 120.80000
15 School Grant
15.01 Primary School School 0.05000 1349 67.45000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):61-RaiBareilly(A):07-06-11 51/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : RailBareilly -61
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 636 44.52000
Sub Total 1985.000 111.97000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1985 19.85000
Sub Total 1985 19.85000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 79.69000
Actual
Calculated Amt.
(b) EMIS Cell District 1 14.27280Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.30000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 160.00000Actual
Calculated Amt.
Sub Total 255.26280
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 5628 33.76800 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 5628 16.88400 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2097 12.58200 3 days
Sub Total 13353.000 63.23400
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 8536.56364
Management Cost & MIS Cost % 1.1%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.9%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.0%
Civil Work 9.4%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):61-RaiBareilly(A):07-06-11 52/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 31 85.56000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 204 78.54000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 308 212.52000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 235 733.20000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2340 900.90000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1042 718.98000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 742 2315.04000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 232 603.20000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 108 362.88000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 379 1061.20000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Pratapgarh -60
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):60-Pratapgarh:07-06-11 53/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Pratapgarh -60
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 261 203.58000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 210 44.10000 3 Months
(b) Health and Physical Education 0.07000 210 44.10000 3 Months
(c) Work Education 0.07000 210 44.10000 3 Months
Sub Total (2.19 to 2.38) 6512 7407.90000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
6512 7407.90000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 7104 35.52000
3.02 Upper Primary Teachers Teacher 0.00500 1461 7.30500
Sub Total 8565 42.82500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 56 235.20000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 36 71.28000 9 Months
4.02 1 MIS Coordinator RP 0.15500 18 25.11000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 18 23.49000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 18 16.20000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 18 9.00000
4.08 Meeting, TA BRC/ URC 0.30000 18 5.40000
4.09 TLM Grant BRC/ URC 0.10000 18 1.80000
4.10 Maintenance Grant BRC/ URC 0.10000 18 1.80000
Sub Total 18 389.28000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 172 17.20000
5.05 Meeting, TA CRC/UERC 0.12000 172 20.64000
5.06 TLM Grant CRC/UERC 0.03000 172 5.16000
5.07 Maintenance Grant CRC/UERC 0.02000 172 3.44000
Sub Total 172 46.44000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 8565 102.78000
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 8565 85.65000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 18 57.15000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 316 1.89600Actual
Calculated Amt.
Sub Total 8899 247.47600
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 26 8.2680025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 5 1.81250
25
children/centre
Sub Total 31 10.08050
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 31 4.65000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):60-Pratapgarh:07-06-11 54/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Pratapgarh -60
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 15 2.25000
10 children per
center, '6
MonthsSub Total 46 6.90000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 172442 86.22100
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 71594 114.55040
9.03 Free Brail Books (PS) Set 0.00150 76 0.11400
9.04 Free Brail Books (UPS) Set 0.00250 14 0.03500
Sub Total 244126 200.92040
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.01987 7745 153.89315
Sub Total 7745 153.89315
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 323 649.23000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 649.23000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 370 27.75000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 2122 159.15000
Sub Total 2492 186.90000
15 School Grant
15.01 Primary School School 0.05000 1775 88.75000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):60-Pratapgarh:07-06-11 55/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Pratapgarh -60
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 893 62.51000
Sub Total 2668.00 151.26000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2668 26.68000
Sub Total 2668 26.68000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 149.91500
Actual
Calculated Amt.
(b) EMIS Cell District 1 15.78200Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.15000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 175.00000Actual
Calculated Amt.
Sub Total 341.84700
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 7476 44.85600 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 7476 22.42800 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 3315 19.89000 3 days
Sub Total 18267.00 87.17400
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 10018.80605
Management Cost & MIS Cost % 1.7%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.7%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.4%
Civil Work 6.5%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):60-Pratapgarh:07-06-11 56/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 2 1.56000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 1 0.84900 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 3.00 2.40900
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 3.00 2.40900
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 2 5.52000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 125 48.12500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 147 101.43000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 2 4.60000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 127 396.24000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1626 626.01000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1422 981.18000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 490 1528.80000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 245 823.20000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Pilibhit -59
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):59-Pilibhit:07-06-11 57/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Pilibhit -59
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 551 429.78000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 275 57.75000 3 Months
(b) Health and Physical Education 0.07000 275 57.75000 3 Months
(c) Work Education 0.07000 275 57.75000 3 Months
Sub Total (2.19 to 2.38) 5562 5118.13500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
5565 5120.54400
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 3616 18.08000
3.02 Upper Primary Teachers Teacher 0.00500 1414 7.07000
Sub Total 5030 25.15000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 26 109.20000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 16 31.68000 9 Months
4.02 1 MIS Coordinator RP 0.15500 8 11.16000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 8 10.44000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 8 7.20000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 8 4.00000
4.08 Meeting, TA BRC/ URC 0.30000 8 2.40000
4.09 TLM Grant BRC/ URC 0.10000 8 0.80000
4.10 Maintenance Grant BRC/ URC 0.10000 8 0.80000
Sub Total 8 177.68000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 79 7.90000
5.05 Meeting, TA CRC/UERC 0.12000 79 9.48000
5.06 TLM Grant CRC/UERC 0.03000 79 2.37000
5.07 Maintenance Grant CRC/UERC 0.02000 79 1.58000
Sub Total 79 21.33000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 5030 60.36000
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 5030 50.30000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 8 25.40000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 143 0.85800Actual
Calculated Amt.
Sub Total 5181 136.91800
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 30 9.5400025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 51 18.48750
25
children/centre
Sub Total 81 28.02750
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 90 13.50000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):59-Pilibhit:07-06-11 58/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Pilibhit -59
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 45 6.75000
10 children per
center, '6
MonthsSub Total 135 20.25000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 108123 54.06150
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 47507 76.01120
9.03 Free Brail Books (PS) Set 0.00150 40 0.06000
9.04 Free Brail Books (UPS) Set 0.00250 9 0.02250
Sub Total 155679 130.15520
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02984 3606 107.60304
Sub Total 3606 107.60304
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 429 862.29000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 200 24.00000
12.35a Others (Overhead Tank UPS) School 0.12000 100 12.00000
Sub Total (Civil WOrks) 898.29000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 457 34.27500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1304 97.80000
Sub Total 1761 132.07500
15 School Grant
15.01 Primary School School 0.05000 1197 59.85000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):59-Pilibhit:07-06-11 59/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Pilibhit -59
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 600 42.00000
Sub Total 1797.00 101.85000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1797 17.97000
Sub Total 1797 17.97000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 103.35000
Actual
Calculated Amt.
(b) EMIS Cell District 1 8.74040Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.65000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 125.00000Actual
Calculated Amt.
Sub Total 237.74040
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 5283 31.69800 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 5283 15.84900 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1797 10.78200 3 days
Sub Total 12363.00 58.32900
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 7287.91214
Management Cost & MIS Cost % 1.5%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.7%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.3%
Civil Work 12.3%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):59-Pilibhit:07-06-11 60/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 2 1.56000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 1 0.84900 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 3.00 2.40900
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 3.00 2.40900
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 0 0.00000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 19 7.31500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 488 336.72000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 2 4.60000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 19 59.28000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2122 816.97000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 686 473.34000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 530 1653.60000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 265 890.40000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District :Muzaffar Nagar -58
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):58-Muzaffar Nagar:07-06-11 61/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District :Muzaffar Nagar -58
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 57 44.46000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 137 28.77000 3 Months
(b) Health and Physical Education 0.07000 137 28.77000 3 Months
(c) Work Education 0.07000 137 28.77000 3 Months
Sub Total (2.19 to 2.38) 4599 4372.99500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
4602 4375.40400
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 5050 25.25000
3.02 Upper Primary Teachers Teacher 0.00500 2439 12.19500
Sub Total 7489 37.44500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 47 197.40000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 30 59.40000 9 Months
4.02 1 MIS Coordinator RP 0.15500 15 20.92500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 15 19.57500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 15 13.50000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 15 7.50000
4.08 Meeting, TA BRC/ URC 0.30000 15 4.50000
4.09 TLM Grant BRC/ URC 0.10000 15 1.50000
4.10 Maintenance Grant BRC/ URC 0.10000 15 1.50000
Sub Total 15 325.80000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 114 11.40000
5.05 Meeting, TA CRC/UERC 0.12000 114 13.68000
5.06 TLM Grant CRC/UERC 0.03000 114 3.42000
5.07 Maintenance Grant CRC/UERC 0.02000 114 2.28000
Sub Total 114 30.78000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 7489 89.86800
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 7489 74.89000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 15 47.62500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 234 1.40400Actual
Calculated Amt.
Sub Total 7738 213.78700
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 10 3.1800025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 10 3.62500
25
children/centre
Sub Total 20 6.80500
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 118 17.70000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):58-Muzaffar Nagar:07-06-11 62/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District :Muzaffar Nagar -58
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 59 8.85000
10 children per
center, '6
MonthsSub Total 177 26.55000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 118290 59.14500
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 54485 87.17600
9.03 Free Brail Books (PS) Set 0.00150 21 0.03150
9.04 Free Brail Books (UPS) Set 0.00250 3 0.00750
Sub Total 172799 146.36000
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02995 4331 129.71345
Sub Total 4331 129.71345
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 60 120.60000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 120.60000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 453 33.97500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1536 115.20000
Sub Total 1989 149.17500
15 School Grant
15.01 Primary School School 0.05000 1411 70.55000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):58-Muzaffar Nagar:07-06-11 63/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District :Muzaffar Nagar -58
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 758 53.06000
Sub Total 2169.00 123.61000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2169 21.69000
Sub Total 2169 21.69000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 93.72000
Actual
Calculated Amt.
(b) EMIS Cell District 1 13.11610Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.95000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 110.00000Actual
Calculated Amt.
Sub Total 217.78610
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 5967 35.80200 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 5967 17.90100 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2061 12.36600 3 days
Sub Total 13995.00 66.06900
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 6065.57455
Management Cost & MIS Cost % 1.8%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.6%
Civil Work 2.0%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):58-Muzaffar Nagar:07-06-11 64/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 4 11.04000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 225 86.62500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 203 140.07000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 4 9.20000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 229 714.48000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 3102 1194.27000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1996 1377.24000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 1058 3300.96000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 6 15.60000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 529 1777.44000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Moradabad -57
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):57-Moradabad(A):07-06-11 65/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Moradabad -57
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 253 197.34000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 220 46.20000 3 Months
(b) Health and Physical Education 0.07000 220 46.20000 3 Months
(c) Work Education 0.07000 220 46.20000 3 Months
Sub Total (2.19 to 2.38) 8269 8962.86500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
8269 8962.86500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 6815 34.07500
3.02 Upper Primary Teachers Teacher 0.00500 2104 10.52000
Sub Total 8919 44.59500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 44 184.80000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 28 55.44000 9 Months
4.02 1 MIS Coordinator RP 0.15500 14 19.53000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 14 18.27000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 14 12.60000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 14 7.00000
4.08 Meeting, TA BRC/ URC 0.30000 14 4.20000
4.09 TLM Grant BRC/ URC 0.10000 14 1.40000
4.10 Maintenance Grant BRC/ URC 0.10000 14 1.40000
Sub Total 14 304.64000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 97 9.70000
5.05 Meeting, TA CRC/UERC 0.12000 97 11.64000
5.06 TLM Grant CRC/UERC 0.03000 97 2.91000
5.07 Maintenance Grant CRC/UERC 0.02000 97 1.94000
Sub Total 97 26.19000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 8919 107.02800
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 8919 89.19000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 14 44.45000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 209 1.25400Actual
Calculated Amt.
Sub Total 9142 241.92200
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 7 2.2260025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 3 1.08750
25
children/centre
Sub Total 10 3.31350
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 24 3.60000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):57-Moradabad(A):07-06-11 66/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Moradabad -57
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 12 1.80000
10 children per
center, '6
MonthsSub Total 36 5.40000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 235486 117.74300
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 66067 105.70720
9.03 Free Brail Books (PS) Set 0.00150 277 0.41550
9.04 Free Brail Books (UPS) Set 0.00250 126 0.31500
Sub Total 301956 224.18070
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.01385 14478 200.52030
Sub Total 14478 200.52030
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 200 402.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 402.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 846 63.45000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1981 148.57500
Sub Total 2827 212.02500
15 School Grant
15.01 Primary School School 0.05000 1975 98.75000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):57-Moradabad(A):07-06-11 67/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Moradabad -57
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 921 64.47000
Sub Total 2896.00 163.22000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2896 28.96000
Sub Total 2896 28.96000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 75.15000
Actual
Calculated Amt.
(b) EMIS Cell District 1 15.06450Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.95000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 190.00000Actual
Calculated Amt.
Sub Total 281.16450
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 8481 50.88600 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 8481 25.44300 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2646 15.87600 3 days
Sub Total 19608.00 92.20500
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 11267.20100
Management Cost & MIS Cost % 0.8%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.7%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.5%
Civil Work 3.6%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):57-Moradabad(A):07-06-11 68/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 6 4.68000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 3 2.54700 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 9.00 7.22700
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 9.00 7.22700
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 3 8.28000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 245 94.32500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 149 102.81000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 10 23.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 248 773.76000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2334 898.59000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 2020 1393.80000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 500 1560.00000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 290 754.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 80 268.80000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 312 873.60000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Mirzapur -56
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):56-Mirzapur:07-06-11 69/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Mirzapur -56
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 374 291.72000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 253 53.13000 3 Months
(b) Health and Physical Education 0.07000 253 53.13000 3 Months
(c) Work Education 0.07000 253 53.13000 3 Months
Sub Total (2.19 to 2.38) 7324 7202.07500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
7333 7209.30200
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 5358 26.79000
3.02 Upper Primary Teachers Teacher 0.00500 1139 5.69500
Sub Total 6497 32.48500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 41 172.20000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 26 51.48000 9 Months
4.02 1 MIS Coordinator RP 0.15500 13 18.13500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 13 16.96500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 13 11.70000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 13 6.50000
4.08 Meeting, TA BRC/ URC 0.30000 13 3.90000
4.09 TLM Grant BRC/ URC 0.10000 13 1.30000
4.10 Maintenance Grant BRC/ URC 0.10000 13 1.30000
Sub Total 13 283.48000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 106 10.60000
5.05 Meeting, TA CRC/UERC 0.12000 106 12.72000
5.06 TLM Grant CRC/UERC 0.03000 106 3.18000
5.07 Maintenance Grant CRC/UERC 0.02000 106 2.12000
Sub Total 106 28.62000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 6497 77.96400
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 6497 64.97000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 13 41.27500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 210 1.26000Actual
Calculated Amt.
Sub Total 6720 185.46900
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 45 14.3100025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 36 13.05000
25
children/centre
Sub Total 81 27.36000
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 36 5.40000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):56-Mirzapur:07-06-11 70/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Mirzapur -56
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 18 2.70000
10 children per
center, '6
MonthsSub Total 54 8.10000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 166550 83.27500
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 60658 97.05280
9.03 Free Brail Books (PS) Set 0.00150 170 0.25500
9.04 Free Brail Books (UPS) Set 0.00250 30 0.07500
Sub Total 227408 180.65780
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02462 5432 133.73584
Sub Total 5432 133.73584
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 410 824.10000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 300 36.00000
12.35a Others (Overhead Tank UPS) School 0.12000 100 12.00000
Sub Total (Civil WOrks) 872.10000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 537 40.27500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1541 115.57500
Sub Total 2078 155.85000
15 School Grant
15.01 Primary School School 0.05000 1484 74.20000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):56-Mirzapur:07-06-11 71/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Mirzapur -56
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 680 47.60000
Sub Total 2164.00 121.80000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2164 21.64000
Sub Total 2164 21.64000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 73.95000
Actual
Calculated Amt.
(b) EMIS Cell District 1 12.68300Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.90000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 180.00000Actual
Calculated Amt.
Sub Total 267.53300
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 6234 37.40400 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 6234 18.70200 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2253 13.51800 3 days
Sub Total 14721.00 69.62400
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 9667.75664
Management Cost & MIS Cost % 0.9%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.9%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.8%
Civil Work 9.0%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):56-Mirzapur:07-06-11 72/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 2 1.56000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 1 0.84900 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 3.00 2.40900
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 3.00 2.40900
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 1 2.76000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 11 4.23500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 242 166.98000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 6 13.80000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 12 37.44000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 998 384.23000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 185 127.65000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 144 449.28000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 6 15.60000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 72 241.92000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Meerut -55
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):55-Meerut:07-06-11 73/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Meerut -55
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 0 0.00000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 78 16.38000 3 Months
(b) Health and Physical Education 0.07000 78 16.38000 3 Months
(c) Work Education 0.07000 78 16.38000 3 Months
Sub Total (2.19 to 2.38) 1911 1493.03500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
1914 1495.44400
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 4137 20.68500
3.02 Upper Primary Teachers Teacher 0.00500 1857 9.28500
Sub Total 5994 29.97000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 46 193.20000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 28 55.44000 9 Months
4.02 1 MIS Coordinator RP 0.15500 14 19.53000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 14 18.27000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 14 12.60000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 14 7.00000
4.08 Meeting, TA BRC/ URC 0.30000 14 4.20000
4.09 TLM Grant BRC/ URC 0.10000 14 1.40000
4.10 Maintenance Grant BRC/ URC 0.10000 14 1.40000
Sub Total 14 313.04000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 95 9.50000
5.05 Meeting, TA CRC/UERC 0.12000 95 11.40000
5.06 TLM Grant CRC/UERC 0.03000 95 2.85000
5.07 Maintenance Grant CRC/UERC 0.02000 95 1.90000
Sub Total 95 25.65000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 5994 71.92800
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 5994 59.94000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 14 44.45000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 207 1.24200Actual
Calculated Amt.
Sub Total 6215 177.56000
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 0 0.0000025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 0 0.00000
25
children/centre
Sub Total 0 0.00000
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):55-Meerut:07-06-11 74/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Meerut -55
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 19 2.85000
10 children per
center, '6
Months(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 10 1.50000
10 children per
center, '6
MonthsSub Total 29 4.35000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 75849 37.92450
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 35602 56.96320
9.03 Free Brail Books (PS) Set 0.00150 110 0.16500
9.04 Free Brail Books (UPS) Set 0.00250 30 0.07500
Sub Total 111591 95.12770
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02921 2390 69.81190
Sub Total 2390 69.81190
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 76 152.76000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 152.76000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 430 32.25000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):55-Meerut:07-06-11 75/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Meerut -55
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 968 72.60000
Sub Total 1398 104.85000
15 School Grant
15.01 Primary School School 0.05000 997 49.85000
15.02 Upper Primary School School 0.07000 586 41.02000
Sub Total 1583.00 90.87000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1583 15.83000
Sub Total 1583 15.83000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 82.18000
Actual
Calculated Amt.
(b) EMIS Cell District 1 26.15580Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.95000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 53.00000Actual
Calculated Amt.
Sub Total 162.28580
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 4194 25.16400 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 4194 12.58200 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1395 8.37000 3 days
Sub Total 9783.00 46.11600
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 2857.66540
Management Cost & MIS Cost % 3.8%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.9%
Total Mgt. Cost
(Mgt+ CM + LEP) %5.7%
Civil Work 5.3%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):55-Meerut:07-06-11 76/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 2 1.56000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 1 0.84900 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 3.00 2.40900
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months(b) Health and Physical Education Teacher 0.00000 6 Months(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 3.00 2.40900
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 3 8.28000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 100 38.50000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 160 110.40000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 6 13.80000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 103 321.36000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1630 627.55000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1162 801.78000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 584 1822.08000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 288 967.68000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 4 11.20000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Mau -54
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):54-Mau:07-06-11 77/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Mau -54
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 301 234.78000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 177 37.17000 3 Months
(b) Health and Physical Education 0.07000 177 37.17000 3 Months
(c) Work Education 0.07000 177 37.17000 3 Months
Sub Total (2.19 to 2.38) 4872 5068.92000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
4875 5071.32900
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 5060 25.30000
3.02 Upper Primary Teachers Teacher 0.00500 1752 8.76000
Sub Total 6812 34.06000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 32 134.40000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 20 39.60000 9 Months
4.02 1 MIS Coordinator RP 0.15500 10 13.95000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 10 13.05000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 10 9.00000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 10 5.00000
4.08 Meeting, TA BRC/ URC 0.30000 10 3.00000
4.09 TLM Grant BRC/ URC 0.10000 10 1.00000
4.10 Maintenance Grant BRC/ URC 0.10000 10 1.00000
Sub Total 10 220.00000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 93 9.30000
5.05 Meeting, TA CRC/UERC 0.12000 93 11.16000
5.06 TLM Grant CRC/UERC 0.03000 93 2.79000
5.07 Maintenance Grant CRC/UERC 0.02000 93 1.86000
Sub Total 93 25.11000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 6812 81.74400
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 6812 68.12000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 10 31.75000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 173 1.03800Actual
Calculated Amt.
Sub Total 6995 182.65200
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 40 12.7200025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 35 12.68750
25
children/centre
Sub Total 75 25.40750
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 19 2.85000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):54-Mau:07-06-11 78/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Mau -54
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 10 1.50000
10 children per
center, '6
MonthsSub Total 29 4.35000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 136891 68.44550
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 53957 86.33120
9.03 Free Brail Books (PS) Set 0.00150 87 0.13050
9.04 Free Brail Books (UPS) Set 0.00250 56 0.14000
Sub Total 190991 155.04720
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.03000 2463 73.89000
Sub Total 2463 73.89000
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 69 138.69000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 138.69000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 320 24.00000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1142 85.65000
Sub Total 1462 109.65000
15 School Grant
15.01 Primary School School 0.05000 1105 55.25000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):54-Mau:07-06-11 79/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Mau -54
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 526 36.82000
Sub Total 1631.00 92.07000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1631 16.31000
Sub Total 1631 16.31000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 82.68500
Actual
Calculated Amt.
(b) EMIS Cell District 1 9.27900Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.75000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 115.00000Actual
Calculated Amt.
Sub Total 207.71400
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 4386 26.31600 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 4386 13.15800 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1794 10.76400 3 days
Sub Total 10566.00 50.23800
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 6476.51770
Management Cost & MIS Cost % 1.4%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.2%
Civil Work 2.1%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):54-Mau:07-06-11 80/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 14 38.64000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 152 58.52000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 146 100.74000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 166 517.92000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1933 744.20500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 222 153.18000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 710 2215.20000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 355 1192.80000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Mathura -53
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):53-Mathura (B):07-06-11 81/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Mathura -53
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 139 108.42000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 114 23.94000 3 Months
(b) Health and Physical Education 0.07000 114 23.94000 3 Months
(c) Work Education 0.07000 114 23.94000 3 Months
Sub Total (2.19 to 2.38) 4179 5201.44500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
4179 5201.44500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 4952 24.76000
3.02 Upper Primary Teachers Teacher 0.00500 1931 9.65500
Sub Total 6883 34.41500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 35 147.00000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 22 43.56000 9 Months
4.02 1 MIS Coordinator RP 0.15500 11 15.34500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 11 14.35500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 11 9.90000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 11 5.50000
4.08 Meeting, TA BRC/ URC 0.30000 11 3.30000
4.09 TLM Grant BRC/ URC 0.10000 11 1.10000
4.10 Maintenance Grant BRC/ URC 0.10000 11 1.10000
Sub Total 11 241.16000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 90 9.00000
5.05 Meeting, TA CRC/UERC 0.12000 90 10.80000
5.06 TLM Grant CRC/UERC 0.03000 90 2.70000
5.07 Maintenance Grant CRC/UERC 0.02000 90 1.80000
Sub Total 90 24.30000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 6883 82.59600
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 6883 68.83000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 11 34.92500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 178 1.06800Actual
Calculated Amt.
Sub Total 7072 187.41900
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 0 0.0000025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 2 0.72500
25
children/centre
Sub Total 2 0.72500
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 39 5.85000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):53-Mathura (B):07-06-11 82/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Mathura -53
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 20 3.00000
10 children per
center, '6
MonthsSub Total 59 8.85000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 127001 63.50050
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 47200 75.52000
9.03 Free Brail Books (PS) Set 0.00150 75 0.11250
9.04 Free Brail Books (UPS) Set 0.00250 15 0.03750
Sub Total 174291 139.17050
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02728 5006 136.56368
Sub Total 5006 136.56368
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 150 301.50000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 301.50000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 705 52.87500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1115 83.62500
Sub Total 1820 136.50000
15 School Grant
15.01 Primary School School 0.05000 1261 63.05000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):53-Mathura (B):07-06-11 83/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Mathura -53
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 679 47.53000
Sub Total 1940.00 110.58000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1940 19.40000
Sub Total 1940 19.40000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 86.34000
Actual
Calculated Amt.
(b) EMIS Cell District 1 11.12790Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.75000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 125.00000Actual
Calculated Amt.
Sub Total 223.21790
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 5460 32.76000 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 5460 16.38000 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1434 8.60400 3 days
Sub Total 12354.00 57.74400
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 6892.99008
Management Cost & MIS Cost % 1.4%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.2%
Civil Work 4.4%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):53-Mathura (B):07-06-11 84/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 13 35.88000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 279 107.41500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 442 304.98000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 292 911.04000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1856 714.56000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 711 490.59000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 654 2040.48000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 20 52.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 337 1132.32000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Mainpuri -52
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):52-Mainpuri:07-06-11 85/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Mainpuri -52
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 7 5.46000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 130 27.30000 3 Months
(b) Health and Physical Education 0.07000 130 27.30000 3 Months
(c) Work Education 0.07000 130 27.30000 3 Months
Sub Total (2.19 to 2.38) 5001 5876.62500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
5001 5876.62500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 4628 23.14000
3.02 Upper Primary Teachers Teacher 0.00500 1486 7.43000
Sub Total 6114 30.57000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 32 134.40000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 20 39.60000 9 Months
4.02 1 MIS Coordinator RP 0.15500 10 13.95000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 10 13.05000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 10 9.00000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 10 5.00000
4.08 Meeting, TA BRC/ URC 0.30000 10 3.00000
4.09 TLM Grant BRC/ URC 0.10000 10 1.00000
4.10 Maintenance Grant BRC/ URC 0.10000 10 1.00000
Sub Total 10 220.00000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 81 8.10000
5.05 Meeting, TA CRC/UERC 0.12000 81 9.72000
5.06 TLM Grant CRC/UERC 0.03000 81 2.43000
5.07 Maintenance Grant CRC/UERC 0.02000 81 1.62000
Sub Total 81 21.87000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 6114 73.36800
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 6114 61.14000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 10 31.75000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 161 0.96600Actual
Calculated Amt.
Sub Total 6285 167.22400
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 8 2.5440025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 3 1.08750
25
children/centre
Sub Total 11 3.63150
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 12 1.80000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):52-Mainpuri:07-06-11 86/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Mainpuri -52
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 6 0.90000
10 children per
center, '6
MonthsSub Total 18 2.70000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 92348 46.17400
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 39126 62.60160
9.03 Free Brail Books (PS) Set 0.00150 62 0.09300
9.04 Free Brail Books (UPS) Set 0.00250 11 0.02750
Sub Total 131547 108.89610
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.03000 3192 95.76000
Sub Total 3192 95.76000
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 190 381.90000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 675 81.00000
12.35a Others (Overhead Tank UPS) School 0.12000 125 15.00000
Sub Total (Civil WOrks) 477.90000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 466 34.95000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1568 117.60000
Sub Total 2034 152.55000
15 School Grant
15.01 Primary School School 0.05000 1496 74.80000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):52-Mainpuri:07-06-11 87/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Mainpuri -52
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 642 44.94000
Sub Total 2138.00 119.74000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2138 21.38000
Sub Total 2138 21.38000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 74.19000
Actual
Calculated Amt.
(b) EMIS Cell District 1 9.81020Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.70000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 140.00000Actual
Calculated Amt.
Sub Total 224.70020
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 6123 36.73800 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 6123 18.36900 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1509 9.05400 3 days
Sub Total 13755.00 64.16100
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 7657.70780
Management Cost & MIS Cost % 1.1%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.9%
Civil Work 6.2%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):52-Mainpuri:07-06-11 88/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 2 5.52000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 62 23.87000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 69 47.61000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 64 199.68000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 866 333.41000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 906 625.14000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 332 1035.84000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 140 364.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 236 792.96000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Mahoba -51
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):51-Mahoba:07-06-11 89/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Mahoba -51
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 203 158.34000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 95 19.95000 3 Months
(b) Health and Physical Education 0.07000 95 19.95000 3 Months
(c) Work Education 0.07000 95 19.95000 3 Months
Sub Total (2.19 to 2.38) 3165 3646.22000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
3165 3646.22000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 1867 9.33500
3.02 Upper Primary Teachers Teacher 0.00500 779 3.89500
Sub Total 2646 13.23000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 17 71.40000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 10 19.80000 9 Months
4.02 1 MIS Coordinator RP 0.15500 5 6.97500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 5 6.52500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 5 4.50000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 5 2.50000
4.08 Meeting, TA BRC/ URC 0.30000 5 1.50000
4.09 TLM Grant BRC/ URC 0.10000 5 0.50000
4.10 Maintenance Grant BRC/ URC 0.10000 5 0.50000
Sub Total 5 114.20000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 40 4.00000
5.05 Meeting, TA CRC/UERC 0.12000 40 4.80000
5.06 TLM Grant CRC/UERC 0.03000 40 1.20000
5.07 Maintenance Grant CRC/UERC 0.02000 40 0.80000
Sub Total 40 10.80000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 2646 31.75200
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 2646 26.46000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 5 15.87500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 80 0.48000Actual
Calculated Amt.
Sub Total 2731 74.56700
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 4 1.2720025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 0 0.00000
25
children/centre
Sub Total 4 1.27200
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 33 4.95000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):51-Mahoba:07-06-11 90/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Mahoba -51
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 17 2.55000
10 children per
center, '6
MonthsSub Total 50 7.50000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 61864 30.93200
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 23357 37.37120
9.03 Free Brail Books (PS) Set 0.00150 29 0.04350
9.04 Free Brail Books (UPS) Set 0.00250 0 0.00000
Sub Total 85250 68.34670
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02196 4385 96.29460
Sub Total 4385 96.29460
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 227 456.27000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 20 2.40000
12.35a Others (Overhead Tank UPS) School 0.12000 31 3.72000
Sub Total (Civil WOrks) 462.39000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 333 24.97500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 673 50.47500
Sub Total 1006 75.45000
15 School Grant
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):51-Mahoba:07-06-11 91/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Mahoba -51
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.01 Primary School School 0.05000 661 33.05000
15.02 Upper Primary School School 0.07000 357 24.99000
Sub Total 1018.00 58.04000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1018 10.18000
Sub Total 1018 10.18000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 75.57500
Actual
Calculated Amt.
(b) EMIS Cell District 1 6.25650Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.45000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 90.00000Actual
Calculated Amt.
Sub Total 172.28150
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 3018 18.10800 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 3018 9.05400 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 741 4.44600 3 days
Sub Total 6777.00 31.60800
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 4912.37980
Management Cost & MIS Cost % 1.7%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.5%
Civil Work 9.4%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):51-Mahoba:07-06-11 92/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 0 0.00000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 220 84.70000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 117 80.73000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 220 686.40000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1680 646.80000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 2864 1976.16000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 427 1332.24000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 591 1536.60000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 355 1192.80000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 154 431.20000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Maharajganj -50
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):50-Maharajganj:07-06-11 93/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Maharajganj -50
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 142 110.76000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 153 32.13000 3 Months
(b) Health and Physical Education 0.07000 153 32.13000 3 Months
(c) Work Education 0.07000 153 32.13000 3 Months
Sub Total (2.19 to 2.38) 7229 8174.78000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
7229 8174.78000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 4651 23.25500
3.02 Upper Primary Teachers Teacher 0.00500 1192 5.96000
Sub Total 5843 29.21500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 41 172.20000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 26 51.48000 9 Months
4.02 1 MIS Coordinator RP 0.15500 13 18.13500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 13 16.96500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 13 11.70000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 13 6.50000
4.08 Meeting, TA BRC/ URC 0.30000 13 3.90000
4.09 TLM Grant BRC/ URC 0.10000 13 1.30000
4.10 Maintenance Grant BRC/ URC 0.10000 13 1.30000
Sub Total 13 283.48000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 103 10.30000
5.05 Meeting, TA CRC/UERC 0.12000 103 12.36000
5.06 TLM Grant CRC/UERC 0.03000 103 3.09000
5.07 Maintenance Grant CRC/UERC 0.02000 103 2.06000
Sub Total 103 27.81000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 5843 70.11600
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 5843 58.43000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 13 41.27500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 207 1.24200Actual
Calculated Amt.
Sub Total 6063 171.06300
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 25 7.9500025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 50 18.12500
25
children/centre
Sub Total 75 26.07500
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 92 13.80000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):50-Maharajganj:07-06-11 94/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Maharajganj -50
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 46 6.90000
10 children per
center, '6
MonthsSub Total 138 20.70000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 158378 79.18900
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 58271 93.23360
9.03 Free Brail Books (PS) Set 0.00150 244 0.36600
9.04 Free Brail Books (UPS) Set 0.00250 65 0.16250
Sub Total 216958 172.95110
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02188 6323 138.34724
Sub Total 6323 138.34724
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 428 860.28000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 860.28000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 610 45.75000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1270 95.25000
Sub Total 1880 141.00000
15 School Grant
15.01 Primary School School 0.05000 1282 64.10000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):50-Maharajganj:07-06-11 95/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Maharajganj -50
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 656 45.92000
Sub Total 1938.00 110.02000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1938 19.38000
Sub Total 1938 19.38000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 111.42800
Actual
Calculated Amt.
(b) EMIS Cell District 1 11.52650Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.90000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 190.00000Actual
Calculated Amt.
Sub Total 313.85450
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 5640 33.84000 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 5640 16.92000 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2331 13.98600 3 days
Sub Total 13611.00 64.74600
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 10623.70184
Management Cost & MIS Cost % 1.2%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.0%
Civil Work 8.1%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):50-Maharajganj:07-06-11 96/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 4 3.12000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 2 1.69800 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 6.00 4.81800
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 6.00 4.81800
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 1389 3833.64000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 262 100.87000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 172 118.68000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 16 36.80000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 265 826.80000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2088 803.88000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1023 705.87000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 564 1759.68000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 6 15.60000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 282 947.52000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Lucknow -49
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):49-Lucknow:07-06-11 97/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Lucknow -49
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 224 174.72000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 180 37.80000 3 Months
(b) Health and Physical Education 0.07000 180 37.80000 3 Months
(c) Work Education 0.07000 180 37.80000 3 Months
Sub Total (2.19 to 2.38) 6831 9437.46000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
6837 9442.27800
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 5405 27.02500
3.02 Upper Primary Teachers Teacher 0.00500 1780 8.90000
Sub Total 7185 35.92500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 50 210.00000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 20 39.60000 9 Months
4.02 1 MIS Coordinator RP 0.15500 10 13.95000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 10 13.05000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 10 9.00000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 10 5.00000
4.08 Meeting, TA BRC/ URC 0.30000 10 3.00000
4.09 TLM Grant BRC/ URC 0.10000 10 1.00000
4.10 Maintenance Grant BRC/ URC 0.10000 10 1.00000
Sub Total 10 295.60000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 117 491.40000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 117 11.70000
5.05 Meeting, TA CRC/UERC 0.12000 117 14.04000
5.06 TLM Grant CRC/UERC 0.03000 117 3.51000
5.07 Maintenance Grant CRC/UERC 0.02000 117 2.34000
Sub Total 117 522.99000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 7185 86.22000
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 7185 71.85000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 10 31.75000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 197 1.18200Actual
Calculated Amt.
Sub Total 7392 191.00200
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 38 12.0840025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 56 20.30000
25
children/centre
Sub Total 94 32.38400
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 200 30.00000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):49-Lucknow:07-06-11 98/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Lucknow -49
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 50 7.50000
10 children per
center, '6
MonthsSub Total 250 37.50000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 133873 66.93650
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 45885 73.41600
9.03 Free Brail Books (PS) Set 0.00150 25 0.03750
9.04 Free Brail Books (UPS) Set 0.00250 0 0.00000
Sub Total 179783 140.39000
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02150 5355 115.13250
Sub Total 5355 115.13250
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 100 201.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 201.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.05000 1126 56.30000
14.01a Maintenance in School having more than 3 Classrooms School 0.10000 731 73.10000
Sub Total 1857 129.40000
15 School Grant
15.01 Primary School School 0.05000 1391 69.55000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):49-Lucknow:07-06-11 99/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Lucknow -49
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 512 35.84000
Sub Total 1903.00 105.39000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1903 19.03000
Sub Total 1903 19.03000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 120.00000
Actual
Calculated Amt.
(b) EMIS Cell District 1 9.14200Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.75000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 216.49075Actual
Calculated Amt.
Sub Total 346.38275
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 5547 33.28200 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 5547 16.64100 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1533 9.19800 3 days
Sub Total 12627.00 59.12100
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 11747.52525
Management Cost & MIS Cost % 1.1%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.9%
Civil Work 1.7%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):49-Lucknow:07-06-11 100/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 6 16.56000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 162 62.37000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 86 59.34000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 168 524.16000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1263 486.25500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1257 867.33000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 366 1141.92000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 212 551.20000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 289 971.04000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Lalitpur -48
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):48-Lalitpur(A):07-06-11 101/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Lalitpur -48
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 385 300.30000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 250 52.50000 3 Months
(b) Health and Physical Education 0.07000 250 52.50000 3 Months
(c) Work Education 0.07000 250 52.50000 3 Months
Sub Total (2.19 to 2.38) 4944 5137.97500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
4944 5137.97500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 2964 14.82000
3.02 Upper Primary Teachers Teacher 0.00500 1099 5.49500
Sub Total 4063 20.31500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 23 96.60000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 14 27.72000 9 Months
4.02 1 MIS Coordinator RP 0.15500 7 9.76500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 7 9.13500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 7 6.30000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 7 3.50000
4.08 Meeting, TA BRC/ URC 0.30000 7 2.10000
4.09 TLM Grant BRC/ URC 0.10000 7 0.70000
4.10 Maintenance Grant BRC/ URC 0.10000 7 0.70000
Sub Total 7 156.52000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 49 4.90000
5.05 Meeting, TA CRC/UERC 0.12000 49 5.88000
5.06 TLM Grant CRC/UERC 0.03000 49 1.47000
5.07 Maintenance Grant CRC/UERC 0.02000 49 0.98000
Sub Total 49 13.23000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 4063 48.75600
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 4063 40.63000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 7 22.22500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 105 0.63000Actual
Calculated Amt.
Sub Total 4175 112.24100
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 0 0.0000025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 0 0.00000
25
children/centre
Sub Total 0 0.00000
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 40 6.00000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):48-Lalitpur(A):07-06-11 102/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Lalitpur -48
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 20 3.00000
10 children per
center, '6
MonthsSub Total 60 9.00000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 88822 44.41100
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 42354 67.76640
9.03 Free Brail Books (PS) Set 0.00150 25 0.03750
9.04 Free Brail Books (UPS) Set 0.00250 15 0.03750
Sub Total 131216 112.25240
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.03000 2482 74.46000
Sub Total 2482 74.46000
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 250 502.50000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 502.50000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 306 22.95000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1089 81.67500
Sub Total 1395 104.62500
15 School Grant
15.01 Primary School School 0.05000 916 45.80000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):48-Lalitpur(A):07-06-11 103/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Lalitpur -48
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 501 35.07000
Sub Total 1417.00 80.87000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1417 14.17000
Sub Total 1417 14.17000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 95.65400
Actual
Calculated Amt.
(b) EMIS Cell District 1 7.90000Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.60000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 120.00000Actual
Calculated Amt.
Sub Total 224.15400
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 4185 25.11000 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 4185 12.55500 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1020 6.12000 3 days
Sub Total 9390.00 43.78500
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 6676.09740
Management Cost & MIS Cost % 1.6%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.4%
Civil Work 7.5%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):48-Lalitpur(A):07-06-11 104/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 37 102.12000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 451 173.63500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 80 55.20000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 488 1522.56000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 3073 1183.10500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 5311 3664.59000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 641 1999.92000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 889 2311.40000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 300 1008.00000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 465 1302.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Lakhimpur -47
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):47-Lakhimpur:07-06-11 105/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Lakhimpur -47
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 645 503.10000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 423 88.83000 3 Months
(b) Health and Physical Education 0.07000 423 88.83000 3 Months
(c) Work Education 0.07000 423 88.83000 3 Months
Sub Total (2.19 to 2.38) 13649 14092.12000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
13649 14092.12000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 7276 36.38000
3.02 Upper Primary Teachers Teacher 0.00500 1522 7.61000
Sub Total 8798 43.99000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 65 273.00000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 32 63.36000 9 Months
4.02 1 MIS Coordinator RP 0.15500 16 22.32000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 16 20.88000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 16 14.40000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 16 8.00000
4.08 Meeting, TA BRC/ URC 0.30000 16 4.80000
4.09 TLM Grant BRC/ URC 0.10000 16 1.60000
4.10 Maintenance Grant BRC/ URC 0.10000 16 1.60000
Sub Total 16 409.96000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 157 15.70000
5.05 Meeting, TA CRC/UERC 0.12000 157 18.84000
5.06 TLM Grant CRC/UERC 0.03000 157 4.71000
5.07 Maintenance Grant CRC/UERC 0.02000 157 3.14000
Sub Total 157 42.39000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 8798 105.57600
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 8798 87.98000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 16 50.80000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 285 1.71000Actual
Calculated Amt.
Sub Total 9099 246.06600
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 67 21.3060025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 50 18.12500
25
children/centre
Sub Total 117 39.43100
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 171 25.65000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):47-Lakhimpur:07-06-11 106/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Lakhimpur -47
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 85 12.75000
10 children per
center, '6
MonthsSub Total 256 38.40000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 272062 136.03100
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 101590 162.54400
9.03 Free Brail Books (PS) Set 0.00150 240 0.36000
9.04 Free Brail Books (UPS) Set 0.00250 0 0.00000
Sub Total 373892 298.93500
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.01489 10261 152.78629
Sub Total 10261 152.78629
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 215 432.15000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 432.15000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 1043 78.22500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 2447 183.52500
Sub Total 3490 261.75000
15 School Grant
15.01 Primary School School 0.05000 2383 119.15000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):47-Lakhimpur:07-06-11 107/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Lakhimpur -47
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 1204 84.28000
Sub Total 3587.00 203.43000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 3587 35.87000
Sub Total 3587 35.87000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 99.40400
Actual
Calculated Amt.
(b) EMIS Cell District 1 15.32000Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.05000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 300.00000Actual
Calculated Amt.
Sub Total 415.77400
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 10530 63.18000 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 10530 31.59000 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2985 17.91000 3 days
Sub Total 24045.00 112.68000
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 16899.73229
Management Cost & MIS Cost % 0.7%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.5%
Civil Work 2.6%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):47-Lakhimpur:07-06-11 108/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 0 0.00000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 373 143.60500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 138 95.22000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 373 1163.76000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2223 855.85500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 3352 2312.88000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 579 1806.48000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 609 1583.40000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 90 302.40000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 504 1411.20000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Kushinagar -46
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):46-Kushinagar (B):07-06-11 109/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Kushinagar -46
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 183 142.74000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 154 32.34000 3 Months
(b) Health and Physical Education 0.07000 154 32.34000 3 Months
(c) Work Education 0.07000 154 32.34000 3 Months
Sub Total (2.19 to 2.38) 8886 9914.56000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
8886 9914.56000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 6195 30.97500
3.02 Upper Primary Teachers Teacher 0.00500 1254 6.27000
Sub Total 7449 37.24500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 42 176.40000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 28 55.44000 9 Months
4.02 1 MIS Coordinator RP 0.15500 14 19.53000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 14 18.27000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 14 12.60000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 14 7.00000
4.08 Meeting, TA BRC/ URC 0.30000 14 4.20000
4.09 TLM Grant BRC/ URC 0.10000 14 1.40000
4.10 Maintenance Grant BRC/ URC 0.10000 14 1.40000
Sub Total 14 296.24000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 142 14.20000
5.05 Meeting, TA CRC/UERC 0.12000 142 17.04000
5.06 TLM Grant CRC/UERC 0.03000 142 4.26000
5.07 Maintenance Grant CRC/UERC 0.02000 142 2.84000
Sub Total 142 38.34000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 7449 89.38800
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 7449 74.49000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 14 44.45000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 254 1.52400Actual
Calculated Amt.
Sub Total 7717 209.85200
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 34 10.8120025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 100 36.25000
25
children/centre
Sub Total 134 47.06200
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 77 11.55000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):46-Kushinagar (B):07-06-11 110/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Kushinagar -46
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 39 5.85000
10 children per
center, '6
MonthsSub Total 116 17.40000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 223116 111.55800
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 54060 86.49600
9.03 Free Brail Books (PS) Set 0.00150 172 0.25800
9.04 Free Brail Books (UPS) Set 0.00250 17 0.04250
Sub Total 277365 198.35450
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.01879 7055 132.56345
Sub Total 7055 132.56345
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 500 1005.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 1005.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 418 31.35000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 2160 162.00000
Sub Total 2578 193.35000
15 School Grant
15.01 Primary School School 0.05000 1807 90.35000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):46-Kushinagar (B):07-06-11 111/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Kushinagar -46
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 861 60.27000
Sub Total 2668.00 150.62000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2668 26.68000
Sub Total 2668 26.68000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 76.92900
Actual
Calculated Amt.
(b) EMIS Cell District 1 14.15910Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.00000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 225.00000Actual
Calculated Amt.
Sub Total 317.08810
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 7734 46.40400 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 7734 23.20200 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2871 17.22600 3 days
Sub Total 18339.00 86.83200
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 12741.18705
Management Cost & MIS Cost % 0.7%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.5%
Civil Work 7.9%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):46-Kushinagar (B):07-06-11 112/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 310 855.60000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 241 92.78500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 44 30.36000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 244 761.28000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 985 379.22500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1392 960.48000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 496 1547.52000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 190 494.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 343 1152.48000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Kaushambi -45
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):45-Kaushambi:07-06-11 113/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Kaushambi -45
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 18 14.04000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 67 14.07000 3 Months
(b) Health and Physical Education 0.07000 67 14.07000 3 Months
(c) Work Education 0.07000 67 14.07000 3 Months
Sub Total (2.19 to 2.38) 4464 6329.98000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
4464 6329.98000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 3216 16.08000
3.02 Upper Primary Teachers Teacher 0.00500 1189 5.94500
Sub Total 4405 22.02500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 24 100.80000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 16 31.68000 9 Months
4.02 1 MIS Coordinator RP 0.15500 8 11.16000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 8 10.44000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 8 7.20000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 8 4.00000
4.08 Meeting, TA BRC/ URC 0.30000 8 2.40000
4.09 TLM Grant BRC/ URC 0.10000 8 0.80000
4.10 Maintenance Grant BRC/ URC 0.10000 8 0.80000
Sub Total 8 169.28000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 85 8.50000
5.05 Meeting, TA CRC/UERC 0.12000 85 10.20000
5.06 TLM Grant CRC/UERC 0.03000 85 2.55000
5.07 Maintenance Grant CRC/UERC 0.02000 85 1.70000
Sub Total 85 22.95000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 4405 52.86000
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 4405 44.05000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 8 25.40000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 149 0.89400Actual
Calculated Amt.
Sub Total 4562 123.20400
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 37 11.7660025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 5 1.81250
25
children/centre
Sub Total 42 13.57850
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 45 6.75000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):45-Kaushambi:07-06-11 114/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Kaushambi -45
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 23 3.45000
10 children per
center, '6
MonthsSub Total 68 10.20000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 120846 60.42300
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 31251 50.00160
9.03 Free Brail Books (PS) Set 0.00150 43 0.06450
9.04 Free Brail Books (UPS) Set 0.00250 8 0.02000
Sub Total 152148 110.50910
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.01989 5609 111.56301
Sub Total 5609 111.56301
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 200 402.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 610 3.05000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 405.05000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 187 14.02500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1166 87.45000
Sub Total 1353 101.47500
15 School Grant
15.01 Primary School School 0.05000 894 44.70000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):45-Kaushambi:07-06-11 115/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Kaushambi -45
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 502 35.14000
Sub Total 1396.00 79.84000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1396 13.96000
Sub Total 1396 13.96000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 76.71400
Actual
Calculated Amt.
(b) EMIS Cell District 1 8.45060Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.65000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 150.00000Actual
Calculated Amt.
Sub Total 235.81460
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 4059 24.35400 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 4059 12.17700 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1320 7.92000 3 days
Sub Total 9438.00 44.45100
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 7863.88021
Management Cost & MIS Cost % 1.1%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.9%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.0%
Civil Work 5.2%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):45-Kaushambi:07-06-11 116/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 12 33.12000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 127 48.89500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 163 112.47000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 139 433.68000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1286 495.11000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1379 951.51000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 322 1004.64000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 100 336.00000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 61 170.80000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
RemarksS. No. Activity
Approved for the year 2011-12
Physical
Unit
Name of District : KanshiramNagar -44
Fresh
(Rs. In Lakhs)
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):44-KanshiramNagar:07-06-11 117/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
RemarksS. No. Activity
Approved for the year 2011-12
Physical
Unit
Name of District : KanshiramNagar -44
Fresh
(Rs. In Lakhs)
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 0 0.00000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 56 11.76000 3 Months
(b) Health and Physical Education 0.07000 56 11.76000 3 Months
(c) Work Education 0.07000 56 11.76000 3 Months
Sub Total (2.19 to 2.38) 3757 3621.50500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
3757 3621.50500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 3232 16.16000
3.02 Upper Primary Teachers Teacher 0.00500 696 3.48000
Sub Total 3928 19.64000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 21 88.20000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 14 27.72000 9 Months
4.02 1 MIS Coordinator RP 0.15500 7 9.76500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 7 9.13500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 7 6.30000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 7 3.50000
4.08 Meeting, TA BRC/ URC 0.30000 7 2.10000
4.09 TLM Grant BRC/ URC 0.10000 7 0.70000
4.10 Maintenance Grant BRC/ URC 0.10000 7 0.70000
Sub Total 7 148.12000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 78 7.80000
5.05 Meeting, TA CRC/UERC 0.12000 78 9.36000
5.06 TLM Grant CRC/UERC 0.03000 78 2.34000
5.07 Maintenance Grant CRC/UERC 0.02000 78 1.56000
Sub Total 78 21.06000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 3928 47.13600
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 3928 39.28000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 7 22.22500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 134 0.80400Actual
Calculated Amt.
Sub Total 4069 109.44500
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 0 0.0000025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 10 3.62500
25
children/centre
Sub Total 10 3.62500
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 61 9.15000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):44-KanshiramNagar:07-06-11 118/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
RemarksS. No. Activity
Approved for the year 2011-12
Physical
Unit
Name of District : KanshiramNagar -44
Fresh
(Rs. In Lakhs)
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 31 4.65000
10 children per
center, '6
MonthsSub Total 92 13.80000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 80305 40.15250
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 24330 38.92800
9.03 Free Brail Books (PS) Set 0.00150 50 0.07500
9.04 Free Brail Books (UPS) Set 0.00250 12 0.03000
Sub Total 104697 79.18550
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.03000 2614 78.42000
Sub Total 2614 78.42000
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 100 201.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 850 102.00000
12.35a Others (Overhead Tank UPS) School 0.12000 411 49.32000
Sub Total (Civil WOrks) 352.32000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 447 33.52500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 893 66.97500
Sub Total 1340 100.50000
15 School Grant
15.01 Primary School School 0.05000 912 45.60000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):44-KanshiramNagar:07-06-11 119/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
RemarksS. No. Activity
Approved for the year 2011-12
Physical
Unit
Name of District : KanshiramNagar -44
Fresh
(Rs. In Lakhs)
15.02 Upper Primary School School 0.07000 462 32.34000
Sub Total 1374.00 77.94000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1374 13.74000
Sub Total 1374 13.74000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 87.03600
Actual
Calculated Amt.
(b) EMIS Cell District 1 11.60720Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.60000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 90.00000Actual
Calculated Amt.
Sub Total 189.24320
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 4020 24.12000 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 4020 12.06000 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2295 13.77000 3 days
Sub Total 10335.00 49.95000
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 4948.49370
Management Cost & MIS Cost % 2.0%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.8%
Civil Work 7.1%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):44-KanshiramNagar:07-06-11 120/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 8 6.24000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 4 3.39600 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 12.00 9.63600
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 12.00 9.63600
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 38 104.88000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 275 105.87500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 312 215.28000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 12 27.60000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 281 876.72000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2343 902.05500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 815 562.35000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 662 2065.44000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 6 15.60000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 331 1112.16000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : KanpurNagar -43
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):43-KanpurNagar:07-06-11 121/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : KanpurNagar -43
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 34 26.52000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 148 31.08000 3 Months
(b) Health and Physical Education 0.07000 148 31.08000 3 Months
(c) Work Education 0.07000 148 31.08000 3 Months
Sub Total (2.19 to 2.38) 5553 6107.72000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
5565 6117.35600
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 6050 30.25000
3.02 Upper Primary Teachers Teacher 0.00500 2181 10.90500
Sub Total 8231 41.15500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 55 231.00000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 22 43.56000 9 Months
4.02 1 MIS Coordinator RP 0.15500 11 15.34500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 11 14.35500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 11 9.90000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 11 5.50000
4.08 Meeting, TA BRC/ URC 0.30000 11 3.30000
4.09 TLM Grant BRC/ URC 0.10000 11 1.10000
4.10 Maintenance Grant BRC/ URC 0.10000 11 1.10000
Sub Total 11 325.16000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 97 407.40000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 97 9.70000
5.05 Meeting, TA CRC/UERC 0.12000 97 11.64000
5.06 TLM Grant CRC/UERC 0.03000 97 2.91000
5.07 Maintenance Grant CRC/UERC 0.02000 97 1.94000
Sub Total 97 433.59000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 8231 98.77200
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 8231 82.31000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 11 34.92500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 185 1.11000Actual
Calculated Amt.
Sub Total 8427 217.11700
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 14 4.4520025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 31 11.23750
25
children/centre
Sub Total 45 15.68950
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 76 11.40000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):43-KanpurNagar:07-06-11 122/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : KanpurNagar -43
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 38 5.70000
10 children per
center, '6
MonthsSub Total 114 17.10000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 112627 56.31350
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 59520 95.23200
9.03 Free Brail Books (PS) Set 0.00150 57 0.08550
9.04 Free Brail Books (UPS) Set 0.00250 27 0.06750
Sub Total 172231 151.69850
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02375 5508 130.81500
Sub Total 5508 130.81500
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 35 70.35000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 70.35000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 954 71.55000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1294 97.05000
Sub Total 2248 168.60000
15 School Grant
15.01 Primary School School 0.05000 1641 82.05000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):43-KanpurNagar:07-06-11 123/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : KanpurNagar -43
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 811 56.77000
Sub Total 2452.00 138.82000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2452 24.52000
Sub Total 2452 24.52000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 75.46000
Actual
Calculated Amt.
(b) EMIS Cell District 1 11.16700Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.80000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 150.00000Actual
Calculated Amt.
Sub Total 237.42700
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 6744 40.46400 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 6744 20.23200 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1671 10.02600 3 days
Sub Total 15159.00 70.72200
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 8230.12000
Management Cost & MIS Cost % 1.1%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.9%
Civil Work 0.9%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):43-KanpurNagar:07-06-11 124/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 0 0.00000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 339 130.51500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 296 204.24000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 339 1057.68000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1705 656.42500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 622 429.18000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 475 1482.00000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 407 1058.20000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 441 1481.76000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : (KanpurDehat) Ramabai Nagar -
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):42-KanpurDehat(RamabaiNagar):07-06-11 125/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : (KanpurDehat) Ramabai Nagar -
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 27 21.06000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 139 29.19000 3 Months
(b) Health and Physical Education 0.07000 139 29.19000 3 Months
(c) Work Education 0.07000 139 29.19000 3 Months
Sub Total (2.19 to 2.38) 5068 6608.63000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
5068 6608.63000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 4791 23.95500
3.02 Upper Primary Teachers Teacher 0.00500 1489 7.44500
Sub Total 6280 31.40000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 30 126.00000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 20 39.60000 9 Months
4.02 1 MIS Coordinator RP 0.15500 10 13.95000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 10 13.05000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 10 9.00000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 10 5.00000
4.08 Meeting, TA BRC/ URC 0.30000 10 3.00000
4.09 TLM Grant BRC/ URC 0.10000 10 1.00000
4.10 Maintenance Grant BRC/ URC 0.10000 10 1.00000
Sub Total 10 211.60000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 110 11.00000
5.05 Meeting, TA CRC/UERC 0.12000 110 13.20000
5.06 TLM Grant CRC/UERC 0.03000 110 3.30000
5.07 Maintenance Grant CRC/UERC 0.02000 110 2.20000
Sub Total 110 29.70000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 6280 75.36000
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 6280 62.80000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 10 31.75000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 190 1.14000Actual
Calculated Amt.
Sub Total 6480 171.05000
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 19 6.0420025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 6 2.17500
25
children/centre
Sub Total 25 8.21700
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 10 1.50000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):42-KanpurDehat(RamabaiNagar):07-06-11 126/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : (KanpurDehat) Ramabai Nagar -
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 5 0.75000
10 children per
center, '6
MonthsSub Total 15 2.25000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 86498 43.24900
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 40963 65.54080
9.03 Free Brail Books (PS) Set 0.00150 42 0.06300
9.04 Free Brail Books (UPS) Set 0.00250 18 0.04500
Sub Total 127521 108.89780
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02581 4883 126.03023
Sub Total 4883 126.03023
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 100 201.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 201.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 926 69.45000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1284 96.30000
Sub Total 2210 165.75000
15 School Grant
15.01 Primary School School 0.05000 1565 78.25000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):42-KanpurDehat(RamabaiNagar):07-06-11 127/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : (KanpurDehat) Ramabai Nagar -
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 775 54.25000
Sub Total 2340.00 132.50000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2340 23.40000
Sub Total 2340 23.40000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 74.19000
Actual
Calculated Amt.
(b) EMIS Cell District 1 9.97340Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.80000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 150.00000Actual
Calculated Amt.
Sub Total 234.96340
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 6690 40.14000 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 6690 20.07000 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1839 11.03400 3 days
Sub Total 15219.00 71.24400
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 8196.63243
Management Cost & MIS Cost % 1.0%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.9%
Civil Work 2.5%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):42-KanpurDehat(RamabaiNagar):07-06-11 128/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 10 27.60000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 217 83.54500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 184 126.96000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 227 708.24000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1460 562.10000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 934 644.46000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 634 1978.08000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 317 1065.12000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Kannauj -41
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):41-Kannauj:07-06-11 129/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Kannauj -41
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 286 223.08000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 159 33.39000 3 Months
(b) Health and Physical Education 0.07000 159 33.39000 3 Months
(c) Work Education 0.07000 159 33.39000 3 Months
Sub Total (2.19 to 2.38) 4746 5519.35500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
4746 5519.35500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 3516 17.58000
3.02 Upper Primary Teachers Teacher 0.00500 1418 7.09000
Sub Total 4934 24.67000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 31 130.20000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 18 35.64000 9 Months
4.02 1 MIS Coordinator RP 0.15500 9 12.55500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 9 11.74500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 9 8.10000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 9 4.50000
4.08 Meeting, TA BRC/ URC 0.30000 9 2.70000
4.09 TLM Grant BRC/ URC 0.10000 9 0.90000
4.10 Maintenance Grant BRC/ URC 0.10000 9 0.90000
Sub Total 9 207.24000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 82 8.20000
5.05 Meeting, TA CRC/UERC 0.12000 82 9.84000
5.06 TLM Grant CRC/UERC 0.03000 82 2.46000
5.07 Maintenance Grant CRC/UERC 0.02000 82 1.64000
Sub Total 82 22.14000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 4934 59.20800
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 4934 49.34000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 9 28.57500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 154 0.92400Actual
Calculated Amt.
Sub Total 5097 138.04700
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 18 5.7240025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 7 2.53750
25
children/centre
Sub Total 25 8.26150
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 16 2.40000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):41-Kannauj:07-06-11 130/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Kannauj -41
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 8 1.20000
10 children per
center, '6
MonthsSub Total 24 3.60000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 88089 44.04450
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 34876 55.80160
9.03 Free Brail Books (PS) Set 0.00150 58 0.08700
9.04 Free Brail Books (UPS) Set 0.00250 17 0.04250
Sub Total 123040 99.97560
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02969 3541 105.13229
Sub Total 3541 105.13229
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 100 201.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 201.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 343 25.72500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1127 84.52500
Sub Total 1470 110.25000
15 School Grant
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):41-Kannauj:07-06-11 131/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Kannauj -41
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.01 Primary School School 0.05000 1053 52.65000
15.02 Upper Primary School School 0.07000 525 36.75000
Sub Total 1578.00 89.40000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1578 15.78000
Sub Total 1578 15.78000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 77.82000
Actual
Calculated Amt.
(b) EMIS Cell District 1 8.85410Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.70000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 125.00000Actual
Calculated Amt.
Sub Total 212.37410
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 4467 26.80200 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 4467 13.40100 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1323 7.93800 3 days
Sub Total 10257.00 48.14100
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 6875.36649
Management Cost & MIS Cost % 1.3%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.1%
Civil Work 2.9%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):41-Kannauj:07-06-11 132/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 0 0.00000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 194 74.69000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 22 15.18000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 194 605.28000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1539 592.51500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 928 640.32000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 516 1609.92000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 212 551.20000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 147 493.92000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 217 607.60000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District :JPNagar -40
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):40-JPNagar:07-06-11 133/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District :JPNagar -40
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 433 337.74000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 138 28.98000 3 Months
(b) Health and Physical Education 0.07000 138 28.98000 3 Months
(c) Work Education 0.07000 138 28.98000 3 Months
Sub Total (2.19 to 2.38) 4816 5615.30500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
4816 5615.30500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 3840 19.20000
3.02 Upper Primary Teachers Teacher 0.00500 1018 5.09000
Sub Total 4858 24.29000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 23 96.60000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 14 27.72000 9 Months
4.02 1 MIS Coordinator RP 0.15500 7 9.76500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 7 9.13500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 7 6.30000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 7 3.50000
4.08 Meeting, TA BRC/ URC 0.30000 7 2.10000
4.09 TLM Grant BRC/ URC 0.10000 7 0.70000
4.10 Maintenance Grant BRC/ URC 0.10000 7 0.70000
Sub Total 7 156.52000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 49 4.90000
5.05 Meeting, TA CRC/UERC 0.12000 49 5.88000
5.06 TLM Grant CRC/UERC 0.03000 49 1.47000
5.07 Maintenance Grant CRC/UERC 0.02000 49 0.98000
Sub Total 49 13.23000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 4858 58.29600
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 4858 48.58000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 7 22.22500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 105 0.63000Actual
Calculated Amt.
Sub Total 4970 129.73100
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 4 1.2720025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 0 0.00000
25
children/centre
Sub Total 4 1.27200
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 150 22.50000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):40-JPNagar:07-06-11 134/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District :JPNagar -40
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 75 11.25000
10 children per
center, '6
MonthsSub Total 225 33.75000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 74415 37.20750
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 21244 33.99040
9.03 Free Brail Books (PS) Set 0.00150 70 0.10500
9.04 Free Brail Books (UPS) Set 0.00250 6 0.01500
Sub Total 95735 71.31790
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02705 4494 121.56270
Sub Total 4494 121.56270
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 150 301.50000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 301.50000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 194 14.55000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1289 96.67500
Sub Total 1483 111.22500
15 School Grant
15.01 Primary School School 0.05000 1052 52.60000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):40-JPNagar:07-06-11 135/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District :JPNagar -40
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 526 36.82000
Sub Total 1578.00 89.42000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1578 15.78000
Sub Total 1578 15.78000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 75.42000
Actual
Calculated Amt.
(b) EMIS Cell District 1 7.76060Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.65000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 131.90925Actual
Calculated Amt.
Sub Total 215.73985
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 4545 27.27000 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 4545 13.63500 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1407 8.44200 3 days
Sub Total 10497.00 49.34700
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 7023.99045
Management Cost & MIS Cost % 1.2%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.9%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.1%
Civil Work 4.3%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):40-JPNagar:07-06-11 136/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 2 5.52000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 154 59.29000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 111 76.59000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 4 9.20000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 156 486.72000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1674 644.49000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 796 549.24000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 600 1872.00000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 42 109.20000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 318 1068.48000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Jhansi - 39
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):39-Jhansi:07-06-11 137/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Jhansi - 39
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 452 352.56000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 236 49.56000 3 Months
(b) Health and Physical Education 0.07000 236 49.56000 3 Months
(c) Work Education 0.07000 236 49.56000 3 Months
Sub Total (2.19 to 2.38) 5017 5381.97000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
5017 5381.97000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 3902 19.51000
3.02 Upper Primary Teachers Teacher 0.00500 1452 7.26000
Sub Total 5354 26.77000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 29 121.80000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 18 35.64000 9 Months
4.02 1 MIS Coordinator RP 0.15500 9 12.55500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 9 11.74500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 9 8.10000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 9 4.50000
4.08 Meeting, TA BRC/ URC 0.30000 9 2.70000
4.09 TLM Grant BRC/ URC 0.10000 9 0.90000
4.10 Maintenance Grant BRC/ URC 0.10000 9 0.90000
Sub Total 9 198.84000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 66 6.60000
5.05 Meeting, TA CRC/UERC 0.12000 66 7.92000
5.06 TLM Grant CRC/UERC 0.03000 66 1.98000
5.07 Maintenance Grant CRC/UERC 0.02000 66 1.32000
Sub Total 66 17.82000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 5354 64.24800
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 5354 53.54000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 9 28.57500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 138 0.82800Actual
Calculated Amt.
Sub Total 5501 147.19100
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 43 13.6740025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 74 26.82500
25
children/centre
Sub Total 117 40.49900
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 14 2.10000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):39-Jhansi:07-06-11 138/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Jhansi - 39
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 7 1.05000
10 children per
center, '6
MonthsSub Total 21 3.15000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 94553 47.27650
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 46682 74.69120
9.03 Free Brail Books (PS) Set 0.00150 58 0.08700
9.04 Free Brail Books (UPS) Set 0.00250 31 0.07750
Sub Total 141324 122.13220
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02929 2296 67.24984
Sub Total 2296 67.24984
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 161 323.61000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 323.61000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 730 54.75000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 962 72.15000
Sub Total 1692 126.90000
15 School Grant
15.01 Primary School School 0.05000 1161 58.05000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):39-Jhansi:07-06-11 139/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Jhansi - 39
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 602 42.14000
Sub Total 1763.00 100.19000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1763 17.63000
Sub Total 1763 17.63000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 86.84000
Actual
Calculated Amt.
(b) EMIS Cell District 1 9.49000Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.65000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 125.00000Actual
Calculated Amt.
Sub Total 221.98000
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 5076 30.45600 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 5076 15.22800 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1311 7.86600 3 days
Sub Total 11463.00 53.55000
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 6919.48204
Management Cost & MIS Cost % 1.4%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.2%
Civil Work 4.7%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):39-Jhansi:07-06-11 140/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 8 22.08000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 211 81.23500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 386 266.34000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 219 683.28000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 3534 1360.59000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 4119 2842.11000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 1094 3413.28000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 547 1837.92000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Jaunpur -38
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):38-Jaunpur(B):07-06-11 141/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Jaunpur -38
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 622 485.16000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 338 70.98000 3 Months
(b) Health and Physical Education 0.07000 338 70.98000 3 Months
(c) Work Education 0.07000 338 70.98000 3 Months
Sub Total (2.19 to 2.38) 11754 11204.93500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
11754 11204.93500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 8548 42.74000
3.02 Upper Primary Teachers Teacher 0.00500 3032 15.16000
Sub Total 11580 57.90000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 68 285.60000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 44 87.12000 9 Months
4.02 1 MIS Coordinator RP 0.15500 22 30.69000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 22 28.71000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 22 19.80000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 22 11.00000
4.08 Meeting, TA BRC/ URC 0.30000 22 6.60000
4.09 TLM Grant BRC/ URC 0.10000 22 2.20000
4.10 Maintenance Grant BRC/ URC 0.10000 22 2.20000
Sub Total 22 473.92000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 219 21.90000
5.05 Meeting, TA CRC/UERC 0.12000 219 26.28000
5.06 TLM Grant CRC/UERC 0.03000 219 6.57000
5.07 Maintenance Grant CRC/UERC 0.02000 219 4.38000
Sub Total 219 59.13000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 11580 138.96000
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 11580 115.80000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 22 69.85000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 294 1.76400Actual
Calculated Amt.
Sub Total 11896 326.37400
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 49 15.5820025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 0 0.00000
25
children/centre
Sub Total 49 15.58200
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 26 3.90000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):38-Jaunpur(B):07-06-11 142/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Jaunpur -38
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 13 1.95000
10 children per
center, '6
MonthsSub Total 39 5.85000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 305458 152.72900
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 65207 104.33120
9.03 Free Brail Books (PS) Set 0.00150 230 0.34500
9.04 Free Brail Books (UPS) Set 0.00250 35 0.08750
Sub Total 370930 257.49270
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02275 8104 184.36600
Sub Total 8104 184.36600
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 400 804.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 804.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 1254 94.05000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1812 135.90000
Sub Total 3066 229.95000
15 School Grant
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):38-Jaunpur(B):07-06-11 143/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Jaunpur -38
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.01 Primary School School 0.05000 2246 112.30000
15.02 Upper Primary School School 0.07000 1117 78.19000
Sub Total 3363.00 190.49000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 3363 33.63000
Sub Total 3363 33.63000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 74.19000
Actual
Calculated Amt.
(b) EMIS Cell District 1 19.26000Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.35000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 250.00000Actual
Calculated Amt.
Sub Total 344.80000
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 9303 55.81800 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 9303 27.90900 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 4551 27.30600 3 days
Sub Total 23157.00 111.03300
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 14369.45270
Management Cost & MIS Cost % 0.7%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.7%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.4%
Civil Work 5.6%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):38-Jaunpur(B):07-06-11 144/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 0 0.00000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 90 34.65000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 161 111.09000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 90 280.80000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 860 331.10000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 610 420.90000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 692 2159.04000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 346 1162.56000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Jalaun -37
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):37-Jalaun:07-06-11 145/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Jalaun -37
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 194 151.32000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 113 23.73000 3 Months
(b) Health and Physical Education 0.07000 113 23.73000 3 Months
(c) Work Education 0.07000 113 23.73000 3 Months
Sub Total (2.19 to 2.38) 3382 4722.65000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
3382 4722.65000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 2975 14.87500
3.02 Upper Primary Teachers Teacher 0.00500 1635 8.17500
Sub Total 4610 23.05000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 32 134.40000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 20 39.60000 9 Months
4.02 1 MIS Coordinator RP 0.15500 10 13.95000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 10 13.05000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 10 9.00000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 10 5.00000
4.08 Meeting, TA BRC/ URC 0.30000 10 3.00000
4.09 TLM Grant BRC/ URC 0.10000 10 1.00000
4.10 Maintenance Grant BRC/ URC 0.10000 10 1.00000
Sub Total 10 220.00000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 82 8.20000
5.05 Meeting, TA CRC/UERC 0.12000 82 9.84000
5.06 TLM Grant CRC/UERC 0.03000 82 2.46000
5.07 Maintenance Grant CRC/UERC 0.02000 82 1.64000
Sub Total 82 22.14000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 4610 55.32000
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 4610 46.10000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 10 31.75000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 162 0.97200Actual
Calculated Amt.
Sub Total 4782 134.14200
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 16 5.0880025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 5 1.81250
25
children/centre
Sub Total 21 6.90050
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 11 1.65000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):37-Jalaun:07-06-11 146/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Jalaun -37
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 6 0.90000
10 children per
center, '6
MonthsSub Total 17 2.55000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 80333 40.16650
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 39445 63.11200
9.03 Free Brail Books (PS) Set 0.00150 24 0.03600
9.04 Free Brail Books (UPS) Set 0.00250 14 0.03500
Sub Total 119816 103.34950
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.03000 1407 42.21000
Sub Total 1407 42.21000
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 409 822.09000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 822.09000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 805 60.37500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 989 74.17500
Sub Total 1794 134.55000
15 School Grant
15.01 Primary School School 0.05000 1262 63.10000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):37-Jalaun:07-06-11 147/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Jalaun -37
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 666 46.62000
Sub Total 1928.00 109.72000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1928 19.28000
Sub Total 1928 19.28000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 76.32600
Actual
Calculated Amt.
(b) EMIS Cell District 1 9.58940Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.70000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 125.00000Actual
Calculated Amt.
Sub Total 211.61540
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 5382 32.29200 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 5382 16.14600 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1692 10.15200 3 days
Sub Total 12456.00 58.59000
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 6702.83740
Management Cost & MIS Cost % 1.3%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.9%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.2%
Civil Work 12.3%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):37-Jalaun:07-06-11 148/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 49 135.24000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 213 82.00500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 201 138.69000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 229 714.48000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1239 477.01500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 808 557.52000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 576 1797.12000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 2 5.20000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 289 971.04000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Hathrus -36
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):36-Hathrus:07-06-11 149/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Hathrus -36
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 128 99.84000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 148 31.08000 3 Months
(b) Health and Physical Education 0.07000 148 31.08000 3 Months
(c) Work Education 0.07000 148 31.08000 3 Months
Sub Total (2.19 to 2.38) 4178 5071.39000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
4178 5071.39000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 2919 14.59500
3.02 Upper Primary Teachers Teacher 0.00500 1574 7.87000
Sub Total 4493 22.46500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 30 126.00000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 16 31.68000 9 Months
4.02 1 MIS Coordinator RP 0.15500 8 11.16000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 8 10.44000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 8 7.20000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 8 4.00000
4.08 Meeting, TA BRC/ URC 0.30000 8 2.40000
4.09 TLM Grant BRC/ URC 0.10000 8 0.80000
4.10 Maintenance Grant BRC/ URC 0.10000 8 0.80000
Sub Total 8 194.48000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 15 63.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 65 6.50000
5.05 Meeting, TA CRC/UERC 0.12000 65 7.80000
5.06 TLM Grant CRC/UERC 0.03000 65 1.95000
5.07 Maintenance Grant CRC/UERC 0.02000 65 1.30000
Sub Total 65 80.55000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 4493 53.91600
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 4493 44.93000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 8 25.40000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 129 0.77400Actual
Calculated Amt.
Sub Total 4630 125.02000
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 0 0.0000025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 0 0.00000
25
children/centre
Sub Total 0 0.00000
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 67 10.05000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):36-Hathrus:07-06-11 150/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Hathrus -36
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 34 5.10000
10 children per
center, '6
MonthsSub Total 101 15.15000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 89114 44.55700
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 29804 47.68640
9.03 Free Brail Books (PS) Set 0.00150 62 0.09300
9.04 Free Brail Books (UPS) Set 0.00250 11 0.02750
Sub Total 118991 92.36390
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.03000 2926 87.78000
Sub Total 2926 87.78000
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 212 426.12000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 46 5.52000
12.35a Others (Overhead Tank UPS) School 0.12000 58 6.96000
Sub Total (Civil WOrks) 438.60000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 489 36.67500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 912 68.40000
Sub Total 1401 105.07500
15 School Grant
15.01 Primary School School 0.05000 964 48.20000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):36-Hathrus:07-06-11 151/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Hathrus -36
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 516 36.12000
Sub Total 1480.00 84.32000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1480 14.80000
Sub Total 1480 14.80000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 76.71400
Actual
Calculated Amt.
(b) EMIS Cell District 1 8.32820Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.65000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 125.00000Actual
Calculated Amt.
Sub Total 210.69220
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 4206 25.23600 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 4206 12.61800 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1290 7.74000 3 days
Sub Total 9702.00 45.59400
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 6658.28010
Management Cost & MIS Cost % 1.3%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.9%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.2%
Civil Work 6.6%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):36-Hathrus:07-06-11 152/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 47 129.72000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 288 110.88000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 265 182.85000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 335 1045.20000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 4018 1546.93000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 4200 2898.00000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 982 3063.84000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 60 156.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 521 1750.56000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Hardoi -35
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):35-Hardoi(A):07-06-11 153/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Hardoi -35
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 338 263.64000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 460 96.60000 3 Months
(b) Health and Physical Education 0.07000 460 96.60000 3 Months
(c) Work Education 0.07000 460 96.60000 3 Months
Sub Total (2.19 to 2.38) 12434 11437.42000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
12434 11437.42000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 8447 42.23500
3.02 Upper Primary Teachers Teacher 0.00500 2422 12.11000
Sub Total 10869 54.34500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 62 260.40000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 40 79.20000 9 Months
4.02 1 MIS Coordinator RP 0.15500 20 27.90000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 20 26.10000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 20 18.00000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 20 10.00000
4.08 Meeting, TA BRC/ URC 0.30000 20 6.00000
4.09 TLM Grant BRC/ URC 0.10000 20 2.00000
4.10 Maintenance Grant BRC/ URC 0.10000 20 2.00000
Sub Total 20 431.60000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 192 19.20000
5.05 Meeting, TA CRC/UERC 0.12000 192 23.04000
5.06 TLM Grant CRC/UERC 0.03000 192 5.76000
5.07 Maintenance Grant CRC/UERC 0.02000 192 3.84000
Sub Total 192 51.84000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 10869 130.42800
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 10869 108.69000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 20 63.50000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 352 2.11200Actual
Calculated Amt.
Sub Total 11241 304.73000
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 21 6.6780025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 14 5.07500
25
children/centre
Sub Total 35 11.75300
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 43 6.45000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):35-Hardoi(A):07-06-11 154/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Hardoi -35
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 22 3.30000
10 children per
center, '6
MonthsSub Total 65 9.75000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 299215 149.60750
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 116633 186.61280
9.03 Free Brail Books (PS) Set 0.00150 125 0.18750
9.04 Free Brail Books (UPS) Set 0.00250 45 0.11250
Sub Total 416018 336.52030
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02101 5395 113.34895
Sub Total 5395 113.34895
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 685 1376.85000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 1376.85000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 344 25.80000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 3199 239.92500
Sub Total 3543 265.72500
15 School Grant
15.01 Primary School School 0.05000 2560 128.00000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):35-Hardoi(A):07-06-11 155/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Hardoi -35
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 1122 78.54000
Sub Total 3682.00 206.54000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 3682 36.82000
Sub Total 3682 36.82000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 84.64000
Actual
Calculated Amt.
(b) EMIS Cell District 1 17.14750Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.20000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 275.00000Actual
Calculated Amt.
Sub Total 377.98750
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 10629 63.77400 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 10629 31.88700 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 3303 19.81800 3 days
Sub Total 24561.00 115.47900
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 15200.70875
Management Cost & MIS Cost % 0.7%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.5%
Civil Work 9.1%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):35-Hardoi(A):07-06-11 156/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 1 2.76000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 76 29.26000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 245 169.05000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 77 240.24000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 964 371.14000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 520 358.80000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 392 1223.04000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 196 658.56000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Hamirpur -34
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):34-Hamirpur:07-06-11 157/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Hamirpur -34
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 104 81.12000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 144 30.24000 3 Months
(b) Health and Physical Education 0.07000 144 30.24000 3 Months
(c) Work Education 0.07000 144 30.24000 3 Months
Sub Total (2.19 to 2.38) 3007 3224.69000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
3007 3224.69000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 2755 13.77500
3.02 Upper Primary Teachers Teacher 0.00500 928 4.64000
Sub Total 3683 18.41500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 21 88.20000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 14 27.72000 9 Months
4.02 1 MIS Coordinator RP 0.15500 7 9.76500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 7 9.13500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 7 6.30000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 7 3.50000
4.08 Meeting, TA BRC/ URC 0.30000 7 2.10000
4.09 TLM Grant BRC/ URC 0.10000 7 0.70000
4.10 Maintenance Grant BRC/ URC 0.10000 7 0.70000
Sub Total 7 148.12000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 60 6.00000
5.05 Meeting, TA CRC/UERC 0.12000 60 7.20000
5.06 TLM Grant CRC/UERC 0.03000 60 1.80000
5.07 Maintenance Grant CRC/UERC 0.02000 60 1.20000
Sub Total 60 16.20000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 3683 44.19600
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 3683 36.83000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 7 22.22500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 115 0.69000Actual
Calculated Amt.
Sub Total 3805 103.94100
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 6 1.9080025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 13 4.71250
25
children/centre
Sub Total 19 6.62050
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 31 4.65000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):34-Hamirpur:07-06-11 158/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Hamirpur -34
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 15 2.25000
10 children per
center, '6
MonthsSub Total 46 6.90000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 60731 30.36550
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 29064 46.50240
9.03 Free Brail Books (PS) Set 0.00150 10 0.01500
9.04 Free Brail Books (UPS) Set 0.00250 0 0.00000
Sub Total 89805 76.88290
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02996 1674 50.15304
Sub Total 1674 50.15304
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 100 201.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 201.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 231 17.32500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 928 69.60000
Sub Total 1159 86.92500
15 School Grant
15.01 Primary School School 0.05000 800 40.00000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):34-Hamirpur:07-06-11 159/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Hamirpur -34
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 427 29.89000
Sub Total 1227.00 69.89000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1227 12.27000
Sub Total 1227 12.27000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 81.52600
Actual
Calculated Amt.
(b) EMIS Cell District 1 8.44630Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.60000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 75.00000Actual
Calculated Amt.
Sub Total 165.57230
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 3477 20.86200 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 3477 10.43100 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 942 5.65200 3 days
Sub Total 7896.00 36.94500
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 4294.52474
Management Cost & MIS Cost % 2.1%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.7%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.9%
Civil Work 4.7%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):34-Hamirpur:07-06-11 160/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 325 897.00000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 217 83.54500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 177 122.13000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 4 9.20000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 224 698.88000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1892 728.42000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 786 542.34000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 1036 3232.32000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 8 20.80000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 519 1743.84000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Gorakhpur -33
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):33-Gorakhpur(B):07-06-11 161/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Gorakhpur -33
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 124 96.72000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 238 49.98000 3 Months
(b) Health and Physical Education 0.07000 238 49.98000 3 Months
(c) Work Education 0.07000 238 49.98000 3 Months
Sub Total (2.19 to 2.38) 6026 8325.13500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
6026 8325.13500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 7454 37.27000
3.02 Upper Primary Teachers Teacher 0.00500 3102 15.51000
Sub Total 10556 52.78000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 62 260.40000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 40 79.20000 9 Months
4.02 1 MIS Coordinator RP 0.15500 20 27.90000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 20 26.10000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 20 18.00000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 20 10.00000
4.08 Meeting, TA BRC/ URC 0.30000 20 6.00000
4.09 TLM Grant BRC/ URC 0.10000 20 2.00000
4.10 Maintenance Grant BRC/ URC 0.10000 20 2.00000
Sub Total 20 431.60000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 192 19.20000
5.05 Meeting, TA CRC/UERC 0.12000 192 23.04000
5.06 TLM Grant CRC/UERC 0.03000 192 5.76000
5.07 Maintenance Grant CRC/UERC 0.02000 192 3.84000
Sub Total 192 51.84000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 10556 126.67200
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 10556 105.56000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 20 63.50000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 343 2.05800Actual
Calculated Amt.
Sub Total 10919 297.79000
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 40 12.7200025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 98 35.52500
25
children/centre
Sub Total 138 48.24500
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 71 10.65000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):33-Gorakhpur(B):07-06-11 162/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Gorakhpur -33
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 36 5.40000
10 children per
center, '6
MonthsSub Total 107 16.05000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 235612 117.80600
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 84632 135.41120
9.03 Free Brail Books (PS) Set 0.00150 245 0.36750
9.04 Free Brail Books (UPS) Set 0.00250 65 0.16250
Sub Total 320554 253.74720
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02151 7701 165.64851
Sub Total 7701 165.64851
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 670 1346.70000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 1346.70000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 163 12.22500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 2700 202.50000
Sub Total 2863 214.72500
15 School Grant
15.01 Primary School School 0.05000 2048 102.40000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):33-Gorakhpur(B):07-06-11 163/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Gorakhpur -33
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 915 64.05000
Sub Total 2963.00 166.45000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2963 29.63000
Sub Total 2963 29.63000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 87.10000
Actual
Calculated Amt.
(b) EMIS Cell District 1 17.03280Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.20000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 225.00000Actual
Calculated Amt.
Sub Total 330.33280
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 8589 51.53400 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 8589 25.76700 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 3699 22.19400 3 days
Sub Total 20877.00 99.49500
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 11900.16851
Management Cost & MIS Cost % 0.9%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.9%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.8%
Civil Work 11.3%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):33-Gorakhpur(B):07-06-11 164/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 2 1.56000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 1 0.84900 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 3.00 2.40900
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 3.00 2.40900
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 35 96.60000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 260 100.10000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 174 120.06000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 6 13.80000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 295 920.40000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2917 1123.04500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 3593 2479.17000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 440 1372.80000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 886 2303.60000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 553 1858.08000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 107 299.60000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Gonda -32
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):32-Gonda:07-06-11 165/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Gonda -32
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 260 202.80000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 201 42.21000 3 Months
(b) Health and Physical Education 0.07000 201 42.21000 3 Months
(c) Work Education 0.07000 201 42.21000 3 Months
Sub Total (2.19 to 2.38) 10129 11016.68500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
10132 11019.09400
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 5732 28.66000
3.02 Upper Primary Teachers Teacher 0.00500 1532 7.66000
Sub Total 7264 36.32000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 53 222.60000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 34 67.32000 9 Months
4.02 1 MIS Coordinator RP 0.15500 17 23.71500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 17 22.18500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 17 15.30000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 17 8.50000
4.08 Meeting, TA BRC/ URC 0.30000 17 5.10000
4.09 TLM Grant BRC/ URC 0.10000 17 1.70000
4.10 Maintenance Grant BRC/ URC 0.10000 17 1.70000
Sub Total 17 368.12000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 167 16.70000
5.05 Meeting, TA CRC/UERC 0.12000 167 20.04000
5.06 TLM Grant CRC/UERC 0.03000 167 5.01000
5.07 Maintenance Grant CRC/UERC 0.02000 167 3.34000
Sub Total 167 45.09000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 7264 87.16800
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 7264 72.64000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 17 53.97500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 303 1.81800Actual
Calculated Amt.
Sub Total 7584 215.60100
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 7 2.2260025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 115 41.68750
25
children/centre
Sub Total 122 43.91350
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 90 13.50000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):32-Gonda:07-06-11 166/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Gonda -32
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 45 6.75000
10 children per
center, '6
MonthsSub Total 135 20.25000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 194022 97.01100
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 57412 91.85920
9.03 Free Brail Books (PS) Set 0.00150 110 0.16500
9.04 Free Brail Books (UPS) Set 0.00250 17 0.04250
Sub Total 251561 189.07770
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.01867 7603 141.94801
Sub Total 7603 141.94801
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 431 866.31000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 150 18.00000
12.35a Others (Overhead Tank UPS) School 0.12000 110 13.20000
Sub Total (Civil WOrks) 897.51000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 101 7.57500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 2651 198.82500
Sub Total 2752 206.40000
15 School Grant
15.01 Primary School School 0.05000 1932 96.60000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):32-Gonda:07-06-11 167/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Gonda -32
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 956 66.92000
Sub Total 2888.00 163.52000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2888 28.88000
Sub Total 2888 28.88000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 89.90000
Actual
Calculated Amt.
(b) EMIS Cell District 1 15.65720Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.10000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 225.00000Actual
Calculated Amt.
Sub Total 331.65720
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 8226 49.35600 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 8226 24.67800 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 3162 18.97200 3 days
Sub Total 19614.00 93.00600
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 13870.38741
Management Cost & MIS Cost % 0.8%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.6%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.4%
Civil Work 6.5%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):32-Gonda:07-06-11 168/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 12 33.12000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 259 99.71500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 278 191.82000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 271 845.52000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2742 1055.67000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 2139 1475.91000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 855 2667.60000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 303 787.80000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 579 1945.44000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Ghazipur -31
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):31-Ghazipur:07-06-11 169/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Ghazipur -31
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 123 95.94000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 193 40.53000 3 Months
(b) Health and Physical Education 0.07000 193 40.53000 3 Months
(c) Work Education 0.07000 193 40.53000 3 Months
Sub Total (2.19 to 2.38) 8140 9320.12500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
8140 9320.12500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 6338 31.69000
3.02 Upper Primary Teachers Teacher 0.00500 2440 12.20000
Sub Total 8778 43.89000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 53 222.60000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 34 67.32000 9 Months
4.02 1 MIS Coordinator RP 0.15500 17 23.71500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 17 22.18500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 17 15.30000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 17 8.50000
4.08 Meeting, TA BRC/ URC 0.30000 17 5.10000
4.09 TLM Grant BRC/ URC 0.10000 17 1.70000
4.10 Maintenance Grant BRC/ URC 0.10000 17 1.70000
Sub Total 17 368.12000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 194 19.40000
5.05 Meeting, TA CRC/UERC 0.12000 194 23.28000
5.06 TLM Grant CRC/UERC 0.03000 194 5.82000
5.07 Maintenance Grant CRC/UERC 0.02000 194 3.88000
Sub Total 194 52.38000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 8778 105.33600
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 8778 87.78000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 17 53.97500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 330 1.98000Actual
Calculated Amt.
Sub Total 9125 249.07100
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 120 38.1600025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 4 1.45000
25
children/centre
Sub Total 124 39.61000
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 43 6.45000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):31-Ghazipur:07-06-11 170/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Ghazipur -31
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 22 3.30000
10 children per
center, '6
MonthsSub Total 65 9.75000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 209607 104.80350
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 80809 129.29440
9.03 Free Brail Books (PS) Set 0.00150 225 0.33750
9.04 Free Brail Books (UPS) Set 0.00250 35 0.08750
Sub Total 290676 234.52290
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.01673 10288 172.11824
Sub Total 10288 172.11824
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 0 0.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 0.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 505 37.87500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1951 146.32500
Sub Total 2456 184.20000
15 School Grant
15.01 Primary School School 0.05000 1788 89.40000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):31-Ghazipur:07-06-11 171/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Ghazipur -31
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 868 60.76000
Sub Total 2656.00 150.16000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2656 26.56000
Sub Total 2656 26.56000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 74.19000
Actual
Calculated Amt.
(b) EMIS Cell District 1 14.83270Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.05000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 200.00000Actual
Calculated Amt.
Sub Total 290.07270
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 7467 44.80200 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 7467 22.40100 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 3150 18.90000 3 days
Sub Total 18084.00 86.10300
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 11296.68284
Management Cost & MIS Cost % 0.8%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.6%
Civil Work 0.0%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):31-Ghazipur:07-06-11 172/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle (a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of
children exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13Head Teacher for primary (if the number of children
exceeds 150 in a school)0.00000 6 Months
2.14 Subject specific New Additional Teachers-UPS (Regular) Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of
children exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 0 0.00000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 41 15.78500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 123 84.87000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 41 127.92000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1234 475.09000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 583 402.27000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 288 898.56000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of
children exceeds 100)-ExistingTeacher 0.28000 144 483.84000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 68 53.04000 3 Months
2.36 Others 0.00000
Physical
Unit
Fresh
Name of District : Ghaziabad -30
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):30-Ghaziabad:07-06-11 173/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Ghaziabad -30
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 86 18.06000 3 Months
(b) Health and Physical Education 0.07000 86 18.06000 3 Months
(c) Work Education 0.07000 86 18.06000 3 Months
Sub Total (2.19 to 2.38) 2780 2595.55500TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
2780 2595.55500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 3369 16.84500
3.02 Upper Primary Teachers Teacher 0.00500 1157 5.78500
Sub Total 4526 22.63000
4Academic Support through Block Resource Centre/
URC4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months(a) 6 Resource Persons at BRC for subject specific
trainingRP 0.35000 29 121.80000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 18 35.64000 9 Months
4.02 1 MIS Coordinator RP 0.15500 9 12.55500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 9 11.74500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 9 8.10000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 9 4.50000
4.08 Meeting, TA BRC/ URC 0.30000 9 2.70000
4.09 TLM Grant BRC/ URC 0.10000 9 0.90000
4.10 Maintenance Grant BRC/ URC 0.10000 9 0.90000
Sub Total 9 198.84000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 75 7.50000
5.05 Meeting, TA CRC/UERC 0.12000 75 9.00000
5.06 TLM Grant CRC/UERC 0.03000 75 2.25000
5.07Maintenance Grant
CRC/UERC 0.02000 75 1.50000
Sub Total 75 20.25000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 4526 54.31200
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 4526 45.26000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30
days (Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per
year for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 9 28.57500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 145 0.87000Actual
Calculated Amt.
Sub Total 4680 129.01700
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000(a) AIE Center (@Rs.1370/- per child for 9 months)-
Urban SlumsCentre 0.00000
25
children/centre(b) AIE Center (@Rs.1130/- per child for 6 months)-
BricksCentre 0.00000
25
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 34 10.8120025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 25 9.06250
25
children/centreSub Total 59 19.87450
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):30-Ghaziabad:07-06-11 174/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Ghaziabad -30
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(i)Special Training (by Special Instructors-NRBC)-6 months
(1-5) Centre 0.15000 76 11.40000
10 children per
center, '6
Months(ii) Special Training (by Special Instructors-NRBC)-6 months
(6-8) 0.15000 38 5.70000
10 children per
center, '6
MonthsSub Total 114 17.10000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 80658 40.32900
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 39387 63.01920
9.03 Free Brail Books (PS) Set 0.00150 100 0.15000
9.04 Free Brail Books (UPS) Set 0.00250 30 0.07500
Sub Total 120175 103.57320
10 2 set of Uniforms to children studying in Govt
schools10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02563 4887 125.25381
Sub Total 4887 125.25381
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 245 492.45000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28Residential Schools for specific category of
childrenBuilding 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 200 1.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 493.45000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 241 18.07500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 977 73.27500
Sub Total 1218 91.35000
15 School Grant
15.01 Primary School School 0.05000 830 41.50000
15.02 Upper Primary School School 0.07000 429 30.03000
Sub Total 1259.00 71.53000
For All Girls,
SC, ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):30-Ghaziabad:07-06-11 175/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Ghaziabad -30
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1259 12.59000
Sub Total 1259 12.59000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 84.79000
Actual
Calculated Amt.
(b) EMIS Cell District 1 8.53450Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.70000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to
2%)District 1 75.00000
Actual
Calculated Amt.
Sub Total 169.02450
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities) (a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 3654 21.92400 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 3654 10.96200 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1212 7.27200 3 days
Sub Total 8520.00 40.15800
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21Residential Schools for specific category of
childrenNon-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 4184.19601
Management Cost & MIS Cost % 2.2%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %4.0%
Civil Work 11.8%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):30-Ghaziabad:07-06-11 176/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 0 0.00000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 73 28.10500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 92 63.48000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 83 258.96000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 667 256.79500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 193 133.17000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 143 446.16000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 133 345.80000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 126 423.36000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 12 33.60000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : G.B.Nagar -29
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):29-GBNagar:07-06-11 177/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : G.B.Nagar -29
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 0 0.00000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 28 5.88000 3 Months
(b) Health and Physical Education 0.07000 28 5.88000 3 Months
(c) Work Education 0.07000 28 5.88000 3 Months
Sub Total (2.19 to 2.38) 1606 2007.07000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
1606 2007.07000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 1802 9.01000
3.02 Upper Primary Teachers Teacher 0.00500 510 2.55000
Sub Total 2312 11.56000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 12 50.40000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 8 15.84000 9 Months
4.02 1 MIS Coordinator RP 0.15500 4 5.58000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 4 5.22000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 4 3.60000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 4 2.00000
4.08 Meeting, TA BRC/ URC 0.30000 4 1.20000
4.09 TLM Grant BRC/ URC 0.10000 4 0.40000
4.10 Maintenance Grant BRC/ URC 0.10000 4 0.40000
Sub Total 4 84.64000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 37 3.70000
5.05 Meeting, TA CRC/UERC 0.12000 37 4.44000
5.06 TLM Grant CRC/UERC 0.03000 37 1.11000
5.07 Maintenance Grant CRC/UERC 0.02000 37 0.74000
Sub Total 37 9.99000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 2312 27.74400
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 2312 23.12000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 4 12.70000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 69 0.41400Actual
Calculated Amt.
Sub Total 2385 63.97800
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 0 0.0000025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 0 0.00000
25
children/centre
Sub Total 0 0.00000
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 49 7.35000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):29-GBNagar:07-06-11 178/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : G.B.Nagar -29
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 25 3.75000
10 children per
center, '6
MonthsSub Total 74 11.10000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 47171 23.58550
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 13599 21.75840
9.03 Free Brail Books (PS) Set 0.00150 15 0.02250
9.04 Free Brail Books (UPS) Set 0.00250 15 0.03750
Sub Total 60800 45.40390
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02966 2090 61.98940
Sub Total 2090 61.98940
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 50 100.50000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 100.50000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.05000 423 21.15000
14.01a Maintenance in School having more than 3 Classrooms School 0.10000 248 24.80000
Sub Total 671 45.95000
15 School Grant
15.01 Primary School School 0.05000 468 23.40000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):29-GBNagar:07-06-11 179/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : G.B.Nagar -29
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 265 18.55000
Sub Total 733.00 41.95000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 733 7.33000
Sub Total 733 7.33000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 74.98800
Actual
Calculated Amt.
(b) EMIS Cell District 1 8.33000Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.45000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 50.00000Actual
Calculated Amt.
Sub Total 133.76800
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 2013 12.07800 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 2013 6.03900 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 834 5.00400 3 days
Sub Total 4860.00 23.12100
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 2718.35030
Management Cost & MIS Cost % 3.1%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %4.9%
Civil Work 3.7%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):29-GBNagar:07-06-11 180/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 6 4.68000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 3 2.54700 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 9.00 7.22700
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 9.00 7.22700
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 26 71.76000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 339 130.51500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 358 247.02000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 6 13.80000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 365 1138.80000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1824 702.24000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1047 722.43000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 732 2283.84000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 110 286.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 300 1008.00000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 121 338.80000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Firozabad -28
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):28-Firozabad(B):07-06-11 181/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Firozabad -28
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 218 170.04000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 131 27.51000 3 Months
(b) Health and Physical Education 0.07000 131 27.51000 3 Months
(c) Work Education 0.07000 131 27.51000 3 Months
Sub Total (2.19 to 2.38) 5839 7195.77500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
5848 7203.00200
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 4052 20.26000
3.02 Upper Primary Teachers Teacher 0.00500 1486 7.43000
Sub Total 5538 27.69000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 32 134.40000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 20 39.60000 9 Months
4.02 1 MIS Coordinator RP 0.15500 10 13.95000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 10 13.05000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 10 9.00000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 10 5.00000
4.08 Meeting, TA BRC/ URC 0.30000 10 3.00000
4.09 TLM Grant BRC/ URC 0.10000 10 1.00000
4.10 Maintenance Grant BRC/ URC 0.10000 10 1.00000
Sub Total 10 220.00000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 81 8.10000
5.05 Meeting, TA CRC/UERC 0.12000 81 9.72000
5.06 TLM Grant CRC/UERC 0.03000 81 2.43000
5.07 Maintenance Grant CRC/UERC 0.02000 81 1.62000
Sub Total 81 21.87000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 5538 66.45600
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 5538 55.38000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 10 31.75000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 161 0.96600Actual
Calculated Amt.
Sub Total 5709 154.55200
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 11 3.4980025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 2 0.72500
25
children/centre
Sub Total 13 4.22300
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 22 3.30000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):28-Firozabad(B):07-06-11 182/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Firozabad -28
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 11 1.65000
10 children per
center, '6
MonthsSub Total 33 4.95000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 100706 50.35300
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 40213 64.34080
9.03 Free Brail Books (PS) Set 0.00150 40 0.06000
9.04 Free Brail Books (UPS) Set 0.00250 5 0.01250
Sub Total 140964 114.76630
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02600 4956 128.85600
Sub Total 4956 128.85600
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 50 100.50000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 100.50000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 308 23.10000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1699 127.42500
Sub Total 2007 150.52500
15 School Grant
15.01 Primary School School 0.05000 1383 69.15000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):28-Firozabad(B):07-06-11 183/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Firozabad -28
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 664 46.48000
Sub Total 2047.00 115.63000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2047 20.47000
Sub Total 2047 20.47000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 75.56000
Actual
Calculated Amt.
(b) EMIS Cell District 1 10.22000Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.80000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 160.00000Actual
Calculated Amt.
Sub Total 246.58000
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 6021 36.12600 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 6021 18.06300 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1530 9.18000 3 days
Sub Total 13572.00 63.36900
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 8646.98330
Management Cost & MIS Cost % 1.0%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.9%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.9%
Civil Work 1.2%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):28-Firozabad(B):07-06-11 184/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 16 44.16000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 211 81.23500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 137 94.53000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 227 708.24000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2768 1065.68000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 620 427.80000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 1042 3251.04000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 521 1750.56000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Fatehpur -27
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):27-Fatehpur:07-06-11 185/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Fatehpur -27
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 131 102.18000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 145 30.45000 3 Months
(b) Health and Physical Education 0.07000 145 30.45000 3 Months
(c) Work Education 0.07000 145 30.45000 3 Months
Sub Total (2.19 to 2.38) 6108 7616.77500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
6108 7616.77500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 6294 31.47000
3.02 Upper Primary Teachers Teacher 0.00500 2393 11.96500
Sub Total 8687 43.43500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 44 184.80000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 28 55.44000 9 Months
4.02 1 MIS Coordinator RP 0.15500 14 19.53000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 14 18.27000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 14 12.60000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 14 7.00000
4.08 Meeting, TA BRC/ URC 0.30000 14 4.20000
4.09 TLM Grant BRC/ URC 0.10000 14 1.40000
4.10 Maintenance Grant BRC/ URC 0.10000 14 1.40000
Sub Total 14 304.64000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 133 13.30000
5.05 Meeting, TA CRC/UERC 0.12000 133 15.96000
5.06 TLM Grant CRC/UERC 0.03000 133 3.99000
5.07 Maintenance Grant CRC/UERC 0.02000 133 2.66000
Sub Total 133 35.91000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 8687 104.24400
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 8687 86.87000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 14 44.45000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 245 1.47000Actual
Calculated Amt.
Sub Total 8946 237.03400
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 49 15.5820025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 15 5.43750
25
children/centre
Sub Total 64 21.01950
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 68 10.20000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):27-Fatehpur:07-06-11 186/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Fatehpur -27
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 34 5.10000
10 children per
center, '6
MonthsSub Total 102 15.30000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 145081 72.54050
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 50028 80.04480
9.03 Free Brail Books (PS) Set 0.00150 53 0.07950
9.04 Free Brail Books (UPS) Set 0.00250 36 0.09000
Sub Total 195198 152.75480
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02069 5867 121.38823
Sub Total 5867 121.38823
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 661 1328.61000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 1328.61000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 125 9.37500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 2256 169.20000
Sub Total 2381 178.57500
15 School Grant
15.01 Primary School School 0.05000 1714 85.70000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):27-Fatehpur:07-06-11 187/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Fatehpur -27
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 863 60.41000
Sub Total 2577.00 146.11000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2577 25.77000
Sub Total 2577 25.77000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 86.52300
Actual
Calculated Amt.
(b) EMIS Cell District 1 13.69600Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.95000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 190.00000Actual
Calculated Amt.
Sub Total 291.16900
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 7212 43.27200 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 7212 21.63600 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2367 14.20200 3 days
Sub Total 16791.00 79.11000
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 10667.60053
Management Cost & MIS Cost % 0.9%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.7%
Civil Work 12.5%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):27-Fatehpur:07-06-11 188/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 3 8.28000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 231 88.93500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 265 182.85000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 234 730.08000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1641 631.78500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 895 617.55000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 810 2527.20000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 405 1360.80000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Farrukhabad -26
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):26-Farrukhabad:07-06-11 189/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Farrukhabad -26
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 3 2.34000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 131 27.51000 3 Months
(b) Health and Physical Education 0.07000 131 27.51000 3 Months
(c) Work Education 0.07000 131 27.51000 3 Months
Sub Total (2.19 to 2.38) 4880 6232.35000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
4880 6232.35000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 4186 20.93000
3.02 Upper Primary Teachers Teacher 0.00500 1846 9.23000
Sub Total 6032 30.16000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 26 109.20000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 16 31.68000 9 Months
4.02 1 MIS Coordinator RP 0.15500 8 11.16000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 8 10.44000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 8 7.20000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 8 4.00000
4.08 Meeting, TA BRC/ URC 0.30000 8 2.40000
4.09 TLM Grant BRC/ URC 0.10000 8 0.80000
4.10 Maintenance Grant BRC/ URC 0.10000 8 0.80000
Sub Total 8 177.68000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 88 8.80000
5.05 Meeting, TA CRC/UERC 0.12000 88 10.56000
5.06 TLM Grant CRC/UERC 0.03000 88 2.64000
5.07 Maintenance Grant CRC/UERC 0.02000 88 1.76000
Sub Total 88 23.76000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 6032 72.38400
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 6032 60.32000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 8 25.40000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 152 0.91200Actual
Calculated Amt.
Sub Total 6192 159.01600
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 11 3.4980025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 25 9.06250
25
children/centre
Sub Total 36 12.56050
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 13 1.95000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):26-Farrukhabad:07-06-11 190/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Farrukhabad -26
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 7 1.05000
10 children per
center, '6
MonthsSub Total 20 3.00000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 107979 53.98950
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 44746 71.59360
9.03 Free Brail Books (PS) Set 0.00150 66 0.09900
9.04 Free Brail Books (UPS) Set 0.00250 30 0.07500
Sub Total 152821 125.75710
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02480 5091 126.25680
Sub Total 5091 126.25680
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 200 402.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 402.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.05000 1160 58.00000
14.01a Maintenance in School having more than 3 Classrooms School 0.10000 557 55.70000
Sub Total 1717 113.70000
15 School Grant
15.01 Primary School School 0.05000 1172 58.60000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):26-Farrukhabad:07-06-11 191/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Farrukhabad -26
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 683 47.81000
Sub Total 1855.00 106.41000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1855 18.55000
Sub Total 1855 18.55000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 75.69000
Actual
Calculated Amt.
(b) EMIS Cell District 1 8.45140Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.70000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 150.00000Actual
Calculated Amt.
Sub Total 234.84140
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 5151 30.90600 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 5151 15.45300 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1536 9.21600 3 days
Sub Total 11838.00 55.57500
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 7891.61680
Management Cost & MIS Cost % 1.1%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.9%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.0%
Civil Work 5.1%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):26-Farrukhabad:07-06-11 192/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 10 27.60000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 234 90.09000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 199 137.31000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 4 9.20000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 244 761.28000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1568 603.68000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 711 490.59000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 360 1123.20000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 408 1060.80000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 381 1280.16000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Faizabad -25
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):25-Faizabad:07-06-11 193/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Faizabad -25
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 152 118.56000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 181 38.01000 3 Months
(b) Health and Physical Education 0.07000 181 38.01000 3 Months
(c) Work Education 0.07000 181 38.01000 3 Months
Sub Total (2.19 to 2.38) 4814 5816.50000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
4814 5816.50000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 5101 25.50500
3.02 Upper Primary Teachers Teacher 0.00500 1407 7.03500
Sub Total 6508 32.54000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 38 159.60000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 24 47.52000 9 Months
4.02 1 MIS Coordinator RP 0.15500 12 16.74000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 12 15.66000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 12 10.80000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 12 6.00000
4.08 Meeting, TA BRC/ URC 0.30000 12 3.60000
4.09 TLM Grant BRC/ URC 0.10000 12 1.20000
4.10 Maintenance Grant BRC/ URC 0.10000 12 1.20000
Sub Total 12 262.32000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 131 13.10000
5.05 Meeting, TA CRC/UERC 0.12000 131 15.72000
5.06 TLM Grant CRC/UERC 0.03000 131 3.93000
5.07 Maintenance Grant CRC/UERC 0.02000 131 2.62000
Sub Total 131 35.37000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 6508 78.09600
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 6508 65.08000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 12 38.10000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 227 1.36200Actual
Calculated Amt.
Sub Total 6747 182.63800
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 28 8.9040025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 30 10.87500
25
children/centre
Sub Total 58 19.77900
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 46 6.90000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):25-Faizabad:07-06-11 194/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Faizabad -25
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 23 3.45000
10 children per
center, '6
MonthsSub Total 69 10.35000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 127956 63.97800
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 54908 87.85280
9.03 Free Brail Books (PS) Set 0.00150 69 0.10350
9.04 Free Brail Books (UPS) Set 0.00250 23 0.05750
Sub Total 182956 151.99180
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02474 5009 123.92266
Sub Total 5009 123.92266
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 0 0.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 0.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 634 47.55000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1288 96.60000
Sub Total 1922 144.15000
15 School Grant
15.01 Primary School School 0.05000 1361 68.05000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):25-Faizabad:07-06-11 195/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Faizabad -25
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 666 46.62000
Sub Total 2027.00 114.67000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2027 20.27000
Sub Total 2027 20.27000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 76.16900
Actual
Calculated Amt.
(b) EMIS Cell District 1 12.13840Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.85000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 130.00000Actual
Calculated Amt.
Sub Total 219.15740
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 5766 34.59600 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 5766 17.29800 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1776 10.65600 3 days
Sub Total 13308.00 62.55000
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 7266.20886
Management Cost & MIS Cost % 1.2%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.0%
Civil Work 0.0%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):25-Faizabad:07-06-11 196/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 290 800.40000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 245 94.32500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 175 120.75000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 247 770.64000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1128 434.28000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 526 1641.12000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 263 883.68000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Etawah -24
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):24-Etawah:07-06-11 197/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Etawah -24
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 0 0.00000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 80 16.80000 3 Months
(b) Health and Physical Education 0.07000 80 16.80000 3 Months
(c) Work Education 0.07000 80 16.80000 3 Months
Sub Total (2.19 to 2.38) 3114 4795.59500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
3114 4795.59500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 4129 20.64500
3.02 Upper Primary Teachers Teacher 0.00500 1791 8.95500
Sub Total 5920 29.60000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 29 121.80000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 18 35.64000 9 Months
4.02 1 MIS Coordinator RP 0.15500 9 12.55500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 9 11.74500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 9 8.10000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 9 4.50000
4.08 Meeting, TA BRC/ URC 0.30000 9 2.70000
4.09 TLM Grant BRC/ URC 0.10000 9 0.90000
4.10 Maintenance Grant BRC/ URC 0.10000 9 0.90000
Sub Total 9 198.84000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 76 7.60000
5.05 Meeting, TA CRC/UERC 0.12000 76 9.12000
5.06 TLM Grant CRC/UERC 0.03000 76 2.28000
5.07 Maintenance Grant CRC/UERC 0.02000 76 1.52000
Sub Total 76 20.52000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 5920 71.04000
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 5920 59.20000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 9 28.57500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 148 0.88800Actual
Calculated Amt.
Sub Total 6077 159.70300
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 9 2.8620025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 1 0.36250
25
children/centre
Sub Total 10 3.22450
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 12 1.80000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):24-Etawah:07-06-11 198/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Etawah -24
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 6 0.90000
10 children per
center, '6
MonthsSub Total 18 2.70000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 64869 32.43450
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 39419 63.07040
9.03 Free Brail Books (PS) Set 0.00150 60 0.09000
9.04 Free Brail Books (UPS) Set 0.00250 30 0.07500
Sub Total 104378 95.66990
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02268 5045 114.42060
Sub Total 5045 114.42060
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 178 357.78000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 357 42.84000
12.35a Others (Overhead Tank UPS) School 0.12000 248 29.76000
Sub Total (Civil WOrks) 430.38000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 489 36.67500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1235 92.62500
Sub Total 1724 129.30000
15 School Grant
15.01 Primary School School 0.05000 1198 59.90000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):24-Etawah:07-06-11 199/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Etawah -24
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 647 45.29000
Sub Total 1845.00 105.19000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1845 18.45000
Sub Total 1845 18.45000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 77.07000
Actual
Calculated Amt.
(b) EMIS Cell District 1 10.03000Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.70000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 120.75100Actual
Calculated Amt.
Sub Total 208.55100
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 5172 31.03200 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 5172 15.51600 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1263 7.57800 3 days
Sub Total 11607.00 54.12600
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 6436.27000
Management Cost & MIS Cost % 1.4%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.9%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.2%
Civil Work 6.7%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):24-Etawah:07-06-11 200/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 4 3.12000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 2 1.69800 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 6.00 4.81800
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 6.00 4.81800
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 18 49.68000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 158 60.83000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 192 132.48000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 4 9.20000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 176 549.12000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1476 568.26000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 583 402.27000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 426 1329.12000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 180 604.80000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 33 92.40000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Etah -23
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):23-Etah:07-06-11 201/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Etah -23
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 0 0.00000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 80 16.80000 3 Months
(b) Health and Physical Education 0.07000 80 16.80000 3 Months
(c) Work Education 0.07000 80 16.80000 3 Months
Sub Total (2.19 to 2.38) 3486 3848.56000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
3492 3853.37800
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 4034 20.17000
3.02 Upper Primary Teachers Teacher 0.00500 1524 7.62000
Sub Total 5558 27.79000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 29 121.80000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 18 35.64000 9 Months
4.02 1 MIS Coordinator RP 0.15500 9 12.55500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 9 11.74500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 9 8.10000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 9 4.50000
4.08 Meeting, TA BRC/ URC 0.30000 9 2.70000
4.09 TLM Grant BRC/ URC 0.10000 9 0.90000
4.10 Maintenance Grant BRC/ URC 0.10000 9 0.90000
Sub Total 9 198.84000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 71 7.10000
5.05 Meeting, TA CRC/UERC 0.12000 71 8.52000
5.06 TLM Grant CRC/UERC 0.03000 71 2.13000
5.07 Maintenance Grant CRC/UERC 0.02000 71 1.42000
Sub Total 71 19.17000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 5558 66.69600
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 5558 55.58000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 9 28.57500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 143 0.85800Actual
Calculated Amt.
Sub Total 5710 151.70900
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 0 0.0000025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 0 0.00000
25
children/centre
Sub Total 0 0.00000
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 31 4.65000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):23-Etah:07-06-11 202/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Etah -23
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 16 2.40000
10 children per
center, '6
MonthsSub Total 47 7.05000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 90347 45.17350
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 33111 52.97760
9.03 Free Brail Books (PS) Set 0.00150 80 0.12000
9.04 Free Brail Books (UPS) Set 0.00250 30 0.07500
Sub Total 123568 98.34610
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02954 3551 104.89654
Sub Total 3551 104.89654
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 100 201.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 201.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.05000 996 49.80000
14.01a Maintenance in School having more than 3 Classrooms School 0.10000 752 75.20000
Sub Total 1748 125.00000
15 School Grant
15.01 Primary School School 0.05000 1195 59.75000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):23-Etah:07-06-11 203/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Etah -23
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 596 41.72000
Sub Total 1791.00 101.47000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1791 17.91000
Sub Total 1791 17.91000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 87.03600
Actual
Calculated Amt.
(b) EMIS Cell District 1 9.55200Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.70000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 90.00000Actual
Calculated Amt.
Sub Total 187.28800
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 5244 31.46400 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 5244 15.73200 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2550 15.30000 3 days
Sub Total 13038.00 62.49600
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 5226.34364
Management Cost & MIS Cost % 1.8%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.7%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.6%
Civil Work 3.8%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):23-Etah:07-06-11 204/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 11 30.36000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 175 67.37500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 239 164.91000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 186 580.32000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2875 1106.87500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1220 841.80000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 946 2951.52000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 473 1589.28000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Deoria -22
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):22-Deoria:07-06-11 205/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Deoria -22
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 0 0.00000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 183 38.43000 3 Months
(b) Health and Physical Education 0.07000 183 38.43000 3 Months
(c) Work Education 0.07000 183 38.43000 3 Months
Sub Total (2.19 to 2.38) 6674 7447.73000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
6674 7447.73000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 6258 31.29000
3.02 Upper Primary Teachers Teacher 0.00500 2575 12.87500
Sub Total 8833 44.16500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 53 222.60000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 34 67.32000 9 Months
4.02 1 MIS Coordinator RP 0.15500 17 23.71500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 17 22.18500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 17 15.30000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 17 8.50000
4.08 Meeting, TA BRC/ URC 0.30000 17 5.10000
4.09 TLM Grant BRC/ URC 0.10000 17 1.70000
4.10 Maintenance Grant BRC/ URC 0.10000 17 1.70000
Sub Total 17 368.12000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 177 17.70000
5.05 Meeting, TA CRC/UERC 0.12000 177 21.24000
5.06 TLM Grant CRC/UERC 0.03000 177 5.31000
5.07 Maintenance Grant CRC/UERC 0.02000 177 3.54000
Sub Total 177 47.79000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 8833 105.99600
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 8833 88.33000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 17 53.97500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 313 1.87800Actual
Calculated Amt.
Sub Total 9163 250.17900
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 100 31.8000025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 8 2.90000
25
children/centre
Sub Total 108 34.70000
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 36 5.40000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):22-Deoria:07-06-11 206/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Deoria -22
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 18 2.70000
10 children per
center, '6
MonthsSub Total 54 8.10000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 198134 99.06700
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 78516 125.62560
9.03 Free Brail Books (PS) Set 0.00150 125 0.18750
9.04 Free Brail Books (UPS) Set 0.00250 45 0.11250
Sub Total 276820 224.99260
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02213 7141 158.03033
Sub Total 7141 158.03033
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 0 0.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 157 18.84000
12.35a Others (Overhead Tank UPS) School 0.12000 100 12.00000
Sub Total (Civil WOrks) 30.84000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.05000 1652 82.60000
14.01a Maintenance in School having more than 3 Classrooms School 0.10000 715 71.50000
Sub Total 2367 154.10000
15 School Grant
15.01 Primary School School 0.05000 1719 85.95000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):22-Deoria:07-06-11 207/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Deoria -22
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 898 62.86000
Sub Total 2617.00 148.81000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2617 26.17000
Sub Total 2617 26.17000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 87.34000
Actual
Calculated Amt.
(b) EMIS Cell District 1 14.39750Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.10000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 175.00000Actual
Calculated Amt.
Sub Total 277.83750
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 7101 42.60600 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 7101 21.30300 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 3078 18.46800 3 days
Sub Total 17280.00 82.37700
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 9373.94143
Management Cost & MIS Cost % 1.1%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.9%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.0%
Civil Work 0.3%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):22-Deoria:07-06-11 208/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 330 910.80000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 212 81.62000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 67 46.23000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 4 9.20000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 214 667.68000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1102 424.27000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 632 436.08000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 414 1291.68000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 74 192.40000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 241 809.76000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Chitrakoot -21
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):21-Chitrakoot:07-06-11 209/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Chitrakoot -21
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 182 141.96000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 139 29.19000 3 Months
(b) Health and Physical Education 0.07000 139 29.19000 3 Months
(c) Work Education 0.07000 139 29.19000 3 Months
Sub Total (2.19 to 2.38) 3889 5099.25000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
3889 5099.25000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 3065 15.32500
3.02 Upper Primary Teachers Teacher 0.00500 887 4.43500
Sub Total 3952 19.76000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 15 63.00000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 10 19.80000 9 Months
4.02 1 MIS Coordinator RP 0.15500 5 6.97500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 5 6.52500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 5 4.50000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 5 2.50000
4.08 Meeting, TA BRC/ URC 0.30000 5 1.50000
4.09 TLM Grant BRC/ URC 0.10000 5 0.50000
4.10 Maintenance Grant BRC/ URC 0.10000 5 0.50000
Sub Total 5 105.80000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 49 4.90000
5.05 Meeting, TA CRC/UERC 0.12000 49 5.88000
5.06 TLM Grant CRC/UERC 0.03000 49 1.47000
5.07 Maintenance Grant CRC/UERC 0.02000 49 0.98000
Sub Total 49 13.23000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 3952 47.42400
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 3952 39.52000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 5 15.87500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 89 0.53400Actual
Calculated Amt.
Sub Total 4046 103.35300
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 0 0.0000025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 0 0.00000
25
children/centre
Sub Total 0 0.00000
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 19 2.85000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):21-Chitrakoot:07-06-11 210/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Chitrakoot -21
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 10 1.50000
10 children per
center, '6
MonthsSub Total 29 4.35000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 76867 38.43350
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 31440 50.30400
9.03 Free Brail Books (PS) Set 0.00150 70 0.10500
9.04 Free Brail Books (UPS) Set 0.00250 14 0.03500
Sub Total 108391 88.87750
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02970 3025 89.84250
Sub Total 3025 89.84250
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 195 391.95000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 519 62.28000
12.35a Others (Overhead Tank UPS) School 0.12000 147 17.64000
Sub Total (Civil WOrks) 471.87000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 507 38.02500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 805 60.37500
Sub Total 1312 98.40000
15 School Grant
15.01 Primary School School 0.05000 883 44.15000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):21-Chitrakoot:07-06-11 211/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Chitrakoot -21
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 458 32.06000
Sub Total 1341.00 76.21000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1341 13.41000
Sub Total 1341 13.41000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 74.19000
Actual
Calculated Amt.
(b) EMIS Cell District 1 6.63990Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.55000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 125.00000Actual
Calculated Amt.
Sub Total 206.37990
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 3936 23.61600 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 3936 11.80800 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 993 5.95800 3 days
Sub Total 8865.00 41.38200
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 6502.11490
Management Cost & MIS Cost % 1.2%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.9%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.2%
Civil Work 7.3%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):21-Chitrakoot:07-06-11 212/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 31 85.56000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 101 38.88500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 165 113.85000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 132 411.84000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1674 644.49000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 533 1662.96000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 165 429.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 349 1172.64000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Approved for the year 2011-12
Fresh
Name of District :Chhatrapati Sahuji Maharaj
S. No. Activity
(Rs. In Lakhs)
RemarksPhysical
Unit
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):20-ChhatrapatiSMNagar:07-06-11 213/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Approved for the year 2011-12
Fresh
Name of District :Chhatrapati Sahuji Maharaj
S. No. Activity
(Rs. In Lakhs)
RemarksPhysical
Unit
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 0 0.00000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 0 0.00000 3 Months
(b) Health and Physical Education 0.07000 0 0.00000 3 Months
(c) Work Education 0.07000 0 0.00000 3 Months
Sub Total (2.19 to 2.38) 3150 4559.22500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
3150 4559.22500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 4734 23.67000
3.02 Upper Primary Teachers Teacher 0.00500 1352 6.76000
Sub Total 6086 30.43000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 48 201.60000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 32 63.36000 9 Months
4.02 1 MIS Coordinator RP 0.15500 16 22.32000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 16 20.88000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 16 14.40000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 16 8.00000
4.08 Meeting, TA BRC/ URC 0.30000 16 4.80000
4.09 TLM Grant BRC/ URC 0.10000 16 1.60000
4.10 Maintenance Grant BRC/ URC 0.10000 16 1.60000
Sub Total 16 338.56000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 127 12.70000
5.05 Meeting, TA CRC/UERC 0.12000 127 15.24000
5.06 TLM Grant CRC/UERC 0.03000 127 3.81000
5.07 Maintenance Grant CRC/UERC 0.02000 127 2.54000
Sub Total 127 34.29000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 6086 73.03200
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 6086 60.86000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 16 50.80000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 255 1.53000Actual
Calculated Amt.
Sub Total 6357 186.22200
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 24 7.6320025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 11 3.98750
25
children/centre
Sub Total 35 11.61950
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 71 10.65000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):20-ChhatrapatiSMNagar:07-06-11 214/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Approved for the year 2011-12
Fresh
Name of District :Chhatrapati Sahuji Maharaj
S. No. Activity
(Rs. In Lakhs)
RemarksPhysical
Unit
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 36 5.40000
10 children per
center, '6
MonthsSub Total 107 16.05000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 144097 72.04850
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 59576 95.32160
9.03 Free Brail Books (PS) Set 0.00150 74 0.11100
9.04 Free Brail Books (UPS) Set 0.00250 21 0.05250
Sub Total 203768 167.53360
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02966 4080 121.01280
Sub Total 4080 121.01280
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 500 1005.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 1005.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 617 46.27500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1147 86.02500
Sub Total 1764 132.30000
15 School Grant
15.01 Primary School School 0.05000 1295 64.75000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):20-ChhatrapatiSMNagar:07-06-11 215/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Approved for the year 2011-12
Fresh
Name of District :Chhatrapati Sahuji Maharaj
S. No. Activity
(Rs. In Lakhs)
RemarksPhysical
Unit
15.02 Upper Primary School School 0.07000 579 40.53000
Sub Total 1874.00 105.28000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1874 18.74000
Sub Total 1874 18.74000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 131.16300
Actual
Calculated Amt.
(b) EMIS Cell District 1 18.35310Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.05000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 100.00000Actual
Calculated Amt.
Sub Total 250.56610
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 5340 32.04000 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 5340 16.02000 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2016 12.09600 3 days
Sub Total 12696.00 60.15600
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 7106.98500
Management Cost & MIS Cost % 2.1%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.4%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.5%
Civil Work 14.1%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):20-ChhatrapatiSMNagar:07-06-11 216/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 19 52.44000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 176 67.76000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 177 122.13000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 178 555.36000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1125 433.12500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 827 570.63000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 598 1865.76000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 299 1004.64000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
Physical
Unit
Fresh
Name of District :Chandauli -19
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):19-Chandauli:07-06-11 217/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District :Chandauli -19
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 476 371.28000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 235 49.35000 3 Months
(b) Health and Physical Education 0.07000 235 49.35000 3 Months
(c) Work Education 0.07000 235 49.35000 3 Months
Sub Total (2.19 to 2.38) 4580 5191.17500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
4580 5191.17500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 3743 18.71500
3.02 Upper Primary Teachers Teacher 0.00500 1484 7.42000
Sub Total 5227 26.13500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 27 113.40000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 18 35.64000 9 Months
4.02 1 MIS Coordinator RP 0.15500 9 12.55500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 9 11.74500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 9 8.10000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 9 4.50000
4.08 Meeting, TA BRC/ URC 0.30000 9 2.70000
4.09 TLM Grant BRC/ URC 0.10000 9 0.90000
4.10 Maintenance Grant BRC/ URC 0.10000 9 0.90000
Sub Total 9 190.44000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 103 10.30000
5.05 Meeting, TA CRC/UERC 0.12000 103 12.36000
5.06 TLM Grant CRC/UERC 0.03000 103 3.09000
5.07 Maintenance Grant CRC/UERC 0.02000 103 2.06000
Sub Total 103 27.81000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 5227 62.72400
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 5227 52.27000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 9 28.57500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 175 1.05000Actual
Calculated Amt.
Sub Total 5411 144.61900
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 16 5.0880025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 12 4.35000
25
children/centre
Sub Total 28 9.43800
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 50 7.50000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):19-Chandauli:07-06-11 218/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District :Chandauli -19
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 25 3.75000
10 children per
center, '6
MonthsSub Total 75 11.25000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 120713 60.35650
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 50340 80.54400
9.03 Free Brail Books (PS) Set 0.00150 152 0.22800
9.04 Free Brail Books (UPS) Set 0.00250 49 0.12250
Sub Total 171254 141.25100
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02922 3593 104.98746
Sub Total 3593 104.98746
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 470 944.70000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 11967 59.83500
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 1004.53500
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 52 3.90000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1388 104.10000
Sub Total 1440 108.00000
15 School Grant
15.01 Primary School School 0.05000 988 49.40000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):19-Chandauli:07-06-11 219/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District :Chandauli -19
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 522 36.54000
Sub Total 1510.00 85.94000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1510 15.10000
Sub Total 1510 15.10000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 99.01200
Actual
Calculated Amt.
(b) EMIS Cell District 1 9.76600Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.70000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 135.00000Actual
Calculated Amt.
Sub Total 244.47800
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 4332 25.99200 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 4332 12.99600 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1866 11.19600 3 days
Sub Total 10530.00 50.18400
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 7425.34246
Management Cost & MIS Cost % 1.5%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.3%
Civil Work 13.5%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):19-Chandauli:07-06-11 220/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 2 5.52000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 142 54.67000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 361 249.09000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 144 449.28000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2503 963.65500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1145 790.05000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 1172 3656.64000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 435 1461.60000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 151 422.80000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Buland Shahar -18
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):18-Buland Shahar:07-06-11 221/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Buland Shahar -18
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 131 102.18000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 241 50.61000 3 Months
(b) Health and Physical Education 0.07000 241 50.61000 3 Months
(c) Work Education 0.07000 241 50.61000 3 Months
Sub Total (2.19 to 2.38) 6909 8307.31500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
6909 8307.31500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 5551 27.75500
3.02 Upper Primary Teachers Teacher 0.00500 2410 12.05000
Sub Total 7961 39.80500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 48 201.60000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 32 63.36000 9 Months
4.02 1 MIS Coordinator RP 0.15500 16 22.32000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 16 20.88000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 16 14.40000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 16 8.00000
4.08 Meeting, TA BRC/ URC 0.30000 16 4.80000
4.09 TLM Grant BRC/ URC 0.10000 16 1.60000
4.10 Maintenance Grant BRC/ URC 0.10000 16 1.60000
Sub Total 16 338.56000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 154 15.40000
5.05 Meeting, TA CRC/UERC 0.12000 154 18.48000
5.06 TLM Grant CRC/UERC 0.03000 154 4.62000
5.07 Maintenance Grant CRC/UERC 0.02000 154 3.08000
Sub Total 154 41.58000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 7961 95.53200
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 7961 79.61000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 16 50.80000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 289 1.73400Actual
Calculated Amt.
Sub Total 8266 227.67600
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 0 0.0000025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 16 5.80000
25
children/centre
Sub Total 16 5.80000
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 176 26.40000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):18-Buland Shahar:07-06-11 222/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Buland Shahar -18
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 88 13.20000
10 children per
center, '6
MonthsSub Total 264 39.60000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 132785 66.39250
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 66374 106.19840
9.03 Free Brail Books (PS) Set 0.00150 0 0.00000
9.04 Free Brail Books (UPS) Set 0.00250 0 0.00000
Sub Total 199159 172.59090
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.03000 4608 138.24000
Sub Total 4608 138.24000
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 200 402.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 402.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 474 35.55000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1939 145.42500
Sub Total 2413 180.97500
15 School Grant
15.01 Primary School School 0.05000 1657 82.85000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):18-Buland Shahar:07-06-11 223/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Buland Shahar -18
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 829 58.03000
Sub Total 2486.00 140.88000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2486 24.86000
Sub Total 2486 24.86000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 73.24400
Actual
Calculated Amt.
(b) EMIS Cell District 1 14.51060Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.05000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 175.00000Actual
Calculated Amt.
Sub Total 263.80460
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 7239 43.43400 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 7239 21.71700 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2667 16.00200 3 days
Sub Total 17145.00 81.15300
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 10478.83950
Management Cost & MIS Cost % 0.8%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.7%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.5%
Civil Work 3.8%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):18-Buland Shahar:07-06-11 224/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 2 1.56000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 1 0.84900 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 3.00 2.40900
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 3.00 2.40900
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 15 41.40000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 118 45.43000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 142 97.98000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 2 4.60000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 133 414.96000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2914 1121.89000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1694 1168.86000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 854 2664.48000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 427 1434.72000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District :Bijnor -17
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):17-Bijnor:07-06-11 225/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District :Bijnor -17
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 446 347.88000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 230 48.30000 3 Months
(b) Health and Physical Education 0.07000 230 48.30000 3 Months
(c) Work Education 0.07000 230 48.30000 3 Months
Sub Total (2.19 to 2.38) 7435 7487.10000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
7438 7489.50900
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 6138 30.69000
3.02 Upper Primary Teachers Teacher 0.00500 2142 10.71000
Sub Total 8280 41.40000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 38 159.60000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 24 47.52000 9 Months
4.02 1 MIS Coordinator RP 0.15500 12 16.74000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 12 15.66000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 12 10.80000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 12 6.00000
4.08 Meeting, TA BRC/ URC 0.30000 12 3.60000
4.09 TLM Grant BRC/ URC 0.10000 12 1.20000
4.10 Maintenance Grant BRC/ URC 0.10000 12 1.20000
Sub Total 12 262.32000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 131 13.10000
5.05 Meeting, TA CRC/UERC 0.12000 131 15.72000
5.06 TLM Grant CRC/UERC 0.03000 131 3.93000
5.07 Maintenance Grant CRC/UERC 0.02000 131 2.62000
Sub Total 131 35.37000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 8280 99.36000
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 8280 82.80000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 12 38.10000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 227 1.36200Actual
Calculated Amt.
Sub Total 8519 221.62200
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 5 1.5900025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 58 21.02500
25
children/centre
Sub Total 63 22.61500
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 144 21.60000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):17-Bijnor:07-06-11 226/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District :Bijnor -17
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 72 10.80000
10 children per
center, '6
MonthsSub Total 216 32.40000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 149506 74.75300
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 74929 119.88640
9.03 Free Brail Books (PS) Set 0.00150 100 0.15000
9.04 Free Brail Books (UPS) Set 0.00250 25 0.06250
Sub Total 224560 194.85190
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.01692 8431 142.65252
Sub Total 8431 142.65252
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 300 603.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 603.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 59 4.42500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 2430 182.25000
Sub Total 2489 186.67500
15 School Grant
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):17-Bijnor:07-06-11 227/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District :Bijnor -17
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.01 Primary School School 0.05000 1769 88.45000
15.02 Upper Primary School School 0.07000 796 55.72000
Sub Total 2565.00 144.17000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2565 25.65000
Sub Total 2565 25.65000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 85.86000
Actual
Calculated Amt.
(b) EMIS Cell District 1 11.98370Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.80000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 175.00000Actual
Calculated Amt.
Sub Total 273.64370
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 7488 44.92800 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 7488 22.46400 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2877 17.26200 3 days
Sub Total 17853.00 84.65400
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 9834.53312
Management Cost & MIS Cost % 1.0%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.8%
Civil Work 6.1%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):17-Bijnor:07-06-11 228/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 379 1046.04000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 145 55.82500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 92 63.48000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 160 499.20000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 583 224.45500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 777 536.13000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 458 1428.96000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 229 769.44000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District :Bhadohi -16
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):16-Bhadohi:07-06-11 229/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District :Bhadohi -16
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 377 294.06000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 185 38.85000 3 Months
(b) Health and Physical Education 0.07000 185 38.85000 3 Months
(c) Work Education 0.07000 185 38.85000 3 Months
Sub Total (2.19 to 2.38) 3755 5034.14000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
3755 5034.14000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 3067 15.33500
3.02 Upper Primary Teachers Teacher 0.00500 1179 5.89500
Sub Total 4246 21.23000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 25 105.00000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 14 27.72000 9 Months
4.02 1 MIS Coordinator RP 0.15500 7 9.76500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 7 9.13500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 7 6.30000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 7 3.50000
4.08 Meeting, TA BRC/ URC 0.30000 7 2.10000
4.09 TLM Grant BRC/ URC 0.10000 7 0.70000
4.10 Maintenance Grant BRC/ URC 0.10000 7 0.70000
Sub Total 7 164.92000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 80 8.00000
5.05 Meeting, TA CRC/UERC 0.12000 80 9.60000
5.06 TLM Grant CRC/UERC 0.03000 80 2.40000
5.07 Maintenance Grant CRC/UERC 0.02000 80 1.60000
Sub Total 80 21.60000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 4246 50.95200
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 4246 42.46000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 7 22.22500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 136 0.81600Actual
Calculated Amt.
Sub Total 4389 116.45300
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 18 5.7240025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 4 1.45000
25
children/centre
Sub Total 22 7.17400
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 43 6.45000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):16-Bhadohi:07-06-11 230/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District :Bhadohi -16
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 22 3.30000
10 children per
center, '6
MonthsSub Total 65 9.75000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 95993 47.99650
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 42953 68.72480
9.03 Free Brail Books (PS) Set 0.00150 75 0.11250
9.04 Free Brail Books (UPS) Set 0.00250 9 0.02250
Sub Total 139030 116.85630
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02332 4120 96.07840
Sub Total 4120 96.07840
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 450 904.50000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 1180 5.90000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 12 1.44000
12.35a Others (Overhead Tank UPS) School 0.12000 8 0.96000
Sub Total (Civil WOrks) 912.80000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 25 1.87500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 997 74.77500
Sub Total 1022 76.65000
15 School Grant
15.01 Primary School School 0.05000 666 33.30000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):16-Bhadohi:07-06-11 231/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District :Bhadohi -16
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 408 28.56000
Sub Total 1074.00 61.86000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1074 10.74000
Sub Total 1074 10.74000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 73.40000
Actual
Calculated Amt.
(b) EMIS Cell District 1 7.67900Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.60000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 125.00000Actual
Calculated Amt.
Sub Total 206.67900
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 3066 18.39600 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 3066 9.19800 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1467 8.80200 3 days
Sub Total 7599.00 36.39600
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 6963.32670
Management Cost & MIS Cost % 1.2%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.0%
Civil Work 13.1%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):16-Bhadohi:07-06-11 232/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 6 16.56000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 214 82.39000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 206 142.14000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 4 9.20000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 203 633.36000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2455 945.17500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1113 767.97000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 818 2552.16000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 6 15.60000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 200 672.00000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 209 585.20000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Basti -15
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):15-Basti:07-06-11 233/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Basti -15
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 220 171.60000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 193 40.53000 3 Months
(b) Health and Physical Education 0.07000 193 40.53000 3 Months
(c) Work Education 0.07000 193 40.53000 3 Months
Sub Total (2.19 to 2.38) 6233 6714.94500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
6233 6714.94500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 5333 26.66500
3.02 Upper Primary Teachers Teacher 0.00500 1805 9.02500
Sub Total 7138 35.69000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 49 205.80000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 30 59.40000 9 Months
4.02 1 MIS Coordinator RP 0.15500 15 20.92500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 15 19.57500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 15 13.50000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 15 7.50000
4.08 Meeting, TA BRC/ URC 0.30000 15 4.50000
4.09 TLM Grant BRC/ URC 0.10000 15 1.50000
4.10 Maintenance Grant BRC/ URC 0.10000 15 1.50000
Sub Total 15 334.20000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 140 14.00000
5.05 Meeting, TA CRC/UERC 0.12000 140 16.80000
5.06 TLM Grant CRC/UERC 0.03000 140 4.20000
5.07 Maintenance Grant CRC/UERC 0.02000 140 2.80000
Sub Total 140 37.80000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 7138 85.65600
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 7138 71.38000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 15 47.62500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 260 1.56000Actual
Calculated Amt.
Sub Total 7413 206.22100
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 25 7.9500025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 0 0.00000
25
children/centre
Sub Total 25 7.95000
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 20 3.00000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):15-Basti:07-06-11 234/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Basti -15
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 10 1.50000
10 children per
center, '6
MonthsSub Total 30 4.50000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 146259 73.12950
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 59905 95.84800
9.03 Free Brail Books (PS) Set 0.00150 85 0.12750
9.04 Free Brail Books (UPS) Set 0.00250 20 0.05000
Sub Total 206269 169.15500
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.01883 7111 133.90013
Sub Total 7111 133.90013
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 156 313.56000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 313.56000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 700 52.50000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1481 111.07500
Sub Total 2181 163.57500
15 School Grant
15.01 Primary School School 0.05000 1554 77.70000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):15-Basti:07-06-11 235/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Basti -15
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 766 53.62000
Sub Total 2320.00 131.32000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2320 23.20000
Sub Total 2320 23.20000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 81.39000
Actual
Calculated Amt.
(b) EMIS Cell District 1 13.52410Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.00000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 150.00000Actual
Calculated Amt.
Sub Total 245.91410
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 6543 39.25800 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 6543 19.62900 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 3144 18.86400 3 days
Sub Total 16230.00 77.75100
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 8669.68123
Management Cost & MIS Cost % 1.1%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.7%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.8%
Civil Work 3.6%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):15-Basti:07-06-11 236/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 16 44.16000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 321 123.58500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 163 112.47000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 4 9.20000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 337 1051.44000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 3214 1237.39000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 2307 1591.83000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 832 2595.84000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 8 20.80000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 298 1001.28000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 119 333.20000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Bareilly -14
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):14-Bareilly(A):07-06-11 237/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Bareilly -14
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 230 179.40000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 259 54.39000 3 Months
(b) Health and Physical Education 0.07000 259 54.39000 3 Months
(c) Work Education 0.07000 259 54.39000 3 Months
Sub Total (2.19 to 2.38) 8626 8463.76500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
8626 8463.76500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 6924 34.62000
3.02 Upper Primary Teachers Teacher 0.00500 2203 11.01500
Sub Total 9127 45.63500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 50 210.00000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 32 63.36000 9 Months
4.02 1 MIS Coordinator RP 0.15500 16 22.32000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 16 20.88000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 16 14.40000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 16 8.00000
4.08 Meeting, TA BRC/ URC 0.30000 16 4.80000
4.09 TLM Grant BRC/ URC 0.10000 16 1.60000
4.10 Maintenance Grant BRC/ URC 0.10000 16 1.60000
Sub Total 16 346.96000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 146 14.60000
5.05 Meeting, TA CRC/UERC 0.12000 146 17.52000
5.06 TLM Grant CRC/UERC 0.03000 146 4.38000
5.07 Maintenance Grant CRC/UERC 0.02000 146 2.92000
Sub Total 146 39.42000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 9127 109.52400
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 9127 91.27000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 16 50.80000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 274 1.64400Actual
Calculated Amt.
Sub Total 9417 253.23800
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 47 14.9460025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 39 14.13750
25
children/centre
Sub Total 86 29.08350
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 94 14.10000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):14-Bareilly(A):07-06-11 238/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Bareilly -14
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 47 7.05000
10 children per
center, '6
MonthsSub Total 141 21.15000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 191613 95.80650
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 80680 129.08800
9.03 Free Brail Books (PS) Set 0.00150 45 0.06750
9.04 Free Brail Books (UPS) Set 0.00250 0 0.00000
Sub Total 272338 224.96200
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02995 3740 112.01300
Sub Total 3740 112.01300
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 500 1005.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 1005.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 721 54.07500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1879 140.92500
Sub Total 2600 195.00000
15 School Grant
15.01 Primary School School 0.05000 2056 102.80000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):14-Bareilly(A):07-06-11 239/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Bareilly -14
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 830 58.10000
Sub Total 2886.00 160.90000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2886 28.86000
Sub Total 2886 28.86000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 75.50250
Actual
Calculated Amt.
(b) EMIS Cell District 1 14.39690Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.05000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 200.00000Actual
Calculated Amt.
Sub Total 290.94940
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 8526 51.15600 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 8526 25.57800 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 3024 18.14400 3 days
Sub Total 20076.00 94.87800
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 11385.81390
Management Cost & MIS Cost % 0.8%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.6%
Civil Work 8.8%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):14-Bareilly(A):07-06-11 240/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 7 19.32000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 289 111.26500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 122 84.18000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 296 923.52000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2663 1025.25500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1672 1153.68000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 1030 3213.60000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 258 866.88000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 257 719.60000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Barabanki -13
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):13-Barabanki:07-06-11 241/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Barabanki -13
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 611 476.58000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 332 69.72000 3 Months
(b) Health and Physical Education 0.07000 332 69.72000 3 Months
(c) Work Education 0.07000 332 69.72000 3 Months
Sub Total (2.19 to 2.38) 8201 8803.04000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
8201 8803.04000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 7030 35.15000
3.02 Upper Primary Teachers Teacher 0.00500 1993 9.96500
Sub Total 9023 45.11500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 50 210.00000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 32 63.36000 9 Months
4.02 1 MIS Coordinator RP 0.15500 16 22.32000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 16 20.88000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 16 14.40000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 16 8.00000
4.08 Meeting, TA BRC/ URC 0.30000 16 4.80000
4.09 TLM Grant BRC/ URC 0.10000 16 1.60000
4.10 Maintenance Grant BRC/ URC 0.10000 16 1.60000
Sub Total 16 346.96000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 137 13.70000
5.05 Meeting, TA CRC/UERC 0.12000 137 16.44000
5.06 TLM Grant CRC/UERC 0.03000 137 4.11000
5.07 Maintenance Grant CRC/UERC 0.02000 137 2.74000
Sub Total 137 36.99000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 9023 108.27600
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 9023 90.23000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 16 50.80000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 264 1.58400Actual
Calculated Amt.
Sub Total 9303 250.89000
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 78 24.8040025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 69 25.01250
25
children/centre
Sub Total 147 49.81650
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 106 15.90000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):13-Barabanki:07-06-11 242/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Barabanki -13
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 53 7.95000
10 children per
center, '6
MonthsSub Total 159 23.85000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 208885 104.44250
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 76587 122.53920
9.03 Free Brail Books (PS) Set 0.00150 215 0.32250
9.04 Free Brail Books (UPS) Set 0.00250 50 0.12500
Sub Total 285737 227.42920
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02156 6954 149.92824
Sub Total 6954 149.92824
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 835 1678.35000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 1678.35000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 557 41.77500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 2165 162.37500
Sub Total 2722 204.15000
15 School Grant
15.01 Primary School School 0.05000 1949 97.45000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):13-Barabanki:07-06-11 243/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Barabanki -13
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 871 60.97000
Sub Total 2820.00 158.42000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2820 28.20000
Sub Total 2820 28.20000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 97.83000
Actual
Calculated Amt.
(b) EMIS Cell District 1 14.28900Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.05000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 225.00000Actual
Calculated Amt.
Sub Total 338.16900
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 8166 48.99600 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 8166 24.49800 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 3420 20.52000 3 days
Sub Total 19752.00 94.01400
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 12509.32194
Management Cost & MIS Cost % 0.9%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.7%
Civil Work 13.4%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):13-Barabanki:07-06-11 244/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 369 1018.44000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 238 91.63000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 371 255.99000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 238 742.56000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1366 525.91000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1067 736.23000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 492 1535.04000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 114 296.40000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 303 1018.08000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Banda -12
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):12-Banda:07-06-11 245/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Banda -12
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 346 269.88000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 284 59.64000 3 Months
(b) Health and Physical Education 0.07000 284 59.64000 3 Months
(c) Work Education 0.07000 284 59.64000 3 Months
Sub Total (2.19 to 2.38) 5756 6669.08000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
5756 6669.08000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 4939 24.69500
3.02 Upper Primary Teachers Teacher 0.00500 1232 6.16000
Sub Total 6171 30.85500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 29 121.80000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 18 35.64000 9 Months
4.02 1 MIS Coordinator RP 0.15500 9 12.55500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 9 11.74500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 9 8.10000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 9 4.50000
4.08 Meeting, TA BRC/ URC 0.30000 9 2.70000
4.09 TLM Grant BRC/ URC 0.10000 9 0.90000
4.10 Maintenance Grant BRC/ URC 0.10000 9 0.90000
Sub Total 9 198.84000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 72 7.20000
5.05 Meeting, TA CRC/UERC 0.12000 72 8.64000
5.06 TLM Grant CRC/UERC 0.03000 72 2.16000
5.07 Maintenance Grant CRC/UERC 0.02000 72 1.44000
Sub Total 72 19.44000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 6171 74.05200
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 6171 61.71000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 9 28.57500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 144 0.86400Actual
Calculated Amt.
Sub Total 6324 165.20100
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 0 0.0000025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 0 0.00000
25
children/centre
Sub Total 0 0.00000
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 15 2.25000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):12-Banda:07-06-11 246/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Banda -12
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 8 1.20000
10 children per
center, '6
MonthsSub Total 23 3.45000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 123629 61.81450
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 53243 85.18880
9.03 Free Brail Books (PS) Set 0.00150 38 0.05700
9.04 Free Brail Books (UPS) Set 0.00250 11 0.02750
Sub Total 176921 147.08780
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02635 4627 121.92145
Sub Total 4627 121.92145
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 100 201.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 201.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.05000 1244 62.20000
14.01a Maintenance in School having more than 3 Classrooms School 0.10000 693 69.30000
Sub Total 1937 131.50000
15 School Grant
15.01 Primary School School 0.05000 1323 66.15000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):12-Banda:07-06-11 247/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Banda -12
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 666 46.62000
Sub Total 1989.00 112.77000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1989 19.89000
Sub Total 1989 19.89000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 79.59000
Actual
Calculated Amt.
(b) EMIS Cell District 1 9.27000Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.70000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 150.00000Actual
Calculated Amt.
Sub Total 239.56000
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 5811 34.86600 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 5811 17.43300 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1311 7.86600 3 days
Sub Total 12933.00 60.16500
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 8190.76025
Management Cost & MIS Cost % 1.1%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.9%
Civil Work 2.5%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):12-Banda:07-06-11 248/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 63 173.88000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 254 97.79000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 119 82.11000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 317 989.04000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1198 461.23000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1449 999.81000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 111 346.32000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 831 2160.60000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 369 1239.84000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 102 285.60000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Balrampur -11
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):11-Balrampur(A):07-06-11 249/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Balrampur -11
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 277 216.06000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 61 12.81000 3 Months
(b) Health and Physical Education 0.07000 61 12.81000 3 Months
(c) Work Education 0.07000 61 12.81000 3 Months
Sub Total (2.19 to 2.38) 5273 7090.71000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
5273 7090.71000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 4311 21.55500
3.02 Upper Primary Teachers Teacher 0.00500 823 4.11500
Sub Total 5134 25.67000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 32 134.40000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 20 39.60000 9 Months
4.02 1 MIS Coordinator RP 0.15500 10 13.95000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 10 13.05000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 10 9.00000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 10 5.00000
4.08 Meeting, TA BRC/ URC 0.30000 10 3.00000
4.09 TLM Grant BRC/ URC 0.10000 10 1.00000
4.10 Maintenance Grant BRC/ URC 0.10000 10 1.00000
Sub Total 10 220.00000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 102 10.20000
5.05 Meeting, TA CRC/UERC 0.12000 102 12.24000
5.06 TLM Grant CRC/UERC 0.03000 102 3.06000
5.07 Maintenance Grant CRC/UERC 0.02000 102 2.04000
Sub Total 102 27.54000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 5134 61.60800
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 5134 51.34000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 10 31.75000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 182 1.09200Actual
Calculated Amt.
Sub Total 5326 145.79000
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 3 0.9540025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 50 18.12500
25
children/centre
Sub Total 53 19.07900
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 219 32.85000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):11-Balrampur(A):07-06-11 250/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Balrampur -11
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 110 16.50000
10 children per
center, '6
MonthsSub Total 329 49.35000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 122098 61.04900
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 26037 41.65920
9.03 Free Brail Books (PS) Set 0.00150 25 0.03750
9.04 Free Brail Books (UPS) Set 0.00250 0 0.00000
Sub Total 148160 102.74570
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02993 2637 78.92541
Sub Total 2637 78.92541
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 488 980.88000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 980.88000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 446 33.45000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1472 110.40000
Sub Total 1918 143.85000
15 School Grant
15.01 Primary School School 0.05000 1276 63.80000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):11-Balrampur(A):07-06-11 251/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Balrampur -11
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 655 45.85000
Sub Total 1931.00 109.65000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1931 19.31000
Sub Total 1931 19.31000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 78.72000
Actual
Calculated Amt.
(b) EMIS Cell District 1 9.67800Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.70000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 175.00000Actual
Calculated Amt.
Sub Total 264.09800
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 5754 34.52400 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 5754 17.26200 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2001 12.00600 3 days
Sub Total 13509.00 63.79200
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 9415.39011
Management Cost & MIS Cost % 0.9%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.9%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.8%
Civil Work 10.4%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):11-Balrampur(A):07-06-11 252/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 3 8.28000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 293 112.80500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 176 121.44000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 296 923.52000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2906 1118.81000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1588 1095.72000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 820 2558.40000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 410 1377.60000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Balia -10
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):10-Balia:07-06-11 253/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Balia -10
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 397 309.66000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 242 50.82000 3 Months
(b) Health and Physical Education 0.07000 242 50.82000 3 Months
(c) Work Education 0.07000 242 50.82000 3 Months
Sub Total (2.19 to 2.38) 7615 7778.69500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
7615 7778.69500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 7350 36.75000
3.02 Upper Primary Teachers Teacher 0.00500 2216 11.08000
Sub Total 9566 47.83000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 56 235.20000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 36 71.28000 9 Months
4.02 1 MIS Coordinator RP 0.15500 18 25.11000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 18 23.49000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 18 16.20000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 18 9.00000
4.08 Meeting, TA BRC/ URC 0.30000 18 5.40000
4.09 TLM Grant BRC/ URC 0.10000 18 1.80000
4.10 Maintenance Grant BRC/ URC 0.10000 18 1.80000
Sub Total 18 389.28000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 164 16.40000
5.05 Meeting, TA CRC/UERC 0.12000 164 19.68000
5.06 TLM Grant CRC/UERC 0.03000 164 4.92000
5.07 Maintenance Grant CRC/UERC 0.02000 164 3.28000
Sub Total 164 44.28000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 9566 114.79200
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 9566 95.66000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 18 57.15000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 308 1.84800Actual
Calculated Amt.
Sub Total 9892 269.45000
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 73 23.2140025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 40 14.50000
25
children/centre
Sub Total 113 37.71400
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 15 2.25000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):10-Balia:07-06-11 254/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Balia -10
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 8 1.20000
10 children per
center, '6
MonthsSub Total 23 3.45000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 189760 94.88000
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 65547 104.87520
9.03 Free Brail Books (PS) Set 0.00150 65 0.09750
9.04 Free Brail Books (UPS) Set 0.00250 15 0.03750
Sub Total 255387 199.89020
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.01343 12946 173.86478
Sub Total 12946 173.86478
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 300 603.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 603.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 978 73.35000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1480 111.00000
Sub Total 2458 184.35000
15 School Grant
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):10-Balia:07-06-11 255/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Balia -10
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.01 Primary School School 0.05000 1867 93.35000
15.02 Upper Primary School School 0.07000 693 48.51000
Sub Total 2560.00 141.86000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2560 25.60000
Sub Total 2560 25.60000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 81.82360
Actual
Calculated Amt.
(b) EMIS Cell District 1 15.28990Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.15000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 190.00000Actual
Calculated Amt.
Sub Total 288.26350
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 7374 44.24400 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 7374 22.12200 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2505 15.03000 3 days
Sub Total 17253.00 81.39600
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 10338.92348
Management Cost & MIS Cost % 0.9%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.8%
Civil Work 5.8%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):10-Balia:07-06-11 256/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 25 69.00000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 509 195.96500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 0 0.00000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 26 59.80000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 534 1666.08000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2905 1118.42500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 4113 2837.97000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 198 617.76000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 1198 3114.80000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 500 1680.00000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 198 554.40000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Baharaich -9
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):9-Baharaich:07-06-11 257/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Baharaich -9
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 419 326.82000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 218 45.78000 3 Months
(b) Health and Physical Education 0.07000 218 45.78000 3 Months
(c) Work Education 0.07000 218 45.78000 3 Months
Sub Total (2.19 to 2.38) 11279 12378.36000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
11279 12378.36000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 6864 34.32000
3.02 Upper Primary Teachers Teacher 0.00500 1106 5.53000
Sub Total 7970 39.85000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 47 197.40000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 30 59.40000 9 Months
4.02 1 MIS Coordinator RP 0.15500 15 20.92500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 15 19.57500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 15 13.50000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 15 7.50000
4.08 Meeting, TA BRC/ URC 0.30000 15 4.50000
4.09 TLM Grant BRC/ URC 0.10000 15 1.50000
4.10 Maintenance Grant BRC/ URC 0.10000 15 1.50000
Sub Total 15 325.80000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 137 13.70000
5.05 Meeting, TA CRC/UERC 0.12000 137 16.44000
5.06 TLM Grant CRC/UERC 0.03000 137 4.11000
5.07 Maintenance Grant CRC/UERC 0.02000 137 2.74000
Sub Total 137 36.99000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 7970 95.64000
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 7970 79.70000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 15 47.62500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 256 1.53600Actual
Calculated Amt.
Sub Total 8241 224.50100
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 67 21.3060025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 29 10.51250
25
children/centre
Sub Total 96 31.81850
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 35 5.25000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):9-Baharaich:07-06-11 258/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Baharaich -9
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 18 2.70000
10 children per
center, '6
MonthsSub Total 53 7.95000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 209469 104.73450
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 55963 89.54080
9.03 Free Brail Books (PS) Set 0.00150 37 0.05550
9.04 Free Brail Books (UPS) Set 0.00250 3 0.00750
Sub Total 265472 194.33830
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02145 6994 150.02130
Sub Total 6994 150.02130
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 552 1109.52000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 1109.52000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 1070 80.25000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 2129 159.67500
Sub Total 3199 239.92500
15 School Grant
15.01 Primary School School 0.05000 2252 112.60000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):9-Baharaich:07-06-11 259/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Baharaich -9
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 1021 71.47000
Sub Total 3273.00 184.07000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 3273 32.73000
Sub Total 3273 32.73000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 78.72000
Actual
Calculated Amt.
(b) EMIS Cell District 1 14.79660Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.00000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 250.00000Actual
Calculated Amt.
Sub Total 344.51660
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 9636 57.81600 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 9636 28.90800 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2703 16.21800 3 days
Sub Total 21975.00 102.94200
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 15477.33270
Management Cost & MIS Cost % 0.6%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.6%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.2%
Civil Work 7.2%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):9-Baharaich:07-06-11 260/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 0 0.00000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 20 7.70000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 39 26.91000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 20 62.40000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 450 173.25000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 146 100.74000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 204 636.48000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 102 342.72000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Baghpat -8
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):8-Baghpat(A):07-06-11 261/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Baghpat -8
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 0 0.00000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 37 7.77000 3 Months
(b) Health and Physical Education 0.07000 37 7.77000 3 Months
(c) Work Education 0.07000 37 7.77000 3 Months
Sub Total (2.19 to 2.38) 1092 1373.51000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
1092 1373.51000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 1971 9.85500
3.02 Upper Primary Teachers Teacher 0.00500 899 4.49500
Sub Total 2870 14.35000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 18 75.60000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 12 23.76000 9 Months
4.02 1 MIS Coordinator RP 0.15500 6 8.37000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 6 7.83000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 6 5.40000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 6 3.00000
4.08 Meeting, TA BRC/ URC 0.30000 6 1.80000
4.09 TLM Grant BRC/ URC 0.10000 6 0.60000
4.10 Maintenance Grant BRC/ URC 0.10000 6 0.60000
Sub Total 6 126.96000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 47 4.70000
5.05 Meeting, TA CRC/UERC 0.12000 47 5.64000
5.06 TLM Grant CRC/UERC 0.03000 47 1.41000
5.07 Maintenance Grant CRC/UERC 0.02000 47 0.94000
Sub Total 47 12.69000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 2870 34.44000
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 2870 28.70000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 6 19.05000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 95 0.57000Actual
Calculated Amt.
Sub Total 2971 82.76000
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 0 0.0000025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 1 0.36250
25
children/centre
Sub Total 1 0.36250
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 54 8.10000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):8-Baghpat(A):07-06-11 262/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Baghpat -8
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 27 4.05000
10 children per
center, '6
MonthsSub Total 81 12.15000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 45022 22.51100
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 19409 31.05440
9.03 Free Brail Books (PS) Set 0.00150 70 0.10500
9.04 Free Brail Books (UPS) Set 0.00250 10 0.02500
Sub Total 64511 53.69540
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02474 3626 89.70724
Sub Total 3626 89.70724
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 51 102.51000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 346 41.52000
12.35a Others (Overhead Tank UPS) School 0.12000 119 14.28000
Sub Total (Civil WOrks) 158.31000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 194 14.55000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 472 35.40000
Sub Total 666 49.95000
15 School Grant
15.01 Primary School School 0.05000 491 24.55000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):8-Baghpat(A):07-06-11 263/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Baghpat -8
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 215 15.05000
Sub Total 706.00 39.60000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 706 7.06000
Sub Total 706 7.06000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 74.19000
Actual
Calculated Amt.
(b) EMIS Cell District 1 7.20730Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.60000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 40.00000Actual
Calculated Amt.
Sub Total 121.99730
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 1998 11.98800 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 1998 5.99400 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 861 5.16600 3 days
Sub Total 4857.00 23.14800
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 2240.25044
Management Cost & MIS Cost % 3.6%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %5.4%
Civil Work 7.1%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):8-Baghpat(A):07-06-11 264/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 9 24.84000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 397 152.84500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 316 218.04000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 406 1266.72000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2780 1070.30000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 2652 1829.88000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 775 2418.00000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 177 460.20000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 300 1008.00000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 176 492.80000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Badaun -7
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):7-Badaun(A):07-06-11 265/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Badaun -7
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 487 379.86000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 330 69.30000 3 Months
(b) Health and Physical Education 0.07000 330 69.30000 3 Months
(c) Work Education 0.07000 330 69.30000 3 Months
Sub Total (2.19 to 2.38) 9465 9529.38500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
9465 9529.38500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 7715 38.57500
3.02 Upper Primary Teachers Teacher 0.00500 1637 8.18500
Sub Total 9352 46.76000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 59 247.80000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 38 75.24000 9 Months
4.02 1 MIS Coordinator RP 0.15500 19 26.50500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 19 24.79500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 19 17.10000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 19 9.50000
4.08 Meeting, TA BRC/ URC 0.30000 19 5.70000
4.09 TLM Grant BRC/ URC 0.10000 19 1.90000
4.10 Maintenance Grant BRC/ URC 0.10000 19 1.90000
Sub Total 19 410.44000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 165 16.50000
5.05 Meeting, TA CRC/UERC 0.12000 165 19.80000
5.06 TLM Grant CRC/UERC 0.03000 165 4.95000
5.07 Maintenance Grant CRC/UERC 0.02000 165 3.30000
Sub Total 165 44.55000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 9352 112.22400
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 9352 93.52000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 19 60.32500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 317 1.90200Actual
Calculated Amt.
Sub Total 9688 267.97100
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 21 6.6780025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 34 12.32500
25
children/centre
Sub Total 55 19.00300
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 71 10.65000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):7-Badaun(A):07-06-11 266/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Badaun -7
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 36 5.40000
10 children per
center, '6
MonthsSub Total 107 16.05000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 204893 102.44650
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 65648 105.03680
9.03 Free Brail Books (PS) Set 0.00150 359 0.53850
9.04 Free Brail Books (UPS) Set 0.00250 49 0.12250
Sub Total 270949 208.14430
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02448 5919 144.89712
Sub Total 5919 144.89712
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 300 603.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 14389 71.94500
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 674.94500
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 678 50.85000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 2130 159.75000
Sub Total 2808 210.60000
15 School Grant
15.01 Primary School School 0.05000 2104 105.20000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):7-Badaun(A):07-06-11 267/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Badaun -7
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 858 60.06000
Sub Total 2962.00 165.26000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2962 29.62000
Sub Total 2962 29.62000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 84.17400
Actual
Calculated Amt.
(b) EMIS Cell District 1 15.91440Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.15000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 175.00000Actual
Calculated Amt.
Sub Total 276.23840
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 1 4.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 74.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 8574 51.44400 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 8574 25.72200 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 3207 19.24200 3 days
Sub Total 20355.00 96.40800
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 12214.27182
Management Cost & MIS Cost % 0.8%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.4%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.3%
Civil Work 5.5%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):7-Badaun(A):07-06-11 268/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 4 11.04000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 324 124.74000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 512 353.28000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 4 9.20000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 328 1023.36000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2848 1096.48000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1516 1046.04000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 1478 4611.36000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 6 15.60000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 739 2483.04000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Azamgarh -6
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):6-Azamgarh:07-06-11 269/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Azamgarh -6
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 511 398.58000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 374 78.54000 3 Months
(b) Health and Physical Education 0.07000 374 78.54000 3 Months
(c) Work Education 0.07000 374 78.54000 3 Months
Sub Total (2.19 to 2.38) 9392 11408.34000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
9392 11408.34000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 9569 47.84500
3.02 Upper Primary Teachers Teacher 0.00500 3357 16.78500
Sub Total 12926 64.63000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 71 298.20000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 46 91.08000 9 Months
4.02 1 MIS Coordinator RP 0.15500 23 32.08500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 23 30.01500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 23 20.70000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 23 11.50000
4.08 Meeting, TA BRC/ URC 0.30000 23 6.90000
4.09 TLM Grant BRC/ URC 0.10000 23 2.30000
4.10 Maintenance Grant BRC/ URC 0.10000 23 2.30000
Sub Total 23 495.08000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 279 27.90000
5.05 Meeting, TA CRC/UERC 0.12000 279 33.48000
5.06 TLM Grant CRC/UERC 0.03000 279 8.37000
5.07 Maintenance Grant CRC/UERC 0.02000 279 5.58000
Sub Total 279 75.33000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 12926 155.11200
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 12926 129.26000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 23 73.02500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 462 2.77200Actual
Calculated Amt.
Sub Total 13411 360.16900
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 6 1.9080025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 1 0.36250
25
children/centre
Sub Total 7 2.27050
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 26 3.90000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):6-Azamgarh:07-06-11 270/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Azamgarh -6
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 13 1.95000
10 children per
center, '6
MonthsSub Total 39 5.85000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 270810 135.40500
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 107828 172.52480
9.03 Free Brail Books (PS) Set 0.00150 275 0.41250
9.04 Free Brail Books (UPS) Set 0.00250 66 0.16500
Sub Total 378979 308.50730
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.01563 11914 186.21582
Sub Total 11914 186.21582
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 593 1191.93000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 1191.93000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 249 18.67500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 2808 210.60000
Sub Total 3057 229.27500
15 School Grant
15.01 Primary School School 0.05000 2164 108.20000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):6-Azamgarh:07-06-11 271/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Azamgarh -6
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 1093 76.51000
Sub Total 3257.00 184.71000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 3257 32.57000
Sub Total 3257 32.57000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 92.17900
Actual
Calculated Amt.
(b) EMIS Cell District 1 18.96240Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.40000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 250.00000Actual
Calculated Amt.
Sub Total 362.54140
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 9171 55.02600 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 9171 27.51300 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 4845 29.07000 3 days
Sub Total 23187.00 111.60900
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 15089.02802
Management Cost & MIS Cost % 0.7%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.7%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.4%
Civil Work 7.9%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):6-Azamgarh:07-06-11 272/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 143 394.68000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 237 91.24500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 298 205.62000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 241 751.92000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1205 463.92500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 490 1528.80000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 245 823.20000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Auraiya -5
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):5-Auraiya:07-06-11 273/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Auraiya -5
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 0 0.00000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 81 17.01000 3 Months
(b) Health and Physical Education 0.07000 81 17.01000 3 Months
(c) Work Education 0.07000 81 17.01000 3 Months
Sub Total (2.19 to 2.38) 3102 4310.42000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
3102 4310.42000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 4071 20.35500
3.02 Upper Primary Teachers Teacher 0.00500 1590 7.95000
Sub Total 5661 28.30500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 26 109.20000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 16 31.68000 9 Months
4.02 1 MIS Coordinator RP 0.15500 8 11.16000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 8 10.44000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 8 7.20000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 8 4.00000
4.08 Meeting, TA BRC/ URC 0.30000 8 2.40000
4.09 TLM Grant BRC/ URC 0.10000 8 0.80000
4.10 Maintenance Grant BRC/ URC 0.10000 8 0.80000
Sub Total 8 177.68000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 78 7.80000
5.05 Meeting, TA CRC/UERC 0.12000 78 9.36000
5.06 TLM Grant CRC/UERC 0.03000 78 2.34000
5.07 Maintenance Grant CRC/UERC 0.02000 78 1.56000
Sub Total 78 21.06000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 5661 67.93200
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 5661 56.61000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 8 25.40000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 142 0.85200Actual
Calculated Amt.
Sub Total 5811 150.79400
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 6 1.9080025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 1 0.36250
25
children/centre
Sub Total 7 2.27050
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 10 1.50000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):5-Auraiya:07-06-11 274/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Auraiya -5
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 5 0.75000
10 children per
center, '6
MonthsSub Total 15 2.25000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 65680 32.84000
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 29276 46.84160
9.03 Free Brail Books (PS) Set 0.00150 55 0.08250
9.04 Free Brail Books (UPS) Set 0.00250 15 0.03750
Sub Total 95026 79.80160
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.01883 5220 98.29260
Sub Total 5220 98.29260
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 0 0.00000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 0.00000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 641 48.07500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 844 63.30000
Sub Total 1485 111.37500
15 School Grant
15.01 Primary School School 0.05000 1042 52.10000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):5-Auraiya:07-06-11 275/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Auraiya -5
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 511 35.77000
Sub Total 1553.00 87.87000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1553 15.53000
Sub Total 1553 15.53000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 74.78700
Actual
Calculated Amt.
(b) EMIS Cell District 1 8.37240Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.60000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 100.00000Actual
Calculated Amt.
Sub Total 183.75940
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 4455 26.73000 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 4455 13.36500 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1323 7.93800 3 days
Sub Total 10233.00 48.03300
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 5387.44110
Management Cost & MIS Cost % 1.5%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.9%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.4%
Civil Work 0.0%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):5-Auraiya:07-06-11 276/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 3 8.28000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 214 82.39000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 216 149.04000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 0 0.00000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 217 677.04000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1922 739.97000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 913 629.97000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 844 2633.28000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 0 0.00000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 193 648.48000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 229 641.20000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Ambedkar Nagar - 4
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):4-Ambedkar Nagar:07-06-11 277/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Ambedkar Nagar - 4
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 378 294.84000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 170 35.70000 3 Months
(b) Health and Physical Education 0.07000 170 35.70000 3 Months
(c) Work Education 0.07000 170 35.70000 3 Months
Sub Total (2.19 to 2.38) 5639 6611.59000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
5639 6611.59000
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 5103 25.51500
3.02 Upper Primary Teachers Teacher 0.00500 1485 7.42500
Sub Total 6588 32.94000
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 32 134.40000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 20 39.60000 9 Months
4.02 1 MIS Coordinator RP 0.15500 10 13.95000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 10 13.05000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 10 9.00000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 10 5.00000
4.08 Meeting, TA BRC/ URC 0.30000 10 3.00000
4.09 TLM Grant BRC/ URC 0.10000 10 1.00000
4.10 Maintenance Grant BRC/ URC 0.10000 10 1.00000
Sub Total 10 220.00000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 113 11.30000
5.05 Meeting, TA CRC/UERC 0.12000 113 13.56000
5.06 TLM Grant CRC/UERC 0.03000 113 3.39000
5.07 Maintenance Grant CRC/UERC 0.02000 113 2.26000
Sub Total 113 30.51000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 6588 79.05600
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 6588 65.88000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 10 31.75000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 193 1.15800Actual
Calculated Amt.
Sub Total 6791 177.84400
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 41 13.0380025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 70 25.37500
25
children/centre
Sub Total 111 38.41300
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 7 1.05000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):4-Ambedkar Nagar:07-06-11 278/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Ambedkar Nagar - 4
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 4 0.60000
10 children per
center, '6
MonthsSub Total 11 1.65000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 125429 62.71450
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 54554 87.28640
9.03 Free Brail Books (PS) Set 0.00150 50 0.07500
9.04 Free Brail Books (UPS) Set 0.00250 15 0.03750
Sub Total 180048 150.11340
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.03000 3199 95.97000
Sub Total 3199 95.97000
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 37 74.37000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 74.37000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.05000 1346 67.30000
14.01a Maintenance in School having more than 3 Classrooms School 0.10000 455 45.50000
Sub Total 1801 112.80000
15 School Grant
15.01 Primary School School 0.05000 1296 64.80000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):4-Ambedkar Nagar:07-06-11 279/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Ambedkar Nagar - 4
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 594 41.58000
Sub Total 1890.00 106.38000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 1890 18.90000
Sub Total 1890 18.90000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 85.98500
Actual
Calculated Amt.
(b) EMIS Cell District 1 9.58750Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.70000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 150.00000Actual
Calculated Amt.
Sub Total 246.27250
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 5403 32.41800 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 5403 16.20900 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2415 14.49000 3 days
Sub Total 13221.00 63.11700
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
Child 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 8050.86990
Management Cost & MIS Cost % 1.2%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.9%
Total Mgt. Cost
(Mgt+ CM + LEP) %3.1%
Civil Work 0.9%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):4-Ambedkar Nagar:07-06-11 280/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 2 1.56000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 1 0.84900 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 3.00 2.40900
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 3.00 2.40900
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 511 1410.36000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 451 173.63500 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 133 91.77000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 6 13.80000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 485 1513.20000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 1861 716.48500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 3215 2218.35000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 1198 3737.76000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 6 15.60000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 599 2012.64000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
Physical
Unit
Fresh
Name of District : Allahbad -3
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):3-Allahabad:07-06-11 281/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Allahbad -3
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 229 178.62000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 353 74.13000 3 Months
(b) Health and Physical Education 0.07000 353 74.13000 3 Months
(c) Work Education 0.07000 353 74.13000 3 Months
Sub Total (2.19 to 2.38) 9753 12304.61000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
9756 12307.01900
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 8139 40.69500
3.02 Upper Primary Teachers Teacher 0.00500 3768 18.84000
Sub Total 11907 59.53500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 65 273.00000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 42 83.16000 9 Months
4.02 1 MIS Coordinator RP 0.15500 21 29.29500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 21 27.40500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 21 18.90000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 21 10.50000
4.08 Meeting, TA BRC/ URC 0.30000 21 6.30000
4.09 TLM Grant BRC/ URC 0.10000 21 2.10000
4.10 Maintenance Grant BRC/ URC 0.10000 21 2.10000
Sub Total 21 452.76000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 221 22.10000
5.05 Meeting, TA CRC/UERC 0.12000 221 26.52000
5.06 TLM Grant CRC/UERC 0.03000 221 6.63000
5.07 Maintenance Grant CRC/UERC 0.02000 221 4.42000
Sub Total 221 59.67000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 11907 142.88400
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 11907 119.07000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 21 66.67500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 388 2.32800Actual
Calculated Amt.
Sub Total 12316 330.95700
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 51 16.2180025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 20 7.25000
25
children/centre
Sub Total 71 23.46800
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 85 12.75000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):3-Allahabad:07-06-11 282/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Allahbad -3
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 43 6.45000
10 children per
center, '6
MonthsSub Total 128 19.20000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 289346 144.67300
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 122513 196.02080
9.03 Free Brail Books (PS) Set 0.00150 180 0.27000
9.04 Free Brail Books (UPS) Set 0.00250 27 0.06750
Sub Total 412066 341.03130
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.01680 10525 176.82000
Sub Total 10525 176.82000
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 80 160.80000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 160.80000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 360 27.00000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 2950 221.25000
Sub Total 3310 248.25000
15 School Grant
15.01 Primary School School 0.05000 2426 121.30000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):3-Allahabad:07-06-11 283/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Allahbad -3
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 1309 91.63000
Sub Total 3735.00 212.93000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 3735 37.35000
Sub Total 3735 37.35000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 74.34400
Actual
Calculated Amt.
(b) EMIS Cell District 1 18.09160Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.30000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 225.00000Actual
Calculated Amt.
Sub Total 318.73560
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 9930 59.58000 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 9930 29.79000 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 4275 25.65000 3 days
Sub Total 24135.00 115.02000
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 14933.54590
Management Cost & MIS Cost % 0.6%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.5%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.1%
Civil Work 1.1%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):3-Allahabad:07-06-11 284/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 2 1.56000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 1 0.84900 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 3.00 2.40900
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months
(b) Health and Physical Education Teacher 0.00000 6 Months
(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 3.00 2.40900
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 40 110.40000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 316 121.66000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 416 287.04000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 6 13.80000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 327 1020.24000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2302 886.27000 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 996 687.24000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 860 2683.20000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 6 15.60000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 430 1444.80000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Physical
Unit
Fresh
Name of District : Aligarh-2
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):2-Aligarh:07-06-11 285/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Aligarh-2
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 0 0.00000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 160 33.60000 3 Months
(b) Health and Physical Education 0.07000 160 33.60000 3 Months
(c) Work Education 0.07000 160 33.60000 3 Months
Sub Total (2.19 to 2.38) 6179 7371.05000
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
6182 7373.45900
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 6226 31.13000
3.02 Upper Primary Teachers Teacher 0.00500 2261 11.30500
Sub Total 8487 42.43500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 41 172.20000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 26 51.48000 9 Months
4.02 1 MIS Coordinator RP 0.15500 13 18.13500 9 Months
4.03 1 Datra Entry Operator RP 0.14500 13 16.96500 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 13 11.70000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 13 6.50000
4.08 Meeting, TA BRC/ URC 0.30000 13 3.90000
4.09 TLM Grant BRC/ URC 0.10000 13 1.30000
4.10 Maintenance Grant BRC/ URC 0.10000 13 1.30000
Sub Total 13 283.48000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 123 12.30000
5.05 Meeting, TA CRC/UERC 0.12000 123 14.76000
5.06 TLM Grant CRC/UERC 0.03000 123 3.69000
5.07 Maintenance Grant CRC/UERC 0.02000 123 2.46000
Sub Total 123 33.21000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 8487 101.84400
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 8487 84.87000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 13 41.27500Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 227 1.36200Actual
Calculated Amt.
Sub Total 8727 229.35100
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 12 3.8160025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 11 3.98750
25
children/centre
Sub Total 23 7.80350
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 188 28.20000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):2-Aligarh:07-06-11 286/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Aligarh-2
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 94 14.10000
10 children per
center, '6
MonthsSub Total 282 42.30000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 147002 73.50100
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 52261 83.61760
9.03 Free Brail Books (PS) Set 0.00150 250 0.37500
9.04 Free Brail Books (UPS) Set 0.00250 75 0.18750
Sub Total 199588 157.68110
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02669 4424 118.07656
Sub Total 4424 118.07656
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 280 562.80000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 0 0.00000
12.35a Others (Overhead Tank UPS) School 0.12000 0 0.00000
Sub Total (Civil WOrks) 562.80000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 695 52.12500
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1709 128.17500
Sub Total 2404 180.30000
15 School Grant
15.01 Primary School School 0.05000 1690 84.50000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):2-Aligarh:07-06-11 287/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Physical
Unit
Fresh
Name of District : Aligarh-2
S. No. Activity
(Rs. In Lakhs)
Remarks
Approved for the year 2011-12
15.02 Upper Primary School School 0.07000 863 60.41000
Sub Total 2553.00 144.91000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2553 25.53000
Sub Total 2553 25.53000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 86.34000
Actual
Calculated Amt.
(b) EMIS Cell District 1 12.34130Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 0.90000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 175.00000Actual
Calculated Amt.
Sub Total 274.58130
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 7236 43.41600 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 7236 21.70800 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 2559 15.35400 3 days
Sub Total 17031.00 80.47800
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 9626.39546
Management Cost & MIS Cost % 1.0%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.8%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.9%
Civil Work 5.8%
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):2-Aligarh:07-06-11 288/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
1 New Schools
1.01 Upgradation of EGS to PSCentres /
School
1.02 New PS School
1.03 Upgraded / New UPS School
1.04 Composite Schools for Urban Areas School
1.05Integration of Class V and VIII with elementary
cycle
(a) Adding Class V with primary schools
(b) Adding Class VIII with upper primary schools
2 New Teachers Salary (PS)
2.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.00000 6 Months
2.02 Primary Teachers (Contract) (S.M.) Teacher 0.00000
2.03 Primary teachers for schools sanctioned in previous years Teacher 0.00000 6 Months
2.03aUpper Primary teachers for schools sanctioned in previous
years 0.00000 6 Months
(a) Upper Primary Teachers (Regular) Teacher 0.26000 0 0.00000 6 Months
(b) Head Teacher for Upper Primary Teacher 0.28300 0 0.00000 6 Months
2.04Head Teacher for Primary (if the number of children
exceeds 150 in a school)Teacher 0.00000 6 Months
2.05 Subject specific Upper Primary Teachers (Regular) Teacher 0.00000 6 Months
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.06 Subject specific Upper Primary Teachers (Contract) Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.07 UP Teachers for upgraded UPS in previous years 0.00000
2.08 UP teachers for integration of Class VIII 0.00000
2.09Head Teacher for Upper Primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.10Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education 0.00000 6 Months
(b) Health and Physical Education 0.00000 6 Months
(c) Work Education 0.00000 6 Months
Sub Total (2.01 to 2.10) 0.00 0.00000
Add.Teacher against PTR
2.11 New Additional Teachers - PS (Regular) Teacher 0.00000 6 Months
2.12 New Additional Teachers - PS (Para) (S.M.) Teacher 0.00000
2.13 Head Teacher for primary (if the number of children
exceeds 150 in a school)
0.00000 6 Months
2.14Subject specific New Additional Teachers-UPS (Regular)
Teacher 0.00000 6 Months
2.15 (a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.16Subject specific New Additional Teachers - UPS (Contract)
Teacher 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.17Head Teacher for upper primary (if the number of children
exceeds 100 in a school)Teacher 0.00000 6 Months
2.18Part Time Instructors (if the number of children exceeds
100 in a school)0.00000
(a) Art Education Teacher 0.00000 6 Months(b) Health and Physical Education Teacher 0.00000 6 Months(c) Work Education Teacher 0.00000 6 Months
Sub Total (2.11 to 2.18) 0.00 0.00000
Total (New Teacher's Salary-2.01 to 2.18) 0.00 0.00000
Teachers Salary (Recurring)
Primary teachers
2.19 Primary Teachers ( Regular)-Existing Teacher 0.23000 8 22.08000 12 Months
2.20 Primary Teachers (Contract)-Existing Teacher 0.03500 282 108.57000 11 Months
2.20(a) Primary Teachers (Para)- Vacant Teacher 0.23000 400 276.00000 3 Months
2.21 Primary Teachers (Vacant) Teacher 0.23000 4 9.20000 10 Months
2.22Head Teacher for Primary (if the number of children
exceeds 150)Teacher 0.26000 290 904.80000 12 Months
Additional teachers
2.23 Additional Teachers - PS (Regular) Teacher 0.23000 0 0.00000 12 Months
2.24 Additional Teachers - PS (Contract) Teacher 0.03500 2661 1024.48500 11 Months
2.25 Additional Teachers - PS (Vacant) 0.23000 1406 970.14000 3 Months
2.26 Additional Teachers - PS (Vacant) 0.23000 0 0.00000 3 Months
Upper Primary teachers
2.27 UP Teachers (Regular)-Existing Teacher 0.26000 1070 3338.40000 12 Months
2.28 UP Teachers (Contract)-Existing 0.00000
2.29 UP Teachers (Vacant) Teacher 0.26000 6 15.60000 10 Months
2.30Head Teacher for Upper Primary (if the number of children
exceeds 100)-ExistingTeacher 0.28000 535 1797.60000 12 Months
2.30(a) Head Teacher for Upper Primary (Vacant) Teacher 0.28000 0 0.00000 10 Months
2.31 Subject specific Upper Primary Teachers (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.32 Subject specific Upper Primary Teachers (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.33 Additional Teachers - UPS (Regular) 0.26000 0 0.00000 12 Months
Approved for the year 2011-12
Fresh
Name of District : AGRA -1 (Rs. In Lakhs)
RemarksPhysical
UnitS. No. Activity
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):1-Agra:07-06-11 289/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Approved for the year 2011-12
Fresh
Name of District : AGRA -1 (Rs. In Lakhs)
RemarksPhysical
UnitS. No. Activity
2.34 Additional Teachers - UPS (Contract) 0.00000
2.35 Additional Teachers - UPS (Vacant) 0.26000 37 28.86000 3 Months
2.36 Others 0.00000
2.37 Subject specific Additional Teachers-UPS (Regular) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.38 Subject specific Additional Teachers - UPS (Contract) 0.00000
(a) Science and Mathematics 0.00000
(b) Social Studies 0.00000
(c) Languages 0.00000
2.39Part Time Instructors (if the number of children exceeds
100)0.00000
(a) Art Education 0.07000 164 34.44000 3 Months
(b) Health and Physical Education 0.07000 164 34.44000 3 Months
(c) Work Education 0.07000 164 34.44000 3 Months
Sub Total (2.19 to 2.38) 7191 8599.05500
TOTAL
(New Teachers Salary +Teachers Salary-
Recurring)
7191 8599.05500
3 Teachers Grant
3.01 Primary Teachers Teacher 0.00500 6168 30.84000
3.02 Upper Primary Teachers Teacher 0.00500 2683 13.41500
Sub Total 8851 44.25500
4Academic Support through Block Resource Centre/
URC
4.01 Salary of Resource Persons:
4.01a Salary of Resource Persons (Coordinator) RP 0.00000 12 Months
4.01b Salary of Resource Persons (Asstt. Coordinator) RP 0.00000 12 Months
(a) 6 Resource Persons at BRC for subject specific trainingRP 0.35000 50 210.00000 12 Months
(b) 2 Resource Persons for resource support for children
with special needsRP 0.22000 32 63.36000 9 Months
4.02 1 MIS Coordinator RP 0.15500 16 22.32000 9 Months
4.03 1 Datra Entry Operator RP 0.14500 16 20.88000 9 Months
4.04 1 Accountant-cum-support staff for every 50 schools RP 0.10000 16 14.40000 9 Months
4.05 Furniture Grant BRC/ URC 0.00000
4.06Replacement of furniture, computer, TLE etc ( Once in 5
years)BRC/ URC 0.00000
4.07 Contingency Grant BRC/ URC 0.50000 16 8.00000
4.08 Meeting, TA BRC/ URC 0.30000 16 4.80000
4.09 TLM Grant BRC/ URC 0.10000 16 1.60000
4.10 Maintenance Grant BRC/ URC 0.10000 16 1.60000
Sub Total 16 346.96000
5Academic Support through Cluster Resource
Centres
5.01Salary of Cluster Resource Persons (on an average of one
Resource Person per 18 schools in a block)RP 0.35000 0 0.00000 12 Months
5.02 Furniture Grant CRC/ UERC 0.00000
5.03Replacement of furniture, computer, TLE etc. once in 5
yearsCRC/ UERC 0.00000
5.04 Contingency Grant CRC/UERC 0.10000 117 11.70000
5.05 Meeting, TA CRC/UERC 0.12000 117 14.04000
5.06 TLM Grant CRC/UERC 0.03000 117 3.51000
5.07 Maintenance Grant CRC/UERC 0.02000 117 2.34000
Sub Total 117 31.59000
6 Teachers Training
6.01Refresher In-service Teachers' Training at BRC level and
above - 6 days Teacher 0.01200 8851 106.21200
Actual
Calculated Amt.
6.02
One day monthly cluster level meetings and peer group
training sessions for 10 months for all teachers each year
at CRC level - 10 days
Teacher 0.01000 8851 88.51000Actual
Calculated Amt.
6.03Induction Trainging for Newly Recruited Teachers- 30 days
(Contract-S.M. @ Rs. 100/- per head per day)Teacher 0.00000 30 Days
6.04
Contact sessions in distance education of 60 days per year
for untrained Teachers to acquire professional
qualifications over a two year period. (Through SCERT
Study Centre)
Centre 3.17500 16 50.80000Study centre at
BRC/URC
6.05
Refresher Training for all Resource Persons,Master
Trainers, BRC & CRC faculty and Coordinators for 6 days
each year
Teacher 0.00600 245 1.47000Actual
Calculated Amt.
Sub Total 9112 246.99200
7 Interventions for out of School Children (2009-10)
7.19 AIE Center 0.00000
(a) AIE Center (@Rs.1370/- per child for 9 months)-Urban
SlumsCentre 0.00000
25
children/centre
(b) AIE Center (@Rs.1130/- per child for 6 months)- Bricks Centre 0.0000025
children/centre
7.20 Madarsa/Maktab (@Rs.1272/- per child) Continuing Centre 0.31800 0 0.0000025
children/centre
7.21Others Madarsa/Maktab (@Rs.1450/- per child) New
CoverageCentre 0.36250 2 0.72500
25
children/centre
Sub Total 2 0.72500
8 Special Training
8.01Setting up of special training facility for age appropriate
admission of out of school children Child 0.00000
(a) Residential 0.00000
(b) Non-Residential 0.00000
(i)Special Training (by Special Instructors-NRBC)-6 months (1-
5) Centre 0.15000 91 13.65000
10 children per
center, '6
Months
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):1-Agra:07-06-11 290/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Approved for the year 2011-12
Fresh
Name of District : AGRA -1 (Rs. In Lakhs)
RemarksPhysical
UnitS. No. Activity
(ii) Special Training (by Special Instructors-NRBC)-6 months (6-
8) 0.15000 46 6.90000
10 children per
center, '6
MonthsSub Total 137 20.55000
9 Free Text Book
9.01 Free Text Book (PS) (Workbooks not included) Child 0.00050 216110 108.05500
9.02 Free Text Book (UPS) (Workbooks not included) Child 0.00160 62325 99.72000
9.03 Free Brail Books (PS) Set 0.00150 90 0.13500
9.04 Free Brail Books (UPS) Set 0.00250 15 0.03750
Sub Total 278540 207.94750
10 2 set of Uniforms to children studying in Govt
schools
10.01 All Girls Child 0.00000
10.02 SC Boys Child 0.00000
10.03 ST Boys Child 0.00000
10.04 BPL Boys Child 0.00000
Sub Total 0.00 0.00000
11 Interventions for CWSN (IE)
11.01 Inclusive Education Child 0.02962 2855 84.56510
Sub Total 2855 84.56510
12 Civil Works
12.01 BRC Building 0.00000
12.02 CRC Building 0.00000
12.03 Primary School (Plain) (New) School 0.00000
12.04 Primary School (Hilly/Rocky) (New) School 0.00000
12.05 Upper Primary (Plain) (New) School 0.00000
12.06 Upper Primary School (Hilly/Rocky) (New) School 0.00000
12.06a Composite Schools for Urban Areas (Class I-VIII) School 0.00000
12.07 ACR in lieu of upgraded Upper Primary School Rooms 0.00000
12.08 Building Less (Pry) (for spill over only) School 0.00000
12.09 Building Less (UP)(for spill over only) School 0.00000
12.10 Dilapidated Building (Pry) (for spill over only) School 0.00000
12.11 Dilapidated Building (UP) (for spill over only) School 0.00000
12.12 Additional Class Room (Rural) ( PS) Rooms 2.01000 95 190.95000
12.12a Additional Class Room (Rural) ( UPS) Rooms 2.01000 0.00000
12.13 Additional Class Room (Urban) 2.01000 0.00000
12.14 Additional Class Room (Hill Area) 2.01000 0.00000
12.15 Additional class rooms for adding Class V 0.00000
12.16 Additional class rooms for adding Class VIII 0.00000
12.17 Toilet/Urinals (PS & UPS) School 0.00000
12.18 Separate Girls Toilet 0.00000
12.19 Drinking Water Facility (Plain PS & UPS) School 0.00000
12.19a Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.00000
12.20 Boundary Wall PS (Total in Meters x .01105) 0.00000
12.20a Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.00000
12.20b Boundary Wall UPS (Total in Meters x .01105) 0.00000
12.20c Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.00000
12.21 Separation Wall 0.00000
12.22 Electrification in P.S. School 0.00000
12.22a Electrification in U. P.S. School 0.00000
12.23 Office-cum-store-cum-Head Teacher's room (Primary) Rooms 0.00000
12.24Office-cum-store-cum-Head Teacher's room (Upper
Primary)Rooms 0.00000
12.25Augumentation of training facility in BRC (one time)
BRC/ URC 0.00000
12.26 Child friendly Elements 0.00000
12.27 Kitchen Shed 0.00000
12.28 Residential Schools for specific category of children Building 0.00000
(a) Construction of Building 0.00000
(b) Boundary Wall 0.00000
(c) Boring/Handpump 0.00000
(d) Electricity/water charges 0.00000
12.29 Construction of Hostel in existing Govt UPS 0.00000
12.30 Barrier Free Elements 0.00000
12.31 Fire Extinguisher in schools 0.00000
12.32 No. of Children (@ Rs.500/- per child enrolled) Child 0.00500 0 0.00000
12.33Infrastructure for setting school libraries including
books0.00000
(a) Primary School (per school) School 0.00000
(b) Upper Primary School (per school) School 0.00000
12.34 Major Repairs 0.00000
(a) Primary School School 0.00000
(b) Upper Primary School School 0.00000
12.35 Others (Overhead Tank PS) School 0.12000 300 36.00000
12.35a Others (Overhead Tank UPS) School 0.12000 131 15.72000
Sub Total (Civil WOrks) 242.67000
13 Teaching Learning Equipment
13.01 TLE - New Primary School 0.20000 0.00000
13.02 TLE - New Upper Primary School 0.50000 0.00000
13.03 TLE for integration of Class V 0.00000
13.04 TLE for integration of Class VIII 0.00000
13.05 Others (for spill over of uncovered OBB schools) 0.00000
Sub Total 0.00000
14 Maintenance Grant
14.01 Maintenance in School having upto3 Classrooms School 0.07500 644 48.30000
14.01a Maintenance in School having more than 3 Classrooms School 0.07500 1961 147.07500
Sub Total 2605 195.37500
15 School Grant
15.01 Primary School School 0.05000 1876 93.80000
For All Girls, SC,
ST boys
Arti:UP Costing 2011-12 -Tarun (Post PAB)-21-6-11(ForMail):1-Agra:07-06-11 291/292
U.P. - SSA - RTE ANNUAL WORK PLAN AND BUDGET - 2011-12
Unit Cost Phy. Fin.
Approved for the year 2011-12
Fresh
Name of District : AGRA -1 (Rs. In Lakhs)
RemarksPhysical
UnitS. No. Activity
15.02 Upper Primary School School 0.07000 938 65.66000
Sub Total 2814.00 159.46000
16 Research & Evaluation
16.01 Research & Evaluation School 0.01000 2814 28.14000
Sub Total 2814 28.14000
17 Management & Quality (Up to 6% of the outlay)
17.01 Management & MIS up to 3.5%
(a) DPO ( Salary, Contigency, Consumables, POL, TA &
Computer etc)District 1 97.00000
Actual
Calculated Amt.
(b) EMIS Cell District 1 14.17680Actual
Calculated Amt.
17.02 Community Mobilization up to 0.5% 1 1.05000Actual
Calculated Amt.
17.03 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1 175.00000Actual
Calculated Amt.
Sub Total 287.22680
18 Innovative Activity
18.150% of funds for Computer Aided Education in upper
primary schoolsDistrict 50.00000 1 50.00000
18.02Balance 50% of funds for innovating projects for:
(Rs.50 Lacs of remaining activities)
(a) Girls Education District 15.00000 1 15.00000
(b) ECCE District 0.00000
(c)Intervention for SC / ST children District 5.00000 1 5.00000
(d) Intervention for Minority Community children District 4.00000 0 0.00000
(e) Intervention for Urban Deprived children District 0.00000
Sub Total 70.00000
19 Community Training
19.01 VEC/SMC - 3 days residential (@ Rs.100/-) Persons 0.00600 7827 46.96200 3 days
19.02 VEC/SMC - 3 days non-residential (@ Rs.50/-) Persons 0.00300 7827 23.48100 3 days
19.03 Local Authority - 3 days residential (@ Rs.100/-) Persons 0.00600 1911 11.46600 3 days
Sub Total 17565.00 81.90900
20 Transport/Escort Facility
20.01Children in remote habitations with sparse populations
where opening of schools is unviable0.00000
20.02
Urban deprived children/children without adult protection
in urban areas where schools are not opened because
availability of land is a problem
District 0.00000
Sub Total 0 0.00000
21 Residential Schools for specific category of children
Non-recurring (one time grant)
21.01 Construction of Building (Included in civil works) 0.00000
21.02 Boundary Wall (Included in civil works) 0.00000
21.03 Boring/Handpump (Included in civil works) 0.00000
21.04 Electricity/water charges(Included in civil works) 0.00000
21.05 Furniture / Equipment (including kitchen equipment) 0.00000
21.06 TLM and equipment including library books 0.00000
21.07 Bedding 0.00000
Sub Total Non-recurring 0.00000
Recurring
21.08 Maintenance per child per month @ Rs. 900/- 0.00000
21.09 Stipend per child per month @ Rs.50/- 0.00000
21.10Supplementary TLM, Stationery and other educational
material0.00000
21.11 Examination Fee 0.00000
21.12 Salaries 0.00000
21.13 Vocational training / specific skill training 0.00000
21.14 Electricity / water charges 0.00000
21.15 Medical care/contingencies @ Rs.750/- per child 0.00000
21.16 Maintenance 0.00000
21.17 Miscellaneous 0.00000
21.18 Preparatory camps 0.00000
21.19 P.T.A / school functions 0.00000
21.20 Provision of Rent 0.00000
21.21 Capacity Building 0.00000
Sub Total Recurring 0.00000
Total - Residential Schools 0.00000
Total of SSA (Districs) 10647.42040
Management Cost & MIS Cost % 1.0%
Community Mobilisation Activities 0.0%
Learning Enhancement Prog % 1.6%
Total Mgt. Cost
(Mgt+ CM + LEP) %2.7%
Civil Work 2.3%