Outline of Today’s Discussion
I. Introductions: The Union Pacific Team
II. UP History & Operations
III. Colorado Railyard Feasibility Study Overview
A. Why is it being conducted?
B. What does it entail?
C. Study Area & Conceptual Site Plan
D. Process Timeline
IV. A Commitment to Stakeholder Involvement
V. Summary/Questions
![Page 3: UP Feasibility Study Presentation Aug 2007](https://reader031.fdocuments.us/reader031/viewer/2022020623/61f1f1ef319f8705583d7e18/html5/thumbnails/3.jpg)
3
![Page 4: UP Feasibility Study Presentation Aug 2007](https://reader031.fdocuments.us/reader031/viewer/2022020623/61f1f1ef319f8705583d7e18/html5/thumbnails/4.jpg)
4
GrangerS.M
orrill Sioux City
Shawnee
Jct.
Sharon Springs
Bond
Wichita
Pueblo
Stratford
Hutchinson
HeringtonArco
NorthPlatte
Denver
O’Fallons
Gibbo
n Jc
t.
CouncilBluffs
Fremont
Topeka
Lincoln
Marysville
Paola
ProvoGrand
Jct.
Walsenburg
Rawlins
Cheyenne
Salina
Phippsburg
Dalhart
UP Denver Service
Unit
![Page 5: UP Feasibility Study Presentation Aug 2007](https://reader031.fdocuments.us/reader031/viewer/2022020623/61f1f1ef319f8705583d7e18/html5/thumbnails/5.jpg)
5
Business Dimensions2006 Commodity Revenue $14.9 Billion
Ag Products16%
Autos10%Chemicals
14%
Energy20%
IndustrialProducts
21%
Intermodal19%
![Page 6: UP Feasibility Study Presentation Aug 2007](https://reader031.fdocuments.us/reader031/viewer/2022020623/61f1f1ef319f8705583d7e18/html5/thumbnails/6.jpg)
6
Colorado Railyard Feasibility Study- Why is it being conducted?
� Regional Transportation District (RTD) must acquire two Union Pacific railroad yards in northeast Denver for its FasTracks rail transit project.
� The Classification Yard will become a maintenance facility serving RTD’s four commuter rail lines.
� The East Corridor line between downtown Denver and Denver International Airport crosses through the Intermodal Yard, whichwill also be a station location.
� Operations at the relocated yards must begin January 1, 2010 to meet the FasTracks schedule.
![Page 7: UP Feasibility Study Presentation Aug 2007](https://reader031.fdocuments.us/reader031/viewer/2022020623/61f1f1ef319f8705583d7e18/html5/thumbnails/7.jpg)
7
Colorado Railyard Feasibility Study- Why is it being conducted?
![Page 8: UP Feasibility Study Presentation Aug 2007](https://reader031.fdocuments.us/reader031/viewer/2022020623/61f1f1ef319f8705583d7e18/html5/thumbnails/8.jpg)
8
Colorado Railyard Feasibility Study- What does it entail?
This study will thoroughly examine the following issues to determine whether or not the area being studied is a viable location for its facilities:
� Impact on Threatened or Endangered Wildlife� Impact on Wetlands� Permitting Summary� Economic Impact� Preliminary Engineering Design� Approval Process Summary� Construction Cost Estimates� Drainage Issues� Project Schedule� Impact on Traffic
![Page 9: UP Feasibility Study Presentation Aug 2007](https://reader031.fdocuments.us/reader031/viewer/2022020623/61f1f1ef319f8705583d7e18/html5/thumbnails/9.jpg)
9
Colorado Railyard Feasibility Study- Study Area
![Page 10: UP Feasibility Study Presentation Aug 2007](https://reader031.fdocuments.us/reader031/viewer/2022020623/61f1f1ef319f8705583d7e18/html5/thumbnails/10.jpg)
10
![Page 11: UP Feasibility Study Presentation Aug 2007](https://reader031.fdocuments.us/reader031/viewer/2022020623/61f1f1ef319f8705583d7e18/html5/thumbnails/11.jpg)
11
![Page 12: UP Feasibility Study Presentation Aug 2007](https://reader031.fdocuments.us/reader031/viewer/2022020623/61f1f1ef319f8705583d7e18/html5/thumbnails/12.jpg)
12
![Page 13: UP Feasibility Study Presentation Aug 2007](https://reader031.fdocuments.us/reader031/viewer/2022020623/61f1f1ef319f8705583d7e18/html5/thumbnails/13.jpg)
13
A Commitment to Stakeholder Involvement
� Community Meetings� Informational Materials� Community Hotline: (303) 534-5409 x110� Landowner Meetings� Fire & Emergency Response Meetings� Business Community Meetings� Elected Official Meetings
![Page 14: UP Feasibility Study Presentation Aug 2007](https://reader031.fdocuments.us/reader031/viewer/2022020623/61f1f1ef319f8705583d7e18/html5/thumbnails/14.jpg)
14
•Questions?