UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN...
Transcript of UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN...
![Page 1: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/1.jpg)
UNLOCKING
THE POTENTIAL of SOLAR ENERGY
IN CAMBODIA
Jack Pegler, NRG Solutions
5th June | Auditorium D, ADB
![Page 2: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/2.jpg)
![Page 3: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/3.jpg)
![Page 4: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/4.jpg)
ENERGY IN CAMBODIA
• More than 9 Million people • Using car-batteries & kerosene• Waste time and money
• Un-reliable power quality• Blackouts• Expensive electricity prices
OFF-GRID ON-GRID
![Page 5: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/5.jpg)
TWO MARKETS – TWO BRANDS
Rural distribution network
providing solar home systems
to off-grid households
Engineering and consultancy
servicing residential, commercial
and industrial customers
![Page 6: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/6.jpg)
TWO MARKETS – TWO BRANDS
![Page 7: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/7.jpg)
![Page 8: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/8.jpg)
WHO is Our Customer?
Over 60% household
Polluting
are using car batteries
Inconvenient Expensive
![Page 9: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/9.jpg)
WHO is Our Customer?
Over 60% household are using car batteries
$50M market
opportunity for solar
![Page 10: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/10.jpg)
Solar is the solution
But what’s stopping the customers?
Clean Convenient Cheaper
![Page 11: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/11.jpg)
But what’s stopping the customers?
Trust
• Poor quality products
• Lack of proper
engineering
• Little/ no after-sales
support
Affordability
• Solar cheaper in long-
term
• Up-front cost prohibitive
![Page 12: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/12.jpg)
HOW do we build trust?
• Properly sized systems
• High-quality components
• Ultra-efficient appliances
By providing quality products
![Page 13: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/13.jpg)
HOW do we build trust?
By effective distribution
Central
management
office
Local office
Local office
In-house Technicians
In-houseAgent
Manager & Admin
![Page 14: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/14.jpg)
HOW do we build trust?
By effective distribution
Central
management
office
Local office
Local office
Off-grid communities
In-house Technicians
In-houseAgent
Manager & Admin
Demo
Village
Chief
![Page 15: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/15.jpg)
HOW do we build trust?
• Structured after-sales plan
• 24hr service hotline
• 48hr issue resolution
By timely after sales support
![Page 16: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/16.jpg)
HOW do we make it affordable?
• MFI Partnerships
• Customer pays over 12-24 months
• We get paid < 30 days after installation
By offering end-user financing
![Page 17: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/17.jpg)
BUSINESS MODEL
Selling Solar
Home systems
direct to end-users
![Page 18: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/18.jpg)
BUSINESS MODEL
CashMFI
Loans Partnerships
3 revenue streams
![Page 19: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/19.jpg)
MANAGEMENT TEAM
Jack Pegler, Operations Manager
Daniel Pacheco, Founder / CEO
Pha Sovananra, Distribution Manager
Pin Phalla, Technical Manager
Strategy, Logistics & Finance Field Operations
8yr 4yr 10yr 6yr
![Page 20: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/20.jpg)
WHAT HAVE WE ACHIEVED SO FAR?
Sold over 2,000 products
Accredited for quality and service
Founding/active member of Solar energy
association of Cambodia
Successful pilot of PAYGO:• 75% uptake
• zero defaults
![Page 21: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/21.jpg)
WHAT COMES NEXT?
Expansion
• 3 new offices / year
• 19 branches by 2022
• Invest in strengthening network
• Product diversification
Internal Financing
• Build on pilot project
• Internal financing
• Avoid challenging MFI
partnerships
![Page 22: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/22.jpg)
IMPACT
BRANCHES 2 4 7 10 13 16 19
UNITS SOLD 2,258 2,558 4,637 8,067 12,979 19,511 23,482
PRE 2017 2017 2018 2019 2020 2021 2022
CUMULATIVE IMPACT IN 2021
PEOPLE IMPACTED
GHG kgCO2e EXTRA HOURS OF LIGHT
EXTRA HOURS OF STUDY
ENERGY SAVINGS
127,977 2,254,272 21,442,001 4,288,400 $4,461,580
Model by:
![Page 23: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/23.jpg)
MAKING IT HAPPEN
We’re asking for $500k in equity / debt to:
• Strengthen and expand our network to
increase reach
• Offer internal end-user financing to bypass MFI
![Page 24: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/24.jpg)
Commercial and Industrial Solar Solutions
![Page 25: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/25.jpg)
WHO is Our Customer?
Individuals & Organizations
Looking for secure
energy supply
No Power /
blackouts
20₵/kWh on grid,
more for diesel
No access to
financing
![Page 26: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/26.jpg)
Providing a SOLUTION
Custom-designed
systems
• On-Grid
• Off-grid
• Hybrid
Focused On
• Understanding needs
• Quality components &
installation
• Excellent service and
support
5-100kW
![Page 27: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/27.jpg)
BUSINESS MODEL
EPC
PROJECTS
COMPLETED
TO DATE
100% CASH
PAYMENT
28
![Page 28: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/28.jpg)
ENGINEERING TEAM
Daniel Pacheco, Founder / CEO
Quentin Boch, Project Manager
Bastien Adamo, Project Manager
Artur Vila, Technical Manager
Col Williams, Site Manager
>35yr
Engineering
experience
![Page 29: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/29.jpg)
WHAT HAVE WE ACHIEVED SO FAR?
Authorized distributer for
Partnership with
Sold first project with customer financing
Won contract with Total Cambodia in Siem Reap Airport
![Page 30: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/30.jpg)
WHAT COMES NEXT?
PROJECTS 5kW – 5MWCUSTOMER
FINANCING
20+
![Page 31: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/31.jpg)
MAKING IT HAPPEN
We’re looking for partners to provide project financing
PILOT:80kW on grid
High-profile factory in Phnom Penh
Business case for Clients & finance
![Page 32: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/32.jpg)
EXCITING OPPORTUNITES
New Partnership to
serve both markets
• First SHS Shipment
• Large on/off-grid projects
under study
![Page 33: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/33.jpg)
THANK YOU!
Rural distribution network
providing solar home systems
to off-grid households
Engineering and consultancy
servicing residential, commercial
and industrial customers
$500K EQUITY/DEBT PROJECT FINANCING
![Page 34: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/34.jpg)
34
APPENDIX
![Page 35: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/35.jpg)
Competition
- Existing solutions (Kerosene & Car Batteries)
- Other “Good Solar” Accredited Companies
- Local (mobile) Sellers
- Local markets and hardware/electrical
shops
- Non-accredited solar companies
} Expensive & dangerous
Cheap but low quality, no financing & poor design and service.
![Page 36: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/36.jpg)
Competitive Advantages
Engineering & Design
Unique DC Appliances
Simplified PAYG technology
Strong Focus on After-Sales
Longer lasting systems
Higher quality, more efficient
Fewer problems, solved faster
ADVANTAGE BENEFIT TO CUSTOMERS
Easier, cheaper financing
![Page 37: UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA · UNLOCKING THE POTENTIAL of SOLAR ENERGY IN CAMBODIA Jack Pegler, NRG Solutions 5th June | Auditorium D, ADB. ENERGY IN CAMBODIA](https://reader033.fdocuments.us/reader033/viewer/2022041416/5e1b7b6b5356565504505487/html5/thumbnails/37.jpg)
Risks & Mitigation
Grid Expansion
Subsidized Products
Product Malfunction / Misuse
(Lack of) Regulatory Policy
HR / Recruitment
Extensive Market research
User training and maintenance
plan