Transcript of Uniting Water and People
Uniting Water and People
University of Minnesota and Minnesota Professionals
Technical Advisory Committee Presentation November 1st 2010
Simajhuleu
Previous Involvement
What We Have Learned
• COCCODE
– Maintain current system
– Collect annual fee
– Skilled Masons
– Part time plumber
– Elected every two years
– Capable and Motivated
Existing System
Water Area A & B(details not included)
3 Supply Springs ≈2.7 L/s
Water Area C
Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram
3 Supply Springs ≈2.7 L/s
Existing System
Water Area A & B(details not included)
Water Area C
Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram
3 Supply Springs ≈2.7 L/s
Water Area C
Existing System
Water Area A & B(details not included)
Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram
3 Supply Springs ≈2.7 L/s
Water Area C
Existing System
Water Area A & B(details not included)
Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram
3 Supply Springs ≈2.7 L/s
Water Area C
Existing System
Water Area A & B(details not included)
Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram
3 Supply Springs ≈2.7 L/s
Water Area C
Existing System
Water Area A & B(details not included)
Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram
Design Assumptions
Requirements
• All Static Pressure below 80 psi
• All Dynamic Pressures greater than 0 psi at peak flow
Objectives
• Listed in 3.1
Proposed System with Existing System Interactions
Water Area A & C(details not included)
connection3
1
2
4
connection
Proposed System with Existing System Interactions
Water Area A & C(details not included)
connection3
1
2
4
connection
Proposed System with Existing System Interactions
Water Area A & C(details not included)
connection3
1
2
4
connection
Proposed System with Existing System Interactions
Water Area A & C(details not included)
connection3
1
2
4
connection
Proposed System with Existing System Interactions
Water Area A & C(details not included)
connection3
1
2
4
connection
Community Involvement• At least 2 skilled
masons and plumber on site
• 10% of material costs• Digging of the entire
trench for pipeline
Community Outreach
Operation and Maintenance
Sustainability