ICCBT 2008 - E - (36) - pp435-448 ICCBT2008 Case Study on Supply and Demand for University Parking Facilities in College of Engineering UNITEN S. Norhisham*, Universiti Tenaga Nasional, MALAYSIA N. Ismail, Universiti Tenaga Nasional, MALAYSIA ABSTRACT This paper was about a study on supply and demand parking in Universiti Tenaga Nasional (UNITEN) main campus. This is predominantly case study based project and the main focus was on the supply and demand car-parking facilities for students in College of Engineering (COE), UNITEN. The objectives were to identify the current parking supply and next five years parking demand in case study area and gave suggestions or recommendations to solving the problem. The study consist parking inventory, parking usage survey using license plate numbers method and parking interview for determination the current parking supply in COE. From the result of current data, the next five years future parking demand had been estimated by study and information from the administration data, questionnaire, parking space zoning regulation and parking generation. A recommendation had been suggested according to the result of demand parking facilities for the next five years. As a result from parking interview, 88% students claimed, they had a parking problem in COE. But this situation was opposite as in calculation of current parking supply which give only parking area A2 exist 85% parking load percentage which was 89% and can considered as have parking problem. For future parking demand 1540 parking spaces should be provided in five years time. As recommendation, besides built a new parking area, which more costly, law enforcement must do strictly to restrict the non-stickers users park at COE parking. As another alternative, a grass area in front of COE café parking should be built as new parking spaces. Keywords: Parking Supply, Parking Demand, and Parking Facilities *Correspondence Author: Shuhairy Norhisham, Universiti Tenaga Nasional, Malaysia. Tel: +6003 8921 2020 ext. 6331, Fax: +60389212116. E-mail: [email protected]

description

case study

Transcript of UNITEN ICCBT 08 Case Study on Supply and Demand for University Parking

Page 1: UNITEN ICCBT 08 Case Study on Supply and Demand for University Parking

ICCBT 2008 - E - (36) - pp435-448

ICCBT2008 Case Study on Supply and Demand for University Parking Facilities in College of Engineering UNITEN

S. Norhisham*, Universiti Tenaga Nasional, MALAYSIA N. Ismail, Universiti Tenaga Nasional, MALAYSIA

ABSTRACT This paper was about a study on supply and demand parking in Universiti Tenaga Nasional (UNITEN) main campus. This is predominantly case study based project and the main focus was on the supply and demand car-parking facilities for students in College of Engineering (COE), UNITEN. The objectives were to identify the current parking supply and next five years parking demand in case study area and gave suggestions or recommendations to solving the problem. The study consist parking inventory, parking usage survey using license plate numbers method and parking interview for determination the current parking supply in COE. From the result of current data, the next five years future parking demand had been estimated by study and information from the administration data, questionnaire, parking space zoning regulation and parking generation. A recommendation had been suggested according to the result of demand parking facilities for the next five years. As a result from parking interview, 88% students claimed, they had a parking problem in COE. But this situation was opposite as in calculation of current parking supply which give only parking area A2 exist 85% parking load percentage which was 89% and can considered as have parking problem. For future parking demand 1540 parking spaces should be provided in five years time. As recommendation, besides built a new parking area, which more costly, law enforcement must do strictly to restrict the non-stickers users park at COE parking. As another alternative, a grass area in front of COE café parking should be built as new parking spaces. Keywords: Parking Supply, Parking Demand, and Parking Facilities *Correspondence Author: Shuhairy Norhisham, Universiti Tenaga Nasional, Malaysia. Tel: +6003 8921 2020 ext. 6331, Fax: +60389212116. E-mail: [email protected]

Page 2: UNITEN ICCBT 08 Case Study on Supply and Demand for University Parking

Case Study on Supply and Demand for University Parking Facilities in College of Engineering UNITEN

ICCBT 2008 - E - (36) – pp435-448 436

1. INTRODUCTION Drivers love parking. This is evidenced by their behavior. Heated discussion erupts in parking lots when one driver “steals” a space from another. Drivers pay parking garage high prices for the right to park one block closer to their destination [4]. The car trips were generated by a development demand car parking spaces. It is important to provide adequate parking, both in respect of the traffic impact on the local highway network and also for he commercial success of development.

Parking facilities and programs were also considerable importance in traffic engineering. Most urban and regional commercial centers were access primarily by automobiles. The viability of these areas depends in a large part on the availability of convenient parking facilities adjacent to or easily accessible to desired destinations. Thus, comprehensive parking programs involve planning, design, construction, operation and financing parking facilities, as well as placement and enforcement of parking regulations [2].

Experts agree that, when it comes to on-campus parking, there is no such thing as a one-size-fits-all approach. The parking problem can be different in each case to another and the parking problem solution also can be varies [7]. This study is about a study on the supply and demand car-parking facilities for the next five years in College of Engineering, UNITEN for students. The objectives are to identify the current and next five years supply and demand parking facilities in case study area. As a result of identify the current parking supply, the parking problem of case study area was also determined. From the future parking demand, a suggestion of recommendation to solve the problem was also identified. 2. PROBLEM STATEMENTS In Universiti Tenaga Nasional (UNITEN), according to UNITEN Students Representation Council Honor Secretary, Mr. Khairul Fadzli Bin Azmi, among the most complaint from UNITEN students, are the parking facilities problems for College of Engineering (COE) students. For COE students, UNITEN had provided various parking area surround the COE building. As COE students, they have choices to park at COE parking (behind COE building) and COE café parking (in front COE café), BV building parking or Administration building parking. Although they are several of parking facilities near COE building, the students are still having the parking problem. Figure 1 show the congestion in College of Engineering to enter parking area.There are only complaints from students about this parking problem in COE and no technical evidences to prove it.

Page 3: UNITEN ICCBT 08 Case Study on Supply and Demand for University Parking

S. Norhisham and N. Ismail.

ICCBT 2008 - E - (36) – pp435-448 437

Figure 1. Congestion in College of Engineering to enter parking area

3. LITERATURE REVIEWS Various researches and theories have been developed to determine the supply and demand of parking facilities. There are also many theories about the recommendation and solution of solving the parking problem. Parking studies was divided to three main study, which is inventories studies, administrative studies and dynamic studies. Inventories studies was included list of graphic display of existing information, geometric design, traffic characteristic, traffic operation and traffic control and regulation [1]. For the administrative studies, result of survey involves field measurement, past case studies result and analysis and the data of the relevant information about the case study area. In Dynamic studies, data collected under operational conditions such as speed study, travel time and delay, traffic volume, parking, accidents and others. 4. METHODOLOGY

Determination of current parking was focused on parking inventory, parking usage survey using License Plate Numbers Method and the parking interview studies [3]. This entire works had given the parking characteristic (existing condition) and the total load of the current parking. Thus, determination of future parking demand was more concentration on parking zoning regulation, parking generation table and parking demand calculation [5]. In order to determine the future parking demand, administration data and information from questionnaire was needed as a figure when calculating the parking demand.

Page 4: UNITEN ICCBT 08 Case Study on Supply and Demand for University Parking

Case Study on Supply and Demand for University Parking Facilities in College of Engineering UNITEN

ICCBT 2008 - E - (36) – pp435-448 438

Parking facilities in UNITEN that provided parking at several area such as library, administration building, College of Engineering building, College of Information Technology building and students and staffs apartment building. The facilities was provide to car parking and motorcycles parking. The restriction area divided to yellow zone for staffs and lecturers and red zone for students and visitors. The focus of the project was at car parking facilities for students in College of Engineering. In COE, the alternative of parking area was at COE building, which labeled as A1, A2 and A3. And others two area which was in front of COE café, labeled as B and near to BV building, labeled as C. Figure 2 show the labeled parking area A1, A2, A3, B and C.

A3 B A2 C A1

Figure 2. The labeled parking area A1, A2, A3, B and C. 5. RESULTS AND ANALYSIS 5.1 Current Parking Supply Parking area in COE is divided to five areas to do the analysis of this project. Which are A1, A2, A3, B and C. A1, A2 and A3 are parking areas in front of COE building. Meanwhile, parking area B is in front of COE café and parking area C at the BV building parking area. The total parking spaces of these parking are 321 parking spaces and the total areas are 1443.56 m2. The characteristics of parking supply in COE are analysis by accumulation (total parking supply), duration distribution, violations (illegal parking) and parking turnover rates. At parking area A1 only on Tuesday at interval 1:30pm to 2:00pm, 2:00pm to 2:30pm and 3:00pm to 3:30pm the parking area were fully occupied. Which is mean only 1 and half hours in Tuesday parking area A1 the accumulation is 100%. In parking area A2, the 100% accumulation only happened on Tuesday from 2:30pm until 4:00pm and on Thursday from 10:00am until 10:30pm. The result also similar as A3 and B parking areas, which only three intervals is fully occupied, which is from 10:00am to 12:00pm for both areas and 2:00pm to 2:30pm in parking area A3, 3:30pm to 4:00pm for parking area B. This accumulation result is

Page 5: UNITEN ICCBT 08 Case Study on Supply and Demand for University Parking

S. Norhisham and N. Ismail.

ICCBT 2008 - E - (36) – pp435-448 439

compare in table 1, with information’s from parking user survey which give, 43% user said 10:00am until 12:00 is the peak hours.

Table 1. Accumulation parking

Total parking supply had been measured in terms of hour many vehicles can be parked during the period of interest within the study area.

P = (∑ NT / D) * F

where P = parking supply, vehicles N = numbers of parking of given type and time restriction T = time that N spaces of given type and time restriction are available during the study period, hours D = average parking duration during the steady period hours / vehicles. F = insufficiency factor to account for turnover – values range from 0.85 to 0.95 and increase as average duration increase

Table 2. Parking supply

A1 527 237.15 A2 1067 480.15 A3 183 82.35 B 203 91.13 C 37 16.65

Total 2016.5 907.425

Total parking load as calculate as parking supply in table 2 give a result that 908 vehicles could be parked in study area over 11 hours period of the study. However, it does not mean that all 908 vehicles could be parked at same time. This is not meant 908 cars can park at 321 parking spaces in same time. It only give a value of capability of 321 parking spaces can receives 908 vehicles in one day (11 hours).

Peak hours or 100% accumulation

A1 1:30pm to 2:30pm (Tuesday) 3:00pm to 3:30pm (Tuesday)

A2 2:30pm until 4:00pm (Tuesday) 10:00am until 10:30pm (Thursday)

A3 10:00am until 12:00pm (Thursday) 2:00pm until 2:30pm (Tuesday)

B 10:00am until 12:00pm (Tuesday) 3:30pm until 4:00pm (Tuesday)

C

None

Parking User Survey (Questionnaire)

10:00am until 12:00pm

Area ∑ NT P = (∑ NT / D) * F

Page 6: UNITEN ICCBT 08 Case Study on Supply and Demand for University Parking

Case Study on Supply and Demand for University Parking Facilities in College of Engineering UNITEN

ICCBT 2008 - E - (36) – pp435-448 440

FIGURE 3 Numbers of car vs. duration time

0

20

40

60

80

100

120

140

160

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Duration time

Num

bers

of c

ar

A1 A2 A3 B C

In figure 3, the highest parking duration is in parking area A2, for 1 hours (2 intervals.), which is 149 vehicles. The longer duration is 20 hours (10 intervals), which is 2 cars in parking area A1, and 1 car in parking area A2. The calculation of average parking durations is record in table 3. The average duration for total area is 0.936 hours. Average parking duration is computed as:

D = ∑ (Nx * X * I)

NT where

D = average parking duration, hour/vehicles Nx = number of vehicles parked for x intervals X = number of intervals parked I = length of the observation interval, h

NT = total number of parked vehicles observed

Page 7: UNITEN ICCBT 08 Case Study on Supply and Demand for University Parking

S. Norhisham and N. Ismail.

ICCBT 2008 - E - (36) – pp435-448 441

Table 3. Average parking duration

Area ∑ (Nx * X * I) NT D (h/vehicles) A1 527 254 0.93 A2 1067.00 498 0.96 A3 183 71 1.16 B 202.5 98 0.93 C 37 24 0.69

Total Average 2016.5 945 0.936

Table 4.Total illegal parking

A1 60 20 A2 81 27 A3 230 77 B 434 147 C 0 0

A violation for parking area, which is total illegal parking, is record in table 4. The total illegal parking in one day is 271 cars. Which get from, 20 illegal parkers in A1, 27 in A2, 77 in A3 and 147 in parking area B. Parking area B has a large numbers of illegal parking, which is they user park their car on motorcycles parking spaces and a along the road to the COE building. Figure 4 show users park their car at motorcycles parking spaces. Figure 5 show users park their car along the road to the COE building.

Figure 4. User park their car at Figure 5. Users park their cars motorcycles parking spaces along the road to the COE building. From table 5 the average turnover rate for all area in COE is 0.532. It is mean for whole COE parking area each parking spaces is have a rate of 0.532 of parking occupy in one hour. TR = NT . (1) Ps * Ts

Area Total illegal parking in 3 days (for 22 intervals)

Average total illegal parking for one day (for 22 intervals)

Page 8: UNITEN ICCBT 08 Case Study on Supply and Demand for University Parking

Case Study on Supply and Demand for University Parking Facilities in College of Engineering UNITEN

ICCBT 2008 - E - (36) – pp435-448 442

where TR = parking turnover rate, veh/stall/h

NT = total number of parked vehicles observed Ps = total number of legal parking stall Ts = duration of the study period, h

Table 5. Parking turnover rates

In Universiti Tenaga Nasional (UNITEN), according to UNITEN Students Representation Council Honor Secretary, Mr. Khairul Fadzli Bin Azmi, among the most complaint from UNITEN students, are the parking facilities problems for College of Engineering (COE) students. This approved by 300 questionnaires among the COE students, 88% said they have parking problem in COE . Meanwhile, 41% claimed they have more than 5 times parking problem in one week. In determination of parking supply load, table 6 state for total area of COE parking it is only 60.9% of parking supply load. Which proportion in each area as 70.4% in parking area A1, 89% in parking area A2, 77% in parking area A3, 77.9% in parking area B and 5.16% for parking area C.

Table 6. Parking supply load

A1 A2 A3 B C TOTAL Numbers of intervals (a) 22 22 22 22 22 22 Numbers of parking (b) 74 199 20 24 64 323 Numbers of car in 22 intervals 1147 2331 339 412 98 4325 Parking load = a/(b*c) 70.4% 89.0% 77.0% 77.9% 5.16% 60.9% 5.2 Future Parking Demand Statistic from Safety Office (car sticker registration) give from 3500 COE students in table 7, only 870 students apply for car sticker. This total numbers are come proportion from out campus which is 256 applications, Ilmu apartment 165 applications, Murni apartment 110

Area Total number of parked vehicles, NT

Total numbers of Parking stalls, Ps

Duration study period, Ts

Turnover rates, TR

A1 254.00 74 22 0.60 A2 498.00 119 22 0.73 A3 71.00 20 22 0.62 B 98.00 24 22 0.71 C 24.00 86 22 0.001

Total 945 323 - - Average - - 22 0.532

Page 9: UNITEN ICCBT 08 Case Study on Supply and Demand for University Parking

S. Norhisham and N. Ismail.

ICCBT 2008 - E - (36) – pp435-448 443

applications, Cendiakawan apartment 148 applications and Amanah apartment 191 applications.

Table 7. Numbers of car sticker registration

Numbers of car sticker registered Out Campus 256 Ilmu Apartment 165 Murni Apartment 110 Cendiakawan Apartment 148 Amanah Apartment 191 Total 870

Questionnaire data give, 42% from 3500 COE students which about 1470 students driving to COE by car. For comparison, only 870 students from 1470 students who’s driving car to COE have car sticker registration, which give a value of 59.18%. The rest, about 40.81% of students don’t have car stickers. As the recommended zoning requirements is 85th percentile demand and from table of Recommended Parking Spaces Zoning Requirements in Suburban, the zone regulation is plus with 0.1% from calculation. Therefore the recommended parking spaces zoning requirements in suburban settings for university and college is 86%. From parkinng generation, average parking rate per base unit for technical college is 0.44 and the total of student in College of Engineering is 3500 students in five years (this data will get from administration data collection). From this two data the estimation of future parking demand in 5 years for 3500 students in COE is 1540 parking spaces. And as a calculation with zoning requirement, the future parking demand is 1325 parking spaces. With parking demand calculation, with data 3500 students, assuming 1000 students are there in peak hours, assuming average 10 classes happened in one hour (110 activities in 11 hours), 42% students COE driving a car, average auto occupancy is 1, most purpose coming to COE consider as 1 (coming to COE for class), the parking demand (with zoning requirement) is 1325 parking spaces. Table 8 shows the two value of different method, which is parking generation table and parking demand calculation

Table 8. Differentiate values of parking generation table and parking demand calculation

Parking generation table Parking demand

calculation Future parking demand

(with zoning requirements)

1324.4 parking spaces

1324.27 parking spaces

Page 10: UNITEN ICCBT 08 Case Study on Supply and Demand for University Parking

Case Study on Supply and Demand for University Parking Facilities in College of Engineering UNITEN

ICCBT 2008 - E - (36) – pp435-448 444

6. DISCUSSION As claims by parking users, 88% of them having a parking problem. But in the parking usage survey, only at parking A2 is consider have parking problem. The others and average parking load doesn’t consider as having problem. The parking area A2 always nearly occupied because it is at strategic location near to BM and BL building which is most lecture conduct at those building.

The user also claims they have parking problem because they really search for free parking spaces. It is can be approve by accumulation data which give average parking spaces 100% occupy is only one and half hours in one day and each areas. Besides that even though, the others intervals (times) is not 100% occupy the numbers of illegal parking give a big statistic, which is average 271 illegal parking in one day (11 hours). This proves, it is not the parking areas are always fully occupied, but the attitudes of user who are in hurry not really searching the empty parking spaces. The car sticker registration statistic gives only 59.18% from 1470 of COE car students parking user whose 88% of them have a parking problem. If consideration of only for whose have a car sticker, which is 870 users, the parking supply is consider enough because from total parking supply analysis it can receives 908 vehicles in one day (11 hours) for value capability of 321 parking spaces.

As a recommended parking spaces zoning requirements and parking generations, the future parking demand is calculate (with zoning requirements) as 1325 parking spaces for 3500 students in next five(5) years. In parking demand calculation, with data statistic from data collection and parking user survey, the future parking demand is calculate same as parking generation table which is 1325 parking spaces for 3500 students in next five(5) years. As a result, it proves the calculation is same as theoretical table of parking generation. 7. CONCLUSION The main focus of this predominantly case study based project was on the supply and demand car-parking facilities for students in College of Engineering (COE), UNITEN. The objectives were to identify the current parking supply and next five years parking demand in case study area and gave suggestions or recommendations to solving the problem. The study consist parking inventory, parking usage survey using license plate numbers method and parking interview for determination the current parking supply in COE. From the result of current data, the next five years future parking demand had been estimated by study and information from the administration data, questionnaire, parking space zoning regulation and parking generation. Recommendations had been suggested according to the result of demand parking facilities for the next five years. As a result from parking interview, 88% students claimed, they had a parking problem in COE. But this situation was opposite as in calculation of current parking supply which give only parking area A2 exist 85% parking load percentage which was 89% and can considered as have parking problem. For future parking demand 1325 parking spaces should be provided in 5 years time.

Page 11: UNITEN ICCBT 08 Case Study on Supply and Demand for University Parking

S. Norhisham and N. Ismail.

ICCBT 2008 - E - (36) – pp435-448 445

8. RECOMMENDATION Back to solving the parking problem, there are two ways to solve the problem, either supply new parking spaces or reduce the parking demand. 8.1 Supply New Parking Area In next five year the future parking demand is five times more than current parking spaces. To supply a new parking can be reconstruct and reline the parking bay, develop a new area or built a parking building. To reconstruct and reline the parking bay in COE parking it is impossible because in part of parking spaces area has a divided island and cover drainage system. To build parking building will be costly and need also new area. The suitable solution is to develop a new area which is a grass flat area besides of COE café parking area B. Figure 6.1 show a new suggested parking area.

Figure 6. New suggested parking area

8.2 Reduce Parking Demand One way to reduce the parking demand is controlling system and regulates charging policy. There was number of reason why some form of control system may be required for a development car park. These include:

1) Desire to generate revenue from car park 2) To deter car parking not associated with the development itself 3) To prevent vehicles entering the car park when it is full 4) Security 5) To restrict times of use of car park

In this case study, the pioneer task must to reduce the parking is to have a regulation of user that can park the car. Although the car system is introduce, but the local authority, which is Safety Officer, should strict in the regulations. The regulations to not allow first years students that had done 4 years ago should be continue to reduce the parking demand. The rational is all first year student is given priority to register staying in hostel, which have shuttle bus in campus movement. In the same time the quality of service in public transportation should be also improve to make a better organize transportation system. The campaign of using shuttle bus should be conduct to reduce the demand. As example the

Page 12: UNITEN ICCBT 08 Case Study on Supply and Demand for University Parking

Case Study on Supply and Demand for University Parking Facilities in College of Engineering UNITEN

ICCBT 2008 - E - (36) – pp435-448 446

shuttle bus riders should give a merit to collect in whole semester and who’s having the highest merit should be priority to parking in next semester. ‘Park and Ride’ system should be introduced to make sure more parking demand decrease. REFERENCES [1]. William R. McShane, Roger P. Roess, 1990, Traffic Engineering. United States:

Prencite-Hall, Inc.

[2]. Roger P. Roess, Elena S. Prassas, William R. McShane, 2004, Traffic Engineering Third Edition. United State: Pearson Prencite-Hall.

[3]. James H. Bank, 2004, Introduction to Transportation. New York: Mc Graw Hill.

[4]. Thomas R. Currin, 1990, Introduction to Traffic Engineering – A Manual for Data Collection and Analysis. London:

[5]. Carol Ashley, 1994, Traffic and Highway Engineering for Development. Great Britain: Black Scientific Publications

[6]. M. Slinn, P. Matthews & P. Guest, 1998, Traffic Enginering Design: Principle & Practice. Great Britain: Arnolds Publishers.

[7]. Ellen Kollie, staff writer, College planning & Management, May 2004 http://www.peterli.com/archive/cpm/681.shtm

[8]. http://darkwing.uoregon.edu/~uplan/subjects/transpo/BRWreport.html

[9]. http://www.globalsecurity.org/military/library/policy/army/fm/19-25/CH27.htm

[10]. http://www.desman.com/hotproperty/task,view/id,49/Itemid,168/

[11]. http://www.desman.com/hotproperty/task,view/id,47/Itemid,168/

[12]. http://www.desman.com/hotproperty/task,view/id,44/Itemid,168/

[13]. http://www.trafficgroup.com/services/parkingOcc.html

[14]. http://www.wenck.com/sitepages/pid177.php

[15]. http://www.cityofseattle.net/transportation/parking/parkingstudy.html

[16]. http://darkwing.uoregon.edu/~uplan/subjects/transpo/BRWreport.html

Page 13: UNITEN ICCBT 08 Case Study on Supply and Demand for University Parking

S. Norhisham and N. Ismail.

ICCBT 2008 - E - (36) – pp435-448 447

Questionnaires result from 300 students

a) Percentage of students College of Engineering driving a car to COE.

YES NO 41.67% 58.33%

b) Origin and destination of the vehicular trip

c) Trip purpose to COE Trip frequency Trip in one day Trip in one week d) Duration in COE

e) Occupancy per trip (numbers of person in one car) f) Parking place

Apartments /home

Others building than COE

Café Others

75% 15% 6% 4%

Class Lecturer Appointment

Society activities

Others

75% 14% 8% 3%

1 2 3 4 5 More than 5 15% 37% 21% 7% 4% 16%

1 2 3 4 5 More than 5 0% 3% 9% 24% 29% 35%

1 hour 2 hours 3 hours 4 hours 5 hours More than 5 hours 9% 18% 18% 15% 10% 30%

1 2 3 4 5 71% 31% 10% 5% 1%

A1 A2 A3 B C 71% 31% 10% 5% 1%

Page 14: UNITEN ICCBT 08 Case Study on Supply and Demand for University Parking

Case Study on Supply and Demand for University Parking Facilities in College of Engineering UNITEN

ICCBT 2008 - E - (36) – pp435-448 448

A1, A2, A3 : In Front of COE building B : In front COE café C : BV building g) Have a parking problem i) Frequency having parking problem in one week h) Peak hours of parking

YES NO Sometimes 88% 7% 12%

none 1 2 3 4 5 More than 5 7% 7% 15% 20% 7% 3% 41%

8am –

10am

10am –

12pm

12pm –

2pm

2pm -

4pm

4pm -

6pm

6pm -

8pm 13% 43% 23% 18% 2% 1%