UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGIONS 1445 ROSSAVENUE, SUITE 1200 DALLAS TX 75202-2733 DEC 2 1 2015 Mr. Dave Roybal Director ofOperations Transwestem Pipeline Company, LLC 85 01 Jefferson, N .E. Albuquerque, New Mexico 87113 RE: Transwestem Pipeline Company, LLC- Application for Renewal of Operating Permit, Compressor Station No. 6 - Laguna, Part 71 Title V Permit Number R6NM-2-08R2 (replaces Dear Mr. Roybal: We are in receipt ofyourrenewal application dated October 31,2012, and supporting docwnentation dated AuguSt II and 20, 2014. Additional application information requested and received in our office on October 2 and 14, 2015, provided clarification for statements contained in the renewal. application. In accordance. with Title V of the Clean Air Act and 40 Code of Federal Regulations (CFR) Part 11, the U.S. Environmental Protection Agency (EPA) has determined that cause exists for a renewal of the Part 71 Title V permit. Requirements found in 40 CFR § 71.11 state notice shall be provided on the preparation of a draft permit. The EPA will publish a public notice of the permitting action in a local newspaper of general circulation and allow for a30-day public comment period. We will notifY you of the date of public notice for· submission of comments and the opportunity to request a public hearing. Enclosed is a copy of the statementofbasis, public alld draft penuit'foryour review. Copiesofthese docwnentsmay also be obtained at the EPA Region 6 Web Site: http://wwwcepa.gov/caa-permitting!part-71-operating-permits-tribal-lands-epas-south-central- region. The draft permit and the statement of basis will also be available atthe Pueblo of Laguna .Library in Laguna, New Mexico. The EPA will consider and answer all comments in making its final decision on the permit and keep a record ofthe persons commenting and the issues raised during the public participation process. JntemetAddress (URL) • http://www.epa.gov/region6 Recycled/Recyclable Printed with Vegetable 01! Based Inks on iOO% Postconsumer, Process Chlorine Free Recycled Paper

Transcript of UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe...

Page 1: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGIONS

1445 ROSSA VENUE SUITE 1200 DALLAS TX 75202-2733

DEC 2 12015

Mr Dave Roybal Director ofOperations Transwestem Pipeline Company LLC 8501 Jefferson N E Albuquerque New Mexico 87113

RE Transwestem Pipeline Company LLC- Application for Renewal ofOperating Permit Compressor Station No 6 - Laguna Part 71 Title V Permit Number R6NM-2-08R2 (replaces R6NM-Ol~08RI)

Dear Mr Roybal

We are in receipt ofyourrenewal application dated October 312012 and supporting docwnentation dated AuguSt II and 20 2014 Additional application information requested and received in our office on October 2 and 14 2015 provided clarification for statements contained in the renewal application

In accordance with Title V of the Clean Air Act and 40 Code of Federal Regulations (CFR) Part 11 the US Environmental Protection Agency (EPA) has determined that cause exists for a renewal of the Part 71 Title V permit Requirements found in 40 CFR sect 7111 state notice shall be provided on the preparation ofa draft permit The EPA will publish a public notice of the permitting action in a local newspaper ofgeneral circulation and allow for a30-day public comment period We will notifY you of the date ofpublic notice formiddot submission of comments and the opportunity to request a public hearing

Enclosed is acopy of the statementofbasis public 11oti~e alld draft penuitforyour review Copiesofthese docwnentsmay also be obtained at the EPA Region 6 Web Site httpwwwcepagovcaa-permittingpart -71-operating-permits-tribal-lands-epas-south-centralshyregion The draft permit and the statement of basis will also be available atthe Pueblo ofLaguna Library in Laguna New Mexico The EPA will consider and answer all comments in making its final decision on the permit and keep a record ofthe persons commenting and the issues raised during the public participation process

JntemetAddress (URL) bull httpwwwepagovregion6 RecycledRecyclable bull Printed with Vegetable 01 Based Inks on iOO Postconsumer Process Chlorine Free Recycled Paper

Should you have any questions regarding the draft permit please feel free to contact Randy Pitre of my staff at the above address or e-mail at pitrerandyepagov or telephone at (214) 665shy7299

Sincerely yours middot ~

~~ Wren Stenger bull J Director Multime(iia Planning and Permitting Division

cc (wEnclosures) Adam M Ringia Environmental artoi Natural Resources Director Pueblo ofLaguna Environmental Program

Ms Jeanne Hoadley Air and Water Quality Specialist Santa Fe National Forest

CDR Me~ldith B()nd PE USPHS Oeputy Chief USlish and Wildlife Service Branchof Air Quality

Mr John Bunyak Chief Policy Plarming and Permit Review Branch Air Resources Division National Park Service- AIR

() j

I

FEDERAL CLEAN AIR ACT TITLE V OPERATING PERMIT

FOR

TRANSWESTERN PIPELINKCOMPANY LLC

COMPRESSOR STATION No 6- LAGUNA

LAGUNA CIBOLA COUNTyen NEW MEXICO

Based On 40 Colle ofFedera Regulations (CFR) Part 71

Federal Qperating Pennit Program Promulgated July I 1996

C) middot----~UNITED STATES ENVIRONMENTAL PROTECTIONAGENCY

REGION6 1445 ROSS AVENUE ~UITE 1200

DALLAS TX 75202-2733

FEDERAL CLEAN AIR ACT TITLEV OPERATING PERMIT

ISSl~Date -------- permit Number R6NMbull208R2 ________Effective Date Replaceslenriit Number R6NM-Ol-08RI Expiration Date ------shy

In accorda~e with the provisions pf title V oftbe Clean Air Act and 40 CFRParf71 and applicable rules and regulations

Transwestem Pipeline Cptnpany LLC Compressor StationNo 6 - LaglJla Laguna Cibola County New Mexico

is authorized to operate air emission unitS arid to conduct other air pollutant emitting activities in accordance wiih the permit conditions listed in this permit

This source is authorized to operate in the following location(s)

05 miles south of Laguna NewMexico in Cibola County Latitude 35deg 01 56 LOngitude I07deg 40 4Q

Laguria PueblpinNew Mexico

Terms not otherwise defined in this perniit have the meaning assigned to them in the referenced regulations All terms and conditipns of the pefulit ue enforceable by the Environmental Protection Agency (EPA) and citizens under the Clean Air Act

Any control measure andor equipment not properly installedoperatced and maintained will be considered a violation of the permit

The permit number cited above shoq]d be referenced in future correspondence regarding this facility

Wren Stenger Date Director Multimedia Planning and Permitting Division United States Environmental Protection Agency

ii

TABLE OF CONTENTS

Terms Abbreviations and Acronyms v

List of Tables v

l Source IdentificlltiQl and Unit Specific Infqrmation L I General Source lnfdrmation 12 Sourcepoundmission Points 2

---c--~----~fab[e-1-Ernission-tJnits-and-eontroi-Devtc-eo-Tramrwestemiipel1ne Company rrcmiddot---------+ Compressor Station No6- Llt~guna 2

Table 2 Potentialto Emit in Tons per Year (tpy) Transwestern Pipeline Company LLC Compressor Station No6- Laguna 3

2 Permit Shield [40CFRsection 716(f)] 4

3 Applicable Requirements and General Permit Conditions 4 31 Applicable Requirements 4 Table 3 Applicable Regulations for Transwestern Pipeline Company LLC Compressor

Station No 6 - Laguna 5 32 General Permit Requirements 5

4 Engine National Emission Standards for Hazardous Air Pollutants (NESHAP) Requirements 7 41 General Provisions 7 42 Requirements for Emissions Unit No 621 7 43 General Compliance Requirements for Emissions Unit No 621 8 44 Performance Requirements for Emissions Unit No621 8 45 Continuous Compliance Requirements for Emissions Unit No 621 9 46 Recordkeeping Requirements for Emissions Unit No 621 9 47 RepolillgRequirementsfor Emissions Unit No 621 10

5 Title yenAdministrative Requirements 10 51 Annual Fee Payment 10 52 Blanket Compliance Statement 13 53Compliance Certifications 14 54 Duty to Provide and Supplement lnformation 14 55 Submissions 15 56 Severability Clause 15 57middotPermit Actions 15 58 Administrative Permit Amendments 16 59Minor Permit Modifications 16 510 Group Processing of Minor Permit Modifications 18 511 Significant Permit Modifications 19 512 Reopening for Cause 20

iii

513 Property Rights 20 514 lnspeCtionand Enhy 20 515 Transfer of Ownership or Operation 21 516 OffPermit Changes 21 517 Permit Expiration jlld Renewal 22 518 Credible Evidcentiice 23

V

Terms Abbreviations and Acronyms

Source Facility CAA CFR HAP

--------------~m

IDNo MMBtu mrnscfyr NOx lMlo PM25 SOz EPA voc IC engine

List of Tables

Tablel

Table2

Table 3

Transwestern Pipeline Company LLC Comptesslir Station No 6 -laguna Transwestern Pipeline Company LLC Compressor Station No 6 -laguna Clean Air Act [42 United States Code Section 7401 et ~] Code of Federal Regulations Hazardous Air Pollutant nour

IdentificationNumber Million BritishThennal Units Million Standard Cubic Feet per year Niqogen Oxides Particulate matter less than 10 microns in diameter Particulate matter less than 25 microns in diameter Sulfur Dioxide United States Environmental Protection Agency Volatile Organic Compounds internal combustion engine ~formerly referred to as reciprocating engine

Source Emission Points and Control Devices

Potential to Ernitin Tons per Year

Applicable Requirements

v

()Transwestem Pipeline Company C9Jllpressor Station No 6- La~una 121l720l5 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ql-08RJ) Draft Permit

1 Source Identification and UnitSpecific Information

llGeqer~lS(lurce Informati(ln

Owner and Operator

Plant Naine

Plant location

EPA Region

State

Tribe

County

Reservation

Plant mailing aoldtess

Responsible Official

I l Plarit Contact

TrjSwesterJJ Pipeline Company LLC amp501 Jefferson NE Albuquerque New Mexico 87113

Compressor Station No(~ Laguna

05 miles South ofLaguna New Mexico

6

NewMexico

Laguna

Cibola

Laguna Pueblo

850 I Jefferson NE Albuquerque New Mexico 87113

DliYil ~Qybal Director ofOperations Transwestem Pipeline Company LLC 8501 Jefferson NE Albuquefqu(l New Mexico 87113 Phone (575)347-6514

Lawrence Campbell Transwestem Pipeline Company LLC 8501 Jefferson NE Albuquerque NewMexico 87113 Phone (575)625-8022

Standard IndustrialCode (SIC) Code 4922

Aerometric Infonnation Retrieval System (AIRS) Facility System Plant ID No R6NM-2-08R2 (replaces R6NM-01-08Rl) ()

1

I

I

Tratl$w~stem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NM-01-08RI) Draft Pennit

Description of Proqess TranswestemPipeline Company LLC Compressor Station No 6- Laguna with SIC code 4922 is a natural gas compression and transmission facility with pressurized natural gas as its principal product

---------12-SourceEmission-lointiH~ndclotential-to-Emit~--------------------t

Table I below provides important information related to significant emissions units at Transwestem Pipeline Company LLCs Compressor Station No 6- Laguna including dates of installation size opound the units serial numbers and any associated control equipment Table 2 lists the potential to emit (PTE) ofair pollutants from the source which will be usedto determine and report deviations to EPA as required by Conditions 3264 and 329 of this permit

Tablet Source Emission Points and Control Devices- Transwestern Pipeline Company LLC Compressor Station No 6 - Laguna

Unit No Type of

Unit Serial No

Manufacturer Model No

De$igHeat Input

Operating Range or

Size of Unit

Date of Installation

Primary Use

Control Equipment

601 ICEngine 107510

CtarkTVCl2 3465 MMBtuhr 4500HP 1961 Compressor

ltrive None

602 lCEngine 107511

Clark TVC-12 3465 MMBtuhr

4500-HP 1967 Compressor

ltrive None

603 1C Engine

107512 Clark TVC-12

3465 MMBtuhr 4500-HP 1967 Compressor

driVe None

621 RIC Engine 129011

Waukesha 42 MMBtuhr

470-HP 1967 Electrical generation None

MIST Fixed Roofsorage Tank

1100-GAL 1966 Natural Gas Condensate None

T2 Fixed Roof Storage Tank

500-BBL 1966 Natural Gas Cltmdensate

None

2

I

I

]

I i I

()Transwestem Pipeline Company Compressor Station No6middot Laguna 121172015 Title VPermitltOperate No R6NM-2-08R2 (repiaces R6NM-O l-08RI) Draft Permit

Table 2 Potential to Emit in Tons per Year (tpy)1- Transwestern Pipeline Company

CompressorStationNo 6- Laguna

UnitiD

601 Clu-k TVCshy12 NGfired Engine

602 Clu-k TVc 12 NCtfired Engine

603 Clu-k TVCshy12 NG fired Engine

62~ Waukesha F3520GUNG Enline FUO

MIST lOOGal Tank

T-2 500BbL Tank

Truck Loadilg

MAIN-SSM

TOTALStpy

Numbers contained mtlus tableareforuncontrolledemSsions are formformatton purposes only and are notan enorceablcent conditio11s See Condition 42 for applicable enforceablemiddotlimitations middot 2 The PMw emission levels fortliesoutcemiddotare within an attainment area Precllsors for PM including )lOX Soz and VOC are monitored for grandfathered unitS or controlled for NESHAP applicable unitsc While thePMto emisSicm rates for the Clark engines are listed for informationalplirposes they may not be reflectivemiddotofPTE for these engines as they could represent calculations from a bad test (totaiPM10 emission levels for this source in the attainment area are considered deminimusfor implementation ofthe PM2csRule and thereforePMzs moniioringwill not be req11ired in this permtaction) NOx- pxides ofnitrogen VOC -volatile organic compounds (nonbullHAP) S02- sulfur dioxide PM0 particulate matter with a diameter 10 microns or less CO - carbon monoxide

3

NOx

4984

4984

4984

046

149566

voc

1822

18)~2

1822

001

134

554

2817

004

092

9068

S02

009

0 09

009

00001

02701

PM25

731

731

731

0004

21934

PM102

731

731

731

0004

21934

co

1512

1512

1512

078

45438

Lead

0

0

0

0

0

0 006 1lOampOo

0 001

00009 27242

0 349019 6736225

11AP3

116

116

116

001

0001

002

GHG

1775712

1775712

1775712

2457

51390

22000

I

- Transwestem Pipeline Company Compressor Station No 6 -Laguna 1211712015 Title V Penni to Operate No R6NM-2-08R2 (replaces R6NM-O 1-08RI) Draft Pennit

HAP- hazardous air pollutants(see CAA Section 112(b)) NG- natural gas 3 Mostly fonllaldehyde

2 PermifShiel1[40 CFR sect 716(f)J

---------2-r--Notniilgin tliis pennifSliallalter or affect the followmg

2lLTheprovisions ofS~ction 303 ofthe CAA(emergencyorclers) including the authorityoftheAlrrlinistrator under that secti(n

212 The liability of a pennittee for any violati(n ofapJgtlicable requirements prior to br atthetime ofpennit issuance or middot

213 The lbility of the EPA to obtain infonnation from a source under Section 114 6ftheCAA

22 Compliance with the tenns and conditions ofthis pennit shall be deemed in cl)Ilpliance with the applicable requirements specifically listed in thispennit as of the date ofpermit issuance

3 Applicable Requirements and General permit Cqnditions

31 Applicable Requirements

The source will continue to comply with all applicable requi~mel)ls For applicable requirements thatwill become effective during the tenn ofthe penni tile source will meet su~h r~quJremeiJ$ on atiYlely bSis The pennittee shall comply with all theapplicable requirements offederalregulltigrts Inparticular the pennittee shall comply with the following

4

( TranswestemPipeline Company Compressor Station No 6 - Laguna 12172015 )TitleV Permitto Operate No R6NM2-08R2 (replaces R6NM-O l-08Rl) Draft Permit

Table 3 Applicable Requirements for Transwestern Pipelilie Company LLC C ta on 0bull - a~tunaompressor StiN6L

Citation Requirement C9mment

40CFR71 FederaLOperating Permits Program

UnitNosmiddot6QJ 602603621

40 CFR6 Subpart A

General Provisions

UnitNq 621

40CFR63 Subpart ZZZZ

National Emission Standardgtforazailous Aili Pollutants for Stationary R~ciproeating Iriternal CombustionmiddotEngines (RICE)

Unit No 621

TlfeTranswesterh Pipeline Company LLC Compressor StationNo 6- Laguna application was reviewed for compliance with the Part 71 Operating Permit Program Based on the inforrnationproviledbyTranswestemPipeline Company LLC in their application Compressqr Stittio)l No 6 (Lag1111a) would be subject to the following General Permit Requirements

32 General Permit Requirements I

Conditions in this section apply to all emissions units located at the facility including anyI units not specifically listed in Table 1

321 All equipment shall be operated in accordance with the manufacturers design values for that equipment

322 flleIIll()lint Of natural gaS llumed in the following emissions ullits shall not exceed the following amounts on a rolling 12-month average

Emissions Unit No 60 I - 289 mmscfyr Emissions Unit No 602-289 mmscfyr Emissions Unit No 603-289 mmscfyr Emissions Unit No 621 - 3504 mmscflyr

323 The actual heat input for Emissions UnitNo 601 Emissions Unit No 602and Emissions Unit No 603 shall not exceed 3465 MMBtulhr adjusted for elevation and for Emissions Unit No 621 the actual heat input shall not exceed 42 MMBtulhr adjusted for elevationmiddot

5

Transwestem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

324 Compliance Tests Compliance tests from units at this source will be conducted using applicable EPA Methods established within 40 CFR Part 51 Appendix M or as otherwise specified in the permit by applicable requirements

325 Monitoring

325J Fuel consumption for Emissions Unit Nos 601 602 603 and 621 shall be monitored witha flow meter monthly for each unit in MMscf (of natural gas)

3252 Heatinputratefor Unit Nos 601 602 603 and 621 shall be monitored Monthly orta per unitbllSis(or individual highest rate in MMBtulhr

326 ReportingRecordkeeping

3261 The permittee shall keep records on all startup shutdown repair and maintenance activities performed on all emission units These records shall identify the relevant emission unit and describe the work performed and calculate any associated emissions

3262 The fuel flowconsumption for each emissions unit (Unit Nos 601 602 603 and 621) shall be recorded on a monthly basis and art annual 12-month rolling average

3263 The records of fuel consumption shall be maintained for each emission unit (Unit Nos 601 602 603and 621) for the last five years

3264 The actualheat input rate for emission Unit Nos 601 602 603 and 621 sh~lbe ~qrlted on a monthly average basis as well as an annual12-month rolling average Ifthe emissions rate ofany ofthe enampines deviates more than 2 above the PTE listed in Table2 ofthis perrrit then the permittee shall evaluate the deviation to determine if there has been a physical change or change in method ofQperation at the source report the deviation and the results of the evaluation to EPA in the report required by Condition329 below and apply for a modification ofthil) pennit ifnecessary

3265 The records of heat input shall be maintainedJor emission Unit Nos 601 602 603 artd 621 for at least the last five years

Cqnditionsin this section apply to all emissions units located atthe facility including any units not specifically listed in Table 1

6

()Transwestern Pipeline Company Compressor Station No 6 Laguna 1211712015 TitleV Permitto Operate No R6NM-2-08R2replaces R6NMOl-08RI) Draft Permit

327 The permittee shall keep records of the serial numbers for each e111ission unit The e111ission ll1its f()rthe RICE and thlir serial nJll11bers are UnitNo 601 withserial nJll11ber 107510 Unit No 602 With serial numo(lr l075UUnitNo 603 with serial number 107512 Unit No 621 with serial number 129011

328 Retenti9n of reltprds ami support information shall be for a period ofat least five years from the date ofmeasurement or report Supportinfonnation includes all calibrationandmamtenance records all origin~ strip-chartrecordings or monitoring instrumeitation and copiltsofall reports [qujJedby thisj)ennjt

329 The pllrmitteeshlill submittothe EPAreportsofany monitoring and recpr~eeping required under this permit8emi-annually )Jy April 1 and O~tober 1of ealtlth year The report due on April l shall cover the prior six--month period from September 1 through the end of February The report due on October l shall cover the prior sixshymonthperiod from March 1 through the end pfAugust

Copies ofthese tecotdsshall also besentto

Environmental Direct()r Pueblo of Laguna PO BoxJ94 Laguna NM 87026

4 EnginllNESHAgtRequirements

41 General Provisions

Thepennittee shalLci)mplywithth(l requirements [rom the NE$HAP General Pfqvisions 40 CFR Part 63 Subpart Afor Emissions Unit No 621 only

42 Requirements for Emissilaquonls UnitNo 6~1I l

421 For Emissions Unit No 621the perniitteeshallmeet the requirements in 422 through 424 below

422 Change oil and filter every 500 hours of operation or annually whichever comes first inspect air cleaner every 1000 hours ofoperation or annually whichever comes first and replace as necessary and inspect aU hoses and

I 7

I

Transwestem Pipeline Company Compressor Station No 6 Laguna 1217205 Title V Permitto Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

belts every 500 hours of operation or annually whichever comes first and replace as necessary [40 CFR sect 636002 Table 2c]

423 Minimize the enginestime spent at idle and minimize the engines startup time at startup to a period needed for appropriate and safe loading ofthe engine not to exceed 30minutesafter which time the non-startup emission

---------~---limitations~pply-[40-CFR--sect6~6002--Iable-2G~~-------------c-t

424 Permittee must install ~~non-resettable hour meter ifone is not already installed [40 CFR sect 636625(f)]

43 General Compliance Requirements for Unit No 621

431 Emissions Unit No 621 must be incompliance with the operating limitations and requirements in Condition 42 at~~ll times [ 40 CFR sect 636605(a)]

432 The permittee must operate and maintain Unit No 621 including air pollution control and monitoring equipment in a manner consistent with good air pollution control practices for minimizing emissions [ 40 CFR sect 636605(b)]

44 Perfonnanee Requirements for Unit No 621

441 As an emergency stationary RICE the permittee must operate Emissions Unit No 621 accordingtotherequirementsof40CFR sect 636640(plusmn)

442 Any operation other than emergency operation maintenance and testing emergency demand response and operation in non-emergency situations for 50 hours per year as described in paragraphs f(l) throug( 4) of40 CFR sect 636640 is prohibited [ 40 CFR sect 636640(plusmn))

443 IfEmissions Unit No 621 is not operated according to the requirements in 40 CFR sect 636640(plusmn)(1) through (f)(4) Emissions Uhit No 621 will not be considered an emergency stationary RICE and it must meet all requirements for non-emergency engines [40 CFR sect 636640(plusmn)]

444 There is no time limit on the use 0femergency stationary RICE in emergency situations [40 CFR sect 636640(plusmn)(2)] middot

445 Emissions Unit No 621 may be operated for up to 50 hours per calendar year in non-emergency situations The 50 hours per year for nonshy

8

Transwestem Pipeline Company Compressor Station No 6 bull Laguna 12fl72015 Title V PermiHo QperateNo R6NMmiddot2middot08RZ(replaces R6NM-Ol-08Rl) Draft Permit

emergency situatipns cartnot be used for peak shaying or non-emergency demand response or to generate income for afacilityto supply power as part o[a financiil arrangement with another entity [ 4QCFRsect 636640(pound)(3)]

446 Pertilitteemay operate Emissions Unit No 621 for any combination of the purposes specified In 40 CFR sect 636640(f)(2)(i)through (iii) for a maximum of 100 hours per calendar year Any operltJiiohfor non-emergency situations as ltJlloVlldby paragraphs 40 CFR sect 63 6640(f)(3) and (4) counts as part ofthe lOOhours per calendamp year allowed ]Jythisparagraph [40 CFRsect 636640(plusmn)(2)]

4S Clntinuous Compliance Requirements for Emissions Unit No 621

Emissions Unit No 621 shall be operated and maintained according to the manufacturers emission-rellited operation and maintenance instructions In the alternative permittee may develop and follow its own maintenance plan which nmst provide to the extent practicable for the maintenance and operation ofEmission Unit No 621 in a martner coiiSisteht with good air pollution control practice for minimizing emissions [40 CFRsect 636640(a) Table 6]

46 Recordkeeping Requirements for Emissions Unit No 621

4(il You mustkeep a copy of each notification and report submitted to comply with 40 CFR Part 63 Subpart ZZZZ including all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted accQrdingto 1herequirementin40 CFR sect~HO(b)(2)(xiv)

462 Records ofthe occurrence and duration of each malfunction ofoperatitm (ie process equipmellt) or any air pollution CQJltrQl and monitoring equipment

463 Records ofaii required maintenance performed on any airpollution control and monitoring equipment

464 The permittee must keep records of the pperating and maintenance conducted ltm Emissions Ulltt No 62 I necessary to ensure compliance with Condition45 above

47 Reporting Requirements (or Emissions Unit No 621

471 Permittee must report each instance in which an applicable emissions limitation operating limitation or requirement in 40 CFR Part 63 Subpart ZZZZ Table 2(c) is not met

9

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 TitleV Pennitto Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

472 These instances are deviations from the emission and operating limitations in 40 CFR Part 63 Subpart zzzz These deviations must be reported according to the requirements in 40 CFR sect 636650

5 Title Y Administrative Requirements

51 Annual Fee Payment [40 CFR sectsect 76(a)(7) and 719]

5I L The pe)Jlittee shall pay an annual permit fee in accordance with the procedures outlinedbelow [40 CFR sect 7l9(a)]

512 ]he )Je)Jlittee shall pay the annual permit fee each year The fee shall be received no later hail July 20 of each year

513 The fee payment shall be in United States currency and shall be paid by money order bank draft certified check corporate check or electronic funds transfer payable to the order ofEP A

514 Thepetmittee shall send fee payment and a completed fee filing form to

Forregular US postal service mail Fornon-US Postal Service express mail

(FedEx AirbomeDHL and UPS)

middotUS Environmental Protection Agency US Bank FOIA and Miscellaneous Payments Government Lockbox 979078 Cincinnati Finance Center US EPA FOfA amp Misc Payments PO Box 979078 1005 Convention Plaza St Louis MO 63197~9000 SL-MQcQ2-GL

St LouisM063101

Contact Craig Steffen 513-487-2091 Contact 314-418-1028 or Eric Volck513-487-2105

For electronic pavment (identifY permit number for payment in form)

Automated Clearinghouse (ACH) for receiving US currency PNCBank ABA 051036706 Account Number 310006 CTX Format Transaction Code 22 -checking

10

TranswestertrPipeline Company Compressor Station No6- Laguna Title V Permitto Operate No R6NMbull2-08R2 (replaces R6NM01~08R1)

121172015 )raft Permit

Environmental Protection Agency 808 17m Street NW Washington DC 20074

Contact Jesse White 301-887-6548

515 The pennitt~ shallsend an updated fee calculation wo~ksheet fonn and a photo~opy ofeach fee payment ~heck (or utherconfinnation ofactual fee paid) submitted annually by the same deadline as required for fee paymenUo the address listed in Section55 ofthis peimit [Note that anannual emissionsreport t~quired atthe same time as the feesalcUJaticmworksheet by40 CPRsect 719(h) has been incorporated intO the fee calculation worksheet fonn as aconvenience]

516 Basisfor~alculating annual fee

bull5161 The annual emissions fee shall be calculated by multiplying the total tons ofactual emissions of a11~egUlated pollutants (for fee calculation) emitted from the source by the emissions fee(in dollarston) in effect atthemiddottime of calculation

51611 Actual emissions means the actllal rate ofemissions in tons per year ofally regulated pollutant(for fee calculation) emitted from a part 71 source over thtl preceding calendar year Actual emissions shall be calcllhlted Using eachemissions units actual operating hours production rates in-place control equipment and types ofmaterials processed stored or combusted during the preceding ~endaryear [See 40 CPR sect 719(c)]

51612 If actual emissions cannot be detenninel )Jsipgthe compliance methods in the pennit the pennittee shall Use other fe~r~ly recognized procedures (40 CFR sect 719(e)(2)]

5L613 The term regulated pollutant (for fee calculation) is qefined in 40 CPR sect 712

51614 The permittee should note that the presumptive fee amount is revised each calendaryear to account for inflation and it is available from EPA prior to the start of each calendar year

5162 The pennittee shall excludethe following emissions from the calculation of fees ()

--middotmiddot--middot

ll

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

51621

51622

-----------------vFR+7-h9(e~)euroii

51623

The amount ofactual emissions ofeach regulated pollutant (for fee calculation) that the source emits in excess of 4000 tons per year See 40 CFR sect 719(c)(S)(i)

Actual emissions of any regulatedpollutant(for fee middot calculation) already included in the fee calculation See 40

The insignificant quantities of actual emissions not required to be listed or calculated in a permit application pursuant to 40 CPRsect 715(c)(11) [40 CPRsect 719(c)(5)(iii)]

517 Fee calculation worksheets shall be certifiedcas tottuthacclllacy and completeness by a responsible official in accordancewi1h 40 CPRsect 715(d)

518 The permittee shall retain fee calculation worksheets and other emissionsshyrelated data used to detennine fee payment for five years following submittal offee payment Elhission-related data include for example emissionsshyrelated forms provided by EPA and used by the pennittee for fee calculation pllrposes emissions-related spreadsheets and emissionsbullrelated data such as records of emissions monitoringdata and related support information required to be kept in accordance with40 CPRsect 716(a)(3)(ii) [See 40 CPR sect 79(i)]

519 Faihtreofthe permittee to pay fees in a timely manner shall subject the permittee to assessmentofpenalties and interest in accQIdancewith40CFR sect 719(1)

5110 The EPA will not act on applications forpermit renewal or modification if the permittee fails to pay all fees interest and penalties owed iri full [See 40 CPR sect 719(m))

5111 When notified by EPA of underpayment of fees the permittee shall remit full payment within 30 days of receipt of notification [See 40 CPR sect 7190)(1) and(2))

5Jl2 Ifthe permittee thinks that the EPA-assessed fee is in error and wishes to challenge the fee the permittee shall provide a written explanation of the alleged error to EPA along with filii payment of the assessed fee [See 40 CFR sect 71 90)(3))

52 Blankd Compliance Statement [40 CPRsectsect 716(a)(6)(i) and (H)]

12

Transwestern Pipeline Company Compressor Station No 6 - Laguna 121172015 CJ TitleVP~rmit to OperateNo R6NM-2-08R2 (replaces R6NM-0 I-08RI) Draft Permit

521 middot The permittee must comply with all conditions ofthis Part 71 permit Any permit noncompliance including Yiolation of any applicable requirement any permit(erm or condition any fee or filing requiteJTIent any duty tomiddotallow or CIIIT) out inspection entry or monitoring actiYities or any regulation or order issued bythe permitting authoritypursuatit to this part constitutes a Yiolation oftheCAA and is grounds for enforcement action permit termination reYocationand~essliance or modification or deni~l ofapertnit renewal application It shall notbe a defense for a permittee in an enforcement ~~ction that it would have been necessary to halt or reduce the permitted actiYity in order to m11intairi compliance with the conditions of this perrnit[40CFR sectsect 716(a)(6)(i)atid(ii)]

Determinations of deYiations continuous or intermittent compliance sts or YiOIItions of this perrnit are not limited to theapplic~ible testing or monitoring methods required by the underlying regulations of thispermit other credible eYidencemust be considered in such determinations [Section 113~a) and 113(e)(l) oftheCAA] middot

i

53 Compliance Certifications[40 CFR sect 716(c)(5)]

I The permittee shall submit to EPA a certificationof compliance withpermit terms and conditions including emission limitations standards or work practices armually Clch year no later thiU April 1 The compliance certification shall coYer tlte same 12 month period as the two consecutiYe semi-atinu~~l monitoring reports The compliance certification shall be certified as to truth accuracyandcompleteness by a responsible official consistent with 4() CFR sect 715(d)

middot 5dl The certification shall includethefollowing

5311 Identification ofeach permit teim or condition that is the basis ofthe certification

5312 Identification ofthe method(s) or other means used for detrmining the compliance status with lteach term and condition during the certification period and whether such methods or other means proYide continuous or intermittentdata If necessary the owner or operator also shall identify any other material infortnation eg operating hours records that must be included in the certification to

middot comply with section 13(c)(2) of the CAA which prohibits knowingly making afalse certification or omitting material 1 information

I i 13middot

I I

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 2: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

Should you have any questions regarding the draft permit please feel free to contact Randy Pitre of my staff at the above address or e-mail at pitrerandyepagov or telephone at (214) 665shy7299

Sincerely yours middot ~

~~ Wren Stenger bull J Director Multime(iia Planning and Permitting Division

cc (wEnclosures) Adam M Ringia Environmental artoi Natural Resources Director Pueblo ofLaguna Environmental Program

Ms Jeanne Hoadley Air and Water Quality Specialist Santa Fe National Forest

CDR Me~ldith B()nd PE USPHS Oeputy Chief USlish and Wildlife Service Branchof Air Quality

Mr John Bunyak Chief Policy Plarming and Permit Review Branch Air Resources Division National Park Service- AIR

() j

I

FEDERAL CLEAN AIR ACT TITLE V OPERATING PERMIT

FOR

TRANSWESTERN PIPELINKCOMPANY LLC

COMPRESSOR STATION No 6- LAGUNA

LAGUNA CIBOLA COUNTyen NEW MEXICO

Based On 40 Colle ofFedera Regulations (CFR) Part 71

Federal Qperating Pennit Program Promulgated July I 1996

C) middot----~UNITED STATES ENVIRONMENTAL PROTECTIONAGENCY

REGION6 1445 ROSS AVENUE ~UITE 1200

DALLAS TX 75202-2733

FEDERAL CLEAN AIR ACT TITLEV OPERATING PERMIT

ISSl~Date -------- permit Number R6NMbull208R2 ________Effective Date Replaceslenriit Number R6NM-Ol-08RI Expiration Date ------shy

In accorda~e with the provisions pf title V oftbe Clean Air Act and 40 CFRParf71 and applicable rules and regulations

Transwestem Pipeline Cptnpany LLC Compressor StationNo 6 - LaglJla Laguna Cibola County New Mexico

is authorized to operate air emission unitS arid to conduct other air pollutant emitting activities in accordance wiih the permit conditions listed in this permit

This source is authorized to operate in the following location(s)

05 miles south of Laguna NewMexico in Cibola County Latitude 35deg 01 56 LOngitude I07deg 40 4Q

Laguria PueblpinNew Mexico

Terms not otherwise defined in this perniit have the meaning assigned to them in the referenced regulations All terms and conditipns of the pefulit ue enforceable by the Environmental Protection Agency (EPA) and citizens under the Clean Air Act

Any control measure andor equipment not properly installedoperatced and maintained will be considered a violation of the permit

The permit number cited above shoq]d be referenced in future correspondence regarding this facility

Wren Stenger Date Director Multimedia Planning and Permitting Division United States Environmental Protection Agency

ii

TABLE OF CONTENTS

Terms Abbreviations and Acronyms v

List of Tables v

l Source IdentificlltiQl and Unit Specific Infqrmation L I General Source lnfdrmation 12 Sourcepoundmission Points 2

---c--~----~fab[e-1-Ernission-tJnits-and-eontroi-Devtc-eo-Tramrwestemiipel1ne Company rrcmiddot---------+ Compressor Station No6- Llt~guna 2

Table 2 Potentialto Emit in Tons per Year (tpy) Transwestern Pipeline Company LLC Compressor Station No6- Laguna 3

2 Permit Shield [40CFRsection 716(f)] 4

3 Applicable Requirements and General Permit Conditions 4 31 Applicable Requirements 4 Table 3 Applicable Regulations for Transwestern Pipeline Company LLC Compressor

Station No 6 - Laguna 5 32 General Permit Requirements 5

4 Engine National Emission Standards for Hazardous Air Pollutants (NESHAP) Requirements 7 41 General Provisions 7 42 Requirements for Emissions Unit No 621 7 43 General Compliance Requirements for Emissions Unit No 621 8 44 Performance Requirements for Emissions Unit No621 8 45 Continuous Compliance Requirements for Emissions Unit No 621 9 46 Recordkeeping Requirements for Emissions Unit No 621 9 47 RepolillgRequirementsfor Emissions Unit No 621 10

5 Title yenAdministrative Requirements 10 51 Annual Fee Payment 10 52 Blanket Compliance Statement 13 53Compliance Certifications 14 54 Duty to Provide and Supplement lnformation 14 55 Submissions 15 56 Severability Clause 15 57middotPermit Actions 15 58 Administrative Permit Amendments 16 59Minor Permit Modifications 16 510 Group Processing of Minor Permit Modifications 18 511 Significant Permit Modifications 19 512 Reopening for Cause 20

iii

513 Property Rights 20 514 lnspeCtionand Enhy 20 515 Transfer of Ownership or Operation 21 516 OffPermit Changes 21 517 Permit Expiration jlld Renewal 22 518 Credible Evidcentiice 23

V

Terms Abbreviations and Acronyms

Source Facility CAA CFR HAP

--------------~m

IDNo MMBtu mrnscfyr NOx lMlo PM25 SOz EPA voc IC engine

List of Tables

Tablel

Table2

Table 3

Transwestern Pipeline Company LLC Comptesslir Station No 6 -laguna Transwestern Pipeline Company LLC Compressor Station No 6 -laguna Clean Air Act [42 United States Code Section 7401 et ~] Code of Federal Regulations Hazardous Air Pollutant nour

IdentificationNumber Million BritishThennal Units Million Standard Cubic Feet per year Niqogen Oxides Particulate matter less than 10 microns in diameter Particulate matter less than 25 microns in diameter Sulfur Dioxide United States Environmental Protection Agency Volatile Organic Compounds internal combustion engine ~formerly referred to as reciprocating engine

Source Emission Points and Control Devices

Potential to Ernitin Tons per Year

Applicable Requirements

v

()Transwestem Pipeline Company C9Jllpressor Station No 6- La~una 121l720l5 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ql-08RJ) Draft Permit

1 Source Identification and UnitSpecific Information

llGeqer~lS(lurce Informati(ln

Owner and Operator

Plant Naine

Plant location

EPA Region

State

Tribe

County

Reservation

Plant mailing aoldtess

Responsible Official

I l Plarit Contact

TrjSwesterJJ Pipeline Company LLC amp501 Jefferson NE Albuquerque New Mexico 87113

Compressor Station No(~ Laguna

05 miles South ofLaguna New Mexico

6

NewMexico

Laguna

Cibola

Laguna Pueblo

850 I Jefferson NE Albuquerque New Mexico 87113

DliYil ~Qybal Director ofOperations Transwestem Pipeline Company LLC 8501 Jefferson NE Albuquefqu(l New Mexico 87113 Phone (575)347-6514

Lawrence Campbell Transwestem Pipeline Company LLC 8501 Jefferson NE Albuquerque NewMexico 87113 Phone (575)625-8022

Standard IndustrialCode (SIC) Code 4922

Aerometric Infonnation Retrieval System (AIRS) Facility System Plant ID No R6NM-2-08R2 (replaces R6NM-01-08Rl) ()

1

I

I

Tratl$w~stem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NM-01-08RI) Draft Pennit

Description of Proqess TranswestemPipeline Company LLC Compressor Station No 6- Laguna with SIC code 4922 is a natural gas compression and transmission facility with pressurized natural gas as its principal product

---------12-SourceEmission-lointiH~ndclotential-to-Emit~--------------------t

Table I below provides important information related to significant emissions units at Transwestem Pipeline Company LLCs Compressor Station No 6- Laguna including dates of installation size opound the units serial numbers and any associated control equipment Table 2 lists the potential to emit (PTE) ofair pollutants from the source which will be usedto determine and report deviations to EPA as required by Conditions 3264 and 329 of this permit

Tablet Source Emission Points and Control Devices- Transwestern Pipeline Company LLC Compressor Station No 6 - Laguna

Unit No Type of

Unit Serial No

Manufacturer Model No

De$igHeat Input

Operating Range or

Size of Unit

Date of Installation

Primary Use

Control Equipment

601 ICEngine 107510

CtarkTVCl2 3465 MMBtuhr 4500HP 1961 Compressor

ltrive None

602 lCEngine 107511

Clark TVC-12 3465 MMBtuhr

4500-HP 1967 Compressor

ltrive None

603 1C Engine

107512 Clark TVC-12

3465 MMBtuhr 4500-HP 1967 Compressor

driVe None

621 RIC Engine 129011

Waukesha 42 MMBtuhr

470-HP 1967 Electrical generation None

MIST Fixed Roofsorage Tank

1100-GAL 1966 Natural Gas Condensate None

T2 Fixed Roof Storage Tank

500-BBL 1966 Natural Gas Cltmdensate

None

2

I

I

]

I i I

()Transwestem Pipeline Company Compressor Station No6middot Laguna 121172015 Title VPermitltOperate No R6NM-2-08R2 (repiaces R6NM-O l-08RI) Draft Permit

Table 2 Potential to Emit in Tons per Year (tpy)1- Transwestern Pipeline Company

CompressorStationNo 6- Laguna

UnitiD

601 Clu-k TVCshy12 NGfired Engine

602 Clu-k TVc 12 NCtfired Engine

603 Clu-k TVCshy12 NG fired Engine

62~ Waukesha F3520GUNG Enline FUO

MIST lOOGal Tank

T-2 500BbL Tank

Truck Loadilg

MAIN-SSM

TOTALStpy

Numbers contained mtlus tableareforuncontrolledemSsions are formformatton purposes only and are notan enorceablcent conditio11s See Condition 42 for applicable enforceablemiddotlimitations middot 2 The PMw emission levels fortliesoutcemiddotare within an attainment area Precllsors for PM including )lOX Soz and VOC are monitored for grandfathered unitS or controlled for NESHAP applicable unitsc While thePMto emisSicm rates for the Clark engines are listed for informationalplirposes they may not be reflectivemiddotofPTE for these engines as they could represent calculations from a bad test (totaiPM10 emission levels for this source in the attainment area are considered deminimusfor implementation ofthe PM2csRule and thereforePMzs moniioringwill not be req11ired in this permtaction) NOx- pxides ofnitrogen VOC -volatile organic compounds (nonbullHAP) S02- sulfur dioxide PM0 particulate matter with a diameter 10 microns or less CO - carbon monoxide

3

NOx

4984

4984

4984

046

149566

voc

1822

18)~2

1822

001

134

554

2817

004

092

9068

S02

009

0 09

009

00001

02701

PM25

731

731

731

0004

21934

PM102

731

731

731

0004

21934

co

1512

1512

1512

078

45438

Lead

0

0

0

0

0

0 006 1lOampOo

0 001

00009 27242

0 349019 6736225

11AP3

116

116

116

001

0001

002

GHG

1775712

1775712

1775712

2457

51390

22000

I

- Transwestem Pipeline Company Compressor Station No 6 -Laguna 1211712015 Title V Penni to Operate No R6NM-2-08R2 (replaces R6NM-O 1-08RI) Draft Pennit

HAP- hazardous air pollutants(see CAA Section 112(b)) NG- natural gas 3 Mostly fonllaldehyde

2 PermifShiel1[40 CFR sect 716(f)J

---------2-r--Notniilgin tliis pennifSliallalter or affect the followmg

2lLTheprovisions ofS~ction 303 ofthe CAA(emergencyorclers) including the authorityoftheAlrrlinistrator under that secti(n

212 The liability of a pennittee for any violati(n ofapJgtlicable requirements prior to br atthetime ofpennit issuance or middot

213 The lbility of the EPA to obtain infonnation from a source under Section 114 6ftheCAA

22 Compliance with the tenns and conditions ofthis pennit shall be deemed in cl)Ilpliance with the applicable requirements specifically listed in thispennit as of the date ofpermit issuance

3 Applicable Requirements and General permit Cqnditions

31 Applicable Requirements

The source will continue to comply with all applicable requi~mel)ls For applicable requirements thatwill become effective during the tenn ofthe penni tile source will meet su~h r~quJremeiJ$ on atiYlely bSis The pennittee shall comply with all theapplicable requirements offederalregulltigrts Inparticular the pennittee shall comply with the following

4

( TranswestemPipeline Company Compressor Station No 6 - Laguna 12172015 )TitleV Permitto Operate No R6NM2-08R2 (replaces R6NM-O l-08Rl) Draft Permit

Table 3 Applicable Requirements for Transwestern Pipelilie Company LLC C ta on 0bull - a~tunaompressor StiN6L

Citation Requirement C9mment

40CFR71 FederaLOperating Permits Program

UnitNosmiddot6QJ 602603621

40 CFR6 Subpart A

General Provisions

UnitNq 621

40CFR63 Subpart ZZZZ

National Emission Standardgtforazailous Aili Pollutants for Stationary R~ciproeating Iriternal CombustionmiddotEngines (RICE)

Unit No 621

TlfeTranswesterh Pipeline Company LLC Compressor StationNo 6- Laguna application was reviewed for compliance with the Part 71 Operating Permit Program Based on the inforrnationproviledbyTranswestemPipeline Company LLC in their application Compressqr Stittio)l No 6 (Lag1111a) would be subject to the following General Permit Requirements

32 General Permit Requirements I

Conditions in this section apply to all emissions units located at the facility including anyI units not specifically listed in Table 1

321 All equipment shall be operated in accordance with the manufacturers design values for that equipment

322 flleIIll()lint Of natural gaS llumed in the following emissions ullits shall not exceed the following amounts on a rolling 12-month average

Emissions Unit No 60 I - 289 mmscfyr Emissions Unit No 602-289 mmscfyr Emissions Unit No 603-289 mmscfyr Emissions Unit No 621 - 3504 mmscflyr

323 The actual heat input for Emissions UnitNo 601 Emissions Unit No 602and Emissions Unit No 603 shall not exceed 3465 MMBtulhr adjusted for elevation and for Emissions Unit No 621 the actual heat input shall not exceed 42 MMBtulhr adjusted for elevationmiddot

5

Transwestem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

324 Compliance Tests Compliance tests from units at this source will be conducted using applicable EPA Methods established within 40 CFR Part 51 Appendix M or as otherwise specified in the permit by applicable requirements

325 Monitoring

325J Fuel consumption for Emissions Unit Nos 601 602 603 and 621 shall be monitored witha flow meter monthly for each unit in MMscf (of natural gas)

3252 Heatinputratefor Unit Nos 601 602 603 and 621 shall be monitored Monthly orta per unitbllSis(or individual highest rate in MMBtulhr

326 ReportingRecordkeeping

3261 The permittee shall keep records on all startup shutdown repair and maintenance activities performed on all emission units These records shall identify the relevant emission unit and describe the work performed and calculate any associated emissions

3262 The fuel flowconsumption for each emissions unit (Unit Nos 601 602 603 and 621) shall be recorded on a monthly basis and art annual 12-month rolling average

3263 The records of fuel consumption shall be maintained for each emission unit (Unit Nos 601 602 603and 621) for the last five years

3264 The actualheat input rate for emission Unit Nos 601 602 603 and 621 sh~lbe ~qrlted on a monthly average basis as well as an annual12-month rolling average Ifthe emissions rate ofany ofthe enampines deviates more than 2 above the PTE listed in Table2 ofthis perrrit then the permittee shall evaluate the deviation to determine if there has been a physical change or change in method ofQperation at the source report the deviation and the results of the evaluation to EPA in the report required by Condition329 below and apply for a modification ofthil) pennit ifnecessary

3265 The records of heat input shall be maintainedJor emission Unit Nos 601 602 603 artd 621 for at least the last five years

Cqnditionsin this section apply to all emissions units located atthe facility including any units not specifically listed in Table 1

6

()Transwestern Pipeline Company Compressor Station No 6 Laguna 1211712015 TitleV Permitto Operate No R6NM-2-08R2replaces R6NMOl-08RI) Draft Permit

327 The permittee shall keep records of the serial numbers for each e111ission unit The e111ission ll1its f()rthe RICE and thlir serial nJll11bers are UnitNo 601 withserial nJll11ber 107510 Unit No 602 With serial numo(lr l075UUnitNo 603 with serial number 107512 Unit No 621 with serial number 129011

328 Retenti9n of reltprds ami support information shall be for a period ofat least five years from the date ofmeasurement or report Supportinfonnation includes all calibrationandmamtenance records all origin~ strip-chartrecordings or monitoring instrumeitation and copiltsofall reports [qujJedby thisj)ennjt

329 The pllrmitteeshlill submittothe EPAreportsofany monitoring and recpr~eeping required under this permit8emi-annually )Jy April 1 and O~tober 1of ealtlth year The report due on April l shall cover the prior six--month period from September 1 through the end of February The report due on October l shall cover the prior sixshymonthperiod from March 1 through the end pfAugust

Copies ofthese tecotdsshall also besentto

Environmental Direct()r Pueblo of Laguna PO BoxJ94 Laguna NM 87026

4 EnginllNESHAgtRequirements

41 General Provisions

Thepennittee shalLci)mplywithth(l requirements [rom the NE$HAP General Pfqvisions 40 CFR Part 63 Subpart Afor Emissions Unit No 621 only

42 Requirements for Emissilaquonls UnitNo 6~1I l

421 For Emissions Unit No 621the perniitteeshallmeet the requirements in 422 through 424 below

422 Change oil and filter every 500 hours of operation or annually whichever comes first inspect air cleaner every 1000 hours ofoperation or annually whichever comes first and replace as necessary and inspect aU hoses and

I 7

I

Transwestem Pipeline Company Compressor Station No 6 Laguna 1217205 Title V Permitto Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

belts every 500 hours of operation or annually whichever comes first and replace as necessary [40 CFR sect 636002 Table 2c]

423 Minimize the enginestime spent at idle and minimize the engines startup time at startup to a period needed for appropriate and safe loading ofthe engine not to exceed 30minutesafter which time the non-startup emission

---------~---limitations~pply-[40-CFR--sect6~6002--Iable-2G~~-------------c-t

424 Permittee must install ~~non-resettable hour meter ifone is not already installed [40 CFR sect 636625(f)]

43 General Compliance Requirements for Unit No 621

431 Emissions Unit No 621 must be incompliance with the operating limitations and requirements in Condition 42 at~~ll times [ 40 CFR sect 636605(a)]

432 The permittee must operate and maintain Unit No 621 including air pollution control and monitoring equipment in a manner consistent with good air pollution control practices for minimizing emissions [ 40 CFR sect 636605(b)]

44 Perfonnanee Requirements for Unit No 621

441 As an emergency stationary RICE the permittee must operate Emissions Unit No 621 accordingtotherequirementsof40CFR sect 636640(plusmn)

442 Any operation other than emergency operation maintenance and testing emergency demand response and operation in non-emergency situations for 50 hours per year as described in paragraphs f(l) throug( 4) of40 CFR sect 636640 is prohibited [ 40 CFR sect 636640(plusmn))

443 IfEmissions Unit No 621 is not operated according to the requirements in 40 CFR sect 636640(plusmn)(1) through (f)(4) Emissions Uhit No 621 will not be considered an emergency stationary RICE and it must meet all requirements for non-emergency engines [40 CFR sect 636640(plusmn)]

444 There is no time limit on the use 0femergency stationary RICE in emergency situations [40 CFR sect 636640(plusmn)(2)] middot

445 Emissions Unit No 621 may be operated for up to 50 hours per calendar year in non-emergency situations The 50 hours per year for nonshy

8

Transwestem Pipeline Company Compressor Station No 6 bull Laguna 12fl72015 Title V PermiHo QperateNo R6NMmiddot2middot08RZ(replaces R6NM-Ol-08Rl) Draft Permit

emergency situatipns cartnot be used for peak shaying or non-emergency demand response or to generate income for afacilityto supply power as part o[a financiil arrangement with another entity [ 4QCFRsect 636640(pound)(3)]

446 Pertilitteemay operate Emissions Unit No 621 for any combination of the purposes specified In 40 CFR sect 636640(f)(2)(i)through (iii) for a maximum of 100 hours per calendar year Any operltJiiohfor non-emergency situations as ltJlloVlldby paragraphs 40 CFR sect 63 6640(f)(3) and (4) counts as part ofthe lOOhours per calendamp year allowed ]Jythisparagraph [40 CFRsect 636640(plusmn)(2)]

4S Clntinuous Compliance Requirements for Emissions Unit No 621

Emissions Unit No 621 shall be operated and maintained according to the manufacturers emission-rellited operation and maintenance instructions In the alternative permittee may develop and follow its own maintenance plan which nmst provide to the extent practicable for the maintenance and operation ofEmission Unit No 621 in a martner coiiSisteht with good air pollution control practice for minimizing emissions [40 CFRsect 636640(a) Table 6]

46 Recordkeeping Requirements for Emissions Unit No 621

4(il You mustkeep a copy of each notification and report submitted to comply with 40 CFR Part 63 Subpart ZZZZ including all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted accQrdingto 1herequirementin40 CFR sect~HO(b)(2)(xiv)

462 Records ofthe occurrence and duration of each malfunction ofoperatitm (ie process equipmellt) or any air pollution CQJltrQl and monitoring equipment

463 Records ofaii required maintenance performed on any airpollution control and monitoring equipment

464 The permittee must keep records of the pperating and maintenance conducted ltm Emissions Ulltt No 62 I necessary to ensure compliance with Condition45 above

47 Reporting Requirements (or Emissions Unit No 621

471 Permittee must report each instance in which an applicable emissions limitation operating limitation or requirement in 40 CFR Part 63 Subpart ZZZZ Table 2(c) is not met

9

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 TitleV Pennitto Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

472 These instances are deviations from the emission and operating limitations in 40 CFR Part 63 Subpart zzzz These deviations must be reported according to the requirements in 40 CFR sect 636650

5 Title Y Administrative Requirements

51 Annual Fee Payment [40 CFR sectsect 76(a)(7) and 719]

5I L The pe)Jlittee shall pay an annual permit fee in accordance with the procedures outlinedbelow [40 CFR sect 7l9(a)]

512 ]he )Je)Jlittee shall pay the annual permit fee each year The fee shall be received no later hail July 20 of each year

513 The fee payment shall be in United States currency and shall be paid by money order bank draft certified check corporate check or electronic funds transfer payable to the order ofEP A

514 Thepetmittee shall send fee payment and a completed fee filing form to

Forregular US postal service mail Fornon-US Postal Service express mail

(FedEx AirbomeDHL and UPS)

middotUS Environmental Protection Agency US Bank FOIA and Miscellaneous Payments Government Lockbox 979078 Cincinnati Finance Center US EPA FOfA amp Misc Payments PO Box 979078 1005 Convention Plaza St Louis MO 63197~9000 SL-MQcQ2-GL

St LouisM063101

Contact Craig Steffen 513-487-2091 Contact 314-418-1028 or Eric Volck513-487-2105

For electronic pavment (identifY permit number for payment in form)

Automated Clearinghouse (ACH) for receiving US currency PNCBank ABA 051036706 Account Number 310006 CTX Format Transaction Code 22 -checking

10

TranswestertrPipeline Company Compressor Station No6- Laguna Title V Permitto Operate No R6NMbull2-08R2 (replaces R6NM01~08R1)

121172015 )raft Permit

Environmental Protection Agency 808 17m Street NW Washington DC 20074

Contact Jesse White 301-887-6548

515 The pennitt~ shallsend an updated fee calculation wo~ksheet fonn and a photo~opy ofeach fee payment ~heck (or utherconfinnation ofactual fee paid) submitted annually by the same deadline as required for fee paymenUo the address listed in Section55 ofthis peimit [Note that anannual emissionsreport t~quired atthe same time as the feesalcUJaticmworksheet by40 CPRsect 719(h) has been incorporated intO the fee calculation worksheet fonn as aconvenience]

516 Basisfor~alculating annual fee

bull5161 The annual emissions fee shall be calculated by multiplying the total tons ofactual emissions of a11~egUlated pollutants (for fee calculation) emitted from the source by the emissions fee(in dollarston) in effect atthemiddottime of calculation

51611 Actual emissions means the actllal rate ofemissions in tons per year ofally regulated pollutant(for fee calculation) emitted from a part 71 source over thtl preceding calendar year Actual emissions shall be calcllhlted Using eachemissions units actual operating hours production rates in-place control equipment and types ofmaterials processed stored or combusted during the preceding ~endaryear [See 40 CPR sect 719(c)]

51612 If actual emissions cannot be detenninel )Jsipgthe compliance methods in the pennit the pennittee shall Use other fe~r~ly recognized procedures (40 CFR sect 719(e)(2)]

5L613 The term regulated pollutant (for fee calculation) is qefined in 40 CPR sect 712

51614 The permittee should note that the presumptive fee amount is revised each calendaryear to account for inflation and it is available from EPA prior to the start of each calendar year

5162 The pennittee shall excludethe following emissions from the calculation of fees ()

--middotmiddot--middot

ll

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

51621

51622

-----------------vFR+7-h9(e~)euroii

51623

The amount ofactual emissions ofeach regulated pollutant (for fee calculation) that the source emits in excess of 4000 tons per year See 40 CFR sect 719(c)(S)(i)

Actual emissions of any regulatedpollutant(for fee middot calculation) already included in the fee calculation See 40

The insignificant quantities of actual emissions not required to be listed or calculated in a permit application pursuant to 40 CPRsect 715(c)(11) [40 CPRsect 719(c)(5)(iii)]

517 Fee calculation worksheets shall be certifiedcas tottuthacclllacy and completeness by a responsible official in accordancewi1h 40 CPRsect 715(d)

518 The permittee shall retain fee calculation worksheets and other emissionsshyrelated data used to detennine fee payment for five years following submittal offee payment Elhission-related data include for example emissionsshyrelated forms provided by EPA and used by the pennittee for fee calculation pllrposes emissions-related spreadsheets and emissionsbullrelated data such as records of emissions monitoringdata and related support information required to be kept in accordance with40 CPRsect 716(a)(3)(ii) [See 40 CPR sect 79(i)]

519 Faihtreofthe permittee to pay fees in a timely manner shall subject the permittee to assessmentofpenalties and interest in accQIdancewith40CFR sect 719(1)

5110 The EPA will not act on applications forpermit renewal or modification if the permittee fails to pay all fees interest and penalties owed iri full [See 40 CPR sect 719(m))

5111 When notified by EPA of underpayment of fees the permittee shall remit full payment within 30 days of receipt of notification [See 40 CPR sect 7190)(1) and(2))

5Jl2 Ifthe permittee thinks that the EPA-assessed fee is in error and wishes to challenge the fee the permittee shall provide a written explanation of the alleged error to EPA along with filii payment of the assessed fee [See 40 CFR sect 71 90)(3))

52 Blankd Compliance Statement [40 CPRsectsect 716(a)(6)(i) and (H)]

12

Transwestern Pipeline Company Compressor Station No 6 - Laguna 121172015 CJ TitleVP~rmit to OperateNo R6NM-2-08R2 (replaces R6NM-0 I-08RI) Draft Permit

521 middot The permittee must comply with all conditions ofthis Part 71 permit Any permit noncompliance including Yiolation of any applicable requirement any permit(erm or condition any fee or filing requiteJTIent any duty tomiddotallow or CIIIT) out inspection entry or monitoring actiYities or any regulation or order issued bythe permitting authoritypursuatit to this part constitutes a Yiolation oftheCAA and is grounds for enforcement action permit termination reYocationand~essliance or modification or deni~l ofapertnit renewal application It shall notbe a defense for a permittee in an enforcement ~~ction that it would have been necessary to halt or reduce the permitted actiYity in order to m11intairi compliance with the conditions of this perrnit[40CFR sectsect 716(a)(6)(i)atid(ii)]

Determinations of deYiations continuous or intermittent compliance sts or YiOIItions of this perrnit are not limited to theapplic~ible testing or monitoring methods required by the underlying regulations of thispermit other credible eYidencemust be considered in such determinations [Section 113~a) and 113(e)(l) oftheCAA] middot

i

53 Compliance Certifications[40 CFR sect 716(c)(5)]

I The permittee shall submit to EPA a certificationof compliance withpermit terms and conditions including emission limitations standards or work practices armually Clch year no later thiU April 1 The compliance certification shall coYer tlte same 12 month period as the two consecutiYe semi-atinu~~l monitoring reports The compliance certification shall be certified as to truth accuracyandcompleteness by a responsible official consistent with 4() CFR sect 715(d)

middot 5dl The certification shall includethefollowing

5311 Identification ofeach permit teim or condition that is the basis ofthe certification

5312 Identification ofthe method(s) or other means used for detrmining the compliance status with lteach term and condition during the certification period and whether such methods or other means proYide continuous or intermittentdata If necessary the owner or operator also shall identify any other material infortnation eg operating hours records that must be included in the certification to

middot comply with section 13(c)(2) of the CAA which prohibits knowingly making afalse certification or omitting material 1 information

I i 13middot

I I

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 3: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

FEDERAL CLEAN AIR ACT TITLE V OPERATING PERMIT

FOR

TRANSWESTERN PIPELINKCOMPANY LLC

COMPRESSOR STATION No 6- LAGUNA

LAGUNA CIBOLA COUNTyen NEW MEXICO

Based On 40 Colle ofFedera Regulations (CFR) Part 71

Federal Qperating Pennit Program Promulgated July I 1996

C) middot----~UNITED STATES ENVIRONMENTAL PROTECTIONAGENCY

REGION6 1445 ROSS AVENUE ~UITE 1200

DALLAS TX 75202-2733

FEDERAL CLEAN AIR ACT TITLEV OPERATING PERMIT

ISSl~Date -------- permit Number R6NMbull208R2 ________Effective Date Replaceslenriit Number R6NM-Ol-08RI Expiration Date ------shy

In accorda~e with the provisions pf title V oftbe Clean Air Act and 40 CFRParf71 and applicable rules and regulations

Transwestem Pipeline Cptnpany LLC Compressor StationNo 6 - LaglJla Laguna Cibola County New Mexico

is authorized to operate air emission unitS arid to conduct other air pollutant emitting activities in accordance wiih the permit conditions listed in this permit

This source is authorized to operate in the following location(s)

05 miles south of Laguna NewMexico in Cibola County Latitude 35deg 01 56 LOngitude I07deg 40 4Q

Laguria PueblpinNew Mexico

Terms not otherwise defined in this perniit have the meaning assigned to them in the referenced regulations All terms and conditipns of the pefulit ue enforceable by the Environmental Protection Agency (EPA) and citizens under the Clean Air Act

Any control measure andor equipment not properly installedoperatced and maintained will be considered a violation of the permit

The permit number cited above shoq]d be referenced in future correspondence regarding this facility

Wren Stenger Date Director Multimedia Planning and Permitting Division United States Environmental Protection Agency

ii

TABLE OF CONTENTS

Terms Abbreviations and Acronyms v

List of Tables v

l Source IdentificlltiQl and Unit Specific Infqrmation L I General Source lnfdrmation 12 Sourcepoundmission Points 2

---c--~----~fab[e-1-Ernission-tJnits-and-eontroi-Devtc-eo-Tramrwestemiipel1ne Company rrcmiddot---------+ Compressor Station No6- Llt~guna 2

Table 2 Potentialto Emit in Tons per Year (tpy) Transwestern Pipeline Company LLC Compressor Station No6- Laguna 3

2 Permit Shield [40CFRsection 716(f)] 4

3 Applicable Requirements and General Permit Conditions 4 31 Applicable Requirements 4 Table 3 Applicable Regulations for Transwestern Pipeline Company LLC Compressor

Station No 6 - Laguna 5 32 General Permit Requirements 5

4 Engine National Emission Standards for Hazardous Air Pollutants (NESHAP) Requirements 7 41 General Provisions 7 42 Requirements for Emissions Unit No 621 7 43 General Compliance Requirements for Emissions Unit No 621 8 44 Performance Requirements for Emissions Unit No621 8 45 Continuous Compliance Requirements for Emissions Unit No 621 9 46 Recordkeeping Requirements for Emissions Unit No 621 9 47 RepolillgRequirementsfor Emissions Unit No 621 10

5 Title yenAdministrative Requirements 10 51 Annual Fee Payment 10 52 Blanket Compliance Statement 13 53Compliance Certifications 14 54 Duty to Provide and Supplement lnformation 14 55 Submissions 15 56 Severability Clause 15 57middotPermit Actions 15 58 Administrative Permit Amendments 16 59Minor Permit Modifications 16 510 Group Processing of Minor Permit Modifications 18 511 Significant Permit Modifications 19 512 Reopening for Cause 20

iii

513 Property Rights 20 514 lnspeCtionand Enhy 20 515 Transfer of Ownership or Operation 21 516 OffPermit Changes 21 517 Permit Expiration jlld Renewal 22 518 Credible Evidcentiice 23

V

Terms Abbreviations and Acronyms

Source Facility CAA CFR HAP

--------------~m

IDNo MMBtu mrnscfyr NOx lMlo PM25 SOz EPA voc IC engine

List of Tables

Tablel

Table2

Table 3

Transwestern Pipeline Company LLC Comptesslir Station No 6 -laguna Transwestern Pipeline Company LLC Compressor Station No 6 -laguna Clean Air Act [42 United States Code Section 7401 et ~] Code of Federal Regulations Hazardous Air Pollutant nour

IdentificationNumber Million BritishThennal Units Million Standard Cubic Feet per year Niqogen Oxides Particulate matter less than 10 microns in diameter Particulate matter less than 25 microns in diameter Sulfur Dioxide United States Environmental Protection Agency Volatile Organic Compounds internal combustion engine ~formerly referred to as reciprocating engine

Source Emission Points and Control Devices

Potential to Ernitin Tons per Year

Applicable Requirements

v

()Transwestem Pipeline Company C9Jllpressor Station No 6- La~una 121l720l5 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ql-08RJ) Draft Permit

1 Source Identification and UnitSpecific Information

llGeqer~lS(lurce Informati(ln

Owner and Operator

Plant Naine

Plant location

EPA Region

State

Tribe

County

Reservation

Plant mailing aoldtess

Responsible Official

I l Plarit Contact

TrjSwesterJJ Pipeline Company LLC amp501 Jefferson NE Albuquerque New Mexico 87113

Compressor Station No(~ Laguna

05 miles South ofLaguna New Mexico

6

NewMexico

Laguna

Cibola

Laguna Pueblo

850 I Jefferson NE Albuquerque New Mexico 87113

DliYil ~Qybal Director ofOperations Transwestem Pipeline Company LLC 8501 Jefferson NE Albuquefqu(l New Mexico 87113 Phone (575)347-6514

Lawrence Campbell Transwestem Pipeline Company LLC 8501 Jefferson NE Albuquerque NewMexico 87113 Phone (575)625-8022

Standard IndustrialCode (SIC) Code 4922

Aerometric Infonnation Retrieval System (AIRS) Facility System Plant ID No R6NM-2-08R2 (replaces R6NM-01-08Rl) ()

1

I

I

Tratl$w~stem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NM-01-08RI) Draft Pennit

Description of Proqess TranswestemPipeline Company LLC Compressor Station No 6- Laguna with SIC code 4922 is a natural gas compression and transmission facility with pressurized natural gas as its principal product

---------12-SourceEmission-lointiH~ndclotential-to-Emit~--------------------t

Table I below provides important information related to significant emissions units at Transwestem Pipeline Company LLCs Compressor Station No 6- Laguna including dates of installation size opound the units serial numbers and any associated control equipment Table 2 lists the potential to emit (PTE) ofair pollutants from the source which will be usedto determine and report deviations to EPA as required by Conditions 3264 and 329 of this permit

Tablet Source Emission Points and Control Devices- Transwestern Pipeline Company LLC Compressor Station No 6 - Laguna

Unit No Type of

Unit Serial No

Manufacturer Model No

De$igHeat Input

Operating Range or

Size of Unit

Date of Installation

Primary Use

Control Equipment

601 ICEngine 107510

CtarkTVCl2 3465 MMBtuhr 4500HP 1961 Compressor

ltrive None

602 lCEngine 107511

Clark TVC-12 3465 MMBtuhr

4500-HP 1967 Compressor

ltrive None

603 1C Engine

107512 Clark TVC-12

3465 MMBtuhr 4500-HP 1967 Compressor

driVe None

621 RIC Engine 129011

Waukesha 42 MMBtuhr

470-HP 1967 Electrical generation None

MIST Fixed Roofsorage Tank

1100-GAL 1966 Natural Gas Condensate None

T2 Fixed Roof Storage Tank

500-BBL 1966 Natural Gas Cltmdensate

None

2

I

I

]

I i I

()Transwestem Pipeline Company Compressor Station No6middot Laguna 121172015 Title VPermitltOperate No R6NM-2-08R2 (repiaces R6NM-O l-08RI) Draft Permit

Table 2 Potential to Emit in Tons per Year (tpy)1- Transwestern Pipeline Company

CompressorStationNo 6- Laguna

UnitiD

601 Clu-k TVCshy12 NGfired Engine

602 Clu-k TVc 12 NCtfired Engine

603 Clu-k TVCshy12 NG fired Engine

62~ Waukesha F3520GUNG Enline FUO

MIST lOOGal Tank

T-2 500BbL Tank

Truck Loadilg

MAIN-SSM

TOTALStpy

Numbers contained mtlus tableareforuncontrolledemSsions are formformatton purposes only and are notan enorceablcent conditio11s See Condition 42 for applicable enforceablemiddotlimitations middot 2 The PMw emission levels fortliesoutcemiddotare within an attainment area Precllsors for PM including )lOX Soz and VOC are monitored for grandfathered unitS or controlled for NESHAP applicable unitsc While thePMto emisSicm rates for the Clark engines are listed for informationalplirposes they may not be reflectivemiddotofPTE for these engines as they could represent calculations from a bad test (totaiPM10 emission levels for this source in the attainment area are considered deminimusfor implementation ofthe PM2csRule and thereforePMzs moniioringwill not be req11ired in this permtaction) NOx- pxides ofnitrogen VOC -volatile organic compounds (nonbullHAP) S02- sulfur dioxide PM0 particulate matter with a diameter 10 microns or less CO - carbon monoxide

3

NOx

4984

4984

4984

046

149566

voc

1822

18)~2

1822

001

134

554

2817

004

092

9068

S02

009

0 09

009

00001

02701

PM25

731

731

731

0004

21934

PM102

731

731

731

0004

21934

co

1512

1512

1512

078

45438

Lead

0

0

0

0

0

0 006 1lOampOo

0 001

00009 27242

0 349019 6736225

11AP3

116

116

116

001

0001

002

GHG

1775712

1775712

1775712

2457

51390

22000

I

- Transwestem Pipeline Company Compressor Station No 6 -Laguna 1211712015 Title V Penni to Operate No R6NM-2-08R2 (replaces R6NM-O 1-08RI) Draft Pennit

HAP- hazardous air pollutants(see CAA Section 112(b)) NG- natural gas 3 Mostly fonllaldehyde

2 PermifShiel1[40 CFR sect 716(f)J

---------2-r--Notniilgin tliis pennifSliallalter or affect the followmg

2lLTheprovisions ofS~ction 303 ofthe CAA(emergencyorclers) including the authorityoftheAlrrlinistrator under that secti(n

212 The liability of a pennittee for any violati(n ofapJgtlicable requirements prior to br atthetime ofpennit issuance or middot

213 The lbility of the EPA to obtain infonnation from a source under Section 114 6ftheCAA

22 Compliance with the tenns and conditions ofthis pennit shall be deemed in cl)Ilpliance with the applicable requirements specifically listed in thispennit as of the date ofpermit issuance

3 Applicable Requirements and General permit Cqnditions

31 Applicable Requirements

The source will continue to comply with all applicable requi~mel)ls For applicable requirements thatwill become effective during the tenn ofthe penni tile source will meet su~h r~quJremeiJ$ on atiYlely bSis The pennittee shall comply with all theapplicable requirements offederalregulltigrts Inparticular the pennittee shall comply with the following

4

( TranswestemPipeline Company Compressor Station No 6 - Laguna 12172015 )TitleV Permitto Operate No R6NM2-08R2 (replaces R6NM-O l-08Rl) Draft Permit

Table 3 Applicable Requirements for Transwestern Pipelilie Company LLC C ta on 0bull - a~tunaompressor StiN6L

Citation Requirement C9mment

40CFR71 FederaLOperating Permits Program

UnitNosmiddot6QJ 602603621

40 CFR6 Subpart A

General Provisions

UnitNq 621

40CFR63 Subpart ZZZZ

National Emission Standardgtforazailous Aili Pollutants for Stationary R~ciproeating Iriternal CombustionmiddotEngines (RICE)

Unit No 621

TlfeTranswesterh Pipeline Company LLC Compressor StationNo 6- Laguna application was reviewed for compliance with the Part 71 Operating Permit Program Based on the inforrnationproviledbyTranswestemPipeline Company LLC in their application Compressqr Stittio)l No 6 (Lag1111a) would be subject to the following General Permit Requirements

32 General Permit Requirements I

Conditions in this section apply to all emissions units located at the facility including anyI units not specifically listed in Table 1

321 All equipment shall be operated in accordance with the manufacturers design values for that equipment

322 flleIIll()lint Of natural gaS llumed in the following emissions ullits shall not exceed the following amounts on a rolling 12-month average

Emissions Unit No 60 I - 289 mmscfyr Emissions Unit No 602-289 mmscfyr Emissions Unit No 603-289 mmscfyr Emissions Unit No 621 - 3504 mmscflyr

323 The actual heat input for Emissions UnitNo 601 Emissions Unit No 602and Emissions Unit No 603 shall not exceed 3465 MMBtulhr adjusted for elevation and for Emissions Unit No 621 the actual heat input shall not exceed 42 MMBtulhr adjusted for elevationmiddot

5

Transwestem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

324 Compliance Tests Compliance tests from units at this source will be conducted using applicable EPA Methods established within 40 CFR Part 51 Appendix M or as otherwise specified in the permit by applicable requirements

325 Monitoring

325J Fuel consumption for Emissions Unit Nos 601 602 603 and 621 shall be monitored witha flow meter monthly for each unit in MMscf (of natural gas)

3252 Heatinputratefor Unit Nos 601 602 603 and 621 shall be monitored Monthly orta per unitbllSis(or individual highest rate in MMBtulhr

326 ReportingRecordkeeping

3261 The permittee shall keep records on all startup shutdown repair and maintenance activities performed on all emission units These records shall identify the relevant emission unit and describe the work performed and calculate any associated emissions

3262 The fuel flowconsumption for each emissions unit (Unit Nos 601 602 603 and 621) shall be recorded on a monthly basis and art annual 12-month rolling average

3263 The records of fuel consumption shall be maintained for each emission unit (Unit Nos 601 602 603and 621) for the last five years

3264 The actualheat input rate for emission Unit Nos 601 602 603 and 621 sh~lbe ~qrlted on a monthly average basis as well as an annual12-month rolling average Ifthe emissions rate ofany ofthe enampines deviates more than 2 above the PTE listed in Table2 ofthis perrrit then the permittee shall evaluate the deviation to determine if there has been a physical change or change in method ofQperation at the source report the deviation and the results of the evaluation to EPA in the report required by Condition329 below and apply for a modification ofthil) pennit ifnecessary

3265 The records of heat input shall be maintainedJor emission Unit Nos 601 602 603 artd 621 for at least the last five years

Cqnditionsin this section apply to all emissions units located atthe facility including any units not specifically listed in Table 1

6

()Transwestern Pipeline Company Compressor Station No 6 Laguna 1211712015 TitleV Permitto Operate No R6NM-2-08R2replaces R6NMOl-08RI) Draft Permit

327 The permittee shall keep records of the serial numbers for each e111ission unit The e111ission ll1its f()rthe RICE and thlir serial nJll11bers are UnitNo 601 withserial nJll11ber 107510 Unit No 602 With serial numo(lr l075UUnitNo 603 with serial number 107512 Unit No 621 with serial number 129011

328 Retenti9n of reltprds ami support information shall be for a period ofat least five years from the date ofmeasurement or report Supportinfonnation includes all calibrationandmamtenance records all origin~ strip-chartrecordings or monitoring instrumeitation and copiltsofall reports [qujJedby thisj)ennjt

329 The pllrmitteeshlill submittothe EPAreportsofany monitoring and recpr~eeping required under this permit8emi-annually )Jy April 1 and O~tober 1of ealtlth year The report due on April l shall cover the prior six--month period from September 1 through the end of February The report due on October l shall cover the prior sixshymonthperiod from March 1 through the end pfAugust

Copies ofthese tecotdsshall also besentto

Environmental Direct()r Pueblo of Laguna PO BoxJ94 Laguna NM 87026

4 EnginllNESHAgtRequirements

41 General Provisions

Thepennittee shalLci)mplywithth(l requirements [rom the NE$HAP General Pfqvisions 40 CFR Part 63 Subpart Afor Emissions Unit No 621 only

42 Requirements for Emissilaquonls UnitNo 6~1I l

421 For Emissions Unit No 621the perniitteeshallmeet the requirements in 422 through 424 below

422 Change oil and filter every 500 hours of operation or annually whichever comes first inspect air cleaner every 1000 hours ofoperation or annually whichever comes first and replace as necessary and inspect aU hoses and

I 7

I

Transwestem Pipeline Company Compressor Station No 6 Laguna 1217205 Title V Permitto Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

belts every 500 hours of operation or annually whichever comes first and replace as necessary [40 CFR sect 636002 Table 2c]

423 Minimize the enginestime spent at idle and minimize the engines startup time at startup to a period needed for appropriate and safe loading ofthe engine not to exceed 30minutesafter which time the non-startup emission

---------~---limitations~pply-[40-CFR--sect6~6002--Iable-2G~~-------------c-t

424 Permittee must install ~~non-resettable hour meter ifone is not already installed [40 CFR sect 636625(f)]

43 General Compliance Requirements for Unit No 621

431 Emissions Unit No 621 must be incompliance with the operating limitations and requirements in Condition 42 at~~ll times [ 40 CFR sect 636605(a)]

432 The permittee must operate and maintain Unit No 621 including air pollution control and monitoring equipment in a manner consistent with good air pollution control practices for minimizing emissions [ 40 CFR sect 636605(b)]

44 Perfonnanee Requirements for Unit No 621

441 As an emergency stationary RICE the permittee must operate Emissions Unit No 621 accordingtotherequirementsof40CFR sect 636640(plusmn)

442 Any operation other than emergency operation maintenance and testing emergency demand response and operation in non-emergency situations for 50 hours per year as described in paragraphs f(l) throug( 4) of40 CFR sect 636640 is prohibited [ 40 CFR sect 636640(plusmn))

443 IfEmissions Unit No 621 is not operated according to the requirements in 40 CFR sect 636640(plusmn)(1) through (f)(4) Emissions Uhit No 621 will not be considered an emergency stationary RICE and it must meet all requirements for non-emergency engines [40 CFR sect 636640(plusmn)]

444 There is no time limit on the use 0femergency stationary RICE in emergency situations [40 CFR sect 636640(plusmn)(2)] middot

445 Emissions Unit No 621 may be operated for up to 50 hours per calendar year in non-emergency situations The 50 hours per year for nonshy

8

Transwestem Pipeline Company Compressor Station No 6 bull Laguna 12fl72015 Title V PermiHo QperateNo R6NMmiddot2middot08RZ(replaces R6NM-Ol-08Rl) Draft Permit

emergency situatipns cartnot be used for peak shaying or non-emergency demand response or to generate income for afacilityto supply power as part o[a financiil arrangement with another entity [ 4QCFRsect 636640(pound)(3)]

446 Pertilitteemay operate Emissions Unit No 621 for any combination of the purposes specified In 40 CFR sect 636640(f)(2)(i)through (iii) for a maximum of 100 hours per calendar year Any operltJiiohfor non-emergency situations as ltJlloVlldby paragraphs 40 CFR sect 63 6640(f)(3) and (4) counts as part ofthe lOOhours per calendamp year allowed ]Jythisparagraph [40 CFRsect 636640(plusmn)(2)]

4S Clntinuous Compliance Requirements for Emissions Unit No 621

Emissions Unit No 621 shall be operated and maintained according to the manufacturers emission-rellited operation and maintenance instructions In the alternative permittee may develop and follow its own maintenance plan which nmst provide to the extent practicable for the maintenance and operation ofEmission Unit No 621 in a martner coiiSisteht with good air pollution control practice for minimizing emissions [40 CFRsect 636640(a) Table 6]

46 Recordkeeping Requirements for Emissions Unit No 621

4(il You mustkeep a copy of each notification and report submitted to comply with 40 CFR Part 63 Subpart ZZZZ including all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted accQrdingto 1herequirementin40 CFR sect~HO(b)(2)(xiv)

462 Records ofthe occurrence and duration of each malfunction ofoperatitm (ie process equipmellt) or any air pollution CQJltrQl and monitoring equipment

463 Records ofaii required maintenance performed on any airpollution control and monitoring equipment

464 The permittee must keep records of the pperating and maintenance conducted ltm Emissions Ulltt No 62 I necessary to ensure compliance with Condition45 above

47 Reporting Requirements (or Emissions Unit No 621

471 Permittee must report each instance in which an applicable emissions limitation operating limitation or requirement in 40 CFR Part 63 Subpart ZZZZ Table 2(c) is not met

9

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 TitleV Pennitto Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

472 These instances are deviations from the emission and operating limitations in 40 CFR Part 63 Subpart zzzz These deviations must be reported according to the requirements in 40 CFR sect 636650

5 Title Y Administrative Requirements

51 Annual Fee Payment [40 CFR sectsect 76(a)(7) and 719]

5I L The pe)Jlittee shall pay an annual permit fee in accordance with the procedures outlinedbelow [40 CFR sect 7l9(a)]

512 ]he )Je)Jlittee shall pay the annual permit fee each year The fee shall be received no later hail July 20 of each year

513 The fee payment shall be in United States currency and shall be paid by money order bank draft certified check corporate check or electronic funds transfer payable to the order ofEP A

514 Thepetmittee shall send fee payment and a completed fee filing form to

Forregular US postal service mail Fornon-US Postal Service express mail

(FedEx AirbomeDHL and UPS)

middotUS Environmental Protection Agency US Bank FOIA and Miscellaneous Payments Government Lockbox 979078 Cincinnati Finance Center US EPA FOfA amp Misc Payments PO Box 979078 1005 Convention Plaza St Louis MO 63197~9000 SL-MQcQ2-GL

St LouisM063101

Contact Craig Steffen 513-487-2091 Contact 314-418-1028 or Eric Volck513-487-2105

For electronic pavment (identifY permit number for payment in form)

Automated Clearinghouse (ACH) for receiving US currency PNCBank ABA 051036706 Account Number 310006 CTX Format Transaction Code 22 -checking

10

TranswestertrPipeline Company Compressor Station No6- Laguna Title V Permitto Operate No R6NMbull2-08R2 (replaces R6NM01~08R1)

121172015 )raft Permit

Environmental Protection Agency 808 17m Street NW Washington DC 20074

Contact Jesse White 301-887-6548

515 The pennitt~ shallsend an updated fee calculation wo~ksheet fonn and a photo~opy ofeach fee payment ~heck (or utherconfinnation ofactual fee paid) submitted annually by the same deadline as required for fee paymenUo the address listed in Section55 ofthis peimit [Note that anannual emissionsreport t~quired atthe same time as the feesalcUJaticmworksheet by40 CPRsect 719(h) has been incorporated intO the fee calculation worksheet fonn as aconvenience]

516 Basisfor~alculating annual fee

bull5161 The annual emissions fee shall be calculated by multiplying the total tons ofactual emissions of a11~egUlated pollutants (for fee calculation) emitted from the source by the emissions fee(in dollarston) in effect atthemiddottime of calculation

51611 Actual emissions means the actllal rate ofemissions in tons per year ofally regulated pollutant(for fee calculation) emitted from a part 71 source over thtl preceding calendar year Actual emissions shall be calcllhlted Using eachemissions units actual operating hours production rates in-place control equipment and types ofmaterials processed stored or combusted during the preceding ~endaryear [See 40 CPR sect 719(c)]

51612 If actual emissions cannot be detenninel )Jsipgthe compliance methods in the pennit the pennittee shall Use other fe~r~ly recognized procedures (40 CFR sect 719(e)(2)]

5L613 The term regulated pollutant (for fee calculation) is qefined in 40 CPR sect 712

51614 The permittee should note that the presumptive fee amount is revised each calendaryear to account for inflation and it is available from EPA prior to the start of each calendar year

5162 The pennittee shall excludethe following emissions from the calculation of fees ()

--middotmiddot--middot

ll

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

51621

51622

-----------------vFR+7-h9(e~)euroii

51623

The amount ofactual emissions ofeach regulated pollutant (for fee calculation) that the source emits in excess of 4000 tons per year See 40 CFR sect 719(c)(S)(i)

Actual emissions of any regulatedpollutant(for fee middot calculation) already included in the fee calculation See 40

The insignificant quantities of actual emissions not required to be listed or calculated in a permit application pursuant to 40 CPRsect 715(c)(11) [40 CPRsect 719(c)(5)(iii)]

517 Fee calculation worksheets shall be certifiedcas tottuthacclllacy and completeness by a responsible official in accordancewi1h 40 CPRsect 715(d)

518 The permittee shall retain fee calculation worksheets and other emissionsshyrelated data used to detennine fee payment for five years following submittal offee payment Elhission-related data include for example emissionsshyrelated forms provided by EPA and used by the pennittee for fee calculation pllrposes emissions-related spreadsheets and emissionsbullrelated data such as records of emissions monitoringdata and related support information required to be kept in accordance with40 CPRsect 716(a)(3)(ii) [See 40 CPR sect 79(i)]

519 Faihtreofthe permittee to pay fees in a timely manner shall subject the permittee to assessmentofpenalties and interest in accQIdancewith40CFR sect 719(1)

5110 The EPA will not act on applications forpermit renewal or modification if the permittee fails to pay all fees interest and penalties owed iri full [See 40 CPR sect 719(m))

5111 When notified by EPA of underpayment of fees the permittee shall remit full payment within 30 days of receipt of notification [See 40 CPR sect 7190)(1) and(2))

5Jl2 Ifthe permittee thinks that the EPA-assessed fee is in error and wishes to challenge the fee the permittee shall provide a written explanation of the alleged error to EPA along with filii payment of the assessed fee [See 40 CFR sect 71 90)(3))

52 Blankd Compliance Statement [40 CPRsectsect 716(a)(6)(i) and (H)]

12

Transwestern Pipeline Company Compressor Station No 6 - Laguna 121172015 CJ TitleVP~rmit to OperateNo R6NM-2-08R2 (replaces R6NM-0 I-08RI) Draft Permit

521 middot The permittee must comply with all conditions ofthis Part 71 permit Any permit noncompliance including Yiolation of any applicable requirement any permit(erm or condition any fee or filing requiteJTIent any duty tomiddotallow or CIIIT) out inspection entry or monitoring actiYities or any regulation or order issued bythe permitting authoritypursuatit to this part constitutes a Yiolation oftheCAA and is grounds for enforcement action permit termination reYocationand~essliance or modification or deni~l ofapertnit renewal application It shall notbe a defense for a permittee in an enforcement ~~ction that it would have been necessary to halt or reduce the permitted actiYity in order to m11intairi compliance with the conditions of this perrnit[40CFR sectsect 716(a)(6)(i)atid(ii)]

Determinations of deYiations continuous or intermittent compliance sts or YiOIItions of this perrnit are not limited to theapplic~ible testing or monitoring methods required by the underlying regulations of thispermit other credible eYidencemust be considered in such determinations [Section 113~a) and 113(e)(l) oftheCAA] middot

i

53 Compliance Certifications[40 CFR sect 716(c)(5)]

I The permittee shall submit to EPA a certificationof compliance withpermit terms and conditions including emission limitations standards or work practices armually Clch year no later thiU April 1 The compliance certification shall coYer tlte same 12 month period as the two consecutiYe semi-atinu~~l monitoring reports The compliance certification shall be certified as to truth accuracyandcompleteness by a responsible official consistent with 4() CFR sect 715(d)

middot 5dl The certification shall includethefollowing

5311 Identification ofeach permit teim or condition that is the basis ofthe certification

5312 Identification ofthe method(s) or other means used for detrmining the compliance status with lteach term and condition during the certification period and whether such methods or other means proYide continuous or intermittentdata If necessary the owner or operator also shall identify any other material infortnation eg operating hours records that must be included in the certification to

middot comply with section 13(c)(2) of the CAA which prohibits knowingly making afalse certification or omitting material 1 information

I i 13middot

I I

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 4: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

C) middot----~UNITED STATES ENVIRONMENTAL PROTECTIONAGENCY

REGION6 1445 ROSS AVENUE ~UITE 1200

DALLAS TX 75202-2733

FEDERAL CLEAN AIR ACT TITLEV OPERATING PERMIT

ISSl~Date -------- permit Number R6NMbull208R2 ________Effective Date Replaceslenriit Number R6NM-Ol-08RI Expiration Date ------shy

In accorda~e with the provisions pf title V oftbe Clean Air Act and 40 CFRParf71 and applicable rules and regulations

Transwestem Pipeline Cptnpany LLC Compressor StationNo 6 - LaglJla Laguna Cibola County New Mexico

is authorized to operate air emission unitS arid to conduct other air pollutant emitting activities in accordance wiih the permit conditions listed in this permit

This source is authorized to operate in the following location(s)

05 miles south of Laguna NewMexico in Cibola County Latitude 35deg 01 56 LOngitude I07deg 40 4Q

Laguria PueblpinNew Mexico

Terms not otherwise defined in this perniit have the meaning assigned to them in the referenced regulations All terms and conditipns of the pefulit ue enforceable by the Environmental Protection Agency (EPA) and citizens under the Clean Air Act

Any control measure andor equipment not properly installedoperatced and maintained will be considered a violation of the permit

The permit number cited above shoq]d be referenced in future correspondence regarding this facility

Wren Stenger Date Director Multimedia Planning and Permitting Division United States Environmental Protection Agency

ii

TABLE OF CONTENTS

Terms Abbreviations and Acronyms v

List of Tables v

l Source IdentificlltiQl and Unit Specific Infqrmation L I General Source lnfdrmation 12 Sourcepoundmission Points 2

---c--~----~fab[e-1-Ernission-tJnits-and-eontroi-Devtc-eo-Tramrwestemiipel1ne Company rrcmiddot---------+ Compressor Station No6- Llt~guna 2

Table 2 Potentialto Emit in Tons per Year (tpy) Transwestern Pipeline Company LLC Compressor Station No6- Laguna 3

2 Permit Shield [40CFRsection 716(f)] 4

3 Applicable Requirements and General Permit Conditions 4 31 Applicable Requirements 4 Table 3 Applicable Regulations for Transwestern Pipeline Company LLC Compressor

Station No 6 - Laguna 5 32 General Permit Requirements 5

4 Engine National Emission Standards for Hazardous Air Pollutants (NESHAP) Requirements 7 41 General Provisions 7 42 Requirements for Emissions Unit No 621 7 43 General Compliance Requirements for Emissions Unit No 621 8 44 Performance Requirements for Emissions Unit No621 8 45 Continuous Compliance Requirements for Emissions Unit No 621 9 46 Recordkeeping Requirements for Emissions Unit No 621 9 47 RepolillgRequirementsfor Emissions Unit No 621 10

5 Title yenAdministrative Requirements 10 51 Annual Fee Payment 10 52 Blanket Compliance Statement 13 53Compliance Certifications 14 54 Duty to Provide and Supplement lnformation 14 55 Submissions 15 56 Severability Clause 15 57middotPermit Actions 15 58 Administrative Permit Amendments 16 59Minor Permit Modifications 16 510 Group Processing of Minor Permit Modifications 18 511 Significant Permit Modifications 19 512 Reopening for Cause 20

iii

513 Property Rights 20 514 lnspeCtionand Enhy 20 515 Transfer of Ownership or Operation 21 516 OffPermit Changes 21 517 Permit Expiration jlld Renewal 22 518 Credible Evidcentiice 23

V

Terms Abbreviations and Acronyms

Source Facility CAA CFR HAP

--------------~m

IDNo MMBtu mrnscfyr NOx lMlo PM25 SOz EPA voc IC engine

List of Tables

Tablel

Table2

Table 3

Transwestern Pipeline Company LLC Comptesslir Station No 6 -laguna Transwestern Pipeline Company LLC Compressor Station No 6 -laguna Clean Air Act [42 United States Code Section 7401 et ~] Code of Federal Regulations Hazardous Air Pollutant nour

IdentificationNumber Million BritishThennal Units Million Standard Cubic Feet per year Niqogen Oxides Particulate matter less than 10 microns in diameter Particulate matter less than 25 microns in diameter Sulfur Dioxide United States Environmental Protection Agency Volatile Organic Compounds internal combustion engine ~formerly referred to as reciprocating engine

Source Emission Points and Control Devices

Potential to Ernitin Tons per Year

Applicable Requirements

v

()Transwestem Pipeline Company C9Jllpressor Station No 6- La~una 121l720l5 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ql-08RJ) Draft Permit

1 Source Identification and UnitSpecific Information

llGeqer~lS(lurce Informati(ln

Owner and Operator

Plant Naine

Plant location

EPA Region

State

Tribe

County

Reservation

Plant mailing aoldtess

Responsible Official

I l Plarit Contact

TrjSwesterJJ Pipeline Company LLC amp501 Jefferson NE Albuquerque New Mexico 87113

Compressor Station No(~ Laguna

05 miles South ofLaguna New Mexico

6

NewMexico

Laguna

Cibola

Laguna Pueblo

850 I Jefferson NE Albuquerque New Mexico 87113

DliYil ~Qybal Director ofOperations Transwestem Pipeline Company LLC 8501 Jefferson NE Albuquefqu(l New Mexico 87113 Phone (575)347-6514

Lawrence Campbell Transwestem Pipeline Company LLC 8501 Jefferson NE Albuquerque NewMexico 87113 Phone (575)625-8022

Standard IndustrialCode (SIC) Code 4922

Aerometric Infonnation Retrieval System (AIRS) Facility System Plant ID No R6NM-2-08R2 (replaces R6NM-01-08Rl) ()

1

I

I

Tratl$w~stem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NM-01-08RI) Draft Pennit

Description of Proqess TranswestemPipeline Company LLC Compressor Station No 6- Laguna with SIC code 4922 is a natural gas compression and transmission facility with pressurized natural gas as its principal product

---------12-SourceEmission-lointiH~ndclotential-to-Emit~--------------------t

Table I below provides important information related to significant emissions units at Transwestem Pipeline Company LLCs Compressor Station No 6- Laguna including dates of installation size opound the units serial numbers and any associated control equipment Table 2 lists the potential to emit (PTE) ofair pollutants from the source which will be usedto determine and report deviations to EPA as required by Conditions 3264 and 329 of this permit

Tablet Source Emission Points and Control Devices- Transwestern Pipeline Company LLC Compressor Station No 6 - Laguna

Unit No Type of

Unit Serial No

Manufacturer Model No

De$igHeat Input

Operating Range or

Size of Unit

Date of Installation

Primary Use

Control Equipment

601 ICEngine 107510

CtarkTVCl2 3465 MMBtuhr 4500HP 1961 Compressor

ltrive None

602 lCEngine 107511

Clark TVC-12 3465 MMBtuhr

4500-HP 1967 Compressor

ltrive None

603 1C Engine

107512 Clark TVC-12

3465 MMBtuhr 4500-HP 1967 Compressor

driVe None

621 RIC Engine 129011

Waukesha 42 MMBtuhr

470-HP 1967 Electrical generation None

MIST Fixed Roofsorage Tank

1100-GAL 1966 Natural Gas Condensate None

T2 Fixed Roof Storage Tank

500-BBL 1966 Natural Gas Cltmdensate

None

2

I

I

]

I i I

()Transwestem Pipeline Company Compressor Station No6middot Laguna 121172015 Title VPermitltOperate No R6NM-2-08R2 (repiaces R6NM-O l-08RI) Draft Permit

Table 2 Potential to Emit in Tons per Year (tpy)1- Transwestern Pipeline Company

CompressorStationNo 6- Laguna

UnitiD

601 Clu-k TVCshy12 NGfired Engine

602 Clu-k TVc 12 NCtfired Engine

603 Clu-k TVCshy12 NG fired Engine

62~ Waukesha F3520GUNG Enline FUO

MIST lOOGal Tank

T-2 500BbL Tank

Truck Loadilg

MAIN-SSM

TOTALStpy

Numbers contained mtlus tableareforuncontrolledemSsions are formformatton purposes only and are notan enorceablcent conditio11s See Condition 42 for applicable enforceablemiddotlimitations middot 2 The PMw emission levels fortliesoutcemiddotare within an attainment area Precllsors for PM including )lOX Soz and VOC are monitored for grandfathered unitS or controlled for NESHAP applicable unitsc While thePMto emisSicm rates for the Clark engines are listed for informationalplirposes they may not be reflectivemiddotofPTE for these engines as they could represent calculations from a bad test (totaiPM10 emission levels for this source in the attainment area are considered deminimusfor implementation ofthe PM2csRule and thereforePMzs moniioringwill not be req11ired in this permtaction) NOx- pxides ofnitrogen VOC -volatile organic compounds (nonbullHAP) S02- sulfur dioxide PM0 particulate matter with a diameter 10 microns or less CO - carbon monoxide

3

NOx

4984

4984

4984

046

149566

voc

1822

18)~2

1822

001

134

554

2817

004

092

9068

S02

009

0 09

009

00001

02701

PM25

731

731

731

0004

21934

PM102

731

731

731

0004

21934

co

1512

1512

1512

078

45438

Lead

0

0

0

0

0

0 006 1lOampOo

0 001

00009 27242

0 349019 6736225

11AP3

116

116

116

001

0001

002

GHG

1775712

1775712

1775712

2457

51390

22000

I

- Transwestem Pipeline Company Compressor Station No 6 -Laguna 1211712015 Title V Penni to Operate No R6NM-2-08R2 (replaces R6NM-O 1-08RI) Draft Pennit

HAP- hazardous air pollutants(see CAA Section 112(b)) NG- natural gas 3 Mostly fonllaldehyde

2 PermifShiel1[40 CFR sect 716(f)J

---------2-r--Notniilgin tliis pennifSliallalter or affect the followmg

2lLTheprovisions ofS~ction 303 ofthe CAA(emergencyorclers) including the authorityoftheAlrrlinistrator under that secti(n

212 The liability of a pennittee for any violati(n ofapJgtlicable requirements prior to br atthetime ofpennit issuance or middot

213 The lbility of the EPA to obtain infonnation from a source under Section 114 6ftheCAA

22 Compliance with the tenns and conditions ofthis pennit shall be deemed in cl)Ilpliance with the applicable requirements specifically listed in thispennit as of the date ofpermit issuance

3 Applicable Requirements and General permit Cqnditions

31 Applicable Requirements

The source will continue to comply with all applicable requi~mel)ls For applicable requirements thatwill become effective during the tenn ofthe penni tile source will meet su~h r~quJremeiJ$ on atiYlely bSis The pennittee shall comply with all theapplicable requirements offederalregulltigrts Inparticular the pennittee shall comply with the following

4

( TranswestemPipeline Company Compressor Station No 6 - Laguna 12172015 )TitleV Permitto Operate No R6NM2-08R2 (replaces R6NM-O l-08Rl) Draft Permit

Table 3 Applicable Requirements for Transwestern Pipelilie Company LLC C ta on 0bull - a~tunaompressor StiN6L

Citation Requirement C9mment

40CFR71 FederaLOperating Permits Program

UnitNosmiddot6QJ 602603621

40 CFR6 Subpart A

General Provisions

UnitNq 621

40CFR63 Subpart ZZZZ

National Emission Standardgtforazailous Aili Pollutants for Stationary R~ciproeating Iriternal CombustionmiddotEngines (RICE)

Unit No 621

TlfeTranswesterh Pipeline Company LLC Compressor StationNo 6- Laguna application was reviewed for compliance with the Part 71 Operating Permit Program Based on the inforrnationproviledbyTranswestemPipeline Company LLC in their application Compressqr Stittio)l No 6 (Lag1111a) would be subject to the following General Permit Requirements

32 General Permit Requirements I

Conditions in this section apply to all emissions units located at the facility including anyI units not specifically listed in Table 1

321 All equipment shall be operated in accordance with the manufacturers design values for that equipment

322 flleIIll()lint Of natural gaS llumed in the following emissions ullits shall not exceed the following amounts on a rolling 12-month average

Emissions Unit No 60 I - 289 mmscfyr Emissions Unit No 602-289 mmscfyr Emissions Unit No 603-289 mmscfyr Emissions Unit No 621 - 3504 mmscflyr

323 The actual heat input for Emissions UnitNo 601 Emissions Unit No 602and Emissions Unit No 603 shall not exceed 3465 MMBtulhr adjusted for elevation and for Emissions Unit No 621 the actual heat input shall not exceed 42 MMBtulhr adjusted for elevationmiddot

5

Transwestem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

324 Compliance Tests Compliance tests from units at this source will be conducted using applicable EPA Methods established within 40 CFR Part 51 Appendix M or as otherwise specified in the permit by applicable requirements

325 Monitoring

325J Fuel consumption for Emissions Unit Nos 601 602 603 and 621 shall be monitored witha flow meter monthly for each unit in MMscf (of natural gas)

3252 Heatinputratefor Unit Nos 601 602 603 and 621 shall be monitored Monthly orta per unitbllSis(or individual highest rate in MMBtulhr

326 ReportingRecordkeeping

3261 The permittee shall keep records on all startup shutdown repair and maintenance activities performed on all emission units These records shall identify the relevant emission unit and describe the work performed and calculate any associated emissions

3262 The fuel flowconsumption for each emissions unit (Unit Nos 601 602 603 and 621) shall be recorded on a monthly basis and art annual 12-month rolling average

3263 The records of fuel consumption shall be maintained for each emission unit (Unit Nos 601 602 603and 621) for the last five years

3264 The actualheat input rate for emission Unit Nos 601 602 603 and 621 sh~lbe ~qrlted on a monthly average basis as well as an annual12-month rolling average Ifthe emissions rate ofany ofthe enampines deviates more than 2 above the PTE listed in Table2 ofthis perrrit then the permittee shall evaluate the deviation to determine if there has been a physical change or change in method ofQperation at the source report the deviation and the results of the evaluation to EPA in the report required by Condition329 below and apply for a modification ofthil) pennit ifnecessary

3265 The records of heat input shall be maintainedJor emission Unit Nos 601 602 603 artd 621 for at least the last five years

Cqnditionsin this section apply to all emissions units located atthe facility including any units not specifically listed in Table 1

6

()Transwestern Pipeline Company Compressor Station No 6 Laguna 1211712015 TitleV Permitto Operate No R6NM-2-08R2replaces R6NMOl-08RI) Draft Permit

327 The permittee shall keep records of the serial numbers for each e111ission unit The e111ission ll1its f()rthe RICE and thlir serial nJll11bers are UnitNo 601 withserial nJll11ber 107510 Unit No 602 With serial numo(lr l075UUnitNo 603 with serial number 107512 Unit No 621 with serial number 129011

328 Retenti9n of reltprds ami support information shall be for a period ofat least five years from the date ofmeasurement or report Supportinfonnation includes all calibrationandmamtenance records all origin~ strip-chartrecordings or monitoring instrumeitation and copiltsofall reports [qujJedby thisj)ennjt

329 The pllrmitteeshlill submittothe EPAreportsofany monitoring and recpr~eeping required under this permit8emi-annually )Jy April 1 and O~tober 1of ealtlth year The report due on April l shall cover the prior six--month period from September 1 through the end of February The report due on October l shall cover the prior sixshymonthperiod from March 1 through the end pfAugust

Copies ofthese tecotdsshall also besentto

Environmental Direct()r Pueblo of Laguna PO BoxJ94 Laguna NM 87026

4 EnginllNESHAgtRequirements

41 General Provisions

Thepennittee shalLci)mplywithth(l requirements [rom the NE$HAP General Pfqvisions 40 CFR Part 63 Subpart Afor Emissions Unit No 621 only

42 Requirements for Emissilaquonls UnitNo 6~1I l

421 For Emissions Unit No 621the perniitteeshallmeet the requirements in 422 through 424 below

422 Change oil and filter every 500 hours of operation or annually whichever comes first inspect air cleaner every 1000 hours ofoperation or annually whichever comes first and replace as necessary and inspect aU hoses and

I 7

I

Transwestem Pipeline Company Compressor Station No 6 Laguna 1217205 Title V Permitto Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

belts every 500 hours of operation or annually whichever comes first and replace as necessary [40 CFR sect 636002 Table 2c]

423 Minimize the enginestime spent at idle and minimize the engines startup time at startup to a period needed for appropriate and safe loading ofthe engine not to exceed 30minutesafter which time the non-startup emission

---------~---limitations~pply-[40-CFR--sect6~6002--Iable-2G~~-------------c-t

424 Permittee must install ~~non-resettable hour meter ifone is not already installed [40 CFR sect 636625(f)]

43 General Compliance Requirements for Unit No 621

431 Emissions Unit No 621 must be incompliance with the operating limitations and requirements in Condition 42 at~~ll times [ 40 CFR sect 636605(a)]

432 The permittee must operate and maintain Unit No 621 including air pollution control and monitoring equipment in a manner consistent with good air pollution control practices for minimizing emissions [ 40 CFR sect 636605(b)]

44 Perfonnanee Requirements for Unit No 621

441 As an emergency stationary RICE the permittee must operate Emissions Unit No 621 accordingtotherequirementsof40CFR sect 636640(plusmn)

442 Any operation other than emergency operation maintenance and testing emergency demand response and operation in non-emergency situations for 50 hours per year as described in paragraphs f(l) throug( 4) of40 CFR sect 636640 is prohibited [ 40 CFR sect 636640(plusmn))

443 IfEmissions Unit No 621 is not operated according to the requirements in 40 CFR sect 636640(plusmn)(1) through (f)(4) Emissions Uhit No 621 will not be considered an emergency stationary RICE and it must meet all requirements for non-emergency engines [40 CFR sect 636640(plusmn)]

444 There is no time limit on the use 0femergency stationary RICE in emergency situations [40 CFR sect 636640(plusmn)(2)] middot

445 Emissions Unit No 621 may be operated for up to 50 hours per calendar year in non-emergency situations The 50 hours per year for nonshy

8

Transwestem Pipeline Company Compressor Station No 6 bull Laguna 12fl72015 Title V PermiHo QperateNo R6NMmiddot2middot08RZ(replaces R6NM-Ol-08Rl) Draft Permit

emergency situatipns cartnot be used for peak shaying or non-emergency demand response or to generate income for afacilityto supply power as part o[a financiil arrangement with another entity [ 4QCFRsect 636640(pound)(3)]

446 Pertilitteemay operate Emissions Unit No 621 for any combination of the purposes specified In 40 CFR sect 636640(f)(2)(i)through (iii) for a maximum of 100 hours per calendar year Any operltJiiohfor non-emergency situations as ltJlloVlldby paragraphs 40 CFR sect 63 6640(f)(3) and (4) counts as part ofthe lOOhours per calendamp year allowed ]Jythisparagraph [40 CFRsect 636640(plusmn)(2)]

4S Clntinuous Compliance Requirements for Emissions Unit No 621

Emissions Unit No 621 shall be operated and maintained according to the manufacturers emission-rellited operation and maintenance instructions In the alternative permittee may develop and follow its own maintenance plan which nmst provide to the extent practicable for the maintenance and operation ofEmission Unit No 621 in a martner coiiSisteht with good air pollution control practice for minimizing emissions [40 CFRsect 636640(a) Table 6]

46 Recordkeeping Requirements for Emissions Unit No 621

4(il You mustkeep a copy of each notification and report submitted to comply with 40 CFR Part 63 Subpart ZZZZ including all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted accQrdingto 1herequirementin40 CFR sect~HO(b)(2)(xiv)

462 Records ofthe occurrence and duration of each malfunction ofoperatitm (ie process equipmellt) or any air pollution CQJltrQl and monitoring equipment

463 Records ofaii required maintenance performed on any airpollution control and monitoring equipment

464 The permittee must keep records of the pperating and maintenance conducted ltm Emissions Ulltt No 62 I necessary to ensure compliance with Condition45 above

47 Reporting Requirements (or Emissions Unit No 621

471 Permittee must report each instance in which an applicable emissions limitation operating limitation or requirement in 40 CFR Part 63 Subpart ZZZZ Table 2(c) is not met

9

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 TitleV Pennitto Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

472 These instances are deviations from the emission and operating limitations in 40 CFR Part 63 Subpart zzzz These deviations must be reported according to the requirements in 40 CFR sect 636650

5 Title Y Administrative Requirements

51 Annual Fee Payment [40 CFR sectsect 76(a)(7) and 719]

5I L The pe)Jlittee shall pay an annual permit fee in accordance with the procedures outlinedbelow [40 CFR sect 7l9(a)]

512 ]he )Je)Jlittee shall pay the annual permit fee each year The fee shall be received no later hail July 20 of each year

513 The fee payment shall be in United States currency and shall be paid by money order bank draft certified check corporate check or electronic funds transfer payable to the order ofEP A

514 Thepetmittee shall send fee payment and a completed fee filing form to

Forregular US postal service mail Fornon-US Postal Service express mail

(FedEx AirbomeDHL and UPS)

middotUS Environmental Protection Agency US Bank FOIA and Miscellaneous Payments Government Lockbox 979078 Cincinnati Finance Center US EPA FOfA amp Misc Payments PO Box 979078 1005 Convention Plaza St Louis MO 63197~9000 SL-MQcQ2-GL

St LouisM063101

Contact Craig Steffen 513-487-2091 Contact 314-418-1028 or Eric Volck513-487-2105

For electronic pavment (identifY permit number for payment in form)

Automated Clearinghouse (ACH) for receiving US currency PNCBank ABA 051036706 Account Number 310006 CTX Format Transaction Code 22 -checking

10

TranswestertrPipeline Company Compressor Station No6- Laguna Title V Permitto Operate No R6NMbull2-08R2 (replaces R6NM01~08R1)

121172015 )raft Permit

Environmental Protection Agency 808 17m Street NW Washington DC 20074

Contact Jesse White 301-887-6548

515 The pennitt~ shallsend an updated fee calculation wo~ksheet fonn and a photo~opy ofeach fee payment ~heck (or utherconfinnation ofactual fee paid) submitted annually by the same deadline as required for fee paymenUo the address listed in Section55 ofthis peimit [Note that anannual emissionsreport t~quired atthe same time as the feesalcUJaticmworksheet by40 CPRsect 719(h) has been incorporated intO the fee calculation worksheet fonn as aconvenience]

516 Basisfor~alculating annual fee

bull5161 The annual emissions fee shall be calculated by multiplying the total tons ofactual emissions of a11~egUlated pollutants (for fee calculation) emitted from the source by the emissions fee(in dollarston) in effect atthemiddottime of calculation

51611 Actual emissions means the actllal rate ofemissions in tons per year ofally regulated pollutant(for fee calculation) emitted from a part 71 source over thtl preceding calendar year Actual emissions shall be calcllhlted Using eachemissions units actual operating hours production rates in-place control equipment and types ofmaterials processed stored or combusted during the preceding ~endaryear [See 40 CPR sect 719(c)]

51612 If actual emissions cannot be detenninel )Jsipgthe compliance methods in the pennit the pennittee shall Use other fe~r~ly recognized procedures (40 CFR sect 719(e)(2)]

5L613 The term regulated pollutant (for fee calculation) is qefined in 40 CPR sect 712

51614 The permittee should note that the presumptive fee amount is revised each calendaryear to account for inflation and it is available from EPA prior to the start of each calendar year

5162 The pennittee shall excludethe following emissions from the calculation of fees ()

--middotmiddot--middot

ll

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

51621

51622

-----------------vFR+7-h9(e~)euroii

51623

The amount ofactual emissions ofeach regulated pollutant (for fee calculation) that the source emits in excess of 4000 tons per year See 40 CFR sect 719(c)(S)(i)

Actual emissions of any regulatedpollutant(for fee middot calculation) already included in the fee calculation See 40

The insignificant quantities of actual emissions not required to be listed or calculated in a permit application pursuant to 40 CPRsect 715(c)(11) [40 CPRsect 719(c)(5)(iii)]

517 Fee calculation worksheets shall be certifiedcas tottuthacclllacy and completeness by a responsible official in accordancewi1h 40 CPRsect 715(d)

518 The permittee shall retain fee calculation worksheets and other emissionsshyrelated data used to detennine fee payment for five years following submittal offee payment Elhission-related data include for example emissionsshyrelated forms provided by EPA and used by the pennittee for fee calculation pllrposes emissions-related spreadsheets and emissionsbullrelated data such as records of emissions monitoringdata and related support information required to be kept in accordance with40 CPRsect 716(a)(3)(ii) [See 40 CPR sect 79(i)]

519 Faihtreofthe permittee to pay fees in a timely manner shall subject the permittee to assessmentofpenalties and interest in accQIdancewith40CFR sect 719(1)

5110 The EPA will not act on applications forpermit renewal or modification if the permittee fails to pay all fees interest and penalties owed iri full [See 40 CPR sect 719(m))

5111 When notified by EPA of underpayment of fees the permittee shall remit full payment within 30 days of receipt of notification [See 40 CPR sect 7190)(1) and(2))

5Jl2 Ifthe permittee thinks that the EPA-assessed fee is in error and wishes to challenge the fee the permittee shall provide a written explanation of the alleged error to EPA along with filii payment of the assessed fee [See 40 CFR sect 71 90)(3))

52 Blankd Compliance Statement [40 CPRsectsect 716(a)(6)(i) and (H)]

12

Transwestern Pipeline Company Compressor Station No 6 - Laguna 121172015 CJ TitleVP~rmit to OperateNo R6NM-2-08R2 (replaces R6NM-0 I-08RI) Draft Permit

521 middot The permittee must comply with all conditions ofthis Part 71 permit Any permit noncompliance including Yiolation of any applicable requirement any permit(erm or condition any fee or filing requiteJTIent any duty tomiddotallow or CIIIT) out inspection entry or monitoring actiYities or any regulation or order issued bythe permitting authoritypursuatit to this part constitutes a Yiolation oftheCAA and is grounds for enforcement action permit termination reYocationand~essliance or modification or deni~l ofapertnit renewal application It shall notbe a defense for a permittee in an enforcement ~~ction that it would have been necessary to halt or reduce the permitted actiYity in order to m11intairi compliance with the conditions of this perrnit[40CFR sectsect 716(a)(6)(i)atid(ii)]

Determinations of deYiations continuous or intermittent compliance sts or YiOIItions of this perrnit are not limited to theapplic~ible testing or monitoring methods required by the underlying regulations of thispermit other credible eYidencemust be considered in such determinations [Section 113~a) and 113(e)(l) oftheCAA] middot

i

53 Compliance Certifications[40 CFR sect 716(c)(5)]

I The permittee shall submit to EPA a certificationof compliance withpermit terms and conditions including emission limitations standards or work practices armually Clch year no later thiU April 1 The compliance certification shall coYer tlte same 12 month period as the two consecutiYe semi-atinu~~l monitoring reports The compliance certification shall be certified as to truth accuracyandcompleteness by a responsible official consistent with 4() CFR sect 715(d)

middot 5dl The certification shall includethefollowing

5311 Identification ofeach permit teim or condition that is the basis ofthe certification

5312 Identification ofthe method(s) or other means used for detrmining the compliance status with lteach term and condition during the certification period and whether such methods or other means proYide continuous or intermittentdata If necessary the owner or operator also shall identify any other material infortnation eg operating hours records that must be included in the certification to

middot comply with section 13(c)(2) of the CAA which prohibits knowingly making afalse certification or omitting material 1 information

I i 13middot

I I

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 5: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

TABLE OF CONTENTS

Terms Abbreviations and Acronyms v

List of Tables v

l Source IdentificlltiQl and Unit Specific Infqrmation L I General Source lnfdrmation 12 Sourcepoundmission Points 2

---c--~----~fab[e-1-Ernission-tJnits-and-eontroi-Devtc-eo-Tramrwestemiipel1ne Company rrcmiddot---------+ Compressor Station No6- Llt~guna 2

Table 2 Potentialto Emit in Tons per Year (tpy) Transwestern Pipeline Company LLC Compressor Station No6- Laguna 3

2 Permit Shield [40CFRsection 716(f)] 4

3 Applicable Requirements and General Permit Conditions 4 31 Applicable Requirements 4 Table 3 Applicable Regulations for Transwestern Pipeline Company LLC Compressor

Station No 6 - Laguna 5 32 General Permit Requirements 5

4 Engine National Emission Standards for Hazardous Air Pollutants (NESHAP) Requirements 7 41 General Provisions 7 42 Requirements for Emissions Unit No 621 7 43 General Compliance Requirements for Emissions Unit No 621 8 44 Performance Requirements for Emissions Unit No621 8 45 Continuous Compliance Requirements for Emissions Unit No 621 9 46 Recordkeeping Requirements for Emissions Unit No 621 9 47 RepolillgRequirementsfor Emissions Unit No 621 10

5 Title yenAdministrative Requirements 10 51 Annual Fee Payment 10 52 Blanket Compliance Statement 13 53Compliance Certifications 14 54 Duty to Provide and Supplement lnformation 14 55 Submissions 15 56 Severability Clause 15 57middotPermit Actions 15 58 Administrative Permit Amendments 16 59Minor Permit Modifications 16 510 Group Processing of Minor Permit Modifications 18 511 Significant Permit Modifications 19 512 Reopening for Cause 20

iii

513 Property Rights 20 514 lnspeCtionand Enhy 20 515 Transfer of Ownership or Operation 21 516 OffPermit Changes 21 517 Permit Expiration jlld Renewal 22 518 Credible Evidcentiice 23

V

Terms Abbreviations and Acronyms

Source Facility CAA CFR HAP

--------------~m

IDNo MMBtu mrnscfyr NOx lMlo PM25 SOz EPA voc IC engine

List of Tables

Tablel

Table2

Table 3

Transwestern Pipeline Company LLC Comptesslir Station No 6 -laguna Transwestern Pipeline Company LLC Compressor Station No 6 -laguna Clean Air Act [42 United States Code Section 7401 et ~] Code of Federal Regulations Hazardous Air Pollutant nour

IdentificationNumber Million BritishThennal Units Million Standard Cubic Feet per year Niqogen Oxides Particulate matter less than 10 microns in diameter Particulate matter less than 25 microns in diameter Sulfur Dioxide United States Environmental Protection Agency Volatile Organic Compounds internal combustion engine ~formerly referred to as reciprocating engine

Source Emission Points and Control Devices

Potential to Ernitin Tons per Year

Applicable Requirements

v

()Transwestem Pipeline Company C9Jllpressor Station No 6- La~una 121l720l5 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ql-08RJ) Draft Permit

1 Source Identification and UnitSpecific Information

llGeqer~lS(lurce Informati(ln

Owner and Operator

Plant Naine

Plant location

EPA Region

State

Tribe

County

Reservation

Plant mailing aoldtess

Responsible Official

I l Plarit Contact

TrjSwesterJJ Pipeline Company LLC amp501 Jefferson NE Albuquerque New Mexico 87113

Compressor Station No(~ Laguna

05 miles South ofLaguna New Mexico

6

NewMexico

Laguna

Cibola

Laguna Pueblo

850 I Jefferson NE Albuquerque New Mexico 87113

DliYil ~Qybal Director ofOperations Transwestem Pipeline Company LLC 8501 Jefferson NE Albuquefqu(l New Mexico 87113 Phone (575)347-6514

Lawrence Campbell Transwestem Pipeline Company LLC 8501 Jefferson NE Albuquerque NewMexico 87113 Phone (575)625-8022

Standard IndustrialCode (SIC) Code 4922

Aerometric Infonnation Retrieval System (AIRS) Facility System Plant ID No R6NM-2-08R2 (replaces R6NM-01-08Rl) ()

1

I

I

Tratl$w~stem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NM-01-08RI) Draft Pennit

Description of Proqess TranswestemPipeline Company LLC Compressor Station No 6- Laguna with SIC code 4922 is a natural gas compression and transmission facility with pressurized natural gas as its principal product

---------12-SourceEmission-lointiH~ndclotential-to-Emit~--------------------t

Table I below provides important information related to significant emissions units at Transwestem Pipeline Company LLCs Compressor Station No 6- Laguna including dates of installation size opound the units serial numbers and any associated control equipment Table 2 lists the potential to emit (PTE) ofair pollutants from the source which will be usedto determine and report deviations to EPA as required by Conditions 3264 and 329 of this permit

Tablet Source Emission Points and Control Devices- Transwestern Pipeline Company LLC Compressor Station No 6 - Laguna

Unit No Type of

Unit Serial No

Manufacturer Model No

De$igHeat Input

Operating Range or

Size of Unit

Date of Installation

Primary Use

Control Equipment

601 ICEngine 107510

CtarkTVCl2 3465 MMBtuhr 4500HP 1961 Compressor

ltrive None

602 lCEngine 107511

Clark TVC-12 3465 MMBtuhr

4500-HP 1967 Compressor

ltrive None

603 1C Engine

107512 Clark TVC-12

3465 MMBtuhr 4500-HP 1967 Compressor

driVe None

621 RIC Engine 129011

Waukesha 42 MMBtuhr

470-HP 1967 Electrical generation None

MIST Fixed Roofsorage Tank

1100-GAL 1966 Natural Gas Condensate None

T2 Fixed Roof Storage Tank

500-BBL 1966 Natural Gas Cltmdensate

None

2

I

I

]

I i I

()Transwestem Pipeline Company Compressor Station No6middot Laguna 121172015 Title VPermitltOperate No R6NM-2-08R2 (repiaces R6NM-O l-08RI) Draft Permit

Table 2 Potential to Emit in Tons per Year (tpy)1- Transwestern Pipeline Company

CompressorStationNo 6- Laguna

UnitiD

601 Clu-k TVCshy12 NGfired Engine

602 Clu-k TVc 12 NCtfired Engine

603 Clu-k TVCshy12 NG fired Engine

62~ Waukesha F3520GUNG Enline FUO

MIST lOOGal Tank

T-2 500BbL Tank

Truck Loadilg

MAIN-SSM

TOTALStpy

Numbers contained mtlus tableareforuncontrolledemSsions are formformatton purposes only and are notan enorceablcent conditio11s See Condition 42 for applicable enforceablemiddotlimitations middot 2 The PMw emission levels fortliesoutcemiddotare within an attainment area Precllsors for PM including )lOX Soz and VOC are monitored for grandfathered unitS or controlled for NESHAP applicable unitsc While thePMto emisSicm rates for the Clark engines are listed for informationalplirposes they may not be reflectivemiddotofPTE for these engines as they could represent calculations from a bad test (totaiPM10 emission levels for this source in the attainment area are considered deminimusfor implementation ofthe PM2csRule and thereforePMzs moniioringwill not be req11ired in this permtaction) NOx- pxides ofnitrogen VOC -volatile organic compounds (nonbullHAP) S02- sulfur dioxide PM0 particulate matter with a diameter 10 microns or less CO - carbon monoxide

3

NOx

4984

4984

4984

046

149566

voc

1822

18)~2

1822

001

134

554

2817

004

092

9068

S02

009

0 09

009

00001

02701

PM25

731

731

731

0004

21934

PM102

731

731

731

0004

21934

co

1512

1512

1512

078

45438

Lead

0

0

0

0

0

0 006 1lOampOo

0 001

00009 27242

0 349019 6736225

11AP3

116

116

116

001

0001

002

GHG

1775712

1775712

1775712

2457

51390

22000

I

- Transwestem Pipeline Company Compressor Station No 6 -Laguna 1211712015 Title V Penni to Operate No R6NM-2-08R2 (replaces R6NM-O 1-08RI) Draft Pennit

HAP- hazardous air pollutants(see CAA Section 112(b)) NG- natural gas 3 Mostly fonllaldehyde

2 PermifShiel1[40 CFR sect 716(f)J

---------2-r--Notniilgin tliis pennifSliallalter or affect the followmg

2lLTheprovisions ofS~ction 303 ofthe CAA(emergencyorclers) including the authorityoftheAlrrlinistrator under that secti(n

212 The liability of a pennittee for any violati(n ofapJgtlicable requirements prior to br atthetime ofpennit issuance or middot

213 The lbility of the EPA to obtain infonnation from a source under Section 114 6ftheCAA

22 Compliance with the tenns and conditions ofthis pennit shall be deemed in cl)Ilpliance with the applicable requirements specifically listed in thispennit as of the date ofpermit issuance

3 Applicable Requirements and General permit Cqnditions

31 Applicable Requirements

The source will continue to comply with all applicable requi~mel)ls For applicable requirements thatwill become effective during the tenn ofthe penni tile source will meet su~h r~quJremeiJ$ on atiYlely bSis The pennittee shall comply with all theapplicable requirements offederalregulltigrts Inparticular the pennittee shall comply with the following

4

( TranswestemPipeline Company Compressor Station No 6 - Laguna 12172015 )TitleV Permitto Operate No R6NM2-08R2 (replaces R6NM-O l-08Rl) Draft Permit

Table 3 Applicable Requirements for Transwestern Pipelilie Company LLC C ta on 0bull - a~tunaompressor StiN6L

Citation Requirement C9mment

40CFR71 FederaLOperating Permits Program

UnitNosmiddot6QJ 602603621

40 CFR6 Subpart A

General Provisions

UnitNq 621

40CFR63 Subpart ZZZZ

National Emission Standardgtforazailous Aili Pollutants for Stationary R~ciproeating Iriternal CombustionmiddotEngines (RICE)

Unit No 621

TlfeTranswesterh Pipeline Company LLC Compressor StationNo 6- Laguna application was reviewed for compliance with the Part 71 Operating Permit Program Based on the inforrnationproviledbyTranswestemPipeline Company LLC in their application Compressqr Stittio)l No 6 (Lag1111a) would be subject to the following General Permit Requirements

32 General Permit Requirements I

Conditions in this section apply to all emissions units located at the facility including anyI units not specifically listed in Table 1

321 All equipment shall be operated in accordance with the manufacturers design values for that equipment

322 flleIIll()lint Of natural gaS llumed in the following emissions ullits shall not exceed the following amounts on a rolling 12-month average

Emissions Unit No 60 I - 289 mmscfyr Emissions Unit No 602-289 mmscfyr Emissions Unit No 603-289 mmscfyr Emissions Unit No 621 - 3504 mmscflyr

323 The actual heat input for Emissions UnitNo 601 Emissions Unit No 602and Emissions Unit No 603 shall not exceed 3465 MMBtulhr adjusted for elevation and for Emissions Unit No 621 the actual heat input shall not exceed 42 MMBtulhr adjusted for elevationmiddot

5

Transwestem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

324 Compliance Tests Compliance tests from units at this source will be conducted using applicable EPA Methods established within 40 CFR Part 51 Appendix M or as otherwise specified in the permit by applicable requirements

325 Monitoring

325J Fuel consumption for Emissions Unit Nos 601 602 603 and 621 shall be monitored witha flow meter monthly for each unit in MMscf (of natural gas)

3252 Heatinputratefor Unit Nos 601 602 603 and 621 shall be monitored Monthly orta per unitbllSis(or individual highest rate in MMBtulhr

326 ReportingRecordkeeping

3261 The permittee shall keep records on all startup shutdown repair and maintenance activities performed on all emission units These records shall identify the relevant emission unit and describe the work performed and calculate any associated emissions

3262 The fuel flowconsumption for each emissions unit (Unit Nos 601 602 603 and 621) shall be recorded on a monthly basis and art annual 12-month rolling average

3263 The records of fuel consumption shall be maintained for each emission unit (Unit Nos 601 602 603and 621) for the last five years

3264 The actualheat input rate for emission Unit Nos 601 602 603 and 621 sh~lbe ~qrlted on a monthly average basis as well as an annual12-month rolling average Ifthe emissions rate ofany ofthe enampines deviates more than 2 above the PTE listed in Table2 ofthis perrrit then the permittee shall evaluate the deviation to determine if there has been a physical change or change in method ofQperation at the source report the deviation and the results of the evaluation to EPA in the report required by Condition329 below and apply for a modification ofthil) pennit ifnecessary

3265 The records of heat input shall be maintainedJor emission Unit Nos 601 602 603 artd 621 for at least the last five years

Cqnditionsin this section apply to all emissions units located atthe facility including any units not specifically listed in Table 1

6

()Transwestern Pipeline Company Compressor Station No 6 Laguna 1211712015 TitleV Permitto Operate No R6NM-2-08R2replaces R6NMOl-08RI) Draft Permit

327 The permittee shall keep records of the serial numbers for each e111ission unit The e111ission ll1its f()rthe RICE and thlir serial nJll11bers are UnitNo 601 withserial nJll11ber 107510 Unit No 602 With serial numo(lr l075UUnitNo 603 with serial number 107512 Unit No 621 with serial number 129011

328 Retenti9n of reltprds ami support information shall be for a period ofat least five years from the date ofmeasurement or report Supportinfonnation includes all calibrationandmamtenance records all origin~ strip-chartrecordings or monitoring instrumeitation and copiltsofall reports [qujJedby thisj)ennjt

329 The pllrmitteeshlill submittothe EPAreportsofany monitoring and recpr~eeping required under this permit8emi-annually )Jy April 1 and O~tober 1of ealtlth year The report due on April l shall cover the prior six--month period from September 1 through the end of February The report due on October l shall cover the prior sixshymonthperiod from March 1 through the end pfAugust

Copies ofthese tecotdsshall also besentto

Environmental Direct()r Pueblo of Laguna PO BoxJ94 Laguna NM 87026

4 EnginllNESHAgtRequirements

41 General Provisions

Thepennittee shalLci)mplywithth(l requirements [rom the NE$HAP General Pfqvisions 40 CFR Part 63 Subpart Afor Emissions Unit No 621 only

42 Requirements for Emissilaquonls UnitNo 6~1I l

421 For Emissions Unit No 621the perniitteeshallmeet the requirements in 422 through 424 below

422 Change oil and filter every 500 hours of operation or annually whichever comes first inspect air cleaner every 1000 hours ofoperation or annually whichever comes first and replace as necessary and inspect aU hoses and

I 7

I

Transwestem Pipeline Company Compressor Station No 6 Laguna 1217205 Title V Permitto Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

belts every 500 hours of operation or annually whichever comes first and replace as necessary [40 CFR sect 636002 Table 2c]

423 Minimize the enginestime spent at idle and minimize the engines startup time at startup to a period needed for appropriate and safe loading ofthe engine not to exceed 30minutesafter which time the non-startup emission

---------~---limitations~pply-[40-CFR--sect6~6002--Iable-2G~~-------------c-t

424 Permittee must install ~~non-resettable hour meter ifone is not already installed [40 CFR sect 636625(f)]

43 General Compliance Requirements for Unit No 621

431 Emissions Unit No 621 must be incompliance with the operating limitations and requirements in Condition 42 at~~ll times [ 40 CFR sect 636605(a)]

432 The permittee must operate and maintain Unit No 621 including air pollution control and monitoring equipment in a manner consistent with good air pollution control practices for minimizing emissions [ 40 CFR sect 636605(b)]

44 Perfonnanee Requirements for Unit No 621

441 As an emergency stationary RICE the permittee must operate Emissions Unit No 621 accordingtotherequirementsof40CFR sect 636640(plusmn)

442 Any operation other than emergency operation maintenance and testing emergency demand response and operation in non-emergency situations for 50 hours per year as described in paragraphs f(l) throug( 4) of40 CFR sect 636640 is prohibited [ 40 CFR sect 636640(plusmn))

443 IfEmissions Unit No 621 is not operated according to the requirements in 40 CFR sect 636640(plusmn)(1) through (f)(4) Emissions Uhit No 621 will not be considered an emergency stationary RICE and it must meet all requirements for non-emergency engines [40 CFR sect 636640(plusmn)]

444 There is no time limit on the use 0femergency stationary RICE in emergency situations [40 CFR sect 636640(plusmn)(2)] middot

445 Emissions Unit No 621 may be operated for up to 50 hours per calendar year in non-emergency situations The 50 hours per year for nonshy

8

Transwestem Pipeline Company Compressor Station No 6 bull Laguna 12fl72015 Title V PermiHo QperateNo R6NMmiddot2middot08RZ(replaces R6NM-Ol-08Rl) Draft Permit

emergency situatipns cartnot be used for peak shaying or non-emergency demand response or to generate income for afacilityto supply power as part o[a financiil arrangement with another entity [ 4QCFRsect 636640(pound)(3)]

446 Pertilitteemay operate Emissions Unit No 621 for any combination of the purposes specified In 40 CFR sect 636640(f)(2)(i)through (iii) for a maximum of 100 hours per calendar year Any operltJiiohfor non-emergency situations as ltJlloVlldby paragraphs 40 CFR sect 63 6640(f)(3) and (4) counts as part ofthe lOOhours per calendamp year allowed ]Jythisparagraph [40 CFRsect 636640(plusmn)(2)]

4S Clntinuous Compliance Requirements for Emissions Unit No 621

Emissions Unit No 621 shall be operated and maintained according to the manufacturers emission-rellited operation and maintenance instructions In the alternative permittee may develop and follow its own maintenance plan which nmst provide to the extent practicable for the maintenance and operation ofEmission Unit No 621 in a martner coiiSisteht with good air pollution control practice for minimizing emissions [40 CFRsect 636640(a) Table 6]

46 Recordkeeping Requirements for Emissions Unit No 621

4(il You mustkeep a copy of each notification and report submitted to comply with 40 CFR Part 63 Subpart ZZZZ including all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted accQrdingto 1herequirementin40 CFR sect~HO(b)(2)(xiv)

462 Records ofthe occurrence and duration of each malfunction ofoperatitm (ie process equipmellt) or any air pollution CQJltrQl and monitoring equipment

463 Records ofaii required maintenance performed on any airpollution control and monitoring equipment

464 The permittee must keep records of the pperating and maintenance conducted ltm Emissions Ulltt No 62 I necessary to ensure compliance with Condition45 above

47 Reporting Requirements (or Emissions Unit No 621

471 Permittee must report each instance in which an applicable emissions limitation operating limitation or requirement in 40 CFR Part 63 Subpart ZZZZ Table 2(c) is not met

9

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 TitleV Pennitto Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

472 These instances are deviations from the emission and operating limitations in 40 CFR Part 63 Subpart zzzz These deviations must be reported according to the requirements in 40 CFR sect 636650

5 Title Y Administrative Requirements

51 Annual Fee Payment [40 CFR sectsect 76(a)(7) and 719]

5I L The pe)Jlittee shall pay an annual permit fee in accordance with the procedures outlinedbelow [40 CFR sect 7l9(a)]

512 ]he )Je)Jlittee shall pay the annual permit fee each year The fee shall be received no later hail July 20 of each year

513 The fee payment shall be in United States currency and shall be paid by money order bank draft certified check corporate check or electronic funds transfer payable to the order ofEP A

514 Thepetmittee shall send fee payment and a completed fee filing form to

Forregular US postal service mail Fornon-US Postal Service express mail

(FedEx AirbomeDHL and UPS)

middotUS Environmental Protection Agency US Bank FOIA and Miscellaneous Payments Government Lockbox 979078 Cincinnati Finance Center US EPA FOfA amp Misc Payments PO Box 979078 1005 Convention Plaza St Louis MO 63197~9000 SL-MQcQ2-GL

St LouisM063101

Contact Craig Steffen 513-487-2091 Contact 314-418-1028 or Eric Volck513-487-2105

For electronic pavment (identifY permit number for payment in form)

Automated Clearinghouse (ACH) for receiving US currency PNCBank ABA 051036706 Account Number 310006 CTX Format Transaction Code 22 -checking

10

TranswestertrPipeline Company Compressor Station No6- Laguna Title V Permitto Operate No R6NMbull2-08R2 (replaces R6NM01~08R1)

121172015 )raft Permit

Environmental Protection Agency 808 17m Street NW Washington DC 20074

Contact Jesse White 301-887-6548

515 The pennitt~ shallsend an updated fee calculation wo~ksheet fonn and a photo~opy ofeach fee payment ~heck (or utherconfinnation ofactual fee paid) submitted annually by the same deadline as required for fee paymenUo the address listed in Section55 ofthis peimit [Note that anannual emissionsreport t~quired atthe same time as the feesalcUJaticmworksheet by40 CPRsect 719(h) has been incorporated intO the fee calculation worksheet fonn as aconvenience]

516 Basisfor~alculating annual fee

bull5161 The annual emissions fee shall be calculated by multiplying the total tons ofactual emissions of a11~egUlated pollutants (for fee calculation) emitted from the source by the emissions fee(in dollarston) in effect atthemiddottime of calculation

51611 Actual emissions means the actllal rate ofemissions in tons per year ofally regulated pollutant(for fee calculation) emitted from a part 71 source over thtl preceding calendar year Actual emissions shall be calcllhlted Using eachemissions units actual operating hours production rates in-place control equipment and types ofmaterials processed stored or combusted during the preceding ~endaryear [See 40 CPR sect 719(c)]

51612 If actual emissions cannot be detenninel )Jsipgthe compliance methods in the pennit the pennittee shall Use other fe~r~ly recognized procedures (40 CFR sect 719(e)(2)]

5L613 The term regulated pollutant (for fee calculation) is qefined in 40 CPR sect 712

51614 The permittee should note that the presumptive fee amount is revised each calendaryear to account for inflation and it is available from EPA prior to the start of each calendar year

5162 The pennittee shall excludethe following emissions from the calculation of fees ()

--middotmiddot--middot

ll

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

51621

51622

-----------------vFR+7-h9(e~)euroii

51623

The amount ofactual emissions ofeach regulated pollutant (for fee calculation) that the source emits in excess of 4000 tons per year See 40 CFR sect 719(c)(S)(i)

Actual emissions of any regulatedpollutant(for fee middot calculation) already included in the fee calculation See 40

The insignificant quantities of actual emissions not required to be listed or calculated in a permit application pursuant to 40 CPRsect 715(c)(11) [40 CPRsect 719(c)(5)(iii)]

517 Fee calculation worksheets shall be certifiedcas tottuthacclllacy and completeness by a responsible official in accordancewi1h 40 CPRsect 715(d)

518 The permittee shall retain fee calculation worksheets and other emissionsshyrelated data used to detennine fee payment for five years following submittal offee payment Elhission-related data include for example emissionsshyrelated forms provided by EPA and used by the pennittee for fee calculation pllrposes emissions-related spreadsheets and emissionsbullrelated data such as records of emissions monitoringdata and related support information required to be kept in accordance with40 CPRsect 716(a)(3)(ii) [See 40 CPR sect 79(i)]

519 Faihtreofthe permittee to pay fees in a timely manner shall subject the permittee to assessmentofpenalties and interest in accQIdancewith40CFR sect 719(1)

5110 The EPA will not act on applications forpermit renewal or modification if the permittee fails to pay all fees interest and penalties owed iri full [See 40 CPR sect 719(m))

5111 When notified by EPA of underpayment of fees the permittee shall remit full payment within 30 days of receipt of notification [See 40 CPR sect 7190)(1) and(2))

5Jl2 Ifthe permittee thinks that the EPA-assessed fee is in error and wishes to challenge the fee the permittee shall provide a written explanation of the alleged error to EPA along with filii payment of the assessed fee [See 40 CFR sect 71 90)(3))

52 Blankd Compliance Statement [40 CPRsectsect 716(a)(6)(i) and (H)]

12

Transwestern Pipeline Company Compressor Station No 6 - Laguna 121172015 CJ TitleVP~rmit to OperateNo R6NM-2-08R2 (replaces R6NM-0 I-08RI) Draft Permit

521 middot The permittee must comply with all conditions ofthis Part 71 permit Any permit noncompliance including Yiolation of any applicable requirement any permit(erm or condition any fee or filing requiteJTIent any duty tomiddotallow or CIIIT) out inspection entry or monitoring actiYities or any regulation or order issued bythe permitting authoritypursuatit to this part constitutes a Yiolation oftheCAA and is grounds for enforcement action permit termination reYocationand~essliance or modification or deni~l ofapertnit renewal application It shall notbe a defense for a permittee in an enforcement ~~ction that it would have been necessary to halt or reduce the permitted actiYity in order to m11intairi compliance with the conditions of this perrnit[40CFR sectsect 716(a)(6)(i)atid(ii)]

Determinations of deYiations continuous or intermittent compliance sts or YiOIItions of this perrnit are not limited to theapplic~ible testing or monitoring methods required by the underlying regulations of thispermit other credible eYidencemust be considered in such determinations [Section 113~a) and 113(e)(l) oftheCAA] middot

i

53 Compliance Certifications[40 CFR sect 716(c)(5)]

I The permittee shall submit to EPA a certificationof compliance withpermit terms and conditions including emission limitations standards or work practices armually Clch year no later thiU April 1 The compliance certification shall coYer tlte same 12 month period as the two consecutiYe semi-atinu~~l monitoring reports The compliance certification shall be certified as to truth accuracyandcompleteness by a responsible official consistent with 4() CFR sect 715(d)

middot 5dl The certification shall includethefollowing

5311 Identification ofeach permit teim or condition that is the basis ofthe certification

5312 Identification ofthe method(s) or other means used for detrmining the compliance status with lteach term and condition during the certification period and whether such methods or other means proYide continuous or intermittentdata If necessary the owner or operator also shall identify any other material infortnation eg operating hours records that must be included in the certification to

middot comply with section 13(c)(2) of the CAA which prohibits knowingly making afalse certification or omitting material 1 information

I i 13middot

I I

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 6: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

513 Property Rights 20 514 lnspeCtionand Enhy 20 515 Transfer of Ownership or Operation 21 516 OffPermit Changes 21 517 Permit Expiration jlld Renewal 22 518 Credible Evidcentiice 23

V

Terms Abbreviations and Acronyms

Source Facility CAA CFR HAP

--------------~m

IDNo MMBtu mrnscfyr NOx lMlo PM25 SOz EPA voc IC engine

List of Tables

Tablel

Table2

Table 3

Transwestern Pipeline Company LLC Comptesslir Station No 6 -laguna Transwestern Pipeline Company LLC Compressor Station No 6 -laguna Clean Air Act [42 United States Code Section 7401 et ~] Code of Federal Regulations Hazardous Air Pollutant nour

IdentificationNumber Million BritishThennal Units Million Standard Cubic Feet per year Niqogen Oxides Particulate matter less than 10 microns in diameter Particulate matter less than 25 microns in diameter Sulfur Dioxide United States Environmental Protection Agency Volatile Organic Compounds internal combustion engine ~formerly referred to as reciprocating engine

Source Emission Points and Control Devices

Potential to Ernitin Tons per Year

Applicable Requirements

v

()Transwestem Pipeline Company C9Jllpressor Station No 6- La~una 121l720l5 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ql-08RJ) Draft Permit

1 Source Identification and UnitSpecific Information

llGeqer~lS(lurce Informati(ln

Owner and Operator

Plant Naine

Plant location

EPA Region

State

Tribe

County

Reservation

Plant mailing aoldtess

Responsible Official

I l Plarit Contact

TrjSwesterJJ Pipeline Company LLC amp501 Jefferson NE Albuquerque New Mexico 87113

Compressor Station No(~ Laguna

05 miles South ofLaguna New Mexico

6

NewMexico

Laguna

Cibola

Laguna Pueblo

850 I Jefferson NE Albuquerque New Mexico 87113

DliYil ~Qybal Director ofOperations Transwestem Pipeline Company LLC 8501 Jefferson NE Albuquefqu(l New Mexico 87113 Phone (575)347-6514

Lawrence Campbell Transwestem Pipeline Company LLC 8501 Jefferson NE Albuquerque NewMexico 87113 Phone (575)625-8022

Standard IndustrialCode (SIC) Code 4922

Aerometric Infonnation Retrieval System (AIRS) Facility System Plant ID No R6NM-2-08R2 (replaces R6NM-01-08Rl) ()

1

I

I

Tratl$w~stem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NM-01-08RI) Draft Pennit

Description of Proqess TranswestemPipeline Company LLC Compressor Station No 6- Laguna with SIC code 4922 is a natural gas compression and transmission facility with pressurized natural gas as its principal product

---------12-SourceEmission-lointiH~ndclotential-to-Emit~--------------------t

Table I below provides important information related to significant emissions units at Transwestem Pipeline Company LLCs Compressor Station No 6- Laguna including dates of installation size opound the units serial numbers and any associated control equipment Table 2 lists the potential to emit (PTE) ofair pollutants from the source which will be usedto determine and report deviations to EPA as required by Conditions 3264 and 329 of this permit

Tablet Source Emission Points and Control Devices- Transwestern Pipeline Company LLC Compressor Station No 6 - Laguna

Unit No Type of

Unit Serial No

Manufacturer Model No

De$igHeat Input

Operating Range or

Size of Unit

Date of Installation

Primary Use

Control Equipment

601 ICEngine 107510

CtarkTVCl2 3465 MMBtuhr 4500HP 1961 Compressor

ltrive None

602 lCEngine 107511

Clark TVC-12 3465 MMBtuhr

4500-HP 1967 Compressor

ltrive None

603 1C Engine

107512 Clark TVC-12

3465 MMBtuhr 4500-HP 1967 Compressor

driVe None

621 RIC Engine 129011

Waukesha 42 MMBtuhr

470-HP 1967 Electrical generation None

MIST Fixed Roofsorage Tank

1100-GAL 1966 Natural Gas Condensate None

T2 Fixed Roof Storage Tank

500-BBL 1966 Natural Gas Cltmdensate

None

2

I

I

]

I i I

()Transwestem Pipeline Company Compressor Station No6middot Laguna 121172015 Title VPermitltOperate No R6NM-2-08R2 (repiaces R6NM-O l-08RI) Draft Permit

Table 2 Potential to Emit in Tons per Year (tpy)1- Transwestern Pipeline Company

CompressorStationNo 6- Laguna

UnitiD

601 Clu-k TVCshy12 NGfired Engine

602 Clu-k TVc 12 NCtfired Engine

603 Clu-k TVCshy12 NG fired Engine

62~ Waukesha F3520GUNG Enline FUO

MIST lOOGal Tank

T-2 500BbL Tank

Truck Loadilg

MAIN-SSM

TOTALStpy

Numbers contained mtlus tableareforuncontrolledemSsions are formformatton purposes only and are notan enorceablcent conditio11s See Condition 42 for applicable enforceablemiddotlimitations middot 2 The PMw emission levels fortliesoutcemiddotare within an attainment area Precllsors for PM including )lOX Soz and VOC are monitored for grandfathered unitS or controlled for NESHAP applicable unitsc While thePMto emisSicm rates for the Clark engines are listed for informationalplirposes they may not be reflectivemiddotofPTE for these engines as they could represent calculations from a bad test (totaiPM10 emission levels for this source in the attainment area are considered deminimusfor implementation ofthe PM2csRule and thereforePMzs moniioringwill not be req11ired in this permtaction) NOx- pxides ofnitrogen VOC -volatile organic compounds (nonbullHAP) S02- sulfur dioxide PM0 particulate matter with a diameter 10 microns or less CO - carbon monoxide

3

NOx

4984

4984

4984

046

149566

voc

1822

18)~2

1822

001

134

554

2817

004

092

9068

S02

009

0 09

009

00001

02701

PM25

731

731

731

0004

21934

PM102

731

731

731

0004

21934

co

1512

1512

1512

078

45438

Lead

0

0

0

0

0

0 006 1lOampOo

0 001

00009 27242

0 349019 6736225

11AP3

116

116

116

001

0001

002

GHG

1775712

1775712

1775712

2457

51390

22000

I

- Transwestem Pipeline Company Compressor Station No 6 -Laguna 1211712015 Title V Penni to Operate No R6NM-2-08R2 (replaces R6NM-O 1-08RI) Draft Pennit

HAP- hazardous air pollutants(see CAA Section 112(b)) NG- natural gas 3 Mostly fonllaldehyde

2 PermifShiel1[40 CFR sect 716(f)J

---------2-r--Notniilgin tliis pennifSliallalter or affect the followmg

2lLTheprovisions ofS~ction 303 ofthe CAA(emergencyorclers) including the authorityoftheAlrrlinistrator under that secti(n

212 The liability of a pennittee for any violati(n ofapJgtlicable requirements prior to br atthetime ofpennit issuance or middot

213 The lbility of the EPA to obtain infonnation from a source under Section 114 6ftheCAA

22 Compliance with the tenns and conditions ofthis pennit shall be deemed in cl)Ilpliance with the applicable requirements specifically listed in thispennit as of the date ofpermit issuance

3 Applicable Requirements and General permit Cqnditions

31 Applicable Requirements

The source will continue to comply with all applicable requi~mel)ls For applicable requirements thatwill become effective during the tenn ofthe penni tile source will meet su~h r~quJremeiJ$ on atiYlely bSis The pennittee shall comply with all theapplicable requirements offederalregulltigrts Inparticular the pennittee shall comply with the following

4

( TranswestemPipeline Company Compressor Station No 6 - Laguna 12172015 )TitleV Permitto Operate No R6NM2-08R2 (replaces R6NM-O l-08Rl) Draft Permit

Table 3 Applicable Requirements for Transwestern Pipelilie Company LLC C ta on 0bull - a~tunaompressor StiN6L

Citation Requirement C9mment

40CFR71 FederaLOperating Permits Program

UnitNosmiddot6QJ 602603621

40 CFR6 Subpart A

General Provisions

UnitNq 621

40CFR63 Subpart ZZZZ

National Emission Standardgtforazailous Aili Pollutants for Stationary R~ciproeating Iriternal CombustionmiddotEngines (RICE)

Unit No 621

TlfeTranswesterh Pipeline Company LLC Compressor StationNo 6- Laguna application was reviewed for compliance with the Part 71 Operating Permit Program Based on the inforrnationproviledbyTranswestemPipeline Company LLC in their application Compressqr Stittio)l No 6 (Lag1111a) would be subject to the following General Permit Requirements

32 General Permit Requirements I

Conditions in this section apply to all emissions units located at the facility including anyI units not specifically listed in Table 1

321 All equipment shall be operated in accordance with the manufacturers design values for that equipment

322 flleIIll()lint Of natural gaS llumed in the following emissions ullits shall not exceed the following amounts on a rolling 12-month average

Emissions Unit No 60 I - 289 mmscfyr Emissions Unit No 602-289 mmscfyr Emissions Unit No 603-289 mmscfyr Emissions Unit No 621 - 3504 mmscflyr

323 The actual heat input for Emissions UnitNo 601 Emissions Unit No 602and Emissions Unit No 603 shall not exceed 3465 MMBtulhr adjusted for elevation and for Emissions Unit No 621 the actual heat input shall not exceed 42 MMBtulhr adjusted for elevationmiddot

5

Transwestem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

324 Compliance Tests Compliance tests from units at this source will be conducted using applicable EPA Methods established within 40 CFR Part 51 Appendix M or as otherwise specified in the permit by applicable requirements

325 Monitoring

325J Fuel consumption for Emissions Unit Nos 601 602 603 and 621 shall be monitored witha flow meter monthly for each unit in MMscf (of natural gas)

3252 Heatinputratefor Unit Nos 601 602 603 and 621 shall be monitored Monthly orta per unitbllSis(or individual highest rate in MMBtulhr

326 ReportingRecordkeeping

3261 The permittee shall keep records on all startup shutdown repair and maintenance activities performed on all emission units These records shall identify the relevant emission unit and describe the work performed and calculate any associated emissions

3262 The fuel flowconsumption for each emissions unit (Unit Nos 601 602 603 and 621) shall be recorded on a monthly basis and art annual 12-month rolling average

3263 The records of fuel consumption shall be maintained for each emission unit (Unit Nos 601 602 603and 621) for the last five years

3264 The actualheat input rate for emission Unit Nos 601 602 603 and 621 sh~lbe ~qrlted on a monthly average basis as well as an annual12-month rolling average Ifthe emissions rate ofany ofthe enampines deviates more than 2 above the PTE listed in Table2 ofthis perrrit then the permittee shall evaluate the deviation to determine if there has been a physical change or change in method ofQperation at the source report the deviation and the results of the evaluation to EPA in the report required by Condition329 below and apply for a modification ofthil) pennit ifnecessary

3265 The records of heat input shall be maintainedJor emission Unit Nos 601 602 603 artd 621 for at least the last five years

Cqnditionsin this section apply to all emissions units located atthe facility including any units not specifically listed in Table 1

6

()Transwestern Pipeline Company Compressor Station No 6 Laguna 1211712015 TitleV Permitto Operate No R6NM-2-08R2replaces R6NMOl-08RI) Draft Permit

327 The permittee shall keep records of the serial numbers for each e111ission unit The e111ission ll1its f()rthe RICE and thlir serial nJll11bers are UnitNo 601 withserial nJll11ber 107510 Unit No 602 With serial numo(lr l075UUnitNo 603 with serial number 107512 Unit No 621 with serial number 129011

328 Retenti9n of reltprds ami support information shall be for a period ofat least five years from the date ofmeasurement or report Supportinfonnation includes all calibrationandmamtenance records all origin~ strip-chartrecordings or monitoring instrumeitation and copiltsofall reports [qujJedby thisj)ennjt

329 The pllrmitteeshlill submittothe EPAreportsofany monitoring and recpr~eeping required under this permit8emi-annually )Jy April 1 and O~tober 1of ealtlth year The report due on April l shall cover the prior six--month period from September 1 through the end of February The report due on October l shall cover the prior sixshymonthperiod from March 1 through the end pfAugust

Copies ofthese tecotdsshall also besentto

Environmental Direct()r Pueblo of Laguna PO BoxJ94 Laguna NM 87026

4 EnginllNESHAgtRequirements

41 General Provisions

Thepennittee shalLci)mplywithth(l requirements [rom the NE$HAP General Pfqvisions 40 CFR Part 63 Subpart Afor Emissions Unit No 621 only

42 Requirements for Emissilaquonls UnitNo 6~1I l

421 For Emissions Unit No 621the perniitteeshallmeet the requirements in 422 through 424 below

422 Change oil and filter every 500 hours of operation or annually whichever comes first inspect air cleaner every 1000 hours ofoperation or annually whichever comes first and replace as necessary and inspect aU hoses and

I 7

I

Transwestem Pipeline Company Compressor Station No 6 Laguna 1217205 Title V Permitto Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

belts every 500 hours of operation or annually whichever comes first and replace as necessary [40 CFR sect 636002 Table 2c]

423 Minimize the enginestime spent at idle and minimize the engines startup time at startup to a period needed for appropriate and safe loading ofthe engine not to exceed 30minutesafter which time the non-startup emission

---------~---limitations~pply-[40-CFR--sect6~6002--Iable-2G~~-------------c-t

424 Permittee must install ~~non-resettable hour meter ifone is not already installed [40 CFR sect 636625(f)]

43 General Compliance Requirements for Unit No 621

431 Emissions Unit No 621 must be incompliance with the operating limitations and requirements in Condition 42 at~~ll times [ 40 CFR sect 636605(a)]

432 The permittee must operate and maintain Unit No 621 including air pollution control and monitoring equipment in a manner consistent with good air pollution control practices for minimizing emissions [ 40 CFR sect 636605(b)]

44 Perfonnanee Requirements for Unit No 621

441 As an emergency stationary RICE the permittee must operate Emissions Unit No 621 accordingtotherequirementsof40CFR sect 636640(plusmn)

442 Any operation other than emergency operation maintenance and testing emergency demand response and operation in non-emergency situations for 50 hours per year as described in paragraphs f(l) throug( 4) of40 CFR sect 636640 is prohibited [ 40 CFR sect 636640(plusmn))

443 IfEmissions Unit No 621 is not operated according to the requirements in 40 CFR sect 636640(plusmn)(1) through (f)(4) Emissions Uhit No 621 will not be considered an emergency stationary RICE and it must meet all requirements for non-emergency engines [40 CFR sect 636640(plusmn)]

444 There is no time limit on the use 0femergency stationary RICE in emergency situations [40 CFR sect 636640(plusmn)(2)] middot

445 Emissions Unit No 621 may be operated for up to 50 hours per calendar year in non-emergency situations The 50 hours per year for nonshy

8

Transwestem Pipeline Company Compressor Station No 6 bull Laguna 12fl72015 Title V PermiHo QperateNo R6NMmiddot2middot08RZ(replaces R6NM-Ol-08Rl) Draft Permit

emergency situatipns cartnot be used for peak shaying or non-emergency demand response or to generate income for afacilityto supply power as part o[a financiil arrangement with another entity [ 4QCFRsect 636640(pound)(3)]

446 Pertilitteemay operate Emissions Unit No 621 for any combination of the purposes specified In 40 CFR sect 636640(f)(2)(i)through (iii) for a maximum of 100 hours per calendar year Any operltJiiohfor non-emergency situations as ltJlloVlldby paragraphs 40 CFR sect 63 6640(f)(3) and (4) counts as part ofthe lOOhours per calendamp year allowed ]Jythisparagraph [40 CFRsect 636640(plusmn)(2)]

4S Clntinuous Compliance Requirements for Emissions Unit No 621

Emissions Unit No 621 shall be operated and maintained according to the manufacturers emission-rellited operation and maintenance instructions In the alternative permittee may develop and follow its own maintenance plan which nmst provide to the extent practicable for the maintenance and operation ofEmission Unit No 621 in a martner coiiSisteht with good air pollution control practice for minimizing emissions [40 CFRsect 636640(a) Table 6]

46 Recordkeeping Requirements for Emissions Unit No 621

4(il You mustkeep a copy of each notification and report submitted to comply with 40 CFR Part 63 Subpart ZZZZ including all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted accQrdingto 1herequirementin40 CFR sect~HO(b)(2)(xiv)

462 Records ofthe occurrence and duration of each malfunction ofoperatitm (ie process equipmellt) or any air pollution CQJltrQl and monitoring equipment

463 Records ofaii required maintenance performed on any airpollution control and monitoring equipment

464 The permittee must keep records of the pperating and maintenance conducted ltm Emissions Ulltt No 62 I necessary to ensure compliance with Condition45 above

47 Reporting Requirements (or Emissions Unit No 621

471 Permittee must report each instance in which an applicable emissions limitation operating limitation or requirement in 40 CFR Part 63 Subpart ZZZZ Table 2(c) is not met

9

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 TitleV Pennitto Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

472 These instances are deviations from the emission and operating limitations in 40 CFR Part 63 Subpart zzzz These deviations must be reported according to the requirements in 40 CFR sect 636650

5 Title Y Administrative Requirements

51 Annual Fee Payment [40 CFR sectsect 76(a)(7) and 719]

5I L The pe)Jlittee shall pay an annual permit fee in accordance with the procedures outlinedbelow [40 CFR sect 7l9(a)]

512 ]he )Je)Jlittee shall pay the annual permit fee each year The fee shall be received no later hail July 20 of each year

513 The fee payment shall be in United States currency and shall be paid by money order bank draft certified check corporate check or electronic funds transfer payable to the order ofEP A

514 Thepetmittee shall send fee payment and a completed fee filing form to

Forregular US postal service mail Fornon-US Postal Service express mail

(FedEx AirbomeDHL and UPS)

middotUS Environmental Protection Agency US Bank FOIA and Miscellaneous Payments Government Lockbox 979078 Cincinnati Finance Center US EPA FOfA amp Misc Payments PO Box 979078 1005 Convention Plaza St Louis MO 63197~9000 SL-MQcQ2-GL

St LouisM063101

Contact Craig Steffen 513-487-2091 Contact 314-418-1028 or Eric Volck513-487-2105

For electronic pavment (identifY permit number for payment in form)

Automated Clearinghouse (ACH) for receiving US currency PNCBank ABA 051036706 Account Number 310006 CTX Format Transaction Code 22 -checking

10

TranswestertrPipeline Company Compressor Station No6- Laguna Title V Permitto Operate No R6NMbull2-08R2 (replaces R6NM01~08R1)

121172015 )raft Permit

Environmental Protection Agency 808 17m Street NW Washington DC 20074

Contact Jesse White 301-887-6548

515 The pennitt~ shallsend an updated fee calculation wo~ksheet fonn and a photo~opy ofeach fee payment ~heck (or utherconfinnation ofactual fee paid) submitted annually by the same deadline as required for fee paymenUo the address listed in Section55 ofthis peimit [Note that anannual emissionsreport t~quired atthe same time as the feesalcUJaticmworksheet by40 CPRsect 719(h) has been incorporated intO the fee calculation worksheet fonn as aconvenience]

516 Basisfor~alculating annual fee

bull5161 The annual emissions fee shall be calculated by multiplying the total tons ofactual emissions of a11~egUlated pollutants (for fee calculation) emitted from the source by the emissions fee(in dollarston) in effect atthemiddottime of calculation

51611 Actual emissions means the actllal rate ofemissions in tons per year ofally regulated pollutant(for fee calculation) emitted from a part 71 source over thtl preceding calendar year Actual emissions shall be calcllhlted Using eachemissions units actual operating hours production rates in-place control equipment and types ofmaterials processed stored or combusted during the preceding ~endaryear [See 40 CPR sect 719(c)]

51612 If actual emissions cannot be detenninel )Jsipgthe compliance methods in the pennit the pennittee shall Use other fe~r~ly recognized procedures (40 CFR sect 719(e)(2)]

5L613 The term regulated pollutant (for fee calculation) is qefined in 40 CPR sect 712

51614 The permittee should note that the presumptive fee amount is revised each calendaryear to account for inflation and it is available from EPA prior to the start of each calendar year

5162 The pennittee shall excludethe following emissions from the calculation of fees ()

--middotmiddot--middot

ll

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

51621

51622

-----------------vFR+7-h9(e~)euroii

51623

The amount ofactual emissions ofeach regulated pollutant (for fee calculation) that the source emits in excess of 4000 tons per year See 40 CFR sect 719(c)(S)(i)

Actual emissions of any regulatedpollutant(for fee middot calculation) already included in the fee calculation See 40

The insignificant quantities of actual emissions not required to be listed or calculated in a permit application pursuant to 40 CPRsect 715(c)(11) [40 CPRsect 719(c)(5)(iii)]

517 Fee calculation worksheets shall be certifiedcas tottuthacclllacy and completeness by a responsible official in accordancewi1h 40 CPRsect 715(d)

518 The permittee shall retain fee calculation worksheets and other emissionsshyrelated data used to detennine fee payment for five years following submittal offee payment Elhission-related data include for example emissionsshyrelated forms provided by EPA and used by the pennittee for fee calculation pllrposes emissions-related spreadsheets and emissionsbullrelated data such as records of emissions monitoringdata and related support information required to be kept in accordance with40 CPRsect 716(a)(3)(ii) [See 40 CPR sect 79(i)]

519 Faihtreofthe permittee to pay fees in a timely manner shall subject the permittee to assessmentofpenalties and interest in accQIdancewith40CFR sect 719(1)

5110 The EPA will not act on applications forpermit renewal or modification if the permittee fails to pay all fees interest and penalties owed iri full [See 40 CPR sect 719(m))

5111 When notified by EPA of underpayment of fees the permittee shall remit full payment within 30 days of receipt of notification [See 40 CPR sect 7190)(1) and(2))

5Jl2 Ifthe permittee thinks that the EPA-assessed fee is in error and wishes to challenge the fee the permittee shall provide a written explanation of the alleged error to EPA along with filii payment of the assessed fee [See 40 CFR sect 71 90)(3))

52 Blankd Compliance Statement [40 CPRsectsect 716(a)(6)(i) and (H)]

12

Transwestern Pipeline Company Compressor Station No 6 - Laguna 121172015 CJ TitleVP~rmit to OperateNo R6NM-2-08R2 (replaces R6NM-0 I-08RI) Draft Permit

521 middot The permittee must comply with all conditions ofthis Part 71 permit Any permit noncompliance including Yiolation of any applicable requirement any permit(erm or condition any fee or filing requiteJTIent any duty tomiddotallow or CIIIT) out inspection entry or monitoring actiYities or any regulation or order issued bythe permitting authoritypursuatit to this part constitutes a Yiolation oftheCAA and is grounds for enforcement action permit termination reYocationand~essliance or modification or deni~l ofapertnit renewal application It shall notbe a defense for a permittee in an enforcement ~~ction that it would have been necessary to halt or reduce the permitted actiYity in order to m11intairi compliance with the conditions of this perrnit[40CFR sectsect 716(a)(6)(i)atid(ii)]

Determinations of deYiations continuous or intermittent compliance sts or YiOIItions of this perrnit are not limited to theapplic~ible testing or monitoring methods required by the underlying regulations of thispermit other credible eYidencemust be considered in such determinations [Section 113~a) and 113(e)(l) oftheCAA] middot

i

53 Compliance Certifications[40 CFR sect 716(c)(5)]

I The permittee shall submit to EPA a certificationof compliance withpermit terms and conditions including emission limitations standards or work practices armually Clch year no later thiU April 1 The compliance certification shall coYer tlte same 12 month period as the two consecutiYe semi-atinu~~l monitoring reports The compliance certification shall be certified as to truth accuracyandcompleteness by a responsible official consistent with 4() CFR sect 715(d)

middot 5dl The certification shall includethefollowing

5311 Identification ofeach permit teim or condition that is the basis ofthe certification

5312 Identification ofthe method(s) or other means used for detrmining the compliance status with lteach term and condition during the certification period and whether such methods or other means proYide continuous or intermittentdata If necessary the owner or operator also shall identify any other material infortnation eg operating hours records that must be included in the certification to

middot comply with section 13(c)(2) of the CAA which prohibits knowingly making afalse certification or omitting material 1 information

I i 13middot

I I

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 7: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

Terms Abbreviations and Acronyms

Source Facility CAA CFR HAP

--------------~m

IDNo MMBtu mrnscfyr NOx lMlo PM25 SOz EPA voc IC engine

List of Tables

Tablel

Table2

Table 3

Transwestern Pipeline Company LLC Comptesslir Station No 6 -laguna Transwestern Pipeline Company LLC Compressor Station No 6 -laguna Clean Air Act [42 United States Code Section 7401 et ~] Code of Federal Regulations Hazardous Air Pollutant nour

IdentificationNumber Million BritishThennal Units Million Standard Cubic Feet per year Niqogen Oxides Particulate matter less than 10 microns in diameter Particulate matter less than 25 microns in diameter Sulfur Dioxide United States Environmental Protection Agency Volatile Organic Compounds internal combustion engine ~formerly referred to as reciprocating engine

Source Emission Points and Control Devices

Potential to Ernitin Tons per Year

Applicable Requirements

v

()Transwestem Pipeline Company C9Jllpressor Station No 6- La~una 121l720l5 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ql-08RJ) Draft Permit

1 Source Identification and UnitSpecific Information

llGeqer~lS(lurce Informati(ln

Owner and Operator

Plant Naine

Plant location

EPA Region

State

Tribe

County

Reservation

Plant mailing aoldtess

Responsible Official

I l Plarit Contact

TrjSwesterJJ Pipeline Company LLC amp501 Jefferson NE Albuquerque New Mexico 87113

Compressor Station No(~ Laguna

05 miles South ofLaguna New Mexico

6

NewMexico

Laguna

Cibola

Laguna Pueblo

850 I Jefferson NE Albuquerque New Mexico 87113

DliYil ~Qybal Director ofOperations Transwestem Pipeline Company LLC 8501 Jefferson NE Albuquefqu(l New Mexico 87113 Phone (575)347-6514

Lawrence Campbell Transwestem Pipeline Company LLC 8501 Jefferson NE Albuquerque NewMexico 87113 Phone (575)625-8022

Standard IndustrialCode (SIC) Code 4922

Aerometric Infonnation Retrieval System (AIRS) Facility System Plant ID No R6NM-2-08R2 (replaces R6NM-01-08Rl) ()

1

I

I

Tratl$w~stem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NM-01-08RI) Draft Pennit

Description of Proqess TranswestemPipeline Company LLC Compressor Station No 6- Laguna with SIC code 4922 is a natural gas compression and transmission facility with pressurized natural gas as its principal product

---------12-SourceEmission-lointiH~ndclotential-to-Emit~--------------------t

Table I below provides important information related to significant emissions units at Transwestem Pipeline Company LLCs Compressor Station No 6- Laguna including dates of installation size opound the units serial numbers and any associated control equipment Table 2 lists the potential to emit (PTE) ofair pollutants from the source which will be usedto determine and report deviations to EPA as required by Conditions 3264 and 329 of this permit

Tablet Source Emission Points and Control Devices- Transwestern Pipeline Company LLC Compressor Station No 6 - Laguna

Unit No Type of

Unit Serial No

Manufacturer Model No

De$igHeat Input

Operating Range or

Size of Unit

Date of Installation

Primary Use

Control Equipment

601 ICEngine 107510

CtarkTVCl2 3465 MMBtuhr 4500HP 1961 Compressor

ltrive None

602 lCEngine 107511

Clark TVC-12 3465 MMBtuhr

4500-HP 1967 Compressor

ltrive None

603 1C Engine

107512 Clark TVC-12

3465 MMBtuhr 4500-HP 1967 Compressor

driVe None

621 RIC Engine 129011

Waukesha 42 MMBtuhr

470-HP 1967 Electrical generation None

MIST Fixed Roofsorage Tank

1100-GAL 1966 Natural Gas Condensate None

T2 Fixed Roof Storage Tank

500-BBL 1966 Natural Gas Cltmdensate

None

2

I

I

]

I i I

()Transwestem Pipeline Company Compressor Station No6middot Laguna 121172015 Title VPermitltOperate No R6NM-2-08R2 (repiaces R6NM-O l-08RI) Draft Permit

Table 2 Potential to Emit in Tons per Year (tpy)1- Transwestern Pipeline Company

CompressorStationNo 6- Laguna

UnitiD

601 Clu-k TVCshy12 NGfired Engine

602 Clu-k TVc 12 NCtfired Engine

603 Clu-k TVCshy12 NG fired Engine

62~ Waukesha F3520GUNG Enline FUO

MIST lOOGal Tank

T-2 500BbL Tank

Truck Loadilg

MAIN-SSM

TOTALStpy

Numbers contained mtlus tableareforuncontrolledemSsions are formformatton purposes only and are notan enorceablcent conditio11s See Condition 42 for applicable enforceablemiddotlimitations middot 2 The PMw emission levels fortliesoutcemiddotare within an attainment area Precllsors for PM including )lOX Soz and VOC are monitored for grandfathered unitS or controlled for NESHAP applicable unitsc While thePMto emisSicm rates for the Clark engines are listed for informationalplirposes they may not be reflectivemiddotofPTE for these engines as they could represent calculations from a bad test (totaiPM10 emission levels for this source in the attainment area are considered deminimusfor implementation ofthe PM2csRule and thereforePMzs moniioringwill not be req11ired in this permtaction) NOx- pxides ofnitrogen VOC -volatile organic compounds (nonbullHAP) S02- sulfur dioxide PM0 particulate matter with a diameter 10 microns or less CO - carbon monoxide

3

NOx

4984

4984

4984

046

149566

voc

1822

18)~2

1822

001

134

554

2817

004

092

9068

S02

009

0 09

009

00001

02701

PM25

731

731

731

0004

21934

PM102

731

731

731

0004

21934

co

1512

1512

1512

078

45438

Lead

0

0

0

0

0

0 006 1lOampOo

0 001

00009 27242

0 349019 6736225

11AP3

116

116

116

001

0001

002

GHG

1775712

1775712

1775712

2457

51390

22000

I

- Transwestem Pipeline Company Compressor Station No 6 -Laguna 1211712015 Title V Penni to Operate No R6NM-2-08R2 (replaces R6NM-O 1-08RI) Draft Pennit

HAP- hazardous air pollutants(see CAA Section 112(b)) NG- natural gas 3 Mostly fonllaldehyde

2 PermifShiel1[40 CFR sect 716(f)J

---------2-r--Notniilgin tliis pennifSliallalter or affect the followmg

2lLTheprovisions ofS~ction 303 ofthe CAA(emergencyorclers) including the authorityoftheAlrrlinistrator under that secti(n

212 The liability of a pennittee for any violati(n ofapJgtlicable requirements prior to br atthetime ofpennit issuance or middot

213 The lbility of the EPA to obtain infonnation from a source under Section 114 6ftheCAA

22 Compliance with the tenns and conditions ofthis pennit shall be deemed in cl)Ilpliance with the applicable requirements specifically listed in thispennit as of the date ofpermit issuance

3 Applicable Requirements and General permit Cqnditions

31 Applicable Requirements

The source will continue to comply with all applicable requi~mel)ls For applicable requirements thatwill become effective during the tenn ofthe penni tile source will meet su~h r~quJremeiJ$ on atiYlely bSis The pennittee shall comply with all theapplicable requirements offederalregulltigrts Inparticular the pennittee shall comply with the following

4

( TranswestemPipeline Company Compressor Station No 6 - Laguna 12172015 )TitleV Permitto Operate No R6NM2-08R2 (replaces R6NM-O l-08Rl) Draft Permit

Table 3 Applicable Requirements for Transwestern Pipelilie Company LLC C ta on 0bull - a~tunaompressor StiN6L

Citation Requirement C9mment

40CFR71 FederaLOperating Permits Program

UnitNosmiddot6QJ 602603621

40 CFR6 Subpart A

General Provisions

UnitNq 621

40CFR63 Subpart ZZZZ

National Emission Standardgtforazailous Aili Pollutants for Stationary R~ciproeating Iriternal CombustionmiddotEngines (RICE)

Unit No 621

TlfeTranswesterh Pipeline Company LLC Compressor StationNo 6- Laguna application was reviewed for compliance with the Part 71 Operating Permit Program Based on the inforrnationproviledbyTranswestemPipeline Company LLC in their application Compressqr Stittio)l No 6 (Lag1111a) would be subject to the following General Permit Requirements

32 General Permit Requirements I

Conditions in this section apply to all emissions units located at the facility including anyI units not specifically listed in Table 1

321 All equipment shall be operated in accordance with the manufacturers design values for that equipment

322 flleIIll()lint Of natural gaS llumed in the following emissions ullits shall not exceed the following amounts on a rolling 12-month average

Emissions Unit No 60 I - 289 mmscfyr Emissions Unit No 602-289 mmscfyr Emissions Unit No 603-289 mmscfyr Emissions Unit No 621 - 3504 mmscflyr

323 The actual heat input for Emissions UnitNo 601 Emissions Unit No 602and Emissions Unit No 603 shall not exceed 3465 MMBtulhr adjusted for elevation and for Emissions Unit No 621 the actual heat input shall not exceed 42 MMBtulhr adjusted for elevationmiddot

5

Transwestem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

324 Compliance Tests Compliance tests from units at this source will be conducted using applicable EPA Methods established within 40 CFR Part 51 Appendix M or as otherwise specified in the permit by applicable requirements

325 Monitoring

325J Fuel consumption for Emissions Unit Nos 601 602 603 and 621 shall be monitored witha flow meter monthly for each unit in MMscf (of natural gas)

3252 Heatinputratefor Unit Nos 601 602 603 and 621 shall be monitored Monthly orta per unitbllSis(or individual highest rate in MMBtulhr

326 ReportingRecordkeeping

3261 The permittee shall keep records on all startup shutdown repair and maintenance activities performed on all emission units These records shall identify the relevant emission unit and describe the work performed and calculate any associated emissions

3262 The fuel flowconsumption for each emissions unit (Unit Nos 601 602 603 and 621) shall be recorded on a monthly basis and art annual 12-month rolling average

3263 The records of fuel consumption shall be maintained for each emission unit (Unit Nos 601 602 603and 621) for the last five years

3264 The actualheat input rate for emission Unit Nos 601 602 603 and 621 sh~lbe ~qrlted on a monthly average basis as well as an annual12-month rolling average Ifthe emissions rate ofany ofthe enampines deviates more than 2 above the PTE listed in Table2 ofthis perrrit then the permittee shall evaluate the deviation to determine if there has been a physical change or change in method ofQperation at the source report the deviation and the results of the evaluation to EPA in the report required by Condition329 below and apply for a modification ofthil) pennit ifnecessary

3265 The records of heat input shall be maintainedJor emission Unit Nos 601 602 603 artd 621 for at least the last five years

Cqnditionsin this section apply to all emissions units located atthe facility including any units not specifically listed in Table 1

6

()Transwestern Pipeline Company Compressor Station No 6 Laguna 1211712015 TitleV Permitto Operate No R6NM-2-08R2replaces R6NMOl-08RI) Draft Permit

327 The permittee shall keep records of the serial numbers for each e111ission unit The e111ission ll1its f()rthe RICE and thlir serial nJll11bers are UnitNo 601 withserial nJll11ber 107510 Unit No 602 With serial numo(lr l075UUnitNo 603 with serial number 107512 Unit No 621 with serial number 129011

328 Retenti9n of reltprds ami support information shall be for a period ofat least five years from the date ofmeasurement or report Supportinfonnation includes all calibrationandmamtenance records all origin~ strip-chartrecordings or monitoring instrumeitation and copiltsofall reports [qujJedby thisj)ennjt

329 The pllrmitteeshlill submittothe EPAreportsofany monitoring and recpr~eeping required under this permit8emi-annually )Jy April 1 and O~tober 1of ealtlth year The report due on April l shall cover the prior six--month period from September 1 through the end of February The report due on October l shall cover the prior sixshymonthperiod from March 1 through the end pfAugust

Copies ofthese tecotdsshall also besentto

Environmental Direct()r Pueblo of Laguna PO BoxJ94 Laguna NM 87026

4 EnginllNESHAgtRequirements

41 General Provisions

Thepennittee shalLci)mplywithth(l requirements [rom the NE$HAP General Pfqvisions 40 CFR Part 63 Subpart Afor Emissions Unit No 621 only

42 Requirements for Emissilaquonls UnitNo 6~1I l

421 For Emissions Unit No 621the perniitteeshallmeet the requirements in 422 through 424 below

422 Change oil and filter every 500 hours of operation or annually whichever comes first inspect air cleaner every 1000 hours ofoperation or annually whichever comes first and replace as necessary and inspect aU hoses and

I 7

I

Transwestem Pipeline Company Compressor Station No 6 Laguna 1217205 Title V Permitto Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

belts every 500 hours of operation or annually whichever comes first and replace as necessary [40 CFR sect 636002 Table 2c]

423 Minimize the enginestime spent at idle and minimize the engines startup time at startup to a period needed for appropriate and safe loading ofthe engine not to exceed 30minutesafter which time the non-startup emission

---------~---limitations~pply-[40-CFR--sect6~6002--Iable-2G~~-------------c-t

424 Permittee must install ~~non-resettable hour meter ifone is not already installed [40 CFR sect 636625(f)]

43 General Compliance Requirements for Unit No 621

431 Emissions Unit No 621 must be incompliance with the operating limitations and requirements in Condition 42 at~~ll times [ 40 CFR sect 636605(a)]

432 The permittee must operate and maintain Unit No 621 including air pollution control and monitoring equipment in a manner consistent with good air pollution control practices for minimizing emissions [ 40 CFR sect 636605(b)]

44 Perfonnanee Requirements for Unit No 621

441 As an emergency stationary RICE the permittee must operate Emissions Unit No 621 accordingtotherequirementsof40CFR sect 636640(plusmn)

442 Any operation other than emergency operation maintenance and testing emergency demand response and operation in non-emergency situations for 50 hours per year as described in paragraphs f(l) throug( 4) of40 CFR sect 636640 is prohibited [ 40 CFR sect 636640(plusmn))

443 IfEmissions Unit No 621 is not operated according to the requirements in 40 CFR sect 636640(plusmn)(1) through (f)(4) Emissions Uhit No 621 will not be considered an emergency stationary RICE and it must meet all requirements for non-emergency engines [40 CFR sect 636640(plusmn)]

444 There is no time limit on the use 0femergency stationary RICE in emergency situations [40 CFR sect 636640(plusmn)(2)] middot

445 Emissions Unit No 621 may be operated for up to 50 hours per calendar year in non-emergency situations The 50 hours per year for nonshy

8

Transwestem Pipeline Company Compressor Station No 6 bull Laguna 12fl72015 Title V PermiHo QperateNo R6NMmiddot2middot08RZ(replaces R6NM-Ol-08Rl) Draft Permit

emergency situatipns cartnot be used for peak shaying or non-emergency demand response or to generate income for afacilityto supply power as part o[a financiil arrangement with another entity [ 4QCFRsect 636640(pound)(3)]

446 Pertilitteemay operate Emissions Unit No 621 for any combination of the purposes specified In 40 CFR sect 636640(f)(2)(i)through (iii) for a maximum of 100 hours per calendar year Any operltJiiohfor non-emergency situations as ltJlloVlldby paragraphs 40 CFR sect 63 6640(f)(3) and (4) counts as part ofthe lOOhours per calendamp year allowed ]Jythisparagraph [40 CFRsect 636640(plusmn)(2)]

4S Clntinuous Compliance Requirements for Emissions Unit No 621

Emissions Unit No 621 shall be operated and maintained according to the manufacturers emission-rellited operation and maintenance instructions In the alternative permittee may develop and follow its own maintenance plan which nmst provide to the extent practicable for the maintenance and operation ofEmission Unit No 621 in a martner coiiSisteht with good air pollution control practice for minimizing emissions [40 CFRsect 636640(a) Table 6]

46 Recordkeeping Requirements for Emissions Unit No 621

4(il You mustkeep a copy of each notification and report submitted to comply with 40 CFR Part 63 Subpart ZZZZ including all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted accQrdingto 1herequirementin40 CFR sect~HO(b)(2)(xiv)

462 Records ofthe occurrence and duration of each malfunction ofoperatitm (ie process equipmellt) or any air pollution CQJltrQl and monitoring equipment

463 Records ofaii required maintenance performed on any airpollution control and monitoring equipment

464 The permittee must keep records of the pperating and maintenance conducted ltm Emissions Ulltt No 62 I necessary to ensure compliance with Condition45 above

47 Reporting Requirements (or Emissions Unit No 621

471 Permittee must report each instance in which an applicable emissions limitation operating limitation or requirement in 40 CFR Part 63 Subpart ZZZZ Table 2(c) is not met

9

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 TitleV Pennitto Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

472 These instances are deviations from the emission and operating limitations in 40 CFR Part 63 Subpart zzzz These deviations must be reported according to the requirements in 40 CFR sect 636650

5 Title Y Administrative Requirements

51 Annual Fee Payment [40 CFR sectsect 76(a)(7) and 719]

5I L The pe)Jlittee shall pay an annual permit fee in accordance with the procedures outlinedbelow [40 CFR sect 7l9(a)]

512 ]he )Je)Jlittee shall pay the annual permit fee each year The fee shall be received no later hail July 20 of each year

513 The fee payment shall be in United States currency and shall be paid by money order bank draft certified check corporate check or electronic funds transfer payable to the order ofEP A

514 Thepetmittee shall send fee payment and a completed fee filing form to

Forregular US postal service mail Fornon-US Postal Service express mail

(FedEx AirbomeDHL and UPS)

middotUS Environmental Protection Agency US Bank FOIA and Miscellaneous Payments Government Lockbox 979078 Cincinnati Finance Center US EPA FOfA amp Misc Payments PO Box 979078 1005 Convention Plaza St Louis MO 63197~9000 SL-MQcQ2-GL

St LouisM063101

Contact Craig Steffen 513-487-2091 Contact 314-418-1028 or Eric Volck513-487-2105

For electronic pavment (identifY permit number for payment in form)

Automated Clearinghouse (ACH) for receiving US currency PNCBank ABA 051036706 Account Number 310006 CTX Format Transaction Code 22 -checking

10

TranswestertrPipeline Company Compressor Station No6- Laguna Title V Permitto Operate No R6NMbull2-08R2 (replaces R6NM01~08R1)

121172015 )raft Permit

Environmental Protection Agency 808 17m Street NW Washington DC 20074

Contact Jesse White 301-887-6548

515 The pennitt~ shallsend an updated fee calculation wo~ksheet fonn and a photo~opy ofeach fee payment ~heck (or utherconfinnation ofactual fee paid) submitted annually by the same deadline as required for fee paymenUo the address listed in Section55 ofthis peimit [Note that anannual emissionsreport t~quired atthe same time as the feesalcUJaticmworksheet by40 CPRsect 719(h) has been incorporated intO the fee calculation worksheet fonn as aconvenience]

516 Basisfor~alculating annual fee

bull5161 The annual emissions fee shall be calculated by multiplying the total tons ofactual emissions of a11~egUlated pollutants (for fee calculation) emitted from the source by the emissions fee(in dollarston) in effect atthemiddottime of calculation

51611 Actual emissions means the actllal rate ofemissions in tons per year ofally regulated pollutant(for fee calculation) emitted from a part 71 source over thtl preceding calendar year Actual emissions shall be calcllhlted Using eachemissions units actual operating hours production rates in-place control equipment and types ofmaterials processed stored or combusted during the preceding ~endaryear [See 40 CPR sect 719(c)]

51612 If actual emissions cannot be detenninel )Jsipgthe compliance methods in the pennit the pennittee shall Use other fe~r~ly recognized procedures (40 CFR sect 719(e)(2)]

5L613 The term regulated pollutant (for fee calculation) is qefined in 40 CPR sect 712

51614 The permittee should note that the presumptive fee amount is revised each calendaryear to account for inflation and it is available from EPA prior to the start of each calendar year

5162 The pennittee shall excludethe following emissions from the calculation of fees ()

--middotmiddot--middot

ll

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

51621

51622

-----------------vFR+7-h9(e~)euroii

51623

The amount ofactual emissions ofeach regulated pollutant (for fee calculation) that the source emits in excess of 4000 tons per year See 40 CFR sect 719(c)(S)(i)

Actual emissions of any regulatedpollutant(for fee middot calculation) already included in the fee calculation See 40

The insignificant quantities of actual emissions not required to be listed or calculated in a permit application pursuant to 40 CPRsect 715(c)(11) [40 CPRsect 719(c)(5)(iii)]

517 Fee calculation worksheets shall be certifiedcas tottuthacclllacy and completeness by a responsible official in accordancewi1h 40 CPRsect 715(d)

518 The permittee shall retain fee calculation worksheets and other emissionsshyrelated data used to detennine fee payment for five years following submittal offee payment Elhission-related data include for example emissionsshyrelated forms provided by EPA and used by the pennittee for fee calculation pllrposes emissions-related spreadsheets and emissionsbullrelated data such as records of emissions monitoringdata and related support information required to be kept in accordance with40 CPRsect 716(a)(3)(ii) [See 40 CPR sect 79(i)]

519 Faihtreofthe permittee to pay fees in a timely manner shall subject the permittee to assessmentofpenalties and interest in accQIdancewith40CFR sect 719(1)

5110 The EPA will not act on applications forpermit renewal or modification if the permittee fails to pay all fees interest and penalties owed iri full [See 40 CPR sect 719(m))

5111 When notified by EPA of underpayment of fees the permittee shall remit full payment within 30 days of receipt of notification [See 40 CPR sect 7190)(1) and(2))

5Jl2 Ifthe permittee thinks that the EPA-assessed fee is in error and wishes to challenge the fee the permittee shall provide a written explanation of the alleged error to EPA along with filii payment of the assessed fee [See 40 CFR sect 71 90)(3))

52 Blankd Compliance Statement [40 CPRsectsect 716(a)(6)(i) and (H)]

12

Transwestern Pipeline Company Compressor Station No 6 - Laguna 121172015 CJ TitleVP~rmit to OperateNo R6NM-2-08R2 (replaces R6NM-0 I-08RI) Draft Permit

521 middot The permittee must comply with all conditions ofthis Part 71 permit Any permit noncompliance including Yiolation of any applicable requirement any permit(erm or condition any fee or filing requiteJTIent any duty tomiddotallow or CIIIT) out inspection entry or monitoring actiYities or any regulation or order issued bythe permitting authoritypursuatit to this part constitutes a Yiolation oftheCAA and is grounds for enforcement action permit termination reYocationand~essliance or modification or deni~l ofapertnit renewal application It shall notbe a defense for a permittee in an enforcement ~~ction that it would have been necessary to halt or reduce the permitted actiYity in order to m11intairi compliance with the conditions of this perrnit[40CFR sectsect 716(a)(6)(i)atid(ii)]

Determinations of deYiations continuous or intermittent compliance sts or YiOIItions of this perrnit are not limited to theapplic~ible testing or monitoring methods required by the underlying regulations of thispermit other credible eYidencemust be considered in such determinations [Section 113~a) and 113(e)(l) oftheCAA] middot

i

53 Compliance Certifications[40 CFR sect 716(c)(5)]

I The permittee shall submit to EPA a certificationof compliance withpermit terms and conditions including emission limitations standards or work practices armually Clch year no later thiU April 1 The compliance certification shall coYer tlte same 12 month period as the two consecutiYe semi-atinu~~l monitoring reports The compliance certification shall be certified as to truth accuracyandcompleteness by a responsible official consistent with 4() CFR sect 715(d)

middot 5dl The certification shall includethefollowing

5311 Identification ofeach permit teim or condition that is the basis ofthe certification

5312 Identification ofthe method(s) or other means used for detrmining the compliance status with lteach term and condition during the certification period and whether such methods or other means proYide continuous or intermittentdata If necessary the owner or operator also shall identify any other material infortnation eg operating hours records that must be included in the certification to

middot comply with section 13(c)(2) of the CAA which prohibits knowingly making afalse certification or omitting material 1 information

I i 13middot

I I

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 8: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

()Transwestem Pipeline Company C9Jllpressor Station No 6- La~una 121l720l5 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ql-08RJ) Draft Permit

1 Source Identification and UnitSpecific Information

llGeqer~lS(lurce Informati(ln

Owner and Operator

Plant Naine

Plant location

EPA Region

State

Tribe

County

Reservation

Plant mailing aoldtess

Responsible Official

I l Plarit Contact

TrjSwesterJJ Pipeline Company LLC amp501 Jefferson NE Albuquerque New Mexico 87113

Compressor Station No(~ Laguna

05 miles South ofLaguna New Mexico

6

NewMexico

Laguna

Cibola

Laguna Pueblo

850 I Jefferson NE Albuquerque New Mexico 87113

DliYil ~Qybal Director ofOperations Transwestem Pipeline Company LLC 8501 Jefferson NE Albuquefqu(l New Mexico 87113 Phone (575)347-6514

Lawrence Campbell Transwestem Pipeline Company LLC 8501 Jefferson NE Albuquerque NewMexico 87113 Phone (575)625-8022

Standard IndustrialCode (SIC) Code 4922

Aerometric Infonnation Retrieval System (AIRS) Facility System Plant ID No R6NM-2-08R2 (replaces R6NM-01-08Rl) ()

1

I

I

Tratl$w~stem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NM-01-08RI) Draft Pennit

Description of Proqess TranswestemPipeline Company LLC Compressor Station No 6- Laguna with SIC code 4922 is a natural gas compression and transmission facility with pressurized natural gas as its principal product

---------12-SourceEmission-lointiH~ndclotential-to-Emit~--------------------t

Table I below provides important information related to significant emissions units at Transwestem Pipeline Company LLCs Compressor Station No 6- Laguna including dates of installation size opound the units serial numbers and any associated control equipment Table 2 lists the potential to emit (PTE) ofair pollutants from the source which will be usedto determine and report deviations to EPA as required by Conditions 3264 and 329 of this permit

Tablet Source Emission Points and Control Devices- Transwestern Pipeline Company LLC Compressor Station No 6 - Laguna

Unit No Type of

Unit Serial No

Manufacturer Model No

De$igHeat Input

Operating Range or

Size of Unit

Date of Installation

Primary Use

Control Equipment

601 ICEngine 107510

CtarkTVCl2 3465 MMBtuhr 4500HP 1961 Compressor

ltrive None

602 lCEngine 107511

Clark TVC-12 3465 MMBtuhr

4500-HP 1967 Compressor

ltrive None

603 1C Engine

107512 Clark TVC-12

3465 MMBtuhr 4500-HP 1967 Compressor

driVe None

621 RIC Engine 129011

Waukesha 42 MMBtuhr

470-HP 1967 Electrical generation None

MIST Fixed Roofsorage Tank

1100-GAL 1966 Natural Gas Condensate None

T2 Fixed Roof Storage Tank

500-BBL 1966 Natural Gas Cltmdensate

None

2

I

I

]

I i I

()Transwestem Pipeline Company Compressor Station No6middot Laguna 121172015 Title VPermitltOperate No R6NM-2-08R2 (repiaces R6NM-O l-08RI) Draft Permit

Table 2 Potential to Emit in Tons per Year (tpy)1- Transwestern Pipeline Company

CompressorStationNo 6- Laguna

UnitiD

601 Clu-k TVCshy12 NGfired Engine

602 Clu-k TVc 12 NCtfired Engine

603 Clu-k TVCshy12 NG fired Engine

62~ Waukesha F3520GUNG Enline FUO

MIST lOOGal Tank

T-2 500BbL Tank

Truck Loadilg

MAIN-SSM

TOTALStpy

Numbers contained mtlus tableareforuncontrolledemSsions are formformatton purposes only and are notan enorceablcent conditio11s See Condition 42 for applicable enforceablemiddotlimitations middot 2 The PMw emission levels fortliesoutcemiddotare within an attainment area Precllsors for PM including )lOX Soz and VOC are monitored for grandfathered unitS or controlled for NESHAP applicable unitsc While thePMto emisSicm rates for the Clark engines are listed for informationalplirposes they may not be reflectivemiddotofPTE for these engines as they could represent calculations from a bad test (totaiPM10 emission levels for this source in the attainment area are considered deminimusfor implementation ofthe PM2csRule and thereforePMzs moniioringwill not be req11ired in this permtaction) NOx- pxides ofnitrogen VOC -volatile organic compounds (nonbullHAP) S02- sulfur dioxide PM0 particulate matter with a diameter 10 microns or less CO - carbon monoxide

3

NOx

4984

4984

4984

046

149566

voc

1822

18)~2

1822

001

134

554

2817

004

092

9068

S02

009

0 09

009

00001

02701

PM25

731

731

731

0004

21934

PM102

731

731

731

0004

21934

co

1512

1512

1512

078

45438

Lead

0

0

0

0

0

0 006 1lOampOo

0 001

00009 27242

0 349019 6736225

11AP3

116

116

116

001

0001

002

GHG

1775712

1775712

1775712

2457

51390

22000

I

- Transwestem Pipeline Company Compressor Station No 6 -Laguna 1211712015 Title V Penni to Operate No R6NM-2-08R2 (replaces R6NM-O 1-08RI) Draft Pennit

HAP- hazardous air pollutants(see CAA Section 112(b)) NG- natural gas 3 Mostly fonllaldehyde

2 PermifShiel1[40 CFR sect 716(f)J

---------2-r--Notniilgin tliis pennifSliallalter or affect the followmg

2lLTheprovisions ofS~ction 303 ofthe CAA(emergencyorclers) including the authorityoftheAlrrlinistrator under that secti(n

212 The liability of a pennittee for any violati(n ofapJgtlicable requirements prior to br atthetime ofpennit issuance or middot

213 The lbility of the EPA to obtain infonnation from a source under Section 114 6ftheCAA

22 Compliance with the tenns and conditions ofthis pennit shall be deemed in cl)Ilpliance with the applicable requirements specifically listed in thispennit as of the date ofpermit issuance

3 Applicable Requirements and General permit Cqnditions

31 Applicable Requirements

The source will continue to comply with all applicable requi~mel)ls For applicable requirements thatwill become effective during the tenn ofthe penni tile source will meet su~h r~quJremeiJ$ on atiYlely bSis The pennittee shall comply with all theapplicable requirements offederalregulltigrts Inparticular the pennittee shall comply with the following

4

( TranswestemPipeline Company Compressor Station No 6 - Laguna 12172015 )TitleV Permitto Operate No R6NM2-08R2 (replaces R6NM-O l-08Rl) Draft Permit

Table 3 Applicable Requirements for Transwestern Pipelilie Company LLC C ta on 0bull - a~tunaompressor StiN6L

Citation Requirement C9mment

40CFR71 FederaLOperating Permits Program

UnitNosmiddot6QJ 602603621

40 CFR6 Subpart A

General Provisions

UnitNq 621

40CFR63 Subpart ZZZZ

National Emission Standardgtforazailous Aili Pollutants for Stationary R~ciproeating Iriternal CombustionmiddotEngines (RICE)

Unit No 621

TlfeTranswesterh Pipeline Company LLC Compressor StationNo 6- Laguna application was reviewed for compliance with the Part 71 Operating Permit Program Based on the inforrnationproviledbyTranswestemPipeline Company LLC in their application Compressqr Stittio)l No 6 (Lag1111a) would be subject to the following General Permit Requirements

32 General Permit Requirements I

Conditions in this section apply to all emissions units located at the facility including anyI units not specifically listed in Table 1

321 All equipment shall be operated in accordance with the manufacturers design values for that equipment

322 flleIIll()lint Of natural gaS llumed in the following emissions ullits shall not exceed the following amounts on a rolling 12-month average

Emissions Unit No 60 I - 289 mmscfyr Emissions Unit No 602-289 mmscfyr Emissions Unit No 603-289 mmscfyr Emissions Unit No 621 - 3504 mmscflyr

323 The actual heat input for Emissions UnitNo 601 Emissions Unit No 602and Emissions Unit No 603 shall not exceed 3465 MMBtulhr adjusted for elevation and for Emissions Unit No 621 the actual heat input shall not exceed 42 MMBtulhr adjusted for elevationmiddot

5

Transwestem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

324 Compliance Tests Compliance tests from units at this source will be conducted using applicable EPA Methods established within 40 CFR Part 51 Appendix M or as otherwise specified in the permit by applicable requirements

325 Monitoring

325J Fuel consumption for Emissions Unit Nos 601 602 603 and 621 shall be monitored witha flow meter monthly for each unit in MMscf (of natural gas)

3252 Heatinputratefor Unit Nos 601 602 603 and 621 shall be monitored Monthly orta per unitbllSis(or individual highest rate in MMBtulhr

326 ReportingRecordkeeping

3261 The permittee shall keep records on all startup shutdown repair and maintenance activities performed on all emission units These records shall identify the relevant emission unit and describe the work performed and calculate any associated emissions

3262 The fuel flowconsumption for each emissions unit (Unit Nos 601 602 603 and 621) shall be recorded on a monthly basis and art annual 12-month rolling average

3263 The records of fuel consumption shall be maintained for each emission unit (Unit Nos 601 602 603and 621) for the last five years

3264 The actualheat input rate for emission Unit Nos 601 602 603 and 621 sh~lbe ~qrlted on a monthly average basis as well as an annual12-month rolling average Ifthe emissions rate ofany ofthe enampines deviates more than 2 above the PTE listed in Table2 ofthis perrrit then the permittee shall evaluate the deviation to determine if there has been a physical change or change in method ofQperation at the source report the deviation and the results of the evaluation to EPA in the report required by Condition329 below and apply for a modification ofthil) pennit ifnecessary

3265 The records of heat input shall be maintainedJor emission Unit Nos 601 602 603 artd 621 for at least the last five years

Cqnditionsin this section apply to all emissions units located atthe facility including any units not specifically listed in Table 1

6

()Transwestern Pipeline Company Compressor Station No 6 Laguna 1211712015 TitleV Permitto Operate No R6NM-2-08R2replaces R6NMOl-08RI) Draft Permit

327 The permittee shall keep records of the serial numbers for each e111ission unit The e111ission ll1its f()rthe RICE and thlir serial nJll11bers are UnitNo 601 withserial nJll11ber 107510 Unit No 602 With serial numo(lr l075UUnitNo 603 with serial number 107512 Unit No 621 with serial number 129011

328 Retenti9n of reltprds ami support information shall be for a period ofat least five years from the date ofmeasurement or report Supportinfonnation includes all calibrationandmamtenance records all origin~ strip-chartrecordings or monitoring instrumeitation and copiltsofall reports [qujJedby thisj)ennjt

329 The pllrmitteeshlill submittothe EPAreportsofany monitoring and recpr~eeping required under this permit8emi-annually )Jy April 1 and O~tober 1of ealtlth year The report due on April l shall cover the prior six--month period from September 1 through the end of February The report due on October l shall cover the prior sixshymonthperiod from March 1 through the end pfAugust

Copies ofthese tecotdsshall also besentto

Environmental Direct()r Pueblo of Laguna PO BoxJ94 Laguna NM 87026

4 EnginllNESHAgtRequirements

41 General Provisions

Thepennittee shalLci)mplywithth(l requirements [rom the NE$HAP General Pfqvisions 40 CFR Part 63 Subpart Afor Emissions Unit No 621 only

42 Requirements for Emissilaquonls UnitNo 6~1I l

421 For Emissions Unit No 621the perniitteeshallmeet the requirements in 422 through 424 below

422 Change oil and filter every 500 hours of operation or annually whichever comes first inspect air cleaner every 1000 hours ofoperation or annually whichever comes first and replace as necessary and inspect aU hoses and

I 7

I

Transwestem Pipeline Company Compressor Station No 6 Laguna 1217205 Title V Permitto Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

belts every 500 hours of operation or annually whichever comes first and replace as necessary [40 CFR sect 636002 Table 2c]

423 Minimize the enginestime spent at idle and minimize the engines startup time at startup to a period needed for appropriate and safe loading ofthe engine not to exceed 30minutesafter which time the non-startup emission

---------~---limitations~pply-[40-CFR--sect6~6002--Iable-2G~~-------------c-t

424 Permittee must install ~~non-resettable hour meter ifone is not already installed [40 CFR sect 636625(f)]

43 General Compliance Requirements for Unit No 621

431 Emissions Unit No 621 must be incompliance with the operating limitations and requirements in Condition 42 at~~ll times [ 40 CFR sect 636605(a)]

432 The permittee must operate and maintain Unit No 621 including air pollution control and monitoring equipment in a manner consistent with good air pollution control practices for minimizing emissions [ 40 CFR sect 636605(b)]

44 Perfonnanee Requirements for Unit No 621

441 As an emergency stationary RICE the permittee must operate Emissions Unit No 621 accordingtotherequirementsof40CFR sect 636640(plusmn)

442 Any operation other than emergency operation maintenance and testing emergency demand response and operation in non-emergency situations for 50 hours per year as described in paragraphs f(l) throug( 4) of40 CFR sect 636640 is prohibited [ 40 CFR sect 636640(plusmn))

443 IfEmissions Unit No 621 is not operated according to the requirements in 40 CFR sect 636640(plusmn)(1) through (f)(4) Emissions Uhit No 621 will not be considered an emergency stationary RICE and it must meet all requirements for non-emergency engines [40 CFR sect 636640(plusmn)]

444 There is no time limit on the use 0femergency stationary RICE in emergency situations [40 CFR sect 636640(plusmn)(2)] middot

445 Emissions Unit No 621 may be operated for up to 50 hours per calendar year in non-emergency situations The 50 hours per year for nonshy

8

Transwestem Pipeline Company Compressor Station No 6 bull Laguna 12fl72015 Title V PermiHo QperateNo R6NMmiddot2middot08RZ(replaces R6NM-Ol-08Rl) Draft Permit

emergency situatipns cartnot be used for peak shaying or non-emergency demand response or to generate income for afacilityto supply power as part o[a financiil arrangement with another entity [ 4QCFRsect 636640(pound)(3)]

446 Pertilitteemay operate Emissions Unit No 621 for any combination of the purposes specified In 40 CFR sect 636640(f)(2)(i)through (iii) for a maximum of 100 hours per calendar year Any operltJiiohfor non-emergency situations as ltJlloVlldby paragraphs 40 CFR sect 63 6640(f)(3) and (4) counts as part ofthe lOOhours per calendamp year allowed ]Jythisparagraph [40 CFRsect 636640(plusmn)(2)]

4S Clntinuous Compliance Requirements for Emissions Unit No 621

Emissions Unit No 621 shall be operated and maintained according to the manufacturers emission-rellited operation and maintenance instructions In the alternative permittee may develop and follow its own maintenance plan which nmst provide to the extent practicable for the maintenance and operation ofEmission Unit No 621 in a martner coiiSisteht with good air pollution control practice for minimizing emissions [40 CFRsect 636640(a) Table 6]

46 Recordkeeping Requirements for Emissions Unit No 621

4(il You mustkeep a copy of each notification and report submitted to comply with 40 CFR Part 63 Subpart ZZZZ including all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted accQrdingto 1herequirementin40 CFR sect~HO(b)(2)(xiv)

462 Records ofthe occurrence and duration of each malfunction ofoperatitm (ie process equipmellt) or any air pollution CQJltrQl and monitoring equipment

463 Records ofaii required maintenance performed on any airpollution control and monitoring equipment

464 The permittee must keep records of the pperating and maintenance conducted ltm Emissions Ulltt No 62 I necessary to ensure compliance with Condition45 above

47 Reporting Requirements (or Emissions Unit No 621

471 Permittee must report each instance in which an applicable emissions limitation operating limitation or requirement in 40 CFR Part 63 Subpart ZZZZ Table 2(c) is not met

9

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 TitleV Pennitto Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

472 These instances are deviations from the emission and operating limitations in 40 CFR Part 63 Subpart zzzz These deviations must be reported according to the requirements in 40 CFR sect 636650

5 Title Y Administrative Requirements

51 Annual Fee Payment [40 CFR sectsect 76(a)(7) and 719]

5I L The pe)Jlittee shall pay an annual permit fee in accordance with the procedures outlinedbelow [40 CFR sect 7l9(a)]

512 ]he )Je)Jlittee shall pay the annual permit fee each year The fee shall be received no later hail July 20 of each year

513 The fee payment shall be in United States currency and shall be paid by money order bank draft certified check corporate check or electronic funds transfer payable to the order ofEP A

514 Thepetmittee shall send fee payment and a completed fee filing form to

Forregular US postal service mail Fornon-US Postal Service express mail

(FedEx AirbomeDHL and UPS)

middotUS Environmental Protection Agency US Bank FOIA and Miscellaneous Payments Government Lockbox 979078 Cincinnati Finance Center US EPA FOfA amp Misc Payments PO Box 979078 1005 Convention Plaza St Louis MO 63197~9000 SL-MQcQ2-GL

St LouisM063101

Contact Craig Steffen 513-487-2091 Contact 314-418-1028 or Eric Volck513-487-2105

For electronic pavment (identifY permit number for payment in form)

Automated Clearinghouse (ACH) for receiving US currency PNCBank ABA 051036706 Account Number 310006 CTX Format Transaction Code 22 -checking

10

TranswestertrPipeline Company Compressor Station No6- Laguna Title V Permitto Operate No R6NMbull2-08R2 (replaces R6NM01~08R1)

121172015 )raft Permit

Environmental Protection Agency 808 17m Street NW Washington DC 20074

Contact Jesse White 301-887-6548

515 The pennitt~ shallsend an updated fee calculation wo~ksheet fonn and a photo~opy ofeach fee payment ~heck (or utherconfinnation ofactual fee paid) submitted annually by the same deadline as required for fee paymenUo the address listed in Section55 ofthis peimit [Note that anannual emissionsreport t~quired atthe same time as the feesalcUJaticmworksheet by40 CPRsect 719(h) has been incorporated intO the fee calculation worksheet fonn as aconvenience]

516 Basisfor~alculating annual fee

bull5161 The annual emissions fee shall be calculated by multiplying the total tons ofactual emissions of a11~egUlated pollutants (for fee calculation) emitted from the source by the emissions fee(in dollarston) in effect atthemiddottime of calculation

51611 Actual emissions means the actllal rate ofemissions in tons per year ofally regulated pollutant(for fee calculation) emitted from a part 71 source over thtl preceding calendar year Actual emissions shall be calcllhlted Using eachemissions units actual operating hours production rates in-place control equipment and types ofmaterials processed stored or combusted during the preceding ~endaryear [See 40 CPR sect 719(c)]

51612 If actual emissions cannot be detenninel )Jsipgthe compliance methods in the pennit the pennittee shall Use other fe~r~ly recognized procedures (40 CFR sect 719(e)(2)]

5L613 The term regulated pollutant (for fee calculation) is qefined in 40 CPR sect 712

51614 The permittee should note that the presumptive fee amount is revised each calendaryear to account for inflation and it is available from EPA prior to the start of each calendar year

5162 The pennittee shall excludethe following emissions from the calculation of fees ()

--middotmiddot--middot

ll

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

51621

51622

-----------------vFR+7-h9(e~)euroii

51623

The amount ofactual emissions ofeach regulated pollutant (for fee calculation) that the source emits in excess of 4000 tons per year See 40 CFR sect 719(c)(S)(i)

Actual emissions of any regulatedpollutant(for fee middot calculation) already included in the fee calculation See 40

The insignificant quantities of actual emissions not required to be listed or calculated in a permit application pursuant to 40 CPRsect 715(c)(11) [40 CPRsect 719(c)(5)(iii)]

517 Fee calculation worksheets shall be certifiedcas tottuthacclllacy and completeness by a responsible official in accordancewi1h 40 CPRsect 715(d)

518 The permittee shall retain fee calculation worksheets and other emissionsshyrelated data used to detennine fee payment for five years following submittal offee payment Elhission-related data include for example emissionsshyrelated forms provided by EPA and used by the pennittee for fee calculation pllrposes emissions-related spreadsheets and emissionsbullrelated data such as records of emissions monitoringdata and related support information required to be kept in accordance with40 CPRsect 716(a)(3)(ii) [See 40 CPR sect 79(i)]

519 Faihtreofthe permittee to pay fees in a timely manner shall subject the permittee to assessmentofpenalties and interest in accQIdancewith40CFR sect 719(1)

5110 The EPA will not act on applications forpermit renewal or modification if the permittee fails to pay all fees interest and penalties owed iri full [See 40 CPR sect 719(m))

5111 When notified by EPA of underpayment of fees the permittee shall remit full payment within 30 days of receipt of notification [See 40 CPR sect 7190)(1) and(2))

5Jl2 Ifthe permittee thinks that the EPA-assessed fee is in error and wishes to challenge the fee the permittee shall provide a written explanation of the alleged error to EPA along with filii payment of the assessed fee [See 40 CFR sect 71 90)(3))

52 Blankd Compliance Statement [40 CPRsectsect 716(a)(6)(i) and (H)]

12

Transwestern Pipeline Company Compressor Station No 6 - Laguna 121172015 CJ TitleVP~rmit to OperateNo R6NM-2-08R2 (replaces R6NM-0 I-08RI) Draft Permit

521 middot The permittee must comply with all conditions ofthis Part 71 permit Any permit noncompliance including Yiolation of any applicable requirement any permit(erm or condition any fee or filing requiteJTIent any duty tomiddotallow or CIIIT) out inspection entry or monitoring actiYities or any regulation or order issued bythe permitting authoritypursuatit to this part constitutes a Yiolation oftheCAA and is grounds for enforcement action permit termination reYocationand~essliance or modification or deni~l ofapertnit renewal application It shall notbe a defense for a permittee in an enforcement ~~ction that it would have been necessary to halt or reduce the permitted actiYity in order to m11intairi compliance with the conditions of this perrnit[40CFR sectsect 716(a)(6)(i)atid(ii)]

Determinations of deYiations continuous or intermittent compliance sts or YiOIItions of this perrnit are not limited to theapplic~ible testing or monitoring methods required by the underlying regulations of thispermit other credible eYidencemust be considered in such determinations [Section 113~a) and 113(e)(l) oftheCAA] middot

i

53 Compliance Certifications[40 CFR sect 716(c)(5)]

I The permittee shall submit to EPA a certificationof compliance withpermit terms and conditions including emission limitations standards or work practices armually Clch year no later thiU April 1 The compliance certification shall coYer tlte same 12 month period as the two consecutiYe semi-atinu~~l monitoring reports The compliance certification shall be certified as to truth accuracyandcompleteness by a responsible official consistent with 4() CFR sect 715(d)

middot 5dl The certification shall includethefollowing

5311 Identification ofeach permit teim or condition that is the basis ofthe certification

5312 Identification ofthe method(s) or other means used for detrmining the compliance status with lteach term and condition during the certification period and whether such methods or other means proYide continuous or intermittentdata If necessary the owner or operator also shall identify any other material infortnation eg operating hours records that must be included in the certification to

middot comply with section 13(c)(2) of the CAA which prohibits knowingly making afalse certification or omitting material 1 information

I i 13middot

I I

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 9: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

I

Tratl$w~stem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NM-01-08RI) Draft Pennit

Description of Proqess TranswestemPipeline Company LLC Compressor Station No 6- Laguna with SIC code 4922 is a natural gas compression and transmission facility with pressurized natural gas as its principal product

---------12-SourceEmission-lointiH~ndclotential-to-Emit~--------------------t

Table I below provides important information related to significant emissions units at Transwestem Pipeline Company LLCs Compressor Station No 6- Laguna including dates of installation size opound the units serial numbers and any associated control equipment Table 2 lists the potential to emit (PTE) ofair pollutants from the source which will be usedto determine and report deviations to EPA as required by Conditions 3264 and 329 of this permit

Tablet Source Emission Points and Control Devices- Transwestern Pipeline Company LLC Compressor Station No 6 - Laguna

Unit No Type of

Unit Serial No

Manufacturer Model No

De$igHeat Input

Operating Range or

Size of Unit

Date of Installation

Primary Use

Control Equipment

601 ICEngine 107510

CtarkTVCl2 3465 MMBtuhr 4500HP 1961 Compressor

ltrive None

602 lCEngine 107511

Clark TVC-12 3465 MMBtuhr

4500-HP 1967 Compressor

ltrive None

603 1C Engine

107512 Clark TVC-12

3465 MMBtuhr 4500-HP 1967 Compressor

driVe None

621 RIC Engine 129011

Waukesha 42 MMBtuhr

470-HP 1967 Electrical generation None

MIST Fixed Roofsorage Tank

1100-GAL 1966 Natural Gas Condensate None

T2 Fixed Roof Storage Tank

500-BBL 1966 Natural Gas Cltmdensate

None

2

I

I

]

I i I

()Transwestem Pipeline Company Compressor Station No6middot Laguna 121172015 Title VPermitltOperate No R6NM-2-08R2 (repiaces R6NM-O l-08RI) Draft Permit

Table 2 Potential to Emit in Tons per Year (tpy)1- Transwestern Pipeline Company

CompressorStationNo 6- Laguna

UnitiD

601 Clu-k TVCshy12 NGfired Engine

602 Clu-k TVc 12 NCtfired Engine

603 Clu-k TVCshy12 NG fired Engine

62~ Waukesha F3520GUNG Enline FUO

MIST lOOGal Tank

T-2 500BbL Tank

Truck Loadilg

MAIN-SSM

TOTALStpy

Numbers contained mtlus tableareforuncontrolledemSsions are formformatton purposes only and are notan enorceablcent conditio11s See Condition 42 for applicable enforceablemiddotlimitations middot 2 The PMw emission levels fortliesoutcemiddotare within an attainment area Precllsors for PM including )lOX Soz and VOC are monitored for grandfathered unitS or controlled for NESHAP applicable unitsc While thePMto emisSicm rates for the Clark engines are listed for informationalplirposes they may not be reflectivemiddotofPTE for these engines as they could represent calculations from a bad test (totaiPM10 emission levels for this source in the attainment area are considered deminimusfor implementation ofthe PM2csRule and thereforePMzs moniioringwill not be req11ired in this permtaction) NOx- pxides ofnitrogen VOC -volatile organic compounds (nonbullHAP) S02- sulfur dioxide PM0 particulate matter with a diameter 10 microns or less CO - carbon monoxide

3

NOx

4984

4984

4984

046

149566

voc

1822

18)~2

1822

001

134

554

2817

004

092

9068

S02

009

0 09

009

00001

02701

PM25

731

731

731

0004

21934

PM102

731

731

731

0004

21934

co

1512

1512

1512

078

45438

Lead

0

0

0

0

0

0 006 1lOampOo

0 001

00009 27242

0 349019 6736225

11AP3

116

116

116

001

0001

002

GHG

1775712

1775712

1775712

2457

51390

22000

I

- Transwestem Pipeline Company Compressor Station No 6 -Laguna 1211712015 Title V Penni to Operate No R6NM-2-08R2 (replaces R6NM-O 1-08RI) Draft Pennit

HAP- hazardous air pollutants(see CAA Section 112(b)) NG- natural gas 3 Mostly fonllaldehyde

2 PermifShiel1[40 CFR sect 716(f)J

---------2-r--Notniilgin tliis pennifSliallalter or affect the followmg

2lLTheprovisions ofS~ction 303 ofthe CAA(emergencyorclers) including the authorityoftheAlrrlinistrator under that secti(n

212 The liability of a pennittee for any violati(n ofapJgtlicable requirements prior to br atthetime ofpennit issuance or middot

213 The lbility of the EPA to obtain infonnation from a source under Section 114 6ftheCAA

22 Compliance with the tenns and conditions ofthis pennit shall be deemed in cl)Ilpliance with the applicable requirements specifically listed in thispennit as of the date ofpermit issuance

3 Applicable Requirements and General permit Cqnditions

31 Applicable Requirements

The source will continue to comply with all applicable requi~mel)ls For applicable requirements thatwill become effective during the tenn ofthe penni tile source will meet su~h r~quJremeiJ$ on atiYlely bSis The pennittee shall comply with all theapplicable requirements offederalregulltigrts Inparticular the pennittee shall comply with the following

4

( TranswestemPipeline Company Compressor Station No 6 - Laguna 12172015 )TitleV Permitto Operate No R6NM2-08R2 (replaces R6NM-O l-08Rl) Draft Permit

Table 3 Applicable Requirements for Transwestern Pipelilie Company LLC C ta on 0bull - a~tunaompressor StiN6L

Citation Requirement C9mment

40CFR71 FederaLOperating Permits Program

UnitNosmiddot6QJ 602603621

40 CFR6 Subpart A

General Provisions

UnitNq 621

40CFR63 Subpart ZZZZ

National Emission Standardgtforazailous Aili Pollutants for Stationary R~ciproeating Iriternal CombustionmiddotEngines (RICE)

Unit No 621

TlfeTranswesterh Pipeline Company LLC Compressor StationNo 6- Laguna application was reviewed for compliance with the Part 71 Operating Permit Program Based on the inforrnationproviledbyTranswestemPipeline Company LLC in their application Compressqr Stittio)l No 6 (Lag1111a) would be subject to the following General Permit Requirements

32 General Permit Requirements I

Conditions in this section apply to all emissions units located at the facility including anyI units not specifically listed in Table 1

321 All equipment shall be operated in accordance with the manufacturers design values for that equipment

322 flleIIll()lint Of natural gaS llumed in the following emissions ullits shall not exceed the following amounts on a rolling 12-month average

Emissions Unit No 60 I - 289 mmscfyr Emissions Unit No 602-289 mmscfyr Emissions Unit No 603-289 mmscfyr Emissions Unit No 621 - 3504 mmscflyr

323 The actual heat input for Emissions UnitNo 601 Emissions Unit No 602and Emissions Unit No 603 shall not exceed 3465 MMBtulhr adjusted for elevation and for Emissions Unit No 621 the actual heat input shall not exceed 42 MMBtulhr adjusted for elevationmiddot

5

Transwestem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

324 Compliance Tests Compliance tests from units at this source will be conducted using applicable EPA Methods established within 40 CFR Part 51 Appendix M or as otherwise specified in the permit by applicable requirements

325 Monitoring

325J Fuel consumption for Emissions Unit Nos 601 602 603 and 621 shall be monitored witha flow meter monthly for each unit in MMscf (of natural gas)

3252 Heatinputratefor Unit Nos 601 602 603 and 621 shall be monitored Monthly orta per unitbllSis(or individual highest rate in MMBtulhr

326 ReportingRecordkeeping

3261 The permittee shall keep records on all startup shutdown repair and maintenance activities performed on all emission units These records shall identify the relevant emission unit and describe the work performed and calculate any associated emissions

3262 The fuel flowconsumption for each emissions unit (Unit Nos 601 602 603 and 621) shall be recorded on a monthly basis and art annual 12-month rolling average

3263 The records of fuel consumption shall be maintained for each emission unit (Unit Nos 601 602 603and 621) for the last five years

3264 The actualheat input rate for emission Unit Nos 601 602 603 and 621 sh~lbe ~qrlted on a monthly average basis as well as an annual12-month rolling average Ifthe emissions rate ofany ofthe enampines deviates more than 2 above the PTE listed in Table2 ofthis perrrit then the permittee shall evaluate the deviation to determine if there has been a physical change or change in method ofQperation at the source report the deviation and the results of the evaluation to EPA in the report required by Condition329 below and apply for a modification ofthil) pennit ifnecessary

3265 The records of heat input shall be maintainedJor emission Unit Nos 601 602 603 artd 621 for at least the last five years

Cqnditionsin this section apply to all emissions units located atthe facility including any units not specifically listed in Table 1

6

()Transwestern Pipeline Company Compressor Station No 6 Laguna 1211712015 TitleV Permitto Operate No R6NM-2-08R2replaces R6NMOl-08RI) Draft Permit

327 The permittee shall keep records of the serial numbers for each e111ission unit The e111ission ll1its f()rthe RICE and thlir serial nJll11bers are UnitNo 601 withserial nJll11ber 107510 Unit No 602 With serial numo(lr l075UUnitNo 603 with serial number 107512 Unit No 621 with serial number 129011

328 Retenti9n of reltprds ami support information shall be for a period ofat least five years from the date ofmeasurement or report Supportinfonnation includes all calibrationandmamtenance records all origin~ strip-chartrecordings or monitoring instrumeitation and copiltsofall reports [qujJedby thisj)ennjt

329 The pllrmitteeshlill submittothe EPAreportsofany monitoring and recpr~eeping required under this permit8emi-annually )Jy April 1 and O~tober 1of ealtlth year The report due on April l shall cover the prior six--month period from September 1 through the end of February The report due on October l shall cover the prior sixshymonthperiod from March 1 through the end pfAugust

Copies ofthese tecotdsshall also besentto

Environmental Direct()r Pueblo of Laguna PO BoxJ94 Laguna NM 87026

4 EnginllNESHAgtRequirements

41 General Provisions

Thepennittee shalLci)mplywithth(l requirements [rom the NE$HAP General Pfqvisions 40 CFR Part 63 Subpart Afor Emissions Unit No 621 only

42 Requirements for Emissilaquonls UnitNo 6~1I l

421 For Emissions Unit No 621the perniitteeshallmeet the requirements in 422 through 424 below

422 Change oil and filter every 500 hours of operation or annually whichever comes first inspect air cleaner every 1000 hours ofoperation or annually whichever comes first and replace as necessary and inspect aU hoses and

I 7

I

Transwestem Pipeline Company Compressor Station No 6 Laguna 1217205 Title V Permitto Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

belts every 500 hours of operation or annually whichever comes first and replace as necessary [40 CFR sect 636002 Table 2c]

423 Minimize the enginestime spent at idle and minimize the engines startup time at startup to a period needed for appropriate and safe loading ofthe engine not to exceed 30minutesafter which time the non-startup emission

---------~---limitations~pply-[40-CFR--sect6~6002--Iable-2G~~-------------c-t

424 Permittee must install ~~non-resettable hour meter ifone is not already installed [40 CFR sect 636625(f)]

43 General Compliance Requirements for Unit No 621

431 Emissions Unit No 621 must be incompliance with the operating limitations and requirements in Condition 42 at~~ll times [ 40 CFR sect 636605(a)]

432 The permittee must operate and maintain Unit No 621 including air pollution control and monitoring equipment in a manner consistent with good air pollution control practices for minimizing emissions [ 40 CFR sect 636605(b)]

44 Perfonnanee Requirements for Unit No 621

441 As an emergency stationary RICE the permittee must operate Emissions Unit No 621 accordingtotherequirementsof40CFR sect 636640(plusmn)

442 Any operation other than emergency operation maintenance and testing emergency demand response and operation in non-emergency situations for 50 hours per year as described in paragraphs f(l) throug( 4) of40 CFR sect 636640 is prohibited [ 40 CFR sect 636640(plusmn))

443 IfEmissions Unit No 621 is not operated according to the requirements in 40 CFR sect 636640(plusmn)(1) through (f)(4) Emissions Uhit No 621 will not be considered an emergency stationary RICE and it must meet all requirements for non-emergency engines [40 CFR sect 636640(plusmn)]

444 There is no time limit on the use 0femergency stationary RICE in emergency situations [40 CFR sect 636640(plusmn)(2)] middot

445 Emissions Unit No 621 may be operated for up to 50 hours per calendar year in non-emergency situations The 50 hours per year for nonshy

8

Transwestem Pipeline Company Compressor Station No 6 bull Laguna 12fl72015 Title V PermiHo QperateNo R6NMmiddot2middot08RZ(replaces R6NM-Ol-08Rl) Draft Permit

emergency situatipns cartnot be used for peak shaying or non-emergency demand response or to generate income for afacilityto supply power as part o[a financiil arrangement with another entity [ 4QCFRsect 636640(pound)(3)]

446 Pertilitteemay operate Emissions Unit No 621 for any combination of the purposes specified In 40 CFR sect 636640(f)(2)(i)through (iii) for a maximum of 100 hours per calendar year Any operltJiiohfor non-emergency situations as ltJlloVlldby paragraphs 40 CFR sect 63 6640(f)(3) and (4) counts as part ofthe lOOhours per calendamp year allowed ]Jythisparagraph [40 CFRsect 636640(plusmn)(2)]

4S Clntinuous Compliance Requirements for Emissions Unit No 621

Emissions Unit No 621 shall be operated and maintained according to the manufacturers emission-rellited operation and maintenance instructions In the alternative permittee may develop and follow its own maintenance plan which nmst provide to the extent practicable for the maintenance and operation ofEmission Unit No 621 in a martner coiiSisteht with good air pollution control practice for minimizing emissions [40 CFRsect 636640(a) Table 6]

46 Recordkeeping Requirements for Emissions Unit No 621

4(il You mustkeep a copy of each notification and report submitted to comply with 40 CFR Part 63 Subpart ZZZZ including all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted accQrdingto 1herequirementin40 CFR sect~HO(b)(2)(xiv)

462 Records ofthe occurrence and duration of each malfunction ofoperatitm (ie process equipmellt) or any air pollution CQJltrQl and monitoring equipment

463 Records ofaii required maintenance performed on any airpollution control and monitoring equipment

464 The permittee must keep records of the pperating and maintenance conducted ltm Emissions Ulltt No 62 I necessary to ensure compliance with Condition45 above

47 Reporting Requirements (or Emissions Unit No 621

471 Permittee must report each instance in which an applicable emissions limitation operating limitation or requirement in 40 CFR Part 63 Subpart ZZZZ Table 2(c) is not met

9

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 TitleV Pennitto Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

472 These instances are deviations from the emission and operating limitations in 40 CFR Part 63 Subpart zzzz These deviations must be reported according to the requirements in 40 CFR sect 636650

5 Title Y Administrative Requirements

51 Annual Fee Payment [40 CFR sectsect 76(a)(7) and 719]

5I L The pe)Jlittee shall pay an annual permit fee in accordance with the procedures outlinedbelow [40 CFR sect 7l9(a)]

512 ]he )Je)Jlittee shall pay the annual permit fee each year The fee shall be received no later hail July 20 of each year

513 The fee payment shall be in United States currency and shall be paid by money order bank draft certified check corporate check or electronic funds transfer payable to the order ofEP A

514 Thepetmittee shall send fee payment and a completed fee filing form to

Forregular US postal service mail Fornon-US Postal Service express mail

(FedEx AirbomeDHL and UPS)

middotUS Environmental Protection Agency US Bank FOIA and Miscellaneous Payments Government Lockbox 979078 Cincinnati Finance Center US EPA FOfA amp Misc Payments PO Box 979078 1005 Convention Plaza St Louis MO 63197~9000 SL-MQcQ2-GL

St LouisM063101

Contact Craig Steffen 513-487-2091 Contact 314-418-1028 or Eric Volck513-487-2105

For electronic pavment (identifY permit number for payment in form)

Automated Clearinghouse (ACH) for receiving US currency PNCBank ABA 051036706 Account Number 310006 CTX Format Transaction Code 22 -checking

10

TranswestertrPipeline Company Compressor Station No6- Laguna Title V Permitto Operate No R6NMbull2-08R2 (replaces R6NM01~08R1)

121172015 )raft Permit

Environmental Protection Agency 808 17m Street NW Washington DC 20074

Contact Jesse White 301-887-6548

515 The pennitt~ shallsend an updated fee calculation wo~ksheet fonn and a photo~opy ofeach fee payment ~heck (or utherconfinnation ofactual fee paid) submitted annually by the same deadline as required for fee paymenUo the address listed in Section55 ofthis peimit [Note that anannual emissionsreport t~quired atthe same time as the feesalcUJaticmworksheet by40 CPRsect 719(h) has been incorporated intO the fee calculation worksheet fonn as aconvenience]

516 Basisfor~alculating annual fee

bull5161 The annual emissions fee shall be calculated by multiplying the total tons ofactual emissions of a11~egUlated pollutants (for fee calculation) emitted from the source by the emissions fee(in dollarston) in effect atthemiddottime of calculation

51611 Actual emissions means the actllal rate ofemissions in tons per year ofally regulated pollutant(for fee calculation) emitted from a part 71 source over thtl preceding calendar year Actual emissions shall be calcllhlted Using eachemissions units actual operating hours production rates in-place control equipment and types ofmaterials processed stored or combusted during the preceding ~endaryear [See 40 CPR sect 719(c)]

51612 If actual emissions cannot be detenninel )Jsipgthe compliance methods in the pennit the pennittee shall Use other fe~r~ly recognized procedures (40 CFR sect 719(e)(2)]

5L613 The term regulated pollutant (for fee calculation) is qefined in 40 CPR sect 712

51614 The permittee should note that the presumptive fee amount is revised each calendaryear to account for inflation and it is available from EPA prior to the start of each calendar year

5162 The pennittee shall excludethe following emissions from the calculation of fees ()

--middotmiddot--middot

ll

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

51621

51622

-----------------vFR+7-h9(e~)euroii

51623

The amount ofactual emissions ofeach regulated pollutant (for fee calculation) that the source emits in excess of 4000 tons per year See 40 CFR sect 719(c)(S)(i)

Actual emissions of any regulatedpollutant(for fee middot calculation) already included in the fee calculation See 40

The insignificant quantities of actual emissions not required to be listed or calculated in a permit application pursuant to 40 CPRsect 715(c)(11) [40 CPRsect 719(c)(5)(iii)]

517 Fee calculation worksheets shall be certifiedcas tottuthacclllacy and completeness by a responsible official in accordancewi1h 40 CPRsect 715(d)

518 The permittee shall retain fee calculation worksheets and other emissionsshyrelated data used to detennine fee payment for five years following submittal offee payment Elhission-related data include for example emissionsshyrelated forms provided by EPA and used by the pennittee for fee calculation pllrposes emissions-related spreadsheets and emissionsbullrelated data such as records of emissions monitoringdata and related support information required to be kept in accordance with40 CPRsect 716(a)(3)(ii) [See 40 CPR sect 79(i)]

519 Faihtreofthe permittee to pay fees in a timely manner shall subject the permittee to assessmentofpenalties and interest in accQIdancewith40CFR sect 719(1)

5110 The EPA will not act on applications forpermit renewal or modification if the permittee fails to pay all fees interest and penalties owed iri full [See 40 CPR sect 719(m))

5111 When notified by EPA of underpayment of fees the permittee shall remit full payment within 30 days of receipt of notification [See 40 CPR sect 7190)(1) and(2))

5Jl2 Ifthe permittee thinks that the EPA-assessed fee is in error and wishes to challenge the fee the permittee shall provide a written explanation of the alleged error to EPA along with filii payment of the assessed fee [See 40 CFR sect 71 90)(3))

52 Blankd Compliance Statement [40 CPRsectsect 716(a)(6)(i) and (H)]

12

Transwestern Pipeline Company Compressor Station No 6 - Laguna 121172015 CJ TitleVP~rmit to OperateNo R6NM-2-08R2 (replaces R6NM-0 I-08RI) Draft Permit

521 middot The permittee must comply with all conditions ofthis Part 71 permit Any permit noncompliance including Yiolation of any applicable requirement any permit(erm or condition any fee or filing requiteJTIent any duty tomiddotallow or CIIIT) out inspection entry or monitoring actiYities or any regulation or order issued bythe permitting authoritypursuatit to this part constitutes a Yiolation oftheCAA and is grounds for enforcement action permit termination reYocationand~essliance or modification or deni~l ofapertnit renewal application It shall notbe a defense for a permittee in an enforcement ~~ction that it would have been necessary to halt or reduce the permitted actiYity in order to m11intairi compliance with the conditions of this perrnit[40CFR sectsect 716(a)(6)(i)atid(ii)]

Determinations of deYiations continuous or intermittent compliance sts or YiOIItions of this perrnit are not limited to theapplic~ible testing or monitoring methods required by the underlying regulations of thispermit other credible eYidencemust be considered in such determinations [Section 113~a) and 113(e)(l) oftheCAA] middot

i

53 Compliance Certifications[40 CFR sect 716(c)(5)]

I The permittee shall submit to EPA a certificationof compliance withpermit terms and conditions including emission limitations standards or work practices armually Clch year no later thiU April 1 The compliance certification shall coYer tlte same 12 month period as the two consecutiYe semi-atinu~~l monitoring reports The compliance certification shall be certified as to truth accuracyandcompleteness by a responsible official consistent with 4() CFR sect 715(d)

middot 5dl The certification shall includethefollowing

5311 Identification ofeach permit teim or condition that is the basis ofthe certification

5312 Identification ofthe method(s) or other means used for detrmining the compliance status with lteach term and condition during the certification period and whether such methods or other means proYide continuous or intermittentdata If necessary the owner or operator also shall identify any other material infortnation eg operating hours records that must be included in the certification to

middot comply with section 13(c)(2) of the CAA which prohibits knowingly making afalse certification or omitting material 1 information

I i 13middot

I I

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 10: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

I

I

]

I i I

()Transwestem Pipeline Company Compressor Station No6middot Laguna 121172015 Title VPermitltOperate No R6NM-2-08R2 (repiaces R6NM-O l-08RI) Draft Permit

Table 2 Potential to Emit in Tons per Year (tpy)1- Transwestern Pipeline Company

CompressorStationNo 6- Laguna

UnitiD

601 Clu-k TVCshy12 NGfired Engine

602 Clu-k TVc 12 NCtfired Engine

603 Clu-k TVCshy12 NG fired Engine

62~ Waukesha F3520GUNG Enline FUO

MIST lOOGal Tank

T-2 500BbL Tank

Truck Loadilg

MAIN-SSM

TOTALStpy

Numbers contained mtlus tableareforuncontrolledemSsions are formformatton purposes only and are notan enorceablcent conditio11s See Condition 42 for applicable enforceablemiddotlimitations middot 2 The PMw emission levels fortliesoutcemiddotare within an attainment area Precllsors for PM including )lOX Soz and VOC are monitored for grandfathered unitS or controlled for NESHAP applicable unitsc While thePMto emisSicm rates for the Clark engines are listed for informationalplirposes they may not be reflectivemiddotofPTE for these engines as they could represent calculations from a bad test (totaiPM10 emission levels for this source in the attainment area are considered deminimusfor implementation ofthe PM2csRule and thereforePMzs moniioringwill not be req11ired in this permtaction) NOx- pxides ofnitrogen VOC -volatile organic compounds (nonbullHAP) S02- sulfur dioxide PM0 particulate matter with a diameter 10 microns or less CO - carbon monoxide

3

NOx

4984

4984

4984

046

149566

voc

1822

18)~2

1822

001

134

554

2817

004

092

9068

S02

009

0 09

009

00001

02701

PM25

731

731

731

0004

21934

PM102

731

731

731

0004

21934

co

1512

1512

1512

078

45438

Lead

0

0

0

0

0

0 006 1lOampOo

0 001

00009 27242

0 349019 6736225

11AP3

116

116

116

001

0001

002

GHG

1775712

1775712

1775712

2457

51390

22000

I

- Transwestem Pipeline Company Compressor Station No 6 -Laguna 1211712015 Title V Penni to Operate No R6NM-2-08R2 (replaces R6NM-O 1-08RI) Draft Pennit

HAP- hazardous air pollutants(see CAA Section 112(b)) NG- natural gas 3 Mostly fonllaldehyde

2 PermifShiel1[40 CFR sect 716(f)J

---------2-r--Notniilgin tliis pennifSliallalter or affect the followmg

2lLTheprovisions ofS~ction 303 ofthe CAA(emergencyorclers) including the authorityoftheAlrrlinistrator under that secti(n

212 The liability of a pennittee for any violati(n ofapJgtlicable requirements prior to br atthetime ofpennit issuance or middot

213 The lbility of the EPA to obtain infonnation from a source under Section 114 6ftheCAA

22 Compliance with the tenns and conditions ofthis pennit shall be deemed in cl)Ilpliance with the applicable requirements specifically listed in thispennit as of the date ofpermit issuance

3 Applicable Requirements and General permit Cqnditions

31 Applicable Requirements

The source will continue to comply with all applicable requi~mel)ls For applicable requirements thatwill become effective during the tenn ofthe penni tile source will meet su~h r~quJremeiJ$ on atiYlely bSis The pennittee shall comply with all theapplicable requirements offederalregulltigrts Inparticular the pennittee shall comply with the following

4

( TranswestemPipeline Company Compressor Station No 6 - Laguna 12172015 )TitleV Permitto Operate No R6NM2-08R2 (replaces R6NM-O l-08Rl) Draft Permit

Table 3 Applicable Requirements for Transwestern Pipelilie Company LLC C ta on 0bull - a~tunaompressor StiN6L

Citation Requirement C9mment

40CFR71 FederaLOperating Permits Program

UnitNosmiddot6QJ 602603621

40 CFR6 Subpart A

General Provisions

UnitNq 621

40CFR63 Subpart ZZZZ

National Emission Standardgtforazailous Aili Pollutants for Stationary R~ciproeating Iriternal CombustionmiddotEngines (RICE)

Unit No 621

TlfeTranswesterh Pipeline Company LLC Compressor StationNo 6- Laguna application was reviewed for compliance with the Part 71 Operating Permit Program Based on the inforrnationproviledbyTranswestemPipeline Company LLC in their application Compressqr Stittio)l No 6 (Lag1111a) would be subject to the following General Permit Requirements

32 General Permit Requirements I

Conditions in this section apply to all emissions units located at the facility including anyI units not specifically listed in Table 1

321 All equipment shall be operated in accordance with the manufacturers design values for that equipment

322 flleIIll()lint Of natural gaS llumed in the following emissions ullits shall not exceed the following amounts on a rolling 12-month average

Emissions Unit No 60 I - 289 mmscfyr Emissions Unit No 602-289 mmscfyr Emissions Unit No 603-289 mmscfyr Emissions Unit No 621 - 3504 mmscflyr

323 The actual heat input for Emissions UnitNo 601 Emissions Unit No 602and Emissions Unit No 603 shall not exceed 3465 MMBtulhr adjusted for elevation and for Emissions Unit No 621 the actual heat input shall not exceed 42 MMBtulhr adjusted for elevationmiddot

5

Transwestem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

324 Compliance Tests Compliance tests from units at this source will be conducted using applicable EPA Methods established within 40 CFR Part 51 Appendix M or as otherwise specified in the permit by applicable requirements

325 Monitoring

325J Fuel consumption for Emissions Unit Nos 601 602 603 and 621 shall be monitored witha flow meter monthly for each unit in MMscf (of natural gas)

3252 Heatinputratefor Unit Nos 601 602 603 and 621 shall be monitored Monthly orta per unitbllSis(or individual highest rate in MMBtulhr

326 ReportingRecordkeeping

3261 The permittee shall keep records on all startup shutdown repair and maintenance activities performed on all emission units These records shall identify the relevant emission unit and describe the work performed and calculate any associated emissions

3262 The fuel flowconsumption for each emissions unit (Unit Nos 601 602 603 and 621) shall be recorded on a monthly basis and art annual 12-month rolling average

3263 The records of fuel consumption shall be maintained for each emission unit (Unit Nos 601 602 603and 621) for the last five years

3264 The actualheat input rate for emission Unit Nos 601 602 603 and 621 sh~lbe ~qrlted on a monthly average basis as well as an annual12-month rolling average Ifthe emissions rate ofany ofthe enampines deviates more than 2 above the PTE listed in Table2 ofthis perrrit then the permittee shall evaluate the deviation to determine if there has been a physical change or change in method ofQperation at the source report the deviation and the results of the evaluation to EPA in the report required by Condition329 below and apply for a modification ofthil) pennit ifnecessary

3265 The records of heat input shall be maintainedJor emission Unit Nos 601 602 603 artd 621 for at least the last five years

Cqnditionsin this section apply to all emissions units located atthe facility including any units not specifically listed in Table 1

6

()Transwestern Pipeline Company Compressor Station No 6 Laguna 1211712015 TitleV Permitto Operate No R6NM-2-08R2replaces R6NMOl-08RI) Draft Permit

327 The permittee shall keep records of the serial numbers for each e111ission unit The e111ission ll1its f()rthe RICE and thlir serial nJll11bers are UnitNo 601 withserial nJll11ber 107510 Unit No 602 With serial numo(lr l075UUnitNo 603 with serial number 107512 Unit No 621 with serial number 129011

328 Retenti9n of reltprds ami support information shall be for a period ofat least five years from the date ofmeasurement or report Supportinfonnation includes all calibrationandmamtenance records all origin~ strip-chartrecordings or monitoring instrumeitation and copiltsofall reports [qujJedby thisj)ennjt

329 The pllrmitteeshlill submittothe EPAreportsofany monitoring and recpr~eeping required under this permit8emi-annually )Jy April 1 and O~tober 1of ealtlth year The report due on April l shall cover the prior six--month period from September 1 through the end of February The report due on October l shall cover the prior sixshymonthperiod from March 1 through the end pfAugust

Copies ofthese tecotdsshall also besentto

Environmental Direct()r Pueblo of Laguna PO BoxJ94 Laguna NM 87026

4 EnginllNESHAgtRequirements

41 General Provisions

Thepennittee shalLci)mplywithth(l requirements [rom the NE$HAP General Pfqvisions 40 CFR Part 63 Subpart Afor Emissions Unit No 621 only

42 Requirements for Emissilaquonls UnitNo 6~1I l

421 For Emissions Unit No 621the perniitteeshallmeet the requirements in 422 through 424 below

422 Change oil and filter every 500 hours of operation or annually whichever comes first inspect air cleaner every 1000 hours ofoperation or annually whichever comes first and replace as necessary and inspect aU hoses and

I 7

I

Transwestem Pipeline Company Compressor Station No 6 Laguna 1217205 Title V Permitto Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

belts every 500 hours of operation or annually whichever comes first and replace as necessary [40 CFR sect 636002 Table 2c]

423 Minimize the enginestime spent at idle and minimize the engines startup time at startup to a period needed for appropriate and safe loading ofthe engine not to exceed 30minutesafter which time the non-startup emission

---------~---limitations~pply-[40-CFR--sect6~6002--Iable-2G~~-------------c-t

424 Permittee must install ~~non-resettable hour meter ifone is not already installed [40 CFR sect 636625(f)]

43 General Compliance Requirements for Unit No 621

431 Emissions Unit No 621 must be incompliance with the operating limitations and requirements in Condition 42 at~~ll times [ 40 CFR sect 636605(a)]

432 The permittee must operate and maintain Unit No 621 including air pollution control and monitoring equipment in a manner consistent with good air pollution control practices for minimizing emissions [ 40 CFR sect 636605(b)]

44 Perfonnanee Requirements for Unit No 621

441 As an emergency stationary RICE the permittee must operate Emissions Unit No 621 accordingtotherequirementsof40CFR sect 636640(plusmn)

442 Any operation other than emergency operation maintenance and testing emergency demand response and operation in non-emergency situations for 50 hours per year as described in paragraphs f(l) throug( 4) of40 CFR sect 636640 is prohibited [ 40 CFR sect 636640(plusmn))

443 IfEmissions Unit No 621 is not operated according to the requirements in 40 CFR sect 636640(plusmn)(1) through (f)(4) Emissions Uhit No 621 will not be considered an emergency stationary RICE and it must meet all requirements for non-emergency engines [40 CFR sect 636640(plusmn)]

444 There is no time limit on the use 0femergency stationary RICE in emergency situations [40 CFR sect 636640(plusmn)(2)] middot

445 Emissions Unit No 621 may be operated for up to 50 hours per calendar year in non-emergency situations The 50 hours per year for nonshy

8

Transwestem Pipeline Company Compressor Station No 6 bull Laguna 12fl72015 Title V PermiHo QperateNo R6NMmiddot2middot08RZ(replaces R6NM-Ol-08Rl) Draft Permit

emergency situatipns cartnot be used for peak shaying or non-emergency demand response or to generate income for afacilityto supply power as part o[a financiil arrangement with another entity [ 4QCFRsect 636640(pound)(3)]

446 Pertilitteemay operate Emissions Unit No 621 for any combination of the purposes specified In 40 CFR sect 636640(f)(2)(i)through (iii) for a maximum of 100 hours per calendar year Any operltJiiohfor non-emergency situations as ltJlloVlldby paragraphs 40 CFR sect 63 6640(f)(3) and (4) counts as part ofthe lOOhours per calendamp year allowed ]Jythisparagraph [40 CFRsect 636640(plusmn)(2)]

4S Clntinuous Compliance Requirements for Emissions Unit No 621

Emissions Unit No 621 shall be operated and maintained according to the manufacturers emission-rellited operation and maintenance instructions In the alternative permittee may develop and follow its own maintenance plan which nmst provide to the extent practicable for the maintenance and operation ofEmission Unit No 621 in a martner coiiSisteht with good air pollution control practice for minimizing emissions [40 CFRsect 636640(a) Table 6]

46 Recordkeeping Requirements for Emissions Unit No 621

4(il You mustkeep a copy of each notification and report submitted to comply with 40 CFR Part 63 Subpart ZZZZ including all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted accQrdingto 1herequirementin40 CFR sect~HO(b)(2)(xiv)

462 Records ofthe occurrence and duration of each malfunction ofoperatitm (ie process equipmellt) or any air pollution CQJltrQl and monitoring equipment

463 Records ofaii required maintenance performed on any airpollution control and monitoring equipment

464 The permittee must keep records of the pperating and maintenance conducted ltm Emissions Ulltt No 62 I necessary to ensure compliance with Condition45 above

47 Reporting Requirements (or Emissions Unit No 621

471 Permittee must report each instance in which an applicable emissions limitation operating limitation or requirement in 40 CFR Part 63 Subpart ZZZZ Table 2(c) is not met

9

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 TitleV Pennitto Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

472 These instances are deviations from the emission and operating limitations in 40 CFR Part 63 Subpart zzzz These deviations must be reported according to the requirements in 40 CFR sect 636650

5 Title Y Administrative Requirements

51 Annual Fee Payment [40 CFR sectsect 76(a)(7) and 719]

5I L The pe)Jlittee shall pay an annual permit fee in accordance with the procedures outlinedbelow [40 CFR sect 7l9(a)]

512 ]he )Je)Jlittee shall pay the annual permit fee each year The fee shall be received no later hail July 20 of each year

513 The fee payment shall be in United States currency and shall be paid by money order bank draft certified check corporate check or electronic funds transfer payable to the order ofEP A

514 Thepetmittee shall send fee payment and a completed fee filing form to

Forregular US postal service mail Fornon-US Postal Service express mail

(FedEx AirbomeDHL and UPS)

middotUS Environmental Protection Agency US Bank FOIA and Miscellaneous Payments Government Lockbox 979078 Cincinnati Finance Center US EPA FOfA amp Misc Payments PO Box 979078 1005 Convention Plaza St Louis MO 63197~9000 SL-MQcQ2-GL

St LouisM063101

Contact Craig Steffen 513-487-2091 Contact 314-418-1028 or Eric Volck513-487-2105

For electronic pavment (identifY permit number for payment in form)

Automated Clearinghouse (ACH) for receiving US currency PNCBank ABA 051036706 Account Number 310006 CTX Format Transaction Code 22 -checking

10

TranswestertrPipeline Company Compressor Station No6- Laguna Title V Permitto Operate No R6NMbull2-08R2 (replaces R6NM01~08R1)

121172015 )raft Permit

Environmental Protection Agency 808 17m Street NW Washington DC 20074

Contact Jesse White 301-887-6548

515 The pennitt~ shallsend an updated fee calculation wo~ksheet fonn and a photo~opy ofeach fee payment ~heck (or utherconfinnation ofactual fee paid) submitted annually by the same deadline as required for fee paymenUo the address listed in Section55 ofthis peimit [Note that anannual emissionsreport t~quired atthe same time as the feesalcUJaticmworksheet by40 CPRsect 719(h) has been incorporated intO the fee calculation worksheet fonn as aconvenience]

516 Basisfor~alculating annual fee

bull5161 The annual emissions fee shall be calculated by multiplying the total tons ofactual emissions of a11~egUlated pollutants (for fee calculation) emitted from the source by the emissions fee(in dollarston) in effect atthemiddottime of calculation

51611 Actual emissions means the actllal rate ofemissions in tons per year ofally regulated pollutant(for fee calculation) emitted from a part 71 source over thtl preceding calendar year Actual emissions shall be calcllhlted Using eachemissions units actual operating hours production rates in-place control equipment and types ofmaterials processed stored or combusted during the preceding ~endaryear [See 40 CPR sect 719(c)]

51612 If actual emissions cannot be detenninel )Jsipgthe compliance methods in the pennit the pennittee shall Use other fe~r~ly recognized procedures (40 CFR sect 719(e)(2)]

5L613 The term regulated pollutant (for fee calculation) is qefined in 40 CPR sect 712

51614 The permittee should note that the presumptive fee amount is revised each calendaryear to account for inflation and it is available from EPA prior to the start of each calendar year

5162 The pennittee shall excludethe following emissions from the calculation of fees ()

--middotmiddot--middot

ll

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

51621

51622

-----------------vFR+7-h9(e~)euroii

51623

The amount ofactual emissions ofeach regulated pollutant (for fee calculation) that the source emits in excess of 4000 tons per year See 40 CFR sect 719(c)(S)(i)

Actual emissions of any regulatedpollutant(for fee middot calculation) already included in the fee calculation See 40

The insignificant quantities of actual emissions not required to be listed or calculated in a permit application pursuant to 40 CPRsect 715(c)(11) [40 CPRsect 719(c)(5)(iii)]

517 Fee calculation worksheets shall be certifiedcas tottuthacclllacy and completeness by a responsible official in accordancewi1h 40 CPRsect 715(d)

518 The permittee shall retain fee calculation worksheets and other emissionsshyrelated data used to detennine fee payment for five years following submittal offee payment Elhission-related data include for example emissionsshyrelated forms provided by EPA and used by the pennittee for fee calculation pllrposes emissions-related spreadsheets and emissionsbullrelated data such as records of emissions monitoringdata and related support information required to be kept in accordance with40 CPRsect 716(a)(3)(ii) [See 40 CPR sect 79(i)]

519 Faihtreofthe permittee to pay fees in a timely manner shall subject the permittee to assessmentofpenalties and interest in accQIdancewith40CFR sect 719(1)

5110 The EPA will not act on applications forpermit renewal or modification if the permittee fails to pay all fees interest and penalties owed iri full [See 40 CPR sect 719(m))

5111 When notified by EPA of underpayment of fees the permittee shall remit full payment within 30 days of receipt of notification [See 40 CPR sect 7190)(1) and(2))

5Jl2 Ifthe permittee thinks that the EPA-assessed fee is in error and wishes to challenge the fee the permittee shall provide a written explanation of the alleged error to EPA along with filii payment of the assessed fee [See 40 CFR sect 71 90)(3))

52 Blankd Compliance Statement [40 CPRsectsect 716(a)(6)(i) and (H)]

12

Transwestern Pipeline Company Compressor Station No 6 - Laguna 121172015 CJ TitleVP~rmit to OperateNo R6NM-2-08R2 (replaces R6NM-0 I-08RI) Draft Permit

521 middot The permittee must comply with all conditions ofthis Part 71 permit Any permit noncompliance including Yiolation of any applicable requirement any permit(erm or condition any fee or filing requiteJTIent any duty tomiddotallow or CIIIT) out inspection entry or monitoring actiYities or any regulation or order issued bythe permitting authoritypursuatit to this part constitutes a Yiolation oftheCAA and is grounds for enforcement action permit termination reYocationand~essliance or modification or deni~l ofapertnit renewal application It shall notbe a defense for a permittee in an enforcement ~~ction that it would have been necessary to halt or reduce the permitted actiYity in order to m11intairi compliance with the conditions of this perrnit[40CFR sectsect 716(a)(6)(i)atid(ii)]

Determinations of deYiations continuous or intermittent compliance sts or YiOIItions of this perrnit are not limited to theapplic~ible testing or monitoring methods required by the underlying regulations of thispermit other credible eYidencemust be considered in such determinations [Section 113~a) and 113(e)(l) oftheCAA] middot

i

53 Compliance Certifications[40 CFR sect 716(c)(5)]

I The permittee shall submit to EPA a certificationof compliance withpermit terms and conditions including emission limitations standards or work practices armually Clch year no later thiU April 1 The compliance certification shall coYer tlte same 12 month period as the two consecutiYe semi-atinu~~l monitoring reports The compliance certification shall be certified as to truth accuracyandcompleteness by a responsible official consistent with 4() CFR sect 715(d)

middot 5dl The certification shall includethefollowing

5311 Identification ofeach permit teim or condition that is the basis ofthe certification

5312 Identification ofthe method(s) or other means used for detrmining the compliance status with lteach term and condition during the certification period and whether such methods or other means proYide continuous or intermittentdata If necessary the owner or operator also shall identify any other material infortnation eg operating hours records that must be included in the certification to

middot comply with section 13(c)(2) of the CAA which prohibits knowingly making afalse certification or omitting material 1 information

I i 13middot

I I

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 11: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

- Transwestem Pipeline Company Compressor Station No 6 -Laguna 1211712015 Title V Penni to Operate No R6NM-2-08R2 (replaces R6NM-O 1-08RI) Draft Pennit

HAP- hazardous air pollutants(see CAA Section 112(b)) NG- natural gas 3 Mostly fonllaldehyde

2 PermifShiel1[40 CFR sect 716(f)J

---------2-r--Notniilgin tliis pennifSliallalter or affect the followmg

2lLTheprovisions ofS~ction 303 ofthe CAA(emergencyorclers) including the authorityoftheAlrrlinistrator under that secti(n

212 The liability of a pennittee for any violati(n ofapJgtlicable requirements prior to br atthetime ofpennit issuance or middot

213 The lbility of the EPA to obtain infonnation from a source under Section 114 6ftheCAA

22 Compliance with the tenns and conditions ofthis pennit shall be deemed in cl)Ilpliance with the applicable requirements specifically listed in thispennit as of the date ofpermit issuance

3 Applicable Requirements and General permit Cqnditions

31 Applicable Requirements

The source will continue to comply with all applicable requi~mel)ls For applicable requirements thatwill become effective during the tenn ofthe penni tile source will meet su~h r~quJremeiJ$ on atiYlely bSis The pennittee shall comply with all theapplicable requirements offederalregulltigrts Inparticular the pennittee shall comply with the following

4

( TranswestemPipeline Company Compressor Station No 6 - Laguna 12172015 )TitleV Permitto Operate No R6NM2-08R2 (replaces R6NM-O l-08Rl) Draft Permit

Table 3 Applicable Requirements for Transwestern Pipelilie Company LLC C ta on 0bull - a~tunaompressor StiN6L

Citation Requirement C9mment

40CFR71 FederaLOperating Permits Program

UnitNosmiddot6QJ 602603621

40 CFR6 Subpart A

General Provisions

UnitNq 621

40CFR63 Subpart ZZZZ

National Emission Standardgtforazailous Aili Pollutants for Stationary R~ciproeating Iriternal CombustionmiddotEngines (RICE)

Unit No 621

TlfeTranswesterh Pipeline Company LLC Compressor StationNo 6- Laguna application was reviewed for compliance with the Part 71 Operating Permit Program Based on the inforrnationproviledbyTranswestemPipeline Company LLC in their application Compressqr Stittio)l No 6 (Lag1111a) would be subject to the following General Permit Requirements

32 General Permit Requirements I

Conditions in this section apply to all emissions units located at the facility including anyI units not specifically listed in Table 1

321 All equipment shall be operated in accordance with the manufacturers design values for that equipment

322 flleIIll()lint Of natural gaS llumed in the following emissions ullits shall not exceed the following amounts on a rolling 12-month average

Emissions Unit No 60 I - 289 mmscfyr Emissions Unit No 602-289 mmscfyr Emissions Unit No 603-289 mmscfyr Emissions Unit No 621 - 3504 mmscflyr

323 The actual heat input for Emissions UnitNo 601 Emissions Unit No 602and Emissions Unit No 603 shall not exceed 3465 MMBtulhr adjusted for elevation and for Emissions Unit No 621 the actual heat input shall not exceed 42 MMBtulhr adjusted for elevationmiddot

5

Transwestem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

324 Compliance Tests Compliance tests from units at this source will be conducted using applicable EPA Methods established within 40 CFR Part 51 Appendix M or as otherwise specified in the permit by applicable requirements

325 Monitoring

325J Fuel consumption for Emissions Unit Nos 601 602 603 and 621 shall be monitored witha flow meter monthly for each unit in MMscf (of natural gas)

3252 Heatinputratefor Unit Nos 601 602 603 and 621 shall be monitored Monthly orta per unitbllSis(or individual highest rate in MMBtulhr

326 ReportingRecordkeeping

3261 The permittee shall keep records on all startup shutdown repair and maintenance activities performed on all emission units These records shall identify the relevant emission unit and describe the work performed and calculate any associated emissions

3262 The fuel flowconsumption for each emissions unit (Unit Nos 601 602 603 and 621) shall be recorded on a monthly basis and art annual 12-month rolling average

3263 The records of fuel consumption shall be maintained for each emission unit (Unit Nos 601 602 603and 621) for the last five years

3264 The actualheat input rate for emission Unit Nos 601 602 603 and 621 sh~lbe ~qrlted on a monthly average basis as well as an annual12-month rolling average Ifthe emissions rate ofany ofthe enampines deviates more than 2 above the PTE listed in Table2 ofthis perrrit then the permittee shall evaluate the deviation to determine if there has been a physical change or change in method ofQperation at the source report the deviation and the results of the evaluation to EPA in the report required by Condition329 below and apply for a modification ofthil) pennit ifnecessary

3265 The records of heat input shall be maintainedJor emission Unit Nos 601 602 603 artd 621 for at least the last five years

Cqnditionsin this section apply to all emissions units located atthe facility including any units not specifically listed in Table 1

6

()Transwestern Pipeline Company Compressor Station No 6 Laguna 1211712015 TitleV Permitto Operate No R6NM-2-08R2replaces R6NMOl-08RI) Draft Permit

327 The permittee shall keep records of the serial numbers for each e111ission unit The e111ission ll1its f()rthe RICE and thlir serial nJll11bers are UnitNo 601 withserial nJll11ber 107510 Unit No 602 With serial numo(lr l075UUnitNo 603 with serial number 107512 Unit No 621 with serial number 129011

328 Retenti9n of reltprds ami support information shall be for a period ofat least five years from the date ofmeasurement or report Supportinfonnation includes all calibrationandmamtenance records all origin~ strip-chartrecordings or monitoring instrumeitation and copiltsofall reports [qujJedby thisj)ennjt

329 The pllrmitteeshlill submittothe EPAreportsofany monitoring and recpr~eeping required under this permit8emi-annually )Jy April 1 and O~tober 1of ealtlth year The report due on April l shall cover the prior six--month period from September 1 through the end of February The report due on October l shall cover the prior sixshymonthperiod from March 1 through the end pfAugust

Copies ofthese tecotdsshall also besentto

Environmental Direct()r Pueblo of Laguna PO BoxJ94 Laguna NM 87026

4 EnginllNESHAgtRequirements

41 General Provisions

Thepennittee shalLci)mplywithth(l requirements [rom the NE$HAP General Pfqvisions 40 CFR Part 63 Subpart Afor Emissions Unit No 621 only

42 Requirements for Emissilaquonls UnitNo 6~1I l

421 For Emissions Unit No 621the perniitteeshallmeet the requirements in 422 through 424 below

422 Change oil and filter every 500 hours of operation or annually whichever comes first inspect air cleaner every 1000 hours ofoperation or annually whichever comes first and replace as necessary and inspect aU hoses and

I 7

I

Transwestem Pipeline Company Compressor Station No 6 Laguna 1217205 Title V Permitto Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

belts every 500 hours of operation or annually whichever comes first and replace as necessary [40 CFR sect 636002 Table 2c]

423 Minimize the enginestime spent at idle and minimize the engines startup time at startup to a period needed for appropriate and safe loading ofthe engine not to exceed 30minutesafter which time the non-startup emission

---------~---limitations~pply-[40-CFR--sect6~6002--Iable-2G~~-------------c-t

424 Permittee must install ~~non-resettable hour meter ifone is not already installed [40 CFR sect 636625(f)]

43 General Compliance Requirements for Unit No 621

431 Emissions Unit No 621 must be incompliance with the operating limitations and requirements in Condition 42 at~~ll times [ 40 CFR sect 636605(a)]

432 The permittee must operate and maintain Unit No 621 including air pollution control and monitoring equipment in a manner consistent with good air pollution control practices for minimizing emissions [ 40 CFR sect 636605(b)]

44 Perfonnanee Requirements for Unit No 621

441 As an emergency stationary RICE the permittee must operate Emissions Unit No 621 accordingtotherequirementsof40CFR sect 636640(plusmn)

442 Any operation other than emergency operation maintenance and testing emergency demand response and operation in non-emergency situations for 50 hours per year as described in paragraphs f(l) throug( 4) of40 CFR sect 636640 is prohibited [ 40 CFR sect 636640(plusmn))

443 IfEmissions Unit No 621 is not operated according to the requirements in 40 CFR sect 636640(plusmn)(1) through (f)(4) Emissions Uhit No 621 will not be considered an emergency stationary RICE and it must meet all requirements for non-emergency engines [40 CFR sect 636640(plusmn)]

444 There is no time limit on the use 0femergency stationary RICE in emergency situations [40 CFR sect 636640(plusmn)(2)] middot

445 Emissions Unit No 621 may be operated for up to 50 hours per calendar year in non-emergency situations The 50 hours per year for nonshy

8

Transwestem Pipeline Company Compressor Station No 6 bull Laguna 12fl72015 Title V PermiHo QperateNo R6NMmiddot2middot08RZ(replaces R6NM-Ol-08Rl) Draft Permit

emergency situatipns cartnot be used for peak shaying or non-emergency demand response or to generate income for afacilityto supply power as part o[a financiil arrangement with another entity [ 4QCFRsect 636640(pound)(3)]

446 Pertilitteemay operate Emissions Unit No 621 for any combination of the purposes specified In 40 CFR sect 636640(f)(2)(i)through (iii) for a maximum of 100 hours per calendar year Any operltJiiohfor non-emergency situations as ltJlloVlldby paragraphs 40 CFR sect 63 6640(f)(3) and (4) counts as part ofthe lOOhours per calendamp year allowed ]Jythisparagraph [40 CFRsect 636640(plusmn)(2)]

4S Clntinuous Compliance Requirements for Emissions Unit No 621

Emissions Unit No 621 shall be operated and maintained according to the manufacturers emission-rellited operation and maintenance instructions In the alternative permittee may develop and follow its own maintenance plan which nmst provide to the extent practicable for the maintenance and operation ofEmission Unit No 621 in a martner coiiSisteht with good air pollution control practice for minimizing emissions [40 CFRsect 636640(a) Table 6]

46 Recordkeeping Requirements for Emissions Unit No 621

4(il You mustkeep a copy of each notification and report submitted to comply with 40 CFR Part 63 Subpart ZZZZ including all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted accQrdingto 1herequirementin40 CFR sect~HO(b)(2)(xiv)

462 Records ofthe occurrence and duration of each malfunction ofoperatitm (ie process equipmellt) or any air pollution CQJltrQl and monitoring equipment

463 Records ofaii required maintenance performed on any airpollution control and monitoring equipment

464 The permittee must keep records of the pperating and maintenance conducted ltm Emissions Ulltt No 62 I necessary to ensure compliance with Condition45 above

47 Reporting Requirements (or Emissions Unit No 621

471 Permittee must report each instance in which an applicable emissions limitation operating limitation or requirement in 40 CFR Part 63 Subpart ZZZZ Table 2(c) is not met

9

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 TitleV Pennitto Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

472 These instances are deviations from the emission and operating limitations in 40 CFR Part 63 Subpart zzzz These deviations must be reported according to the requirements in 40 CFR sect 636650

5 Title Y Administrative Requirements

51 Annual Fee Payment [40 CFR sectsect 76(a)(7) and 719]

5I L The pe)Jlittee shall pay an annual permit fee in accordance with the procedures outlinedbelow [40 CFR sect 7l9(a)]

512 ]he )Je)Jlittee shall pay the annual permit fee each year The fee shall be received no later hail July 20 of each year

513 The fee payment shall be in United States currency and shall be paid by money order bank draft certified check corporate check or electronic funds transfer payable to the order ofEP A

514 Thepetmittee shall send fee payment and a completed fee filing form to

Forregular US postal service mail Fornon-US Postal Service express mail

(FedEx AirbomeDHL and UPS)

middotUS Environmental Protection Agency US Bank FOIA and Miscellaneous Payments Government Lockbox 979078 Cincinnati Finance Center US EPA FOfA amp Misc Payments PO Box 979078 1005 Convention Plaza St Louis MO 63197~9000 SL-MQcQ2-GL

St LouisM063101

Contact Craig Steffen 513-487-2091 Contact 314-418-1028 or Eric Volck513-487-2105

For electronic pavment (identifY permit number for payment in form)

Automated Clearinghouse (ACH) for receiving US currency PNCBank ABA 051036706 Account Number 310006 CTX Format Transaction Code 22 -checking

10

TranswestertrPipeline Company Compressor Station No6- Laguna Title V Permitto Operate No R6NMbull2-08R2 (replaces R6NM01~08R1)

121172015 )raft Permit

Environmental Protection Agency 808 17m Street NW Washington DC 20074

Contact Jesse White 301-887-6548

515 The pennitt~ shallsend an updated fee calculation wo~ksheet fonn and a photo~opy ofeach fee payment ~heck (or utherconfinnation ofactual fee paid) submitted annually by the same deadline as required for fee paymenUo the address listed in Section55 ofthis peimit [Note that anannual emissionsreport t~quired atthe same time as the feesalcUJaticmworksheet by40 CPRsect 719(h) has been incorporated intO the fee calculation worksheet fonn as aconvenience]

516 Basisfor~alculating annual fee

bull5161 The annual emissions fee shall be calculated by multiplying the total tons ofactual emissions of a11~egUlated pollutants (for fee calculation) emitted from the source by the emissions fee(in dollarston) in effect atthemiddottime of calculation

51611 Actual emissions means the actllal rate ofemissions in tons per year ofally regulated pollutant(for fee calculation) emitted from a part 71 source over thtl preceding calendar year Actual emissions shall be calcllhlted Using eachemissions units actual operating hours production rates in-place control equipment and types ofmaterials processed stored or combusted during the preceding ~endaryear [See 40 CPR sect 719(c)]

51612 If actual emissions cannot be detenninel )Jsipgthe compliance methods in the pennit the pennittee shall Use other fe~r~ly recognized procedures (40 CFR sect 719(e)(2)]

5L613 The term regulated pollutant (for fee calculation) is qefined in 40 CPR sect 712

51614 The permittee should note that the presumptive fee amount is revised each calendaryear to account for inflation and it is available from EPA prior to the start of each calendar year

5162 The pennittee shall excludethe following emissions from the calculation of fees ()

--middotmiddot--middot

ll

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

51621

51622

-----------------vFR+7-h9(e~)euroii

51623

The amount ofactual emissions ofeach regulated pollutant (for fee calculation) that the source emits in excess of 4000 tons per year See 40 CFR sect 719(c)(S)(i)

Actual emissions of any regulatedpollutant(for fee middot calculation) already included in the fee calculation See 40

The insignificant quantities of actual emissions not required to be listed or calculated in a permit application pursuant to 40 CPRsect 715(c)(11) [40 CPRsect 719(c)(5)(iii)]

517 Fee calculation worksheets shall be certifiedcas tottuthacclllacy and completeness by a responsible official in accordancewi1h 40 CPRsect 715(d)

518 The permittee shall retain fee calculation worksheets and other emissionsshyrelated data used to detennine fee payment for five years following submittal offee payment Elhission-related data include for example emissionsshyrelated forms provided by EPA and used by the pennittee for fee calculation pllrposes emissions-related spreadsheets and emissionsbullrelated data such as records of emissions monitoringdata and related support information required to be kept in accordance with40 CPRsect 716(a)(3)(ii) [See 40 CPR sect 79(i)]

519 Faihtreofthe permittee to pay fees in a timely manner shall subject the permittee to assessmentofpenalties and interest in accQIdancewith40CFR sect 719(1)

5110 The EPA will not act on applications forpermit renewal or modification if the permittee fails to pay all fees interest and penalties owed iri full [See 40 CPR sect 719(m))

5111 When notified by EPA of underpayment of fees the permittee shall remit full payment within 30 days of receipt of notification [See 40 CPR sect 7190)(1) and(2))

5Jl2 Ifthe permittee thinks that the EPA-assessed fee is in error and wishes to challenge the fee the permittee shall provide a written explanation of the alleged error to EPA along with filii payment of the assessed fee [See 40 CFR sect 71 90)(3))

52 Blankd Compliance Statement [40 CPRsectsect 716(a)(6)(i) and (H)]

12

Transwestern Pipeline Company Compressor Station No 6 - Laguna 121172015 CJ TitleVP~rmit to OperateNo R6NM-2-08R2 (replaces R6NM-0 I-08RI) Draft Permit

521 middot The permittee must comply with all conditions ofthis Part 71 permit Any permit noncompliance including Yiolation of any applicable requirement any permit(erm or condition any fee or filing requiteJTIent any duty tomiddotallow or CIIIT) out inspection entry or monitoring actiYities or any regulation or order issued bythe permitting authoritypursuatit to this part constitutes a Yiolation oftheCAA and is grounds for enforcement action permit termination reYocationand~essliance or modification or deni~l ofapertnit renewal application It shall notbe a defense for a permittee in an enforcement ~~ction that it would have been necessary to halt or reduce the permitted actiYity in order to m11intairi compliance with the conditions of this perrnit[40CFR sectsect 716(a)(6)(i)atid(ii)]

Determinations of deYiations continuous or intermittent compliance sts or YiOIItions of this perrnit are not limited to theapplic~ible testing or monitoring methods required by the underlying regulations of thispermit other credible eYidencemust be considered in such determinations [Section 113~a) and 113(e)(l) oftheCAA] middot

i

53 Compliance Certifications[40 CFR sect 716(c)(5)]

I The permittee shall submit to EPA a certificationof compliance withpermit terms and conditions including emission limitations standards or work practices armually Clch year no later thiU April 1 The compliance certification shall coYer tlte same 12 month period as the two consecutiYe semi-atinu~~l monitoring reports The compliance certification shall be certified as to truth accuracyandcompleteness by a responsible official consistent with 4() CFR sect 715(d)

middot 5dl The certification shall includethefollowing

5311 Identification ofeach permit teim or condition that is the basis ofthe certification

5312 Identification ofthe method(s) or other means used for detrmining the compliance status with lteach term and condition during the certification period and whether such methods or other means proYide continuous or intermittentdata If necessary the owner or operator also shall identify any other material infortnation eg operating hours records that must be included in the certification to

middot comply with section 13(c)(2) of the CAA which prohibits knowingly making afalse certification or omitting material 1 information

I i 13middot

I I

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 12: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

( TranswestemPipeline Company Compressor Station No 6 - Laguna 12172015 )TitleV Permitto Operate No R6NM2-08R2 (replaces R6NM-O l-08Rl) Draft Permit

Table 3 Applicable Requirements for Transwestern Pipelilie Company LLC C ta on 0bull - a~tunaompressor StiN6L

Citation Requirement C9mment

40CFR71 FederaLOperating Permits Program

UnitNosmiddot6QJ 602603621

40 CFR6 Subpart A

General Provisions

UnitNq 621

40CFR63 Subpart ZZZZ

National Emission Standardgtforazailous Aili Pollutants for Stationary R~ciproeating Iriternal CombustionmiddotEngines (RICE)

Unit No 621

TlfeTranswesterh Pipeline Company LLC Compressor StationNo 6- Laguna application was reviewed for compliance with the Part 71 Operating Permit Program Based on the inforrnationproviledbyTranswestemPipeline Company LLC in their application Compressqr Stittio)l No 6 (Lag1111a) would be subject to the following General Permit Requirements

32 General Permit Requirements I

Conditions in this section apply to all emissions units located at the facility including anyI units not specifically listed in Table 1

321 All equipment shall be operated in accordance with the manufacturers design values for that equipment

322 flleIIll()lint Of natural gaS llumed in the following emissions ullits shall not exceed the following amounts on a rolling 12-month average

Emissions Unit No 60 I - 289 mmscfyr Emissions Unit No 602-289 mmscfyr Emissions Unit No 603-289 mmscfyr Emissions Unit No 621 - 3504 mmscflyr

323 The actual heat input for Emissions UnitNo 601 Emissions Unit No 602and Emissions Unit No 603 shall not exceed 3465 MMBtulhr adjusted for elevation and for Emissions Unit No 621 the actual heat input shall not exceed 42 MMBtulhr adjusted for elevationmiddot

5

Transwestem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

324 Compliance Tests Compliance tests from units at this source will be conducted using applicable EPA Methods established within 40 CFR Part 51 Appendix M or as otherwise specified in the permit by applicable requirements

325 Monitoring

325J Fuel consumption for Emissions Unit Nos 601 602 603 and 621 shall be monitored witha flow meter monthly for each unit in MMscf (of natural gas)

3252 Heatinputratefor Unit Nos 601 602 603 and 621 shall be monitored Monthly orta per unitbllSis(or individual highest rate in MMBtulhr

326 ReportingRecordkeeping

3261 The permittee shall keep records on all startup shutdown repair and maintenance activities performed on all emission units These records shall identify the relevant emission unit and describe the work performed and calculate any associated emissions

3262 The fuel flowconsumption for each emissions unit (Unit Nos 601 602 603 and 621) shall be recorded on a monthly basis and art annual 12-month rolling average

3263 The records of fuel consumption shall be maintained for each emission unit (Unit Nos 601 602 603and 621) for the last five years

3264 The actualheat input rate for emission Unit Nos 601 602 603 and 621 sh~lbe ~qrlted on a monthly average basis as well as an annual12-month rolling average Ifthe emissions rate ofany ofthe enampines deviates more than 2 above the PTE listed in Table2 ofthis perrrit then the permittee shall evaluate the deviation to determine if there has been a physical change or change in method ofQperation at the source report the deviation and the results of the evaluation to EPA in the report required by Condition329 below and apply for a modification ofthil) pennit ifnecessary

3265 The records of heat input shall be maintainedJor emission Unit Nos 601 602 603 artd 621 for at least the last five years

Cqnditionsin this section apply to all emissions units located atthe facility including any units not specifically listed in Table 1

6

()Transwestern Pipeline Company Compressor Station No 6 Laguna 1211712015 TitleV Permitto Operate No R6NM-2-08R2replaces R6NMOl-08RI) Draft Permit

327 The permittee shall keep records of the serial numbers for each e111ission unit The e111ission ll1its f()rthe RICE and thlir serial nJll11bers are UnitNo 601 withserial nJll11ber 107510 Unit No 602 With serial numo(lr l075UUnitNo 603 with serial number 107512 Unit No 621 with serial number 129011

328 Retenti9n of reltprds ami support information shall be for a period ofat least five years from the date ofmeasurement or report Supportinfonnation includes all calibrationandmamtenance records all origin~ strip-chartrecordings or monitoring instrumeitation and copiltsofall reports [qujJedby thisj)ennjt

329 The pllrmitteeshlill submittothe EPAreportsofany monitoring and recpr~eeping required under this permit8emi-annually )Jy April 1 and O~tober 1of ealtlth year The report due on April l shall cover the prior six--month period from September 1 through the end of February The report due on October l shall cover the prior sixshymonthperiod from March 1 through the end pfAugust

Copies ofthese tecotdsshall also besentto

Environmental Direct()r Pueblo of Laguna PO BoxJ94 Laguna NM 87026

4 EnginllNESHAgtRequirements

41 General Provisions

Thepennittee shalLci)mplywithth(l requirements [rom the NE$HAP General Pfqvisions 40 CFR Part 63 Subpart Afor Emissions Unit No 621 only

42 Requirements for Emissilaquonls UnitNo 6~1I l

421 For Emissions Unit No 621the perniitteeshallmeet the requirements in 422 through 424 below

422 Change oil and filter every 500 hours of operation or annually whichever comes first inspect air cleaner every 1000 hours ofoperation or annually whichever comes first and replace as necessary and inspect aU hoses and

I 7

I

Transwestem Pipeline Company Compressor Station No 6 Laguna 1217205 Title V Permitto Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

belts every 500 hours of operation or annually whichever comes first and replace as necessary [40 CFR sect 636002 Table 2c]

423 Minimize the enginestime spent at idle and minimize the engines startup time at startup to a period needed for appropriate and safe loading ofthe engine not to exceed 30minutesafter which time the non-startup emission

---------~---limitations~pply-[40-CFR--sect6~6002--Iable-2G~~-------------c-t

424 Permittee must install ~~non-resettable hour meter ifone is not already installed [40 CFR sect 636625(f)]

43 General Compliance Requirements for Unit No 621

431 Emissions Unit No 621 must be incompliance with the operating limitations and requirements in Condition 42 at~~ll times [ 40 CFR sect 636605(a)]

432 The permittee must operate and maintain Unit No 621 including air pollution control and monitoring equipment in a manner consistent with good air pollution control practices for minimizing emissions [ 40 CFR sect 636605(b)]

44 Perfonnanee Requirements for Unit No 621

441 As an emergency stationary RICE the permittee must operate Emissions Unit No 621 accordingtotherequirementsof40CFR sect 636640(plusmn)

442 Any operation other than emergency operation maintenance and testing emergency demand response and operation in non-emergency situations for 50 hours per year as described in paragraphs f(l) throug( 4) of40 CFR sect 636640 is prohibited [ 40 CFR sect 636640(plusmn))

443 IfEmissions Unit No 621 is not operated according to the requirements in 40 CFR sect 636640(plusmn)(1) through (f)(4) Emissions Uhit No 621 will not be considered an emergency stationary RICE and it must meet all requirements for non-emergency engines [40 CFR sect 636640(plusmn)]

444 There is no time limit on the use 0femergency stationary RICE in emergency situations [40 CFR sect 636640(plusmn)(2)] middot

445 Emissions Unit No 621 may be operated for up to 50 hours per calendar year in non-emergency situations The 50 hours per year for nonshy

8

Transwestem Pipeline Company Compressor Station No 6 bull Laguna 12fl72015 Title V PermiHo QperateNo R6NMmiddot2middot08RZ(replaces R6NM-Ol-08Rl) Draft Permit

emergency situatipns cartnot be used for peak shaying or non-emergency demand response or to generate income for afacilityto supply power as part o[a financiil arrangement with another entity [ 4QCFRsect 636640(pound)(3)]

446 Pertilitteemay operate Emissions Unit No 621 for any combination of the purposes specified In 40 CFR sect 636640(f)(2)(i)through (iii) for a maximum of 100 hours per calendar year Any operltJiiohfor non-emergency situations as ltJlloVlldby paragraphs 40 CFR sect 63 6640(f)(3) and (4) counts as part ofthe lOOhours per calendamp year allowed ]Jythisparagraph [40 CFRsect 636640(plusmn)(2)]

4S Clntinuous Compliance Requirements for Emissions Unit No 621

Emissions Unit No 621 shall be operated and maintained according to the manufacturers emission-rellited operation and maintenance instructions In the alternative permittee may develop and follow its own maintenance plan which nmst provide to the extent practicable for the maintenance and operation ofEmission Unit No 621 in a martner coiiSisteht with good air pollution control practice for minimizing emissions [40 CFRsect 636640(a) Table 6]

46 Recordkeeping Requirements for Emissions Unit No 621

4(il You mustkeep a copy of each notification and report submitted to comply with 40 CFR Part 63 Subpart ZZZZ including all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted accQrdingto 1herequirementin40 CFR sect~HO(b)(2)(xiv)

462 Records ofthe occurrence and duration of each malfunction ofoperatitm (ie process equipmellt) or any air pollution CQJltrQl and monitoring equipment

463 Records ofaii required maintenance performed on any airpollution control and monitoring equipment

464 The permittee must keep records of the pperating and maintenance conducted ltm Emissions Ulltt No 62 I necessary to ensure compliance with Condition45 above

47 Reporting Requirements (or Emissions Unit No 621

471 Permittee must report each instance in which an applicable emissions limitation operating limitation or requirement in 40 CFR Part 63 Subpart ZZZZ Table 2(c) is not met

9

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 TitleV Pennitto Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

472 These instances are deviations from the emission and operating limitations in 40 CFR Part 63 Subpart zzzz These deviations must be reported according to the requirements in 40 CFR sect 636650

5 Title Y Administrative Requirements

51 Annual Fee Payment [40 CFR sectsect 76(a)(7) and 719]

5I L The pe)Jlittee shall pay an annual permit fee in accordance with the procedures outlinedbelow [40 CFR sect 7l9(a)]

512 ]he )Je)Jlittee shall pay the annual permit fee each year The fee shall be received no later hail July 20 of each year

513 The fee payment shall be in United States currency and shall be paid by money order bank draft certified check corporate check or electronic funds transfer payable to the order ofEP A

514 Thepetmittee shall send fee payment and a completed fee filing form to

Forregular US postal service mail Fornon-US Postal Service express mail

(FedEx AirbomeDHL and UPS)

middotUS Environmental Protection Agency US Bank FOIA and Miscellaneous Payments Government Lockbox 979078 Cincinnati Finance Center US EPA FOfA amp Misc Payments PO Box 979078 1005 Convention Plaza St Louis MO 63197~9000 SL-MQcQ2-GL

St LouisM063101

Contact Craig Steffen 513-487-2091 Contact 314-418-1028 or Eric Volck513-487-2105

For electronic pavment (identifY permit number for payment in form)

Automated Clearinghouse (ACH) for receiving US currency PNCBank ABA 051036706 Account Number 310006 CTX Format Transaction Code 22 -checking

10

TranswestertrPipeline Company Compressor Station No6- Laguna Title V Permitto Operate No R6NMbull2-08R2 (replaces R6NM01~08R1)

121172015 )raft Permit

Environmental Protection Agency 808 17m Street NW Washington DC 20074

Contact Jesse White 301-887-6548

515 The pennitt~ shallsend an updated fee calculation wo~ksheet fonn and a photo~opy ofeach fee payment ~heck (or utherconfinnation ofactual fee paid) submitted annually by the same deadline as required for fee paymenUo the address listed in Section55 ofthis peimit [Note that anannual emissionsreport t~quired atthe same time as the feesalcUJaticmworksheet by40 CPRsect 719(h) has been incorporated intO the fee calculation worksheet fonn as aconvenience]

516 Basisfor~alculating annual fee

bull5161 The annual emissions fee shall be calculated by multiplying the total tons ofactual emissions of a11~egUlated pollutants (for fee calculation) emitted from the source by the emissions fee(in dollarston) in effect atthemiddottime of calculation

51611 Actual emissions means the actllal rate ofemissions in tons per year ofally regulated pollutant(for fee calculation) emitted from a part 71 source over thtl preceding calendar year Actual emissions shall be calcllhlted Using eachemissions units actual operating hours production rates in-place control equipment and types ofmaterials processed stored or combusted during the preceding ~endaryear [See 40 CPR sect 719(c)]

51612 If actual emissions cannot be detenninel )Jsipgthe compliance methods in the pennit the pennittee shall Use other fe~r~ly recognized procedures (40 CFR sect 719(e)(2)]

5L613 The term regulated pollutant (for fee calculation) is qefined in 40 CPR sect 712

51614 The permittee should note that the presumptive fee amount is revised each calendaryear to account for inflation and it is available from EPA prior to the start of each calendar year

5162 The pennittee shall excludethe following emissions from the calculation of fees ()

--middotmiddot--middot

ll

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

51621

51622

-----------------vFR+7-h9(e~)euroii

51623

The amount ofactual emissions ofeach regulated pollutant (for fee calculation) that the source emits in excess of 4000 tons per year See 40 CFR sect 719(c)(S)(i)

Actual emissions of any regulatedpollutant(for fee middot calculation) already included in the fee calculation See 40

The insignificant quantities of actual emissions not required to be listed or calculated in a permit application pursuant to 40 CPRsect 715(c)(11) [40 CPRsect 719(c)(5)(iii)]

517 Fee calculation worksheets shall be certifiedcas tottuthacclllacy and completeness by a responsible official in accordancewi1h 40 CPRsect 715(d)

518 The permittee shall retain fee calculation worksheets and other emissionsshyrelated data used to detennine fee payment for five years following submittal offee payment Elhission-related data include for example emissionsshyrelated forms provided by EPA and used by the pennittee for fee calculation pllrposes emissions-related spreadsheets and emissionsbullrelated data such as records of emissions monitoringdata and related support information required to be kept in accordance with40 CPRsect 716(a)(3)(ii) [See 40 CPR sect 79(i)]

519 Faihtreofthe permittee to pay fees in a timely manner shall subject the permittee to assessmentofpenalties and interest in accQIdancewith40CFR sect 719(1)

5110 The EPA will not act on applications forpermit renewal or modification if the permittee fails to pay all fees interest and penalties owed iri full [See 40 CPR sect 719(m))

5111 When notified by EPA of underpayment of fees the permittee shall remit full payment within 30 days of receipt of notification [See 40 CPR sect 7190)(1) and(2))

5Jl2 Ifthe permittee thinks that the EPA-assessed fee is in error and wishes to challenge the fee the permittee shall provide a written explanation of the alleged error to EPA along with filii payment of the assessed fee [See 40 CFR sect 71 90)(3))

52 Blankd Compliance Statement [40 CPRsectsect 716(a)(6)(i) and (H)]

12

Transwestern Pipeline Company Compressor Station No 6 - Laguna 121172015 CJ TitleVP~rmit to OperateNo R6NM-2-08R2 (replaces R6NM-0 I-08RI) Draft Permit

521 middot The permittee must comply with all conditions ofthis Part 71 permit Any permit noncompliance including Yiolation of any applicable requirement any permit(erm or condition any fee or filing requiteJTIent any duty tomiddotallow or CIIIT) out inspection entry or monitoring actiYities or any regulation or order issued bythe permitting authoritypursuatit to this part constitutes a Yiolation oftheCAA and is grounds for enforcement action permit termination reYocationand~essliance or modification or deni~l ofapertnit renewal application It shall notbe a defense for a permittee in an enforcement ~~ction that it would have been necessary to halt or reduce the permitted actiYity in order to m11intairi compliance with the conditions of this perrnit[40CFR sectsect 716(a)(6)(i)atid(ii)]

Determinations of deYiations continuous or intermittent compliance sts or YiOIItions of this perrnit are not limited to theapplic~ible testing or monitoring methods required by the underlying regulations of thispermit other credible eYidencemust be considered in such determinations [Section 113~a) and 113(e)(l) oftheCAA] middot

i

53 Compliance Certifications[40 CFR sect 716(c)(5)]

I The permittee shall submit to EPA a certificationof compliance withpermit terms and conditions including emission limitations standards or work practices armually Clch year no later thiU April 1 The compliance certification shall coYer tlte same 12 month period as the two consecutiYe semi-atinu~~l monitoring reports The compliance certification shall be certified as to truth accuracyandcompleteness by a responsible official consistent with 4() CFR sect 715(d)

middot 5dl The certification shall includethefollowing

5311 Identification ofeach permit teim or condition that is the basis ofthe certification

5312 Identification ofthe method(s) or other means used for detrmining the compliance status with lteach term and condition during the certification period and whether such methods or other means proYide continuous or intermittentdata If necessary the owner or operator also shall identify any other material infortnation eg operating hours records that must be included in the certification to

middot comply with section 13(c)(2) of the CAA which prohibits knowingly making afalse certification or omitting material 1 information

I i 13middot

I I

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 13: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

Transwestem Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

324 Compliance Tests Compliance tests from units at this source will be conducted using applicable EPA Methods established within 40 CFR Part 51 Appendix M or as otherwise specified in the permit by applicable requirements

325 Monitoring

325J Fuel consumption for Emissions Unit Nos 601 602 603 and 621 shall be monitored witha flow meter monthly for each unit in MMscf (of natural gas)

3252 Heatinputratefor Unit Nos 601 602 603 and 621 shall be monitored Monthly orta per unitbllSis(or individual highest rate in MMBtulhr

326 ReportingRecordkeeping

3261 The permittee shall keep records on all startup shutdown repair and maintenance activities performed on all emission units These records shall identify the relevant emission unit and describe the work performed and calculate any associated emissions

3262 The fuel flowconsumption for each emissions unit (Unit Nos 601 602 603 and 621) shall be recorded on a monthly basis and art annual 12-month rolling average

3263 The records of fuel consumption shall be maintained for each emission unit (Unit Nos 601 602 603and 621) for the last five years

3264 The actualheat input rate for emission Unit Nos 601 602 603 and 621 sh~lbe ~qrlted on a monthly average basis as well as an annual12-month rolling average Ifthe emissions rate ofany ofthe enampines deviates more than 2 above the PTE listed in Table2 ofthis perrrit then the permittee shall evaluate the deviation to determine if there has been a physical change or change in method ofQperation at the source report the deviation and the results of the evaluation to EPA in the report required by Condition329 below and apply for a modification ofthil) pennit ifnecessary

3265 The records of heat input shall be maintainedJor emission Unit Nos 601 602 603 artd 621 for at least the last five years

Cqnditionsin this section apply to all emissions units located atthe facility including any units not specifically listed in Table 1

6

()Transwestern Pipeline Company Compressor Station No 6 Laguna 1211712015 TitleV Permitto Operate No R6NM-2-08R2replaces R6NMOl-08RI) Draft Permit

327 The permittee shall keep records of the serial numbers for each e111ission unit The e111ission ll1its f()rthe RICE and thlir serial nJll11bers are UnitNo 601 withserial nJll11ber 107510 Unit No 602 With serial numo(lr l075UUnitNo 603 with serial number 107512 Unit No 621 with serial number 129011

328 Retenti9n of reltprds ami support information shall be for a period ofat least five years from the date ofmeasurement or report Supportinfonnation includes all calibrationandmamtenance records all origin~ strip-chartrecordings or monitoring instrumeitation and copiltsofall reports [qujJedby thisj)ennjt

329 The pllrmitteeshlill submittothe EPAreportsofany monitoring and recpr~eeping required under this permit8emi-annually )Jy April 1 and O~tober 1of ealtlth year The report due on April l shall cover the prior six--month period from September 1 through the end of February The report due on October l shall cover the prior sixshymonthperiod from March 1 through the end pfAugust

Copies ofthese tecotdsshall also besentto

Environmental Direct()r Pueblo of Laguna PO BoxJ94 Laguna NM 87026

4 EnginllNESHAgtRequirements

41 General Provisions

Thepennittee shalLci)mplywithth(l requirements [rom the NE$HAP General Pfqvisions 40 CFR Part 63 Subpart Afor Emissions Unit No 621 only

42 Requirements for Emissilaquonls UnitNo 6~1I l

421 For Emissions Unit No 621the perniitteeshallmeet the requirements in 422 through 424 below

422 Change oil and filter every 500 hours of operation or annually whichever comes first inspect air cleaner every 1000 hours ofoperation or annually whichever comes first and replace as necessary and inspect aU hoses and

I 7

I

Transwestem Pipeline Company Compressor Station No 6 Laguna 1217205 Title V Permitto Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

belts every 500 hours of operation or annually whichever comes first and replace as necessary [40 CFR sect 636002 Table 2c]

423 Minimize the enginestime spent at idle and minimize the engines startup time at startup to a period needed for appropriate and safe loading ofthe engine not to exceed 30minutesafter which time the non-startup emission

---------~---limitations~pply-[40-CFR--sect6~6002--Iable-2G~~-------------c-t

424 Permittee must install ~~non-resettable hour meter ifone is not already installed [40 CFR sect 636625(f)]

43 General Compliance Requirements for Unit No 621

431 Emissions Unit No 621 must be incompliance with the operating limitations and requirements in Condition 42 at~~ll times [ 40 CFR sect 636605(a)]

432 The permittee must operate and maintain Unit No 621 including air pollution control and monitoring equipment in a manner consistent with good air pollution control practices for minimizing emissions [ 40 CFR sect 636605(b)]

44 Perfonnanee Requirements for Unit No 621

441 As an emergency stationary RICE the permittee must operate Emissions Unit No 621 accordingtotherequirementsof40CFR sect 636640(plusmn)

442 Any operation other than emergency operation maintenance and testing emergency demand response and operation in non-emergency situations for 50 hours per year as described in paragraphs f(l) throug( 4) of40 CFR sect 636640 is prohibited [ 40 CFR sect 636640(plusmn))

443 IfEmissions Unit No 621 is not operated according to the requirements in 40 CFR sect 636640(plusmn)(1) through (f)(4) Emissions Uhit No 621 will not be considered an emergency stationary RICE and it must meet all requirements for non-emergency engines [40 CFR sect 636640(plusmn)]

444 There is no time limit on the use 0femergency stationary RICE in emergency situations [40 CFR sect 636640(plusmn)(2)] middot

445 Emissions Unit No 621 may be operated for up to 50 hours per calendar year in non-emergency situations The 50 hours per year for nonshy

8

Transwestem Pipeline Company Compressor Station No 6 bull Laguna 12fl72015 Title V PermiHo QperateNo R6NMmiddot2middot08RZ(replaces R6NM-Ol-08Rl) Draft Permit

emergency situatipns cartnot be used for peak shaying or non-emergency demand response or to generate income for afacilityto supply power as part o[a financiil arrangement with another entity [ 4QCFRsect 636640(pound)(3)]

446 Pertilitteemay operate Emissions Unit No 621 for any combination of the purposes specified In 40 CFR sect 636640(f)(2)(i)through (iii) for a maximum of 100 hours per calendar year Any operltJiiohfor non-emergency situations as ltJlloVlldby paragraphs 40 CFR sect 63 6640(f)(3) and (4) counts as part ofthe lOOhours per calendamp year allowed ]Jythisparagraph [40 CFRsect 636640(plusmn)(2)]

4S Clntinuous Compliance Requirements for Emissions Unit No 621

Emissions Unit No 621 shall be operated and maintained according to the manufacturers emission-rellited operation and maintenance instructions In the alternative permittee may develop and follow its own maintenance plan which nmst provide to the extent practicable for the maintenance and operation ofEmission Unit No 621 in a martner coiiSisteht with good air pollution control practice for minimizing emissions [40 CFRsect 636640(a) Table 6]

46 Recordkeeping Requirements for Emissions Unit No 621

4(il You mustkeep a copy of each notification and report submitted to comply with 40 CFR Part 63 Subpart ZZZZ including all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted accQrdingto 1herequirementin40 CFR sect~HO(b)(2)(xiv)

462 Records ofthe occurrence and duration of each malfunction ofoperatitm (ie process equipmellt) or any air pollution CQJltrQl and monitoring equipment

463 Records ofaii required maintenance performed on any airpollution control and monitoring equipment

464 The permittee must keep records of the pperating and maintenance conducted ltm Emissions Ulltt No 62 I necessary to ensure compliance with Condition45 above

47 Reporting Requirements (or Emissions Unit No 621

471 Permittee must report each instance in which an applicable emissions limitation operating limitation or requirement in 40 CFR Part 63 Subpart ZZZZ Table 2(c) is not met

9

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 TitleV Pennitto Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

472 These instances are deviations from the emission and operating limitations in 40 CFR Part 63 Subpart zzzz These deviations must be reported according to the requirements in 40 CFR sect 636650

5 Title Y Administrative Requirements

51 Annual Fee Payment [40 CFR sectsect 76(a)(7) and 719]

5I L The pe)Jlittee shall pay an annual permit fee in accordance with the procedures outlinedbelow [40 CFR sect 7l9(a)]

512 ]he )Je)Jlittee shall pay the annual permit fee each year The fee shall be received no later hail July 20 of each year

513 The fee payment shall be in United States currency and shall be paid by money order bank draft certified check corporate check or electronic funds transfer payable to the order ofEP A

514 Thepetmittee shall send fee payment and a completed fee filing form to

Forregular US postal service mail Fornon-US Postal Service express mail

(FedEx AirbomeDHL and UPS)

middotUS Environmental Protection Agency US Bank FOIA and Miscellaneous Payments Government Lockbox 979078 Cincinnati Finance Center US EPA FOfA amp Misc Payments PO Box 979078 1005 Convention Plaza St Louis MO 63197~9000 SL-MQcQ2-GL

St LouisM063101

Contact Craig Steffen 513-487-2091 Contact 314-418-1028 or Eric Volck513-487-2105

For electronic pavment (identifY permit number for payment in form)

Automated Clearinghouse (ACH) for receiving US currency PNCBank ABA 051036706 Account Number 310006 CTX Format Transaction Code 22 -checking

10

TranswestertrPipeline Company Compressor Station No6- Laguna Title V Permitto Operate No R6NMbull2-08R2 (replaces R6NM01~08R1)

121172015 )raft Permit

Environmental Protection Agency 808 17m Street NW Washington DC 20074

Contact Jesse White 301-887-6548

515 The pennitt~ shallsend an updated fee calculation wo~ksheet fonn and a photo~opy ofeach fee payment ~heck (or utherconfinnation ofactual fee paid) submitted annually by the same deadline as required for fee paymenUo the address listed in Section55 ofthis peimit [Note that anannual emissionsreport t~quired atthe same time as the feesalcUJaticmworksheet by40 CPRsect 719(h) has been incorporated intO the fee calculation worksheet fonn as aconvenience]

516 Basisfor~alculating annual fee

bull5161 The annual emissions fee shall be calculated by multiplying the total tons ofactual emissions of a11~egUlated pollutants (for fee calculation) emitted from the source by the emissions fee(in dollarston) in effect atthemiddottime of calculation

51611 Actual emissions means the actllal rate ofemissions in tons per year ofally regulated pollutant(for fee calculation) emitted from a part 71 source over thtl preceding calendar year Actual emissions shall be calcllhlted Using eachemissions units actual operating hours production rates in-place control equipment and types ofmaterials processed stored or combusted during the preceding ~endaryear [See 40 CPR sect 719(c)]

51612 If actual emissions cannot be detenninel )Jsipgthe compliance methods in the pennit the pennittee shall Use other fe~r~ly recognized procedures (40 CFR sect 719(e)(2)]

5L613 The term regulated pollutant (for fee calculation) is qefined in 40 CPR sect 712

51614 The permittee should note that the presumptive fee amount is revised each calendaryear to account for inflation and it is available from EPA prior to the start of each calendar year

5162 The pennittee shall excludethe following emissions from the calculation of fees ()

--middotmiddot--middot

ll

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

51621

51622

-----------------vFR+7-h9(e~)euroii

51623

The amount ofactual emissions ofeach regulated pollutant (for fee calculation) that the source emits in excess of 4000 tons per year See 40 CFR sect 719(c)(S)(i)

Actual emissions of any regulatedpollutant(for fee middot calculation) already included in the fee calculation See 40

The insignificant quantities of actual emissions not required to be listed or calculated in a permit application pursuant to 40 CPRsect 715(c)(11) [40 CPRsect 719(c)(5)(iii)]

517 Fee calculation worksheets shall be certifiedcas tottuthacclllacy and completeness by a responsible official in accordancewi1h 40 CPRsect 715(d)

518 The permittee shall retain fee calculation worksheets and other emissionsshyrelated data used to detennine fee payment for five years following submittal offee payment Elhission-related data include for example emissionsshyrelated forms provided by EPA and used by the pennittee for fee calculation pllrposes emissions-related spreadsheets and emissionsbullrelated data such as records of emissions monitoringdata and related support information required to be kept in accordance with40 CPRsect 716(a)(3)(ii) [See 40 CPR sect 79(i)]

519 Faihtreofthe permittee to pay fees in a timely manner shall subject the permittee to assessmentofpenalties and interest in accQIdancewith40CFR sect 719(1)

5110 The EPA will not act on applications forpermit renewal or modification if the permittee fails to pay all fees interest and penalties owed iri full [See 40 CPR sect 719(m))

5111 When notified by EPA of underpayment of fees the permittee shall remit full payment within 30 days of receipt of notification [See 40 CPR sect 7190)(1) and(2))

5Jl2 Ifthe permittee thinks that the EPA-assessed fee is in error and wishes to challenge the fee the permittee shall provide a written explanation of the alleged error to EPA along with filii payment of the assessed fee [See 40 CFR sect 71 90)(3))

52 Blankd Compliance Statement [40 CPRsectsect 716(a)(6)(i) and (H)]

12

Transwestern Pipeline Company Compressor Station No 6 - Laguna 121172015 CJ TitleVP~rmit to OperateNo R6NM-2-08R2 (replaces R6NM-0 I-08RI) Draft Permit

521 middot The permittee must comply with all conditions ofthis Part 71 permit Any permit noncompliance including Yiolation of any applicable requirement any permit(erm or condition any fee or filing requiteJTIent any duty tomiddotallow or CIIIT) out inspection entry or monitoring actiYities or any regulation or order issued bythe permitting authoritypursuatit to this part constitutes a Yiolation oftheCAA and is grounds for enforcement action permit termination reYocationand~essliance or modification or deni~l ofapertnit renewal application It shall notbe a defense for a permittee in an enforcement ~~ction that it would have been necessary to halt or reduce the permitted actiYity in order to m11intairi compliance with the conditions of this perrnit[40CFR sectsect 716(a)(6)(i)atid(ii)]

Determinations of deYiations continuous or intermittent compliance sts or YiOIItions of this perrnit are not limited to theapplic~ible testing or monitoring methods required by the underlying regulations of thispermit other credible eYidencemust be considered in such determinations [Section 113~a) and 113(e)(l) oftheCAA] middot

i

53 Compliance Certifications[40 CFR sect 716(c)(5)]

I The permittee shall submit to EPA a certificationof compliance withpermit terms and conditions including emission limitations standards or work practices armually Clch year no later thiU April 1 The compliance certification shall coYer tlte same 12 month period as the two consecutiYe semi-atinu~~l monitoring reports The compliance certification shall be certified as to truth accuracyandcompleteness by a responsible official consistent with 4() CFR sect 715(d)

middot 5dl The certification shall includethefollowing

5311 Identification ofeach permit teim or condition that is the basis ofthe certification

5312 Identification ofthe method(s) or other means used for detrmining the compliance status with lteach term and condition during the certification period and whether such methods or other means proYide continuous or intermittentdata If necessary the owner or operator also shall identify any other material infortnation eg operating hours records that must be included in the certification to

middot comply with section 13(c)(2) of the CAA which prohibits knowingly making afalse certification or omitting material 1 information

I i 13middot

I I

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 14: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

()Transwestern Pipeline Company Compressor Station No 6 Laguna 1211712015 TitleV Permitto Operate No R6NM-2-08R2replaces R6NMOl-08RI) Draft Permit

327 The permittee shall keep records of the serial numbers for each e111ission unit The e111ission ll1its f()rthe RICE and thlir serial nJll11bers are UnitNo 601 withserial nJll11ber 107510 Unit No 602 With serial numo(lr l075UUnitNo 603 with serial number 107512 Unit No 621 with serial number 129011

328 Retenti9n of reltprds ami support information shall be for a period ofat least five years from the date ofmeasurement or report Supportinfonnation includes all calibrationandmamtenance records all origin~ strip-chartrecordings or monitoring instrumeitation and copiltsofall reports [qujJedby thisj)ennjt

329 The pllrmitteeshlill submittothe EPAreportsofany monitoring and recpr~eeping required under this permit8emi-annually )Jy April 1 and O~tober 1of ealtlth year The report due on April l shall cover the prior six--month period from September 1 through the end of February The report due on October l shall cover the prior sixshymonthperiod from March 1 through the end pfAugust

Copies ofthese tecotdsshall also besentto

Environmental Direct()r Pueblo of Laguna PO BoxJ94 Laguna NM 87026

4 EnginllNESHAgtRequirements

41 General Provisions

Thepennittee shalLci)mplywithth(l requirements [rom the NE$HAP General Pfqvisions 40 CFR Part 63 Subpart Afor Emissions Unit No 621 only

42 Requirements for Emissilaquonls UnitNo 6~1I l

421 For Emissions Unit No 621the perniitteeshallmeet the requirements in 422 through 424 below

422 Change oil and filter every 500 hours of operation or annually whichever comes first inspect air cleaner every 1000 hours ofoperation or annually whichever comes first and replace as necessary and inspect aU hoses and

I 7

I

Transwestem Pipeline Company Compressor Station No 6 Laguna 1217205 Title V Permitto Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

belts every 500 hours of operation or annually whichever comes first and replace as necessary [40 CFR sect 636002 Table 2c]

423 Minimize the enginestime spent at idle and minimize the engines startup time at startup to a period needed for appropriate and safe loading ofthe engine not to exceed 30minutesafter which time the non-startup emission

---------~---limitations~pply-[40-CFR--sect6~6002--Iable-2G~~-------------c-t

424 Permittee must install ~~non-resettable hour meter ifone is not already installed [40 CFR sect 636625(f)]

43 General Compliance Requirements for Unit No 621

431 Emissions Unit No 621 must be incompliance with the operating limitations and requirements in Condition 42 at~~ll times [ 40 CFR sect 636605(a)]

432 The permittee must operate and maintain Unit No 621 including air pollution control and monitoring equipment in a manner consistent with good air pollution control practices for minimizing emissions [ 40 CFR sect 636605(b)]

44 Perfonnanee Requirements for Unit No 621

441 As an emergency stationary RICE the permittee must operate Emissions Unit No 621 accordingtotherequirementsof40CFR sect 636640(plusmn)

442 Any operation other than emergency operation maintenance and testing emergency demand response and operation in non-emergency situations for 50 hours per year as described in paragraphs f(l) throug( 4) of40 CFR sect 636640 is prohibited [ 40 CFR sect 636640(plusmn))

443 IfEmissions Unit No 621 is not operated according to the requirements in 40 CFR sect 636640(plusmn)(1) through (f)(4) Emissions Uhit No 621 will not be considered an emergency stationary RICE and it must meet all requirements for non-emergency engines [40 CFR sect 636640(plusmn)]

444 There is no time limit on the use 0femergency stationary RICE in emergency situations [40 CFR sect 636640(plusmn)(2)] middot

445 Emissions Unit No 621 may be operated for up to 50 hours per calendar year in non-emergency situations The 50 hours per year for nonshy

8

Transwestem Pipeline Company Compressor Station No 6 bull Laguna 12fl72015 Title V PermiHo QperateNo R6NMmiddot2middot08RZ(replaces R6NM-Ol-08Rl) Draft Permit

emergency situatipns cartnot be used for peak shaying or non-emergency demand response or to generate income for afacilityto supply power as part o[a financiil arrangement with another entity [ 4QCFRsect 636640(pound)(3)]

446 Pertilitteemay operate Emissions Unit No 621 for any combination of the purposes specified In 40 CFR sect 636640(f)(2)(i)through (iii) for a maximum of 100 hours per calendar year Any operltJiiohfor non-emergency situations as ltJlloVlldby paragraphs 40 CFR sect 63 6640(f)(3) and (4) counts as part ofthe lOOhours per calendamp year allowed ]Jythisparagraph [40 CFRsect 636640(plusmn)(2)]

4S Clntinuous Compliance Requirements for Emissions Unit No 621

Emissions Unit No 621 shall be operated and maintained according to the manufacturers emission-rellited operation and maintenance instructions In the alternative permittee may develop and follow its own maintenance plan which nmst provide to the extent practicable for the maintenance and operation ofEmission Unit No 621 in a martner coiiSisteht with good air pollution control practice for minimizing emissions [40 CFRsect 636640(a) Table 6]

46 Recordkeeping Requirements for Emissions Unit No 621

4(il You mustkeep a copy of each notification and report submitted to comply with 40 CFR Part 63 Subpart ZZZZ including all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted accQrdingto 1herequirementin40 CFR sect~HO(b)(2)(xiv)

462 Records ofthe occurrence and duration of each malfunction ofoperatitm (ie process equipmellt) or any air pollution CQJltrQl and monitoring equipment

463 Records ofaii required maintenance performed on any airpollution control and monitoring equipment

464 The permittee must keep records of the pperating and maintenance conducted ltm Emissions Ulltt No 62 I necessary to ensure compliance with Condition45 above

47 Reporting Requirements (or Emissions Unit No 621

471 Permittee must report each instance in which an applicable emissions limitation operating limitation or requirement in 40 CFR Part 63 Subpart ZZZZ Table 2(c) is not met

9

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 TitleV Pennitto Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

472 These instances are deviations from the emission and operating limitations in 40 CFR Part 63 Subpart zzzz These deviations must be reported according to the requirements in 40 CFR sect 636650

5 Title Y Administrative Requirements

51 Annual Fee Payment [40 CFR sectsect 76(a)(7) and 719]

5I L The pe)Jlittee shall pay an annual permit fee in accordance with the procedures outlinedbelow [40 CFR sect 7l9(a)]

512 ]he )Je)Jlittee shall pay the annual permit fee each year The fee shall be received no later hail July 20 of each year

513 The fee payment shall be in United States currency and shall be paid by money order bank draft certified check corporate check or electronic funds transfer payable to the order ofEP A

514 Thepetmittee shall send fee payment and a completed fee filing form to

Forregular US postal service mail Fornon-US Postal Service express mail

(FedEx AirbomeDHL and UPS)

middotUS Environmental Protection Agency US Bank FOIA and Miscellaneous Payments Government Lockbox 979078 Cincinnati Finance Center US EPA FOfA amp Misc Payments PO Box 979078 1005 Convention Plaza St Louis MO 63197~9000 SL-MQcQ2-GL

St LouisM063101

Contact Craig Steffen 513-487-2091 Contact 314-418-1028 or Eric Volck513-487-2105

For electronic pavment (identifY permit number for payment in form)

Automated Clearinghouse (ACH) for receiving US currency PNCBank ABA 051036706 Account Number 310006 CTX Format Transaction Code 22 -checking

10

TranswestertrPipeline Company Compressor Station No6- Laguna Title V Permitto Operate No R6NMbull2-08R2 (replaces R6NM01~08R1)

121172015 )raft Permit

Environmental Protection Agency 808 17m Street NW Washington DC 20074

Contact Jesse White 301-887-6548

515 The pennitt~ shallsend an updated fee calculation wo~ksheet fonn and a photo~opy ofeach fee payment ~heck (or utherconfinnation ofactual fee paid) submitted annually by the same deadline as required for fee paymenUo the address listed in Section55 ofthis peimit [Note that anannual emissionsreport t~quired atthe same time as the feesalcUJaticmworksheet by40 CPRsect 719(h) has been incorporated intO the fee calculation worksheet fonn as aconvenience]

516 Basisfor~alculating annual fee

bull5161 The annual emissions fee shall be calculated by multiplying the total tons ofactual emissions of a11~egUlated pollutants (for fee calculation) emitted from the source by the emissions fee(in dollarston) in effect atthemiddottime of calculation

51611 Actual emissions means the actllal rate ofemissions in tons per year ofally regulated pollutant(for fee calculation) emitted from a part 71 source over thtl preceding calendar year Actual emissions shall be calcllhlted Using eachemissions units actual operating hours production rates in-place control equipment and types ofmaterials processed stored or combusted during the preceding ~endaryear [See 40 CPR sect 719(c)]

51612 If actual emissions cannot be detenninel )Jsipgthe compliance methods in the pennit the pennittee shall Use other fe~r~ly recognized procedures (40 CFR sect 719(e)(2)]

5L613 The term regulated pollutant (for fee calculation) is qefined in 40 CPR sect 712

51614 The permittee should note that the presumptive fee amount is revised each calendaryear to account for inflation and it is available from EPA prior to the start of each calendar year

5162 The pennittee shall excludethe following emissions from the calculation of fees ()

--middotmiddot--middot

ll

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

51621

51622

-----------------vFR+7-h9(e~)euroii

51623

The amount ofactual emissions ofeach regulated pollutant (for fee calculation) that the source emits in excess of 4000 tons per year See 40 CFR sect 719(c)(S)(i)

Actual emissions of any regulatedpollutant(for fee middot calculation) already included in the fee calculation See 40

The insignificant quantities of actual emissions not required to be listed or calculated in a permit application pursuant to 40 CPRsect 715(c)(11) [40 CPRsect 719(c)(5)(iii)]

517 Fee calculation worksheets shall be certifiedcas tottuthacclllacy and completeness by a responsible official in accordancewi1h 40 CPRsect 715(d)

518 The permittee shall retain fee calculation worksheets and other emissionsshyrelated data used to detennine fee payment for five years following submittal offee payment Elhission-related data include for example emissionsshyrelated forms provided by EPA and used by the pennittee for fee calculation pllrposes emissions-related spreadsheets and emissionsbullrelated data such as records of emissions monitoringdata and related support information required to be kept in accordance with40 CPRsect 716(a)(3)(ii) [See 40 CPR sect 79(i)]

519 Faihtreofthe permittee to pay fees in a timely manner shall subject the permittee to assessmentofpenalties and interest in accQIdancewith40CFR sect 719(1)

5110 The EPA will not act on applications forpermit renewal or modification if the permittee fails to pay all fees interest and penalties owed iri full [See 40 CPR sect 719(m))

5111 When notified by EPA of underpayment of fees the permittee shall remit full payment within 30 days of receipt of notification [See 40 CPR sect 7190)(1) and(2))

5Jl2 Ifthe permittee thinks that the EPA-assessed fee is in error and wishes to challenge the fee the permittee shall provide a written explanation of the alleged error to EPA along with filii payment of the assessed fee [See 40 CFR sect 71 90)(3))

52 Blankd Compliance Statement [40 CPRsectsect 716(a)(6)(i) and (H)]

12

Transwestern Pipeline Company Compressor Station No 6 - Laguna 121172015 CJ TitleVP~rmit to OperateNo R6NM-2-08R2 (replaces R6NM-0 I-08RI) Draft Permit

521 middot The permittee must comply with all conditions ofthis Part 71 permit Any permit noncompliance including Yiolation of any applicable requirement any permit(erm or condition any fee or filing requiteJTIent any duty tomiddotallow or CIIIT) out inspection entry or monitoring actiYities or any regulation or order issued bythe permitting authoritypursuatit to this part constitutes a Yiolation oftheCAA and is grounds for enforcement action permit termination reYocationand~essliance or modification or deni~l ofapertnit renewal application It shall notbe a defense for a permittee in an enforcement ~~ction that it would have been necessary to halt or reduce the permitted actiYity in order to m11intairi compliance with the conditions of this perrnit[40CFR sectsect 716(a)(6)(i)atid(ii)]

Determinations of deYiations continuous or intermittent compliance sts or YiOIItions of this perrnit are not limited to theapplic~ible testing or monitoring methods required by the underlying regulations of thispermit other credible eYidencemust be considered in such determinations [Section 113~a) and 113(e)(l) oftheCAA] middot

i

53 Compliance Certifications[40 CFR sect 716(c)(5)]

I The permittee shall submit to EPA a certificationof compliance withpermit terms and conditions including emission limitations standards or work practices armually Clch year no later thiU April 1 The compliance certification shall coYer tlte same 12 month period as the two consecutiYe semi-atinu~~l monitoring reports The compliance certification shall be certified as to truth accuracyandcompleteness by a responsible official consistent with 4() CFR sect 715(d)

middot 5dl The certification shall includethefollowing

5311 Identification ofeach permit teim or condition that is the basis ofthe certification

5312 Identification ofthe method(s) or other means used for detrmining the compliance status with lteach term and condition during the certification period and whether such methods or other means proYide continuous or intermittentdata If necessary the owner or operator also shall identify any other material infortnation eg operating hours records that must be included in the certification to

middot comply with section 13(c)(2) of the CAA which prohibits knowingly making afalse certification or omitting material 1 information

I i 13middot

I I

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 15: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

Transwestem Pipeline Company Compressor Station No 6 Laguna 1217205 Title V Permitto Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

belts every 500 hours of operation or annually whichever comes first and replace as necessary [40 CFR sect 636002 Table 2c]

423 Minimize the enginestime spent at idle and minimize the engines startup time at startup to a period needed for appropriate and safe loading ofthe engine not to exceed 30minutesafter which time the non-startup emission

---------~---limitations~pply-[40-CFR--sect6~6002--Iable-2G~~-------------c-t

424 Permittee must install ~~non-resettable hour meter ifone is not already installed [40 CFR sect 636625(f)]

43 General Compliance Requirements for Unit No 621

431 Emissions Unit No 621 must be incompliance with the operating limitations and requirements in Condition 42 at~~ll times [ 40 CFR sect 636605(a)]

432 The permittee must operate and maintain Unit No 621 including air pollution control and monitoring equipment in a manner consistent with good air pollution control practices for minimizing emissions [ 40 CFR sect 636605(b)]

44 Perfonnanee Requirements for Unit No 621

441 As an emergency stationary RICE the permittee must operate Emissions Unit No 621 accordingtotherequirementsof40CFR sect 636640(plusmn)

442 Any operation other than emergency operation maintenance and testing emergency demand response and operation in non-emergency situations for 50 hours per year as described in paragraphs f(l) throug( 4) of40 CFR sect 636640 is prohibited [ 40 CFR sect 636640(plusmn))

443 IfEmissions Unit No 621 is not operated according to the requirements in 40 CFR sect 636640(plusmn)(1) through (f)(4) Emissions Uhit No 621 will not be considered an emergency stationary RICE and it must meet all requirements for non-emergency engines [40 CFR sect 636640(plusmn)]

444 There is no time limit on the use 0femergency stationary RICE in emergency situations [40 CFR sect 636640(plusmn)(2)] middot

445 Emissions Unit No 621 may be operated for up to 50 hours per calendar year in non-emergency situations The 50 hours per year for nonshy

8

Transwestem Pipeline Company Compressor Station No 6 bull Laguna 12fl72015 Title V PermiHo QperateNo R6NMmiddot2middot08RZ(replaces R6NM-Ol-08Rl) Draft Permit

emergency situatipns cartnot be used for peak shaying or non-emergency demand response or to generate income for afacilityto supply power as part o[a financiil arrangement with another entity [ 4QCFRsect 636640(pound)(3)]

446 Pertilitteemay operate Emissions Unit No 621 for any combination of the purposes specified In 40 CFR sect 636640(f)(2)(i)through (iii) for a maximum of 100 hours per calendar year Any operltJiiohfor non-emergency situations as ltJlloVlldby paragraphs 40 CFR sect 63 6640(f)(3) and (4) counts as part ofthe lOOhours per calendamp year allowed ]Jythisparagraph [40 CFRsect 636640(plusmn)(2)]

4S Clntinuous Compliance Requirements for Emissions Unit No 621

Emissions Unit No 621 shall be operated and maintained according to the manufacturers emission-rellited operation and maintenance instructions In the alternative permittee may develop and follow its own maintenance plan which nmst provide to the extent practicable for the maintenance and operation ofEmission Unit No 621 in a martner coiiSisteht with good air pollution control practice for minimizing emissions [40 CFRsect 636640(a) Table 6]

46 Recordkeeping Requirements for Emissions Unit No 621

4(il You mustkeep a copy of each notification and report submitted to comply with 40 CFR Part 63 Subpart ZZZZ including all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted accQrdingto 1herequirementin40 CFR sect~HO(b)(2)(xiv)

462 Records ofthe occurrence and duration of each malfunction ofoperatitm (ie process equipmellt) or any air pollution CQJltrQl and monitoring equipment

463 Records ofaii required maintenance performed on any airpollution control and monitoring equipment

464 The permittee must keep records of the pperating and maintenance conducted ltm Emissions Ulltt No 62 I necessary to ensure compliance with Condition45 above

47 Reporting Requirements (or Emissions Unit No 621

471 Permittee must report each instance in which an applicable emissions limitation operating limitation or requirement in 40 CFR Part 63 Subpart ZZZZ Table 2(c) is not met

9

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 TitleV Pennitto Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

472 These instances are deviations from the emission and operating limitations in 40 CFR Part 63 Subpart zzzz These deviations must be reported according to the requirements in 40 CFR sect 636650

5 Title Y Administrative Requirements

51 Annual Fee Payment [40 CFR sectsect 76(a)(7) and 719]

5I L The pe)Jlittee shall pay an annual permit fee in accordance with the procedures outlinedbelow [40 CFR sect 7l9(a)]

512 ]he )Je)Jlittee shall pay the annual permit fee each year The fee shall be received no later hail July 20 of each year

513 The fee payment shall be in United States currency and shall be paid by money order bank draft certified check corporate check or electronic funds transfer payable to the order ofEP A

514 Thepetmittee shall send fee payment and a completed fee filing form to

Forregular US postal service mail Fornon-US Postal Service express mail

(FedEx AirbomeDHL and UPS)

middotUS Environmental Protection Agency US Bank FOIA and Miscellaneous Payments Government Lockbox 979078 Cincinnati Finance Center US EPA FOfA amp Misc Payments PO Box 979078 1005 Convention Plaza St Louis MO 63197~9000 SL-MQcQ2-GL

St LouisM063101

Contact Craig Steffen 513-487-2091 Contact 314-418-1028 or Eric Volck513-487-2105

For electronic pavment (identifY permit number for payment in form)

Automated Clearinghouse (ACH) for receiving US currency PNCBank ABA 051036706 Account Number 310006 CTX Format Transaction Code 22 -checking

10

TranswestertrPipeline Company Compressor Station No6- Laguna Title V Permitto Operate No R6NMbull2-08R2 (replaces R6NM01~08R1)

121172015 )raft Permit

Environmental Protection Agency 808 17m Street NW Washington DC 20074

Contact Jesse White 301-887-6548

515 The pennitt~ shallsend an updated fee calculation wo~ksheet fonn and a photo~opy ofeach fee payment ~heck (or utherconfinnation ofactual fee paid) submitted annually by the same deadline as required for fee paymenUo the address listed in Section55 ofthis peimit [Note that anannual emissionsreport t~quired atthe same time as the feesalcUJaticmworksheet by40 CPRsect 719(h) has been incorporated intO the fee calculation worksheet fonn as aconvenience]

516 Basisfor~alculating annual fee

bull5161 The annual emissions fee shall be calculated by multiplying the total tons ofactual emissions of a11~egUlated pollutants (for fee calculation) emitted from the source by the emissions fee(in dollarston) in effect atthemiddottime of calculation

51611 Actual emissions means the actllal rate ofemissions in tons per year ofally regulated pollutant(for fee calculation) emitted from a part 71 source over thtl preceding calendar year Actual emissions shall be calcllhlted Using eachemissions units actual operating hours production rates in-place control equipment and types ofmaterials processed stored or combusted during the preceding ~endaryear [See 40 CPR sect 719(c)]

51612 If actual emissions cannot be detenninel )Jsipgthe compliance methods in the pennit the pennittee shall Use other fe~r~ly recognized procedures (40 CFR sect 719(e)(2)]

5L613 The term regulated pollutant (for fee calculation) is qefined in 40 CPR sect 712

51614 The permittee should note that the presumptive fee amount is revised each calendaryear to account for inflation and it is available from EPA prior to the start of each calendar year

5162 The pennittee shall excludethe following emissions from the calculation of fees ()

--middotmiddot--middot

ll

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

51621

51622

-----------------vFR+7-h9(e~)euroii

51623

The amount ofactual emissions ofeach regulated pollutant (for fee calculation) that the source emits in excess of 4000 tons per year See 40 CFR sect 719(c)(S)(i)

Actual emissions of any regulatedpollutant(for fee middot calculation) already included in the fee calculation See 40

The insignificant quantities of actual emissions not required to be listed or calculated in a permit application pursuant to 40 CPRsect 715(c)(11) [40 CPRsect 719(c)(5)(iii)]

517 Fee calculation worksheets shall be certifiedcas tottuthacclllacy and completeness by a responsible official in accordancewi1h 40 CPRsect 715(d)

518 The permittee shall retain fee calculation worksheets and other emissionsshyrelated data used to detennine fee payment for five years following submittal offee payment Elhission-related data include for example emissionsshyrelated forms provided by EPA and used by the pennittee for fee calculation pllrposes emissions-related spreadsheets and emissionsbullrelated data such as records of emissions monitoringdata and related support information required to be kept in accordance with40 CPRsect 716(a)(3)(ii) [See 40 CPR sect 79(i)]

519 Faihtreofthe permittee to pay fees in a timely manner shall subject the permittee to assessmentofpenalties and interest in accQIdancewith40CFR sect 719(1)

5110 The EPA will not act on applications forpermit renewal or modification if the permittee fails to pay all fees interest and penalties owed iri full [See 40 CPR sect 719(m))

5111 When notified by EPA of underpayment of fees the permittee shall remit full payment within 30 days of receipt of notification [See 40 CPR sect 7190)(1) and(2))

5Jl2 Ifthe permittee thinks that the EPA-assessed fee is in error and wishes to challenge the fee the permittee shall provide a written explanation of the alleged error to EPA along with filii payment of the assessed fee [See 40 CFR sect 71 90)(3))

52 Blankd Compliance Statement [40 CPRsectsect 716(a)(6)(i) and (H)]

12

Transwestern Pipeline Company Compressor Station No 6 - Laguna 121172015 CJ TitleVP~rmit to OperateNo R6NM-2-08R2 (replaces R6NM-0 I-08RI) Draft Permit

521 middot The permittee must comply with all conditions ofthis Part 71 permit Any permit noncompliance including Yiolation of any applicable requirement any permit(erm or condition any fee or filing requiteJTIent any duty tomiddotallow or CIIIT) out inspection entry or monitoring actiYities or any regulation or order issued bythe permitting authoritypursuatit to this part constitutes a Yiolation oftheCAA and is grounds for enforcement action permit termination reYocationand~essliance or modification or deni~l ofapertnit renewal application It shall notbe a defense for a permittee in an enforcement ~~ction that it would have been necessary to halt or reduce the permitted actiYity in order to m11intairi compliance with the conditions of this perrnit[40CFR sectsect 716(a)(6)(i)atid(ii)]

Determinations of deYiations continuous or intermittent compliance sts or YiOIItions of this perrnit are not limited to theapplic~ible testing or monitoring methods required by the underlying regulations of thispermit other credible eYidencemust be considered in such determinations [Section 113~a) and 113(e)(l) oftheCAA] middot

i

53 Compliance Certifications[40 CFR sect 716(c)(5)]

I The permittee shall submit to EPA a certificationof compliance withpermit terms and conditions including emission limitations standards or work practices armually Clch year no later thiU April 1 The compliance certification shall coYer tlte same 12 month period as the two consecutiYe semi-atinu~~l monitoring reports The compliance certification shall be certified as to truth accuracyandcompleteness by a responsible official consistent with 4() CFR sect 715(d)

middot 5dl The certification shall includethefollowing

5311 Identification ofeach permit teim or condition that is the basis ofthe certification

5312 Identification ofthe method(s) or other means used for detrmining the compliance status with lteach term and condition during the certification period and whether such methods or other means proYide continuous or intermittentdata If necessary the owner or operator also shall identify any other material infortnation eg operating hours records that must be included in the certification to

middot comply with section 13(c)(2) of the CAA which prohibits knowingly making afalse certification or omitting material 1 information

I i 13middot

I I

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 16: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

Transwestem Pipeline Company Compressor Station No 6 bull Laguna 12fl72015 Title V PermiHo QperateNo R6NMmiddot2middot08RZ(replaces R6NM-Ol-08Rl) Draft Permit

emergency situatipns cartnot be used for peak shaying or non-emergency demand response or to generate income for afacilityto supply power as part o[a financiil arrangement with another entity [ 4QCFRsect 636640(pound)(3)]

446 Pertilitteemay operate Emissions Unit No 621 for any combination of the purposes specified In 40 CFR sect 636640(f)(2)(i)through (iii) for a maximum of 100 hours per calendar year Any operltJiiohfor non-emergency situations as ltJlloVlldby paragraphs 40 CFR sect 63 6640(f)(3) and (4) counts as part ofthe lOOhours per calendamp year allowed ]Jythisparagraph [40 CFRsect 636640(plusmn)(2)]

4S Clntinuous Compliance Requirements for Emissions Unit No 621

Emissions Unit No 621 shall be operated and maintained according to the manufacturers emission-rellited operation and maintenance instructions In the alternative permittee may develop and follow its own maintenance plan which nmst provide to the extent practicable for the maintenance and operation ofEmission Unit No 621 in a martner coiiSisteht with good air pollution control practice for minimizing emissions [40 CFRsect 636640(a) Table 6]

46 Recordkeeping Requirements for Emissions Unit No 621

4(il You mustkeep a copy of each notification and report submitted to comply with 40 CFR Part 63 Subpart ZZZZ including all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted accQrdingto 1herequirementin40 CFR sect~HO(b)(2)(xiv)

462 Records ofthe occurrence and duration of each malfunction ofoperatitm (ie process equipmellt) or any air pollution CQJltrQl and monitoring equipment

463 Records ofaii required maintenance performed on any airpollution control and monitoring equipment

464 The permittee must keep records of the pperating and maintenance conducted ltm Emissions Ulltt No 62 I necessary to ensure compliance with Condition45 above

47 Reporting Requirements (or Emissions Unit No 621

471 Permittee must report each instance in which an applicable emissions limitation operating limitation or requirement in 40 CFR Part 63 Subpart ZZZZ Table 2(c) is not met

9

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 TitleV Pennitto Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

472 These instances are deviations from the emission and operating limitations in 40 CFR Part 63 Subpart zzzz These deviations must be reported according to the requirements in 40 CFR sect 636650

5 Title Y Administrative Requirements

51 Annual Fee Payment [40 CFR sectsect 76(a)(7) and 719]

5I L The pe)Jlittee shall pay an annual permit fee in accordance with the procedures outlinedbelow [40 CFR sect 7l9(a)]

512 ]he )Je)Jlittee shall pay the annual permit fee each year The fee shall be received no later hail July 20 of each year

513 The fee payment shall be in United States currency and shall be paid by money order bank draft certified check corporate check or electronic funds transfer payable to the order ofEP A

514 Thepetmittee shall send fee payment and a completed fee filing form to

Forregular US postal service mail Fornon-US Postal Service express mail

(FedEx AirbomeDHL and UPS)

middotUS Environmental Protection Agency US Bank FOIA and Miscellaneous Payments Government Lockbox 979078 Cincinnati Finance Center US EPA FOfA amp Misc Payments PO Box 979078 1005 Convention Plaza St Louis MO 63197~9000 SL-MQcQ2-GL

St LouisM063101

Contact Craig Steffen 513-487-2091 Contact 314-418-1028 or Eric Volck513-487-2105

For electronic pavment (identifY permit number for payment in form)

Automated Clearinghouse (ACH) for receiving US currency PNCBank ABA 051036706 Account Number 310006 CTX Format Transaction Code 22 -checking

10

TranswestertrPipeline Company Compressor Station No6- Laguna Title V Permitto Operate No R6NMbull2-08R2 (replaces R6NM01~08R1)

121172015 )raft Permit

Environmental Protection Agency 808 17m Street NW Washington DC 20074

Contact Jesse White 301-887-6548

515 The pennitt~ shallsend an updated fee calculation wo~ksheet fonn and a photo~opy ofeach fee payment ~heck (or utherconfinnation ofactual fee paid) submitted annually by the same deadline as required for fee paymenUo the address listed in Section55 ofthis peimit [Note that anannual emissionsreport t~quired atthe same time as the feesalcUJaticmworksheet by40 CPRsect 719(h) has been incorporated intO the fee calculation worksheet fonn as aconvenience]

516 Basisfor~alculating annual fee

bull5161 The annual emissions fee shall be calculated by multiplying the total tons ofactual emissions of a11~egUlated pollutants (for fee calculation) emitted from the source by the emissions fee(in dollarston) in effect atthemiddottime of calculation

51611 Actual emissions means the actllal rate ofemissions in tons per year ofally regulated pollutant(for fee calculation) emitted from a part 71 source over thtl preceding calendar year Actual emissions shall be calcllhlted Using eachemissions units actual operating hours production rates in-place control equipment and types ofmaterials processed stored or combusted during the preceding ~endaryear [See 40 CPR sect 719(c)]

51612 If actual emissions cannot be detenninel )Jsipgthe compliance methods in the pennit the pennittee shall Use other fe~r~ly recognized procedures (40 CFR sect 719(e)(2)]

5L613 The term regulated pollutant (for fee calculation) is qefined in 40 CPR sect 712

51614 The permittee should note that the presumptive fee amount is revised each calendaryear to account for inflation and it is available from EPA prior to the start of each calendar year

5162 The pennittee shall excludethe following emissions from the calculation of fees ()

--middotmiddot--middot

ll

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

51621

51622

-----------------vFR+7-h9(e~)euroii

51623

The amount ofactual emissions ofeach regulated pollutant (for fee calculation) that the source emits in excess of 4000 tons per year See 40 CFR sect 719(c)(S)(i)

Actual emissions of any regulatedpollutant(for fee middot calculation) already included in the fee calculation See 40

The insignificant quantities of actual emissions not required to be listed or calculated in a permit application pursuant to 40 CPRsect 715(c)(11) [40 CPRsect 719(c)(5)(iii)]

517 Fee calculation worksheets shall be certifiedcas tottuthacclllacy and completeness by a responsible official in accordancewi1h 40 CPRsect 715(d)

518 The permittee shall retain fee calculation worksheets and other emissionsshyrelated data used to detennine fee payment for five years following submittal offee payment Elhission-related data include for example emissionsshyrelated forms provided by EPA and used by the pennittee for fee calculation pllrposes emissions-related spreadsheets and emissionsbullrelated data such as records of emissions monitoringdata and related support information required to be kept in accordance with40 CPRsect 716(a)(3)(ii) [See 40 CPR sect 79(i)]

519 Faihtreofthe permittee to pay fees in a timely manner shall subject the permittee to assessmentofpenalties and interest in accQIdancewith40CFR sect 719(1)

5110 The EPA will not act on applications forpermit renewal or modification if the permittee fails to pay all fees interest and penalties owed iri full [See 40 CPR sect 719(m))

5111 When notified by EPA of underpayment of fees the permittee shall remit full payment within 30 days of receipt of notification [See 40 CPR sect 7190)(1) and(2))

5Jl2 Ifthe permittee thinks that the EPA-assessed fee is in error and wishes to challenge the fee the permittee shall provide a written explanation of the alleged error to EPA along with filii payment of the assessed fee [See 40 CFR sect 71 90)(3))

52 Blankd Compliance Statement [40 CPRsectsect 716(a)(6)(i) and (H)]

12

Transwestern Pipeline Company Compressor Station No 6 - Laguna 121172015 CJ TitleVP~rmit to OperateNo R6NM-2-08R2 (replaces R6NM-0 I-08RI) Draft Permit

521 middot The permittee must comply with all conditions ofthis Part 71 permit Any permit noncompliance including Yiolation of any applicable requirement any permit(erm or condition any fee or filing requiteJTIent any duty tomiddotallow or CIIIT) out inspection entry or monitoring actiYities or any regulation or order issued bythe permitting authoritypursuatit to this part constitutes a Yiolation oftheCAA and is grounds for enforcement action permit termination reYocationand~essliance or modification or deni~l ofapertnit renewal application It shall notbe a defense for a permittee in an enforcement ~~ction that it would have been necessary to halt or reduce the permitted actiYity in order to m11intairi compliance with the conditions of this perrnit[40CFR sectsect 716(a)(6)(i)atid(ii)]

Determinations of deYiations continuous or intermittent compliance sts or YiOIItions of this perrnit are not limited to theapplic~ible testing or monitoring methods required by the underlying regulations of thispermit other credible eYidencemust be considered in such determinations [Section 113~a) and 113(e)(l) oftheCAA] middot

i

53 Compliance Certifications[40 CFR sect 716(c)(5)]

I The permittee shall submit to EPA a certificationof compliance withpermit terms and conditions including emission limitations standards or work practices armually Clch year no later thiU April 1 The compliance certification shall coYer tlte same 12 month period as the two consecutiYe semi-atinu~~l monitoring reports The compliance certification shall be certified as to truth accuracyandcompleteness by a responsible official consistent with 4() CFR sect 715(d)

middot 5dl The certification shall includethefollowing

5311 Identification ofeach permit teim or condition that is the basis ofthe certification

5312 Identification ofthe method(s) or other means used for detrmining the compliance status with lteach term and condition during the certification period and whether such methods or other means proYide continuous or intermittentdata If necessary the owner or operator also shall identify any other material infortnation eg operating hours records that must be included in the certification to

middot comply with section 13(c)(2) of the CAA which prohibits knowingly making afalse certification or omitting material 1 information

I i 13middot

I I

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 17: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 TitleV Pennitto Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

472 These instances are deviations from the emission and operating limitations in 40 CFR Part 63 Subpart zzzz These deviations must be reported according to the requirements in 40 CFR sect 636650

5 Title Y Administrative Requirements

51 Annual Fee Payment [40 CFR sectsect 76(a)(7) and 719]

5I L The pe)Jlittee shall pay an annual permit fee in accordance with the procedures outlinedbelow [40 CFR sect 7l9(a)]

512 ]he )Je)Jlittee shall pay the annual permit fee each year The fee shall be received no later hail July 20 of each year

513 The fee payment shall be in United States currency and shall be paid by money order bank draft certified check corporate check or electronic funds transfer payable to the order ofEP A

514 Thepetmittee shall send fee payment and a completed fee filing form to

Forregular US postal service mail Fornon-US Postal Service express mail

(FedEx AirbomeDHL and UPS)

middotUS Environmental Protection Agency US Bank FOIA and Miscellaneous Payments Government Lockbox 979078 Cincinnati Finance Center US EPA FOfA amp Misc Payments PO Box 979078 1005 Convention Plaza St Louis MO 63197~9000 SL-MQcQ2-GL

St LouisM063101

Contact Craig Steffen 513-487-2091 Contact 314-418-1028 or Eric Volck513-487-2105

For electronic pavment (identifY permit number for payment in form)

Automated Clearinghouse (ACH) for receiving US currency PNCBank ABA 051036706 Account Number 310006 CTX Format Transaction Code 22 -checking

10

TranswestertrPipeline Company Compressor Station No6- Laguna Title V Permitto Operate No R6NMbull2-08R2 (replaces R6NM01~08R1)

121172015 )raft Permit

Environmental Protection Agency 808 17m Street NW Washington DC 20074

Contact Jesse White 301-887-6548

515 The pennitt~ shallsend an updated fee calculation wo~ksheet fonn and a photo~opy ofeach fee payment ~heck (or utherconfinnation ofactual fee paid) submitted annually by the same deadline as required for fee paymenUo the address listed in Section55 ofthis peimit [Note that anannual emissionsreport t~quired atthe same time as the feesalcUJaticmworksheet by40 CPRsect 719(h) has been incorporated intO the fee calculation worksheet fonn as aconvenience]

516 Basisfor~alculating annual fee

bull5161 The annual emissions fee shall be calculated by multiplying the total tons ofactual emissions of a11~egUlated pollutants (for fee calculation) emitted from the source by the emissions fee(in dollarston) in effect atthemiddottime of calculation

51611 Actual emissions means the actllal rate ofemissions in tons per year ofally regulated pollutant(for fee calculation) emitted from a part 71 source over thtl preceding calendar year Actual emissions shall be calcllhlted Using eachemissions units actual operating hours production rates in-place control equipment and types ofmaterials processed stored or combusted during the preceding ~endaryear [See 40 CPR sect 719(c)]

51612 If actual emissions cannot be detenninel )Jsipgthe compliance methods in the pennit the pennittee shall Use other fe~r~ly recognized procedures (40 CFR sect 719(e)(2)]

5L613 The term regulated pollutant (for fee calculation) is qefined in 40 CPR sect 712

51614 The permittee should note that the presumptive fee amount is revised each calendaryear to account for inflation and it is available from EPA prior to the start of each calendar year

5162 The pennittee shall excludethe following emissions from the calculation of fees ()

--middotmiddot--middot

ll

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

51621

51622

-----------------vFR+7-h9(e~)euroii

51623

The amount ofactual emissions ofeach regulated pollutant (for fee calculation) that the source emits in excess of 4000 tons per year See 40 CFR sect 719(c)(S)(i)

Actual emissions of any regulatedpollutant(for fee middot calculation) already included in the fee calculation See 40

The insignificant quantities of actual emissions not required to be listed or calculated in a permit application pursuant to 40 CPRsect 715(c)(11) [40 CPRsect 719(c)(5)(iii)]

517 Fee calculation worksheets shall be certifiedcas tottuthacclllacy and completeness by a responsible official in accordancewi1h 40 CPRsect 715(d)

518 The permittee shall retain fee calculation worksheets and other emissionsshyrelated data used to detennine fee payment for five years following submittal offee payment Elhission-related data include for example emissionsshyrelated forms provided by EPA and used by the pennittee for fee calculation pllrposes emissions-related spreadsheets and emissionsbullrelated data such as records of emissions monitoringdata and related support information required to be kept in accordance with40 CPRsect 716(a)(3)(ii) [See 40 CPR sect 79(i)]

519 Faihtreofthe permittee to pay fees in a timely manner shall subject the permittee to assessmentofpenalties and interest in accQIdancewith40CFR sect 719(1)

5110 The EPA will not act on applications forpermit renewal or modification if the permittee fails to pay all fees interest and penalties owed iri full [See 40 CPR sect 719(m))

5111 When notified by EPA of underpayment of fees the permittee shall remit full payment within 30 days of receipt of notification [See 40 CPR sect 7190)(1) and(2))

5Jl2 Ifthe permittee thinks that the EPA-assessed fee is in error and wishes to challenge the fee the permittee shall provide a written explanation of the alleged error to EPA along with filii payment of the assessed fee [See 40 CFR sect 71 90)(3))

52 Blankd Compliance Statement [40 CPRsectsect 716(a)(6)(i) and (H)]

12

Transwestern Pipeline Company Compressor Station No 6 - Laguna 121172015 CJ TitleVP~rmit to OperateNo R6NM-2-08R2 (replaces R6NM-0 I-08RI) Draft Permit

521 middot The permittee must comply with all conditions ofthis Part 71 permit Any permit noncompliance including Yiolation of any applicable requirement any permit(erm or condition any fee or filing requiteJTIent any duty tomiddotallow or CIIIT) out inspection entry or monitoring actiYities or any regulation or order issued bythe permitting authoritypursuatit to this part constitutes a Yiolation oftheCAA and is grounds for enforcement action permit termination reYocationand~essliance or modification or deni~l ofapertnit renewal application It shall notbe a defense for a permittee in an enforcement ~~ction that it would have been necessary to halt or reduce the permitted actiYity in order to m11intairi compliance with the conditions of this perrnit[40CFR sectsect 716(a)(6)(i)atid(ii)]

Determinations of deYiations continuous or intermittent compliance sts or YiOIItions of this perrnit are not limited to theapplic~ible testing or monitoring methods required by the underlying regulations of thispermit other credible eYidencemust be considered in such determinations [Section 113~a) and 113(e)(l) oftheCAA] middot

i

53 Compliance Certifications[40 CFR sect 716(c)(5)]

I The permittee shall submit to EPA a certificationof compliance withpermit terms and conditions including emission limitations standards or work practices armually Clch year no later thiU April 1 The compliance certification shall coYer tlte same 12 month period as the two consecutiYe semi-atinu~~l monitoring reports The compliance certification shall be certified as to truth accuracyandcompleteness by a responsible official consistent with 4() CFR sect 715(d)

middot 5dl The certification shall includethefollowing

5311 Identification ofeach permit teim or condition that is the basis ofthe certification

5312 Identification ofthe method(s) or other means used for detrmining the compliance status with lteach term and condition during the certification period and whether such methods or other means proYide continuous or intermittentdata If necessary the owner or operator also shall identify any other material infortnation eg operating hours records that must be included in the certification to

middot comply with section 13(c)(2) of the CAA which prohibits knowingly making afalse certification or omitting material 1 information

I i 13middot

I I

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 18: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

TranswestertrPipeline Company Compressor Station No6- Laguna Title V Permitto Operate No R6NMbull2-08R2 (replaces R6NM01~08R1)

121172015 )raft Permit

Environmental Protection Agency 808 17m Street NW Washington DC 20074

Contact Jesse White 301-887-6548

515 The pennitt~ shallsend an updated fee calculation wo~ksheet fonn and a photo~opy ofeach fee payment ~heck (or utherconfinnation ofactual fee paid) submitted annually by the same deadline as required for fee paymenUo the address listed in Section55 ofthis peimit [Note that anannual emissionsreport t~quired atthe same time as the feesalcUJaticmworksheet by40 CPRsect 719(h) has been incorporated intO the fee calculation worksheet fonn as aconvenience]

516 Basisfor~alculating annual fee

bull5161 The annual emissions fee shall be calculated by multiplying the total tons ofactual emissions of a11~egUlated pollutants (for fee calculation) emitted from the source by the emissions fee(in dollarston) in effect atthemiddottime of calculation

51611 Actual emissions means the actllal rate ofemissions in tons per year ofally regulated pollutant(for fee calculation) emitted from a part 71 source over thtl preceding calendar year Actual emissions shall be calcllhlted Using eachemissions units actual operating hours production rates in-place control equipment and types ofmaterials processed stored or combusted during the preceding ~endaryear [See 40 CPR sect 719(c)]

51612 If actual emissions cannot be detenninel )Jsipgthe compliance methods in the pennit the pennittee shall Use other fe~r~ly recognized procedures (40 CFR sect 719(e)(2)]

5L613 The term regulated pollutant (for fee calculation) is qefined in 40 CPR sect 712

51614 The permittee should note that the presumptive fee amount is revised each calendaryear to account for inflation and it is available from EPA prior to the start of each calendar year

5162 The pennittee shall excludethe following emissions from the calculation of fees ()

--middotmiddot--middot

ll

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

51621

51622

-----------------vFR+7-h9(e~)euroii

51623

The amount ofactual emissions ofeach regulated pollutant (for fee calculation) that the source emits in excess of 4000 tons per year See 40 CFR sect 719(c)(S)(i)

Actual emissions of any regulatedpollutant(for fee middot calculation) already included in the fee calculation See 40

The insignificant quantities of actual emissions not required to be listed or calculated in a permit application pursuant to 40 CPRsect 715(c)(11) [40 CPRsect 719(c)(5)(iii)]

517 Fee calculation worksheets shall be certifiedcas tottuthacclllacy and completeness by a responsible official in accordancewi1h 40 CPRsect 715(d)

518 The permittee shall retain fee calculation worksheets and other emissionsshyrelated data used to detennine fee payment for five years following submittal offee payment Elhission-related data include for example emissionsshyrelated forms provided by EPA and used by the pennittee for fee calculation pllrposes emissions-related spreadsheets and emissionsbullrelated data such as records of emissions monitoringdata and related support information required to be kept in accordance with40 CPRsect 716(a)(3)(ii) [See 40 CPR sect 79(i)]

519 Faihtreofthe permittee to pay fees in a timely manner shall subject the permittee to assessmentofpenalties and interest in accQIdancewith40CFR sect 719(1)

5110 The EPA will not act on applications forpermit renewal or modification if the permittee fails to pay all fees interest and penalties owed iri full [See 40 CPR sect 719(m))

5111 When notified by EPA of underpayment of fees the permittee shall remit full payment within 30 days of receipt of notification [See 40 CPR sect 7190)(1) and(2))

5Jl2 Ifthe permittee thinks that the EPA-assessed fee is in error and wishes to challenge the fee the permittee shall provide a written explanation of the alleged error to EPA along with filii payment of the assessed fee [See 40 CFR sect 71 90)(3))

52 Blankd Compliance Statement [40 CPRsectsect 716(a)(6)(i) and (H)]

12

Transwestern Pipeline Company Compressor Station No 6 - Laguna 121172015 CJ TitleVP~rmit to OperateNo R6NM-2-08R2 (replaces R6NM-0 I-08RI) Draft Permit

521 middot The permittee must comply with all conditions ofthis Part 71 permit Any permit noncompliance including Yiolation of any applicable requirement any permit(erm or condition any fee or filing requiteJTIent any duty tomiddotallow or CIIIT) out inspection entry or monitoring actiYities or any regulation or order issued bythe permitting authoritypursuatit to this part constitutes a Yiolation oftheCAA and is grounds for enforcement action permit termination reYocationand~essliance or modification or deni~l ofapertnit renewal application It shall notbe a defense for a permittee in an enforcement ~~ction that it would have been necessary to halt or reduce the permitted actiYity in order to m11intairi compliance with the conditions of this perrnit[40CFR sectsect 716(a)(6)(i)atid(ii)]

Determinations of deYiations continuous or intermittent compliance sts or YiOIItions of this perrnit are not limited to theapplic~ible testing or monitoring methods required by the underlying regulations of thispermit other credible eYidencemust be considered in such determinations [Section 113~a) and 113(e)(l) oftheCAA] middot

i

53 Compliance Certifications[40 CFR sect 716(c)(5)]

I The permittee shall submit to EPA a certificationof compliance withpermit terms and conditions including emission limitations standards or work practices armually Clch year no later thiU April 1 The compliance certification shall coYer tlte same 12 month period as the two consecutiYe semi-atinu~~l monitoring reports The compliance certification shall be certified as to truth accuracyandcompleteness by a responsible official consistent with 4() CFR sect 715(d)

middot 5dl The certification shall includethefollowing

5311 Identification ofeach permit teim or condition that is the basis ofthe certification

5312 Identification ofthe method(s) or other means used for detrmining the compliance status with lteach term and condition during the certification period and whether such methods or other means proYide continuous or intermittentdata If necessary the owner or operator also shall identify any other material infortnation eg operating hours records that must be included in the certification to

middot comply with section 13(c)(2) of the CAA which prohibits knowingly making afalse certification or omitting material 1 information

I i 13middot

I I

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 19: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08RI) Draft Permit

51621

51622

-----------------vFR+7-h9(e~)euroii

51623

The amount ofactual emissions ofeach regulated pollutant (for fee calculation) that the source emits in excess of 4000 tons per year See 40 CFR sect 719(c)(S)(i)

Actual emissions of any regulatedpollutant(for fee middot calculation) already included in the fee calculation See 40

The insignificant quantities of actual emissions not required to be listed or calculated in a permit application pursuant to 40 CPRsect 715(c)(11) [40 CPRsect 719(c)(5)(iii)]

517 Fee calculation worksheets shall be certifiedcas tottuthacclllacy and completeness by a responsible official in accordancewi1h 40 CPRsect 715(d)

518 The permittee shall retain fee calculation worksheets and other emissionsshyrelated data used to detennine fee payment for five years following submittal offee payment Elhission-related data include for example emissionsshyrelated forms provided by EPA and used by the pennittee for fee calculation pllrposes emissions-related spreadsheets and emissionsbullrelated data such as records of emissions monitoringdata and related support information required to be kept in accordance with40 CPRsect 716(a)(3)(ii) [See 40 CPR sect 79(i)]

519 Faihtreofthe permittee to pay fees in a timely manner shall subject the permittee to assessmentofpenalties and interest in accQIdancewith40CFR sect 719(1)

5110 The EPA will not act on applications forpermit renewal or modification if the permittee fails to pay all fees interest and penalties owed iri full [See 40 CPR sect 719(m))

5111 When notified by EPA of underpayment of fees the permittee shall remit full payment within 30 days of receipt of notification [See 40 CPR sect 7190)(1) and(2))

5Jl2 Ifthe permittee thinks that the EPA-assessed fee is in error and wishes to challenge the fee the permittee shall provide a written explanation of the alleged error to EPA along with filii payment of the assessed fee [See 40 CFR sect 71 90)(3))

52 Blankd Compliance Statement [40 CPRsectsect 716(a)(6)(i) and (H)]

12

Transwestern Pipeline Company Compressor Station No 6 - Laguna 121172015 CJ TitleVP~rmit to OperateNo R6NM-2-08R2 (replaces R6NM-0 I-08RI) Draft Permit

521 middot The permittee must comply with all conditions ofthis Part 71 permit Any permit noncompliance including Yiolation of any applicable requirement any permit(erm or condition any fee or filing requiteJTIent any duty tomiddotallow or CIIIT) out inspection entry or monitoring actiYities or any regulation or order issued bythe permitting authoritypursuatit to this part constitutes a Yiolation oftheCAA and is grounds for enforcement action permit termination reYocationand~essliance or modification or deni~l ofapertnit renewal application It shall notbe a defense for a permittee in an enforcement ~~ction that it would have been necessary to halt or reduce the permitted actiYity in order to m11intairi compliance with the conditions of this perrnit[40CFR sectsect 716(a)(6)(i)atid(ii)]

Determinations of deYiations continuous or intermittent compliance sts or YiOIItions of this perrnit are not limited to theapplic~ible testing or monitoring methods required by the underlying regulations of thispermit other credible eYidencemust be considered in such determinations [Section 113~a) and 113(e)(l) oftheCAA] middot

i

53 Compliance Certifications[40 CFR sect 716(c)(5)]

I The permittee shall submit to EPA a certificationof compliance withpermit terms and conditions including emission limitations standards or work practices armually Clch year no later thiU April 1 The compliance certification shall coYer tlte same 12 month period as the two consecutiYe semi-atinu~~l monitoring reports The compliance certification shall be certified as to truth accuracyandcompleteness by a responsible official consistent with 4() CFR sect 715(d)

middot 5dl The certification shall includethefollowing

5311 Identification ofeach permit teim or condition that is the basis ofthe certification

5312 Identification ofthe method(s) or other means used for detrmining the compliance status with lteach term and condition during the certification period and whether such methods or other means proYide continuous or intermittentdata If necessary the owner or operator also shall identify any other material infortnation eg operating hours records that must be included in the certification to

middot comply with section 13(c)(2) of the CAA which prohibits knowingly making afalse certification or omitting material 1 information

I i 13middot

I I

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 20: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

Transwestern Pipeline Company Compressor Station No 6 - Laguna 121172015 CJ TitleVP~rmit to OperateNo R6NM-2-08R2 (replaces R6NM-0 I-08RI) Draft Permit

521 middot The permittee must comply with all conditions ofthis Part 71 permit Any permit noncompliance including Yiolation of any applicable requirement any permit(erm or condition any fee or filing requiteJTIent any duty tomiddotallow or CIIIT) out inspection entry or monitoring actiYities or any regulation or order issued bythe permitting authoritypursuatit to this part constitutes a Yiolation oftheCAA and is grounds for enforcement action permit termination reYocationand~essliance or modification or deni~l ofapertnit renewal application It shall notbe a defense for a permittee in an enforcement ~~ction that it would have been necessary to halt or reduce the permitted actiYity in order to m11intairi compliance with the conditions of this perrnit[40CFR sectsect 716(a)(6)(i)atid(ii)]

Determinations of deYiations continuous or intermittent compliance sts or YiOIItions of this perrnit are not limited to theapplic~ible testing or monitoring methods required by the underlying regulations of thispermit other credible eYidencemust be considered in such determinations [Section 113~a) and 113(e)(l) oftheCAA] middot

i

53 Compliance Certifications[40 CFR sect 716(c)(5)]

I The permittee shall submit to EPA a certificationof compliance withpermit terms and conditions including emission limitations standards or work practices armually Clch year no later thiU April 1 The compliance certification shall coYer tlte same 12 month period as the two consecutiYe semi-atinu~~l monitoring reports The compliance certification shall be certified as to truth accuracyandcompleteness by a responsible official consistent with 4() CFR sect 715(d)

middot 5dl The certification shall includethefollowing

5311 Identification ofeach permit teim or condition that is the basis ofthe certification

5312 Identification ofthe method(s) or other means used for detrmining the compliance status with lteach term and condition during the certification period and whether such methods or other means proYide continuous or intermittentdata If necessary the owner or operator also shall identify any other material infortnation eg operating hours records that must be included in the certification to

middot comply with section 13(c)(2) of the CAA which prohibits knowingly making afalse certification or omitting material 1 information

I i 13middot

I I

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 21: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

Transwestern Pipeline Company Compressor Station No 6- Laguna 121172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-OJ-08Rl) Draft Permit

5313 The compliance status ofeach term and condition of the permit for the period covered by thecertificationbased on the method or means designated above The certification $hall identify each deviation and take it into account in the compliance certifiCation

53L4 Any other requirements sufficient to assure or determine compliance -------------~consistentwith-40-CER-sectsect-7-1-6~~)~5~iiij(D-Md-7-1~6(--)(6)middot~-------+

54 Duty to Provide and Supplement Information

The ptrDiittee shall furnish to EPA within a time specified by EPA any information that EPA may request in writing to determine whether causeexists for modifying revoking and_ reissuing orterminating the permit or to determine compliance with the permit Upon requestthepermitteeshltll also furnish to EPA copiesofrecordsthat are required to be kept pursuant to the-terms ofthe permit including information claimed to be confidential Information claimed to be confidential should be accompanied by a claim ofconfidentiality according to the provisions of40 CFR part 2 subpart B The permittee upon becoming aware thatanyrelevantfacts were omitted or that incorrect information was submittedinthe permit application shall promptly submit such supplemental facts or corrected information~ The permittee shall also provide additional information as necessary to address arty

- reqJiirements that become applicable to the facility after thispennit is issued [40 CFR sectsect 7l6(a)(6)(v) and 715(b)]

55 Submissi(ns[40CFR sectsect 715(d) 716 _and 719]

Any document required to be submitted by this permit shall be certified by a responsible official as to truth accuracy and completeness Such certifications shall state that based on information and belief formed atlcentr reasonable inquiry the statements and informationin the docpment are true accurate and complete All documents required to be submittedincl)ldingncotds reports Jest data monitoring data emissions-related data notificatiorts and contpliance certifications shall be submitted to

Air Enforcement Branch Mailcode 6EN-A 1445 Ross_ Avenue Pallas- TX 75202-2733

while the fee calculation worksheets (that include the annual emissions worksheet and report) and applications for renewals and permit modifications shall be sJibmitted to

Air Permits Section

14

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 22: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

Transwestem PipeLine Company Compressor Station Np 6 - Laguna 121720li TitleV leJllit to Operate No R6NM-2bull081U (replaces R6NM-O 1 -08Rl j Draft Permit

Mailcode 6PD-R 1445 Ross Avenue Dallas TX 75202~2733

56bull Severability CllJSe [40CFRsect 716(a)(5))

The provisions of this permit are severable and in the event ofany challenge to any portion of this permit or if any portion is held invalid the remaining permit conditions shaH remain valid and in force bull

57 Permit Actions [40 CFR sect 716(a)(6)(iii)J

This permit may be moltlifiedrevoked reopenedandreissued ortemiinated for cause ]he ftling of a requesfby the permittee for a permit riloijicati0n revoqation and reissuance or termination or of a notification ofplanned changes or anticipated noncompliance does not stay any permit condition

ss Administrative PermitAmelldments [40 CFR sect 7L7(d)]

The pemiitteernayrequestthe use of administrative permit amendment procedures for a permit revision that

581 Corrects typographicalerrors

582 Identifies a change in the name address or phone number ofanypers0n identified in the permit or provides a similar minor administrative change at the source

583 Requires morefrequentwonit0iingor reporting by the permittee

S8A Allows for a change in ownership or operationaLoontrol ofasource where EPA determines that no other change in the permit is necessary provided that a written agreement containing a specific date for transfer ofpermit responsibility coverage and liability between the current and new permittee has been submitted to EIPA ___ _

585 Incorporates into this permit the requirements from preconstruction review permits authorized under an EPA-approved program ptovide4 that such a program meets procedural requirements substantially equivalent to the requirements of sections 717 and 718 that would be applicable to the change if itmiddotwere subjectto review as a permit modification and compliance requirements substantially equivalent to those containedin section 716 and

15 I

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 23: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

Transwestern Pipeline Company Compressor Station No 6 - Laguna middot 12172015 TitleV Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08Rl) Draft Permit

586 Incorporates any other type of change which EPA has determined to be similar to those listed aboye in subparagraphs 58 I through 585 [Note to permittee Ifthese subparagraphs do not apply please contact EPA for a determination as tosimilarity prior to submitting your request for an administrative permitamendment under this provisionl

59 Minor Permit Modifications [40CFR sect 717(e)(l)]

591 The permittee may request the use ofminor permit modification procedures only for those modifications that

5911 Do not violate any applicable requirement

5912 Do not involve significant changes to existing monitoring reporting or recordkeeping requirements in the permit

5913 Do not require or change a case-by-case determination ofan emission limitation or other standard or a source-specific determination for temporary sources of ambient impacts or a visibility or increment analysis

Do notseekto establish or change a permit term or condition for which there is no c()rresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject Such terms and

middotconditions include

59141 A federally enforceable emissions cap assll)1ed to av()id classification as a modification under any provision oftitle I and

59142 An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of-the CAA

5915 Are not modifications under any provision oftitle I ofthe CAA and

5916 Are not required to be processed as a significant modification

592 Notwithstanding the list ofchanges eligible forminor permit modification procedures in paragraph 591 above minor permit modification procedures may be used for permit modifications involving the use of economic incentives marketable permits emissions trading and other similar approaches to the extent that such

16

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 24: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

()Transwestem Pipeline Company Compressor Station No 6- Laguna 12172015 Title V Permit to Operatcent NocR6NM-2-08R2 (replaces R6NM-01-08R1) Draft Permit

minor permit modification procedures are explicitly provided for in anllpplicable implementation plan or in applicable requirements promulgated by EPA

593 An applicatiqn requesting the use of minor permit modification procedures shall meetthe requirements of 40 CFR sect 715(c) and shall include the following

5931 A description of the chang~ the emissions resulting from the change and any new applicablerequirements thatwill apply if the change occurs

5932 The soUrces suggested elntft permit

5933 Certification by a responsible official consistentwith 40 CFR sect7 LS( d) that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used and

5934 Completed forms for the permitting authority to use to notify affected States as required under 40 CFR sect 7L8

594 The source may make the change proposed in its minor permit modification application immediately after it files such application After the source makes the changeallilwedbythe precedingsentenceanduntil EPA takes any ofthe actions aJthorized by40 CFR sect 7L7(e)(1)(iv)(A)thtoqg)l (C) the source must colllplywith both the applicable requirements govemingthe change and the proposed permit terms and conditions Duringthis time periodthe source need not comply with the existing permit terms ang conditions it seeks-tO modify However ifthe source fails to c()Tiplywith its proposed permit terms and conditions during this time period the existingpermittermsmiddotand conditions it seeks to modifymay be enforced against it

595 The pell)it shield under 40 CFR sect L6(t) may not extend to minor permit modifications [See 40 CFR sect 717(e)(l)(vi)]

510 Group Processing of Minor Permit Molifications [40 CFR sect 717(e)(2)]

5101 Group processing ofmodifications by EPAmaybe used only for those permit modifications

51011 That meet the criteria for minor permit modification procedures under paragraphs591 of this permit and

SJ012 That collectively are below the threshold level of 10 percent of the emissions allowed by the permitfor the emissions unit for whichthe

17

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 25: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

Transwestem Pipeline Company Compressor Station No 6 - Laguna 121172015 TilleY Permit to Operate No R6NM-2-08R2 (replaces R6NM-OI-08RI) Draft Permit

change is requested 20 percent of the applicable definition of major souree in 40 CFR sect 712 or five tons per year whichever is least

51 02 An application requesting the use ofgroup processing procedures shall be submitted to EPA shall meet the requirements of4b CFR sect 715(c) and shall include the following

51021 A description of the change the emissions resulting from the change and any new applicable requirements that will apply if the change occurs

51022 The sources suggested draft permit

51023 Certification by aresponsibleofficial consistent with40 CFR sect 7 L5(d) thatthe proposed modification meets the criteria for use of group processing procedures and a requestthat such procedures be used

51024 A list of the sources other pending applications awaiting group processing and a determination ofwhether the requested modification aggregated with theseotherlpplications equals or exceedS the threshold setundet subplrngrllph51Ql2 above

51025 Completed forms for the permitting authority to use to notifY affected State~ as required under 40 CFR sect 718

5103 The source may make the change proposed in its minor permit modification application immediately after it files such application After the sourcemakes the change allowed by the preceding sentence ltind uptilthe permitting authority takes lillY ofthe aqtions authorized by 40 CFR sect 717(e)(l)(iv)(A) through (C) the source must comply with both the applicable requirements governing the change and the proposed permit tertlls andconditions During this time periodthe source need not comply with the eidsting permittenns and conditions it seeks to modifY However if the source fails to comply with its proposed permit terms and conditions during this time period the existing permit terms and conditions it seeks to modifY may be enforced againSt it

5104 The penni shield under40 CPRsect 716(t) may not extend to group processing of minor permit modifications tSee 40 CFR sect 717(e)(l)(vi)]

511 Significant Permit Modifications [40 CFR sect 717(e)(3)]

18

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 26: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

( middotmiddotmiddotmiddot

J -middot~-Transwestern Pipeline Company Compressor Station No 6 - Laguna 121712015

Title V Pennit to Operate No R6NM-2-08R2 (replaces R6NMmiddotOl-08Rl) Draft Permit

5111 The pepnitteemu~t reque~t the use of significant permit modificatio)lprocedlres for those niodificentations that

51111 Do not quality as minor permit modifications or as administrative amendments

51112 Are significant changes in existing monitoring permiherms or conditions

51113 Are relaxations of reporting or recordkeeping permit terms or conditions

5112 Nothing herein shalL be construed to preclude the permittee from making changes consistent with 40 CFR Part 71 that would render existing permit compliance terms and conditions irrelevant

5113 Permittees must meet all requirements of 40 CFR Part including those for applications public participation and review hy affected Statesas they apply to petmitissuance and permit renewal For the application to be determined complete ~-the permitteemustsupply allinformationthat is required by40 CFRsect 715(c) for permifissuance and renewal but only that infortnation thatis related to the proposed change [See 40CFR sectsect 717(e)(3)(ii) and 715(a)(2)]

512 Reopening for Cau$e [40 CFR sect 717(f)]

The EPA shall reopen and revise this permit under the following circumstances

5121 Additionalapplicablerequirementsunderthe CAAbecome applicable to a major part 71 source with aremaining peiniit term ofthree or more years Such a reopening shall be completed nil later than l8months after promulgation of the applicablereqnitement No reopening is requited ifthe effectivedateofthe requirement is later than thedateonwhich thepemiit is dUe to expire ullless the original permit or any ofits terms and cortditiolls have been extended pursuant to 40 CFRsect 717(c)(3)

5122 Additional requirements (including excess emissions requirements) become applicable to an affected source under the acidtain program Upon approval by the Administrator excess emissions offsets plans shall bedeemed to be incorporated into the permit middot

5123 The EPA determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or

19

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 27: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

Transwesteril Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-01-08Rl) Draft Permit

other terms or conditions of the permit

5124The EPA determines that the permit must be revised or revoked to assure compliance with the applicable requirements

513 Property Rights[40 CPRsect 716(a)(6)(iv)]

This pennit does not convey any property rights ofany sort or any exclusiw privilege

514bull Inspeltion and Entry [40 CPRsect 716(c)(2)]

Uponpresentationof credentials and other documents as may be required by law the permittee shall allow EPAor an authorized representative to perform the following

5141 Enter upon the permittees premises where a40 CFRPart 7l source is located or emissions-related activity is conducted or where records must be kept under the conditions of the pennit

5142 Have accessto andcopy atreasonable times any records that must be kept under the conditi()ns of the permit

5143 Inspect at reasonable times any facilities equipment (including monitoring and air pollution control equipment) practices or operations regulated or required under the permit and

5144 As authorized by the CAA sample or monitor at reasonable times substances or parameters for the purpose ofassuring compliance with the permit or lpplicabe requirements

515 Transfer of Ownership or Operation [40 CPRsect 717(d)(l)(iv)]

A change in ownership or operational control of this facility may be treated as an administrative penllit aIIlendment ifEPA determines no other changes in this pe111lit are necessary and provided that a written agreement containing a specific date for transfer of pennit responsibility coverage and liability between the current and new permittee has been submitted to EPA

516 Off Permit Changes [40 CPRsect 716(a)(l2)]

The permittee is allowed to make certain changes without a permit reyision provided that the following requirements ate met

20

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 28: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

()TranswestmPipeline Company Compressor Station No 6 bull Laguna 121172015 TitleVPenniffo Operate No R6NM-2-08Ureplaces R6NM-Ol-08Rl) Draft Permit

5 16 L Each change is not addressed or prohlbitw by tltis pennit

5162 Each change shall comply with all applicable requirements and may not violate any existing permit term or condition

5163 Changes undetthis provision may not include changes or activities subject to any requirement under TitleiV or that are modifications under any provision of1itle I of the CM

5I6A The permittee shall provide contemporaneous written notice to EPA of each change except for changes that qu~tlify asbullinsignificant activities under 40 CFR sect 715( c )(II) The written notice must describe each change the date of the change any change in emissions poilutantsemitted and any applicable requirementsthatwouldapplyas a result ofthe change

51 65 The permitshielddoes not apply to changesmade under this provision

5166 The permittee must keep a record describing all changesmiddot that resultin emissions ofany regulated air pollutant subject to any applicable requirement not otherwise regulated under this permit and the emissions resulting from those changes

517 Permit Expiration and Renewal [40 CFR sectsect 715(a)(l)(iii) 716(a)(ll) 7L7(b) 717(c)(l)(i)and (ii)7L8(d)]

5~171 This pennitshall expire upon the earlier occurreneeofthefollowing events

51711 Five years elapses from the date ofissuance or

51712 The sourceis issued a part 70 permit by an EPAbullapproved permitting authority

Expiration ofthis permit terminates the permittees right to operate unless a timely and complete permitrenewaLapplicationhas been submitted at least six months but not more thall18 months prior to the expiratipn ofthis permit

5173 If the permittee submits a timely and completepermitapplicationfor renewal consistent with 40 CFR sect 7L5(a)(2) but the permitting authority hasfailed to issue or deny the renewal permit then the permit shall not expire (--) until the renewal permit has been issued or denied and any permit shield granted pursuant to section 40 CFR 716(f) may extend beyond the original

21

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 29: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

Transwestern Pipeline Company Compressor Station No 6 - Laguna 12172015 Title V Permit to Operate No R6NM-2-08R2 (replaces R6NM-Ol-08R1) Draft Permit

permit term until renewal

5174 The permittees failure to have a40 CFR Part71 permit wheretimely and complete application for renewal was submitted is nota violation ofthis part untiLEPA takes final action on the permit renewal application This prot~tion shall cease to apply if subsequent to the completeness

---------------determination-thecpermittee-fails-to-submit-any-additional-infonnation---------T identified as being needed to process the application by the deadline specified in wrifmg by EPA

5175 Renewal of this permit is subject to the same procedural requirements that aplJly toinitial permit issuance including those for public participation and affected State and tribal review

5176 The application for renewal shall include the current permit number description ofpcrmit revisions and off-permit changesthat occurred during the permit term any applicable requirements that were promulgated and not incorporated into the permit during the permit term and other information required by the application form

518 Credible Evidence middot(40 CFR Part 70 and EPAs Credible Evidence Rule 62 Fed Reg 8314 (Feb 24 1997))

Notwithstanding any other provisions ofany applicable rule or regulation or requirementofthispermit that state specific methods that may be used to assess compliance with applicable requirements any credible evidence or information relevant to wliether a source would h11ve been in compliance with applicable requirementsif the appropriate performance or compliance test or proCedure had been performed shall be considered for purposes of Title V compliance certifications middotFurthermore for purposes ofestablishing whether or nota person has violated oris in violation ofany emissions limitation ot standard or permit condition ncithing in this permit shall preclude the use including the exclusive use

middotby any person of any such credible evidence or infonnatiop

22

1 I I I

Page 30: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY … · The EPA will publish a public notice ofthe permitting action in a local newspaper ofgeneral circulation and allow for a30-day

1 I I I