Unit09 - Aggregate Planning MPS

28
Dr. Rameez Khalid, PMP, CQSSBB Faculty, Department of Management Institute of Business Administration, Karachi

description

technology and operational managementDr. Rameez Khalid

Transcript of Unit09 - Aggregate Planning MPS

Page 1: Unit09 - Aggregate Planning MPS

Dr. Rameez Khalid, PMP, CQSSBB Faculty, Department of Management

Institute of Business Administration, Karachi

Page 2: Unit09 - Aggregate Planning MPS

Planning Horizon

Aggregate planning: Intermediate-range capacity planning, usually covering 2 to 12 months.

Short range

Intermediate range

Long range

Now 2 months 1 Year

[email protected] Unit-9: Aggregate Plan & MPS 2

Page 3: Unit09 - Aggregate Planning MPS

• Short-range plans (Detailed plans) – Machine loading – Job assignments

• Intermediate plans (General levels) – Employment – Output

• Long-range plans – Long term capacity – Location / layout

Overview of Planning Levels

3

Page 4: Unit09 - Aggregate Planning MPS

Planning Sequence

Business Plan Establishes operations and capacity strategies

Aggregate plan Establishes

operations capacity

Master schedule Establishes schedules for specific products

Corporate strategies

and policies

Economic, competitive, and political conditions

Aggregate demand

forecasts

4

Page 5: Unit09 - Aggregate Planning MPS

Aggregate Planning

• Begin with forecast of aggregate demand • Forecast intermediate range • General plan to meet demand by setting

– Output levels – Employment – Finished goods inventory level

• Production plan is the output of aggregate planning • Update plan periodically – rolling planning horizon

always covers the next 12 – 18 months

[email protected] Unit-9: Aggregate Plan & MPS 5

Page 6: Unit09 - Aggregate Planning MPS

• Resources – Workforce – Facilities

• Demand forecast • Policies

– Subcontracting – Overtime – Inventory levels – Back orders

• Costs – Inventory carrying – Back orders – Hiring/firing – Overtime – Inventory changes – Subcontracting

Aggregate Planning Inputs

[email protected] Unit-9: Aggregate Plan & MPS 6

Page 7: Unit09 - Aggregate Planning MPS

• Total cost of a plan • Projected levels of inventory

– Inventory – Output – Employment – Subcontracting – Backordering

Aggregate Planning Outputs

[email protected] Unit-9: Aggregate Plan & MPS 7

Page 8: Unit09 - Aggregate Planning MPS

Aggregate Planning Strategies

• Proactive – Alter demand to match capacity

• Reactive – Alter capacity to match demand

• Mixed – Some of each

[email protected] Unit-9: Aggregate Plan & MPS 8

Page 9: Unit09 - Aggregate Planning MPS

• Pricing

• Promotion

• Back orders

• New demand

Demand Options

[email protected] Unit-9: Aggregate Plan & MPS 9

Page 10: Unit09 - Aggregate Planning MPS

• Hire and layoff workers

• Overtime/slack time

• Part-time workers

• Inventories

• Subcontracting

Capacity Options

[email protected] Unit-9: Aggregate Plan & MPS 10

Page 11: Unit09 - Aggregate Planning MPS

Aggregate Planning Strategies

1. Maintain a level workforce

2. Maintain a steady output rate

3. Match demand period by period

4. Use a combination of decision variables

[email protected] Unit-9: Aggregate Plan & MPS 11

Page 12: Unit09 - Aggregate Planning MPS

Basic Strategies

• Level capacity strategy:

– Maintaining a steady rate of regular-time output while meeting variations in demand by a combination of options.

• Chase demand strategy:

– Matching capacity to demand; the planned output for a period is set at the expected demand for that period.

[email protected] Unit-9: Aggregate Plan & MPS 12

Page 13: Unit09 - Aggregate Planning MPS

Chase Approach

• Advantages

– Investment in inventory is low

– Labor utilization is high

• Disadvantages

– The cost of adjusting output rates and/or workforce levels

[email protected] Unit-9: Aggregate Plan & MPS 13

Page 14: Unit09 - Aggregate Planning MPS

Level Approach

• Advantages

– Stable output rates and workforce

• Disadvantages

– Greater inventory costs

– Increased overtime and idle time

– Resource utilizations vary over time

[email protected] Unit-9: Aggregate Plan & MPS 14

Page 15: Unit09 - Aggregate Planning MPS

1. Determine demand for each period

2. Determine capacities for each period

3. Identify policies that are pertinent

4. Determine units costs

5. Develop alternative plans and costs

6. Select the best plan that satisfies objectives. Otherwise return to step 5.

Techniques for Aggregate Planning

[email protected] Unit-9: Aggregate Plan & MPS 15

Page 16: Unit09 - Aggregate Planning MPS

Summary of Planning Techniques

Technique Solution Characteristics Graphical/charting Heuristic (trial

and error) Intuitively appealing, easy to understand; solution not necessarily optimal.

Linear programming

Optimizing Computerized; linear assumptions not always valid.

Simulation Heuristic (trial and error)

Computerized models can be examined under a variety of conditions.

13-16

Page 17: Unit09 - Aggregate Planning MPS

Cumulative Graph

1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10

Cumulative production Cumulative production

Cumulative demand Cumulative demand

Cum

ulat

ive

outp

ut/d

eman

d Cu

mul

ativ

e ou

tput

/dem

and

[email protected] Unit-9: Aggregate Plan & MPS 17

Page 18: Unit09 - Aggregate Planning MPS

Aggregate Plan to Master Schedule

Aggregate Planning

Aggregate Planning

Disaggregation

Master Schedule Master

Schedule

[email protected] Unit-9: Aggregate Plan & MPS 18

Page 19: Unit09 - Aggregate Planning MPS

• Master schedule: The result of disaggregating an aggregate plan; shows quantity and timing of specific end items for a scheduled horizon.

• Rough-cut capacity planning: Approximate balancing of capacity and demand to test the feasibility of a master schedule.

Disaggregating the Aggregate Plan

[email protected] Unit-9: Aggregate Plan & MPS 19

Page 20: Unit09 - Aggregate Planning MPS

Master Scheduling

• Master schedule – Determines quantities needed to meet demand – Interfaces with

• Marketing • Capacity planning • Production planning • Distribution planning

[email protected] Unit-9: Aggregate Plan & MPS 20

Page 21: Unit09 - Aggregate Planning MPS

Master Scheduling Process

Master Scheduling

Beginning inventory

Forecast

Customer orders

Inputs Outputs Projected inventory

Master production schedule

Uncommitted inventory ATP

[email protected] Unit-9: Aggregate Plan & MPS 21

Page 22: Unit09 - Aggregate Planning MPS

Projected On-hand Inventory

Projected on-hand inventory

Inventory from previous week

Current week’s requirements

- =

[email protected] Unit-9: Aggregate Plan & MPS 22

Page 23: Unit09 - Aggregate Planning MPS

Projected On-hand Inventory

64 1 2 3 4 5 6 7 8Forecast 30 30 30 30 40 40 40 40Customer Orders (committed) 33 20 10 4 2Projected on-hand inventory 31 1 -29

Beginning Inventory

Customer orders are larger than forecast in week 1

Forecast is larger than Customer orders in week 2

Forecast is larger than Customer orders in week 3

[email protected] Unit-9: Aggregate Plan & MPS 23

Page 24: Unit09 - Aggregate Planning MPS

Time Fences

Time Fences – points in time that separate phases of a master schedule planning horizon.

[email protected] Unit-9: Aggregate Plan & MPS 24

Page 25: Unit09 - Aggregate Planning MPS

Time Fences in MPS

Period

”frozen” (firm or fixed)

“slushy” somewhat

firm ”liquid” (open)

1 2 3 4 5 6 7 8 9

13-25

Page 26: Unit09 - Aggregate Planning MPS

[email protected] Unit-9: Aggregate Plan & MPS 26

Page 27: Unit09 - Aggregate Planning MPS
Page 28: Unit09 - Aggregate Planning MPS

REFERENCES

•Operations Management William J. Stevenson

•Operations Management Barry Render & Jay Heizer

[email protected] 28