Unit 5 Operation in Shipping Line Operation in Shipping Line.

30
Unit 5 Unit 5 Operation in Shipping Operation in Shipping Line Line

Transcript of Unit 5 Operation in Shipping Line Operation in Shipping Line.

Page 1: Unit 5 Operation in Shipping Line Operation in Shipping Line.

Unit 5Unit 5

Operation in Shipping LineOperation in Shipping Line

Page 2: Unit 5 Operation in Shipping Line Operation in Shipping Line.

•Overview:

Operation in shipping line

•Discussion:

5.1 What does Operation do in shipping line?

•Reading:

5.2 Operation procedures

•Practical Exercise:

5.3 Procedure flow chart

•Terminal Departure Report

Page 3: Unit 5 Operation in Shipping Line Operation in Shipping Line.

What does Operation do in Shipping Line?What does Operation do in Shipping Line?

Page 4: Unit 5 Operation in Shipping Line Operation in Shipping Line.

Work with your partner to get understands the OP job description below.Work with your partner to get understands the OP job description below.

Port Operation

Cargo Operation

Equipment

Coordinate with Terminal

Outbound

Inbound

EIR exchange

Loading list

Inbound container

summary

EIR exchange

OP

Page 5: Unit 5 Operation in Shipping Line Operation in Shipping Line.

Operation ProceduresOperation Procedures

• Read and get understand the procedures below

Page 6: Unit 5 Operation in Shipping Line Operation in Shipping Line.

Procedure Name: Operations - Port Operations Before vessel arrival

1.2 Upon receipt of the vessel’s Coastal Schedule from HKG branch, Operations Personnel must fax or email it to the Planning Department of Terminal Operator and Shipping Agent, meanwhile update Daily vessel schedule.

Page 7: Unit 5 Operation in Shipping Line Operation in Shipping Line.

1.3 Before vessel arrival, Operations Personnel must receive RPM and relay to Shipping Agent.

1.4 According to ETA of vessel in RPM, Operations Personnel must confirm berthing availability with the Berth Allocation Team of Terminal.

1.5 Operations Personnel must provided DG cargo list of vessel to Shipping Agent for declaration to Port Authority.

Page 8: Unit 5 Operation in Shipping Line Operation in Shipping Line.

1.6 Operations Personnel must check if vessel EDI received by Terminal, if the terminal hasn’t received it, Operations Personnel must ask Stowage Section of HKG to resent or email it till Terminal receive it.

1.7 Vessel Berthing at Terminal

Page 9: Unit 5 Operation in Shipping Line Operation in Shipping Line.

1.8 During vessel stays at terminal, the Vessel Operation Personnel must coordinate with the Chief Officer of the ship through shipping agent to check if there are any matters or problems.

1.9 Vessel Operation Personnel is responsible to coordinate with Terminal planning and our stowage section to resolve the stowage problem.

Page 10: Unit 5 Operation in Shipping Line Operation in Shipping Line.

2.0 If vessel delays to depart, Operations Personnel must inform port operation of HKG and CSD the situation and updated the time of departure.

Page 11: Unit 5 Operation in Shipping Line Operation in Shipping Line.

Procedure Name: Operations - Port Operations

After vessel departure 1.2 A Terminal Departure Report (TDR) mu

st be received from Terminal Operator, Operation personnel must inform terminal to send EDI to next port and Stowage Section of HKG after the figures being verified.

Page 12: Unit 5 Operation in Shipping Line Operation in Shipping Line.

1.3 Vessel Operation Personnel must update the sailing information in the vessel schedule system according to the Terminal Departure Report within one working day.

1.4 On receipt of any invoices from shipping agents, pilot company, Tugboat Company or other port authorities, Vessel Operations Personnel must cross-check with the ship’s file whether charges are correct and then create job orders accordingly.

Page 13: Unit 5 Operation in Shipping Line Operation in Shipping Line.

1.5 Special Cases or Exceptional Requirement

1.6 If there are any special cases or exceptional requirements, Operations Personnel must consult the supervisor for guideline to take further actions.

Page 14: Unit 5 Operation in Shipping Line Operation in Shipping Line.
Page 15: Unit 5 Operation in Shipping Line Operation in Shipping Line.
Page 16: Unit 5 Operation in Shipping Line Operation in Shipping Line.

•Useful expressions and code explanation

ETA ( Estimated Time of Arrival 预计到港时间 )ETD ( Estimated Time of Departure 预计离港时间 ) Read and get understand the procedures below:RPM (Radio Pratique Message 进港许可 ) DG cargo (危险品)     CSD (客户服务部)TDR   (Terminal Departure Report  离港报告 )EDI ( Electronic Data Interchange 电子数据交换)Shipping Agent. (船代)  Port Authority. (港务当局)Berth Allocation (泊位策划)   Stowage Section (船舶配积载部门)pilot company  (引航公司)tugboat company (拖轮公司)

Page 17: Unit 5 Operation in Shipping Line Operation in Shipping Line.

5.3 Procedure Flowchart5.3 Procedure Flowchart

The class is divided into two teams.

If you are in team A, look at the file of “Operations - Port Operations”, try to draft a flowchart to show the procedure clearly.

If you are in team B, look at the file of “Issue of Outbound Documents”; try to draft a flowchart to show the procedure clearly.

Exchange your procedure flowchart with a classmate in another team, explain the job procedure in your own words, and make sure your partner can understand completely.

Page 18: Unit 5 Operation in Shipping Line Operation in Shipping Line.

Procedure Name: Operations - Issue of Outbound Documents

1.0 Purpose/ Scope

1.1 This procedure covers the issue of FCL Collection Orders for empty container picked up to outbound customers.

Page 19: Unit 5 Operation in Shipping Line Operation in Shipping Line.

Procedure Name: Operations - Issue of Outbound Documents

2.0 Responsibility

2.1 It is the responsibility of Manager to ensure implementation and adherence to this procedure by all Cargo Operations Personnel.

Page 20: Unit 5 Operation in Shipping Line Operation in Shipping Line.

Procedure Name: Operations - Issue of Outbound Documents

Procedures 3.1 Issuance of FCL Collection Order 3.2 Operations Personnel must issue Expo

rt FCL Collection Order to shipper’s representative when they present the relevant Booking Acknowledgement at our Terminal Office.

Page 21: Unit 5 Operation in Shipping Line Operation in Shipping Line.

Procedure Name: Operations - Issue of Outbound Documents

3.3 for Hanger Container Operations Personnel must type “under-de

ck” and “away from Boiler” Stowage Requirements on the remarks box of the Export FCL Collection Order in order to avoid the possible damage to the cargo.

Page 22: Unit 5 Operation in Shipping Line Operation in Shipping Line.

Procedure Name: Operations - Issue of Outbound Documents

3.4 for Heavy Duty Container and Reefer Container

Operations Personnel need to indicate which kind of equipment on the remarks box of the FCL Collection Order for deport to release empty containers to customers.

Page 23: Unit 5 Operation in Shipping Line Operation in Shipping Line.

Procedure Name: Operations - Issue of Outbound Documents

3.1.4 For Dangerous Cargo Operations Personnel must clearly indicate

the IMCO class, on the remarks box and mark ”DG”, on the Export FCL Collection Order and provide four DG placards to shipper’s representative to stick on the panels of the container.

Page 24: Unit 5 Operation in Shipping Line Operation in Shipping Line.

Procedure Name: Operations - Issue of Outbound Documents

3.6 The shippers’ representative (for merchant haulage) must acknowledge receipts of Export FCL Collection Order by signing on the Booking Acknowledgement for empty container pick-up.

Page 25: Unit 5 Operation in Shipping Line Operation in Shipping Line.

Procedure Name: Operations - Issue of Outbound Documents

3.7 Special Cases or Exceptional Requirements

3.7.1 If there are any special cases or exceptional requirements, Operations Personnel must consult the supervisor for guideline to take further actions.

Page 26: Unit 5 Operation in Shipping Line Operation in Shipping Line.

Work in pairs

imagining that you are an operation personnel, compare the two job procedures, find out the different key points between different job procures you should focus on.

Port Operations Issue of Outbound Documents

Key point 1

Key point 2

Key point 3

Key point 4

Page 27: Unit 5 Operation in Shipping Line Operation in Shipping Line.

Useful expressions and code explanation

Inbound 入港 Outbound 出港FCL Collection Order 整柜提柜单Hanger Container 挂衣柜 Under-deck 甲板下 Away from Boiler 远离发动机Stowage Requirement 配积载要求Heavy Duty Container 超重柜 Reefer Container 冷冻柜IMCO class 危险品等级 merchant haulage 货方拖运 empty container pick-up 提空柜

Page 28: Unit 5 Operation in Shipping Line Operation in Shipping Line.

4.4 Terminal Departure Report4.4 Terminal Departure Report

Page 29: Unit 5 Operation in Shipping Line Operation in Shipping Line.
Page 30: Unit 5 Operation in Shipping Line Operation in Shipping Line.

Look at the document of terminal departure report ,complete the table below:

English Chinese

1 Voy( voyage) 航次2 On board date

3 Reefer container

4 Container Num.

5 Dangerous goods

6 Moves 港口操作吊次

7 P.O.D.

8 Cargo Weight

9 Terminal productivity

10 Crane

11 Discharge for restow( restowage)

12 EOM (end of message) 表示文件到此结束