UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED TO NUTRIENT REMOVAL Wisconsin Wastewater Operators Association October 9, 2019 Allen Williams

Transcript of UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs...

Page 1: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED TO NUTRIENT REMOVAL

W i s c o n s i n W a s t e w a t e r O p e r a t o r s A s s o c i a t i o n

October 9, 2019

Allen Williams

Page 2: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

St. Cloud NEW Recovery Facility

Page 3: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

Overall Nutrient and Resource Recovery (NR2) Process Flow

WAS THICKENING DIGESTERS LYSTEK DEWATERING Centrifuge

Ostara Reactor

WAS P RELEASE (Tank 910)

CO-THICKENING

CENTRATE EQUALIZATION

Cell #6

PROCESS DRAIN TO PLANT HEADWORKS

to Headworks

TWAS

WPR TS BS

EQ

PSD

PFLT CEN

BSC BSL

GBT Washdown Water

WW

Filtrate Pump Station 370

WW FLT

Cake HOPPER HSW BIOSOLIDS STORAGE

Bypass

WAS

BS - Biosolids BSC - Biosolids Centrifuge BSL - Biosolids Loadout CEN - Centrate FLT - Filtrate EQ - Equalization PFLT - Process Filtrate PSD – Primary Sludge TS - Thickened Sludge WPR - WAS P Release Sludge WW- Water Wash Drain

Page 4: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

WASSTRIP Related Innovative Design and Process Opportunity

• Target: 24+ hours detention in WASSTRIP

• Thin WAS (<1% TS) • WASSTRIP requiring 2% TS for

24 hours detention – Solution: Instead of introducing a

new process to thicken – repurpose and utilize one of the existing GBT’s to thicken WAS to 2% and then send to the WASSTRIP tank

Final Clarifiers and RAS Pumps

GBT’s WASSTRIP

Page 5: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

GBT WAS Thickening Pilot • Piloted getting 2% WAS off of the GBT

– Belt Speed (20 to 100%) – WAS flow (110 – 180 gpm) – Dam position – Chicane positions – Polymer dose – Discussed different weave size of the belt

Page 6: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

2% WAS

Page 7: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

WAS Filtrate

Page 8: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

WAS and Co-thickening GBT Floc Hopper issues

• Low flows (100 gpm) to the large GBT’s causing solids settling in upfront hopper and flow distribution problems on the gravity deck – Solution: Reduce the hopper size

Page 9: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

WAS Pre-Thickening

o Operates 24/7 o Bypass designed for blending to 2.0% solids, not typically used

WAS THICKENING

to Headworks

TWAS 2.0% TS Phosphorus and Nitrogen in Biomass

WW FLT

Bypass

WAS 0.5% TS Phosphorus and Nitrogen in Biomass

Page 10: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

WASSTRIP

TWAS 2.0% TS Phosphorus and Nitrogen in Biomass

WAS P RELEASE (Tank 910)

WAS RELEASE PUMPS (2)

WPR 2.0% TS ~100 mg/L PO4-P Nitrogen in Biomass

THICKENED SLUDGE CHUTE

THICKENED SLUDGE PUMP

WAS P-RELEASE TANK (WPRS) WASSTRIP

WASSTRIP Tank Co-Thickener/ 910 Tank

Level WPRS, Total Solids

WPRS ORP

WPRS Temp

HRT – 20 to 50 hours feet % Deg F

7 2 -200 or less 50 – 60

Key Target: Maintain level in 910 at 7 feet • Operator will set the GBT feed flow to the co-thickener

to maintain 7 feet • Pumps operate to maintain GBT feed flow setpoint Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked

periodically • GBT feed flow adjusted as needed to adjust HRT • Mixers continuously run

Page 11: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

GBT flow pattern – Co-thickening

CO-THICKENING THICKENED SLUDGE CHUTE

TO FILTRATE PUMP STATION

TS 9.0% TS Particulate P (Bio and Chem) N in biomass

PFLT ~60 mg/L PO4-P Very little Nitrogen

PSD FCV

WPR FCV

GBT FCV

Polymer

THICKENED SLUDGE PUMPING

WAS RELEASE PUMPS (2)

RAW SLUDGE PUMPS (4)

Primary Scum GBT

Wash Water

TO BNR HSW

DIGESTERS

WPR 2.0% TS ~100 mg/L PO4-P

PSD 2.0% TS ~0 mg/L PO4-P

Page 12: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

Co-thickening GBT

• Key Target: Maintain level in 910 at 7 feet • Operator will set the GBT feed flow to the co-thickener to maintain 7 feet in 910

(WASSTRIP) • Operators will basically match flow leaving and going to WASSTRIP (approximately 40

gpm) • Pumps operate to maintain GBT feed flow setpoint • Primary sludge flow typically 60 gpm • Cake is coming off at 8% to 9% TS

• Secondary Target: Filtrate TSS <500 ppm • Very important to have clean filtrate going to Ostara process

Page 13: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

High Strength Waste

o HSW added to thickened sludge o Receiving up to 10,000-17,000 gpd HSW

including dairy, soda, brewery and food processing waste

o Design average TS flow 30,000 gpd

Page 14: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

Digestion

o Biological phosphorus converted to soluble phosphorus during digestion

o Some soluble phosphorus bound with Al, Ca and Mg in digestion o Organic nitrogen converted to ammonia during digestion o Storage digester to be converted to primary digester

BS 4.0% TS 170 mg/L PO4-P Particulate P (Bio and Chem) 2,500 mg/L NH4-N

HSW Particulate and Soluble P Organic N and NH4

TS 9.0% TS Particulate P (Bio and Chem) N in biomass

PRIMARY DIGESTERS (2)

SECONDARY DIGESTER

STORAGE DIGESTER

Page 15: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

Digester and Centrifuge Operation

1

2

Storage Secondary

Variations in digester %TS concentration

Examples of throughput changes:

75 gallons per minute at 3.5% solids = 1314 lb/hr

75 gallons per minute at 4.0% solids = 1501 lb/hr

• Operates 48 to 72 hours/week at 75 gpm • Target TS concentration of 15%

Page 16: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

Centrifuge Dewatering

Page 17: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

Centrifuge Operation • In order to achieve 15% TS:

• Adjustments to polymer dosage and make up water

• Adjustments to centrifuge speed settings

Page 18: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

Centrifuge Operation

Page 19: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

Centrifuge Operation

Sludge feed % solids

Sludge temperature

Polymer make up water

St. Cloud

Sludge type: Anaerobic digested biosolids at 55% VSDewatering equipment; Centrysis CS18-4Polymer Used: Polydyne C-6275 (liquid emulsion)Polymer % Active: 45Polmer Makeup Water Temp ⁰F: 49

Typical Sludge pH: 7.5Typical Sludge Temperature deg ⁰F: 95

Specified AverageDate: 08/16/18 08/17/18 08/17/18 09/12/18 12/14/18Time: 5:00 PM 2:30 PMCentrifuge Δn : 1 1 2.5 2.5 1.750Centifuge p1 : 20 20 15 22 19.250Centifuge α : 4.5 4.5 2.5 1.7 3.300Sludge temp: #DIV/0!Sludge pH: #DIV/0!Sludge Feed (%TS): 3.8 3.8 3.8 3.8 3.2 3.680Sludge Feed (%TVS): #DIV/0!Sludge Flow Rate (gpm): 76 76 76 75 77 76.000Sludge Throughput (lbs/hr): 1445 1445 1445 1426 1233 1398.918Polymer Pump Capacity (gph): 10.36 10.36 10.36 10.36 10.36 10.360Stroke Length (%): 100 100 100 100 100 100.000Polymer Pump Speed (%): 62 53 50 39 42 49.200Polymer Flow Rate (gpm): 0.11 0.09 0.09 0.07 0.07 0.085Neat Polymer Flow Rate (gph): 6.42 5.49 5.18 4.04 4.35 5.097Polymer Dosage (lbs/ton): 74.14 63.37 59.79 47.26 58.86 60.684Active Polymer Dosage (lb/ton): 33.36 28.52 26.90 21.27 26.49 30 27.308Polymer Sol. (%): 1.07 1.02 1.02 1.12 1.04 1.052Polymer Sol. Flow Rate/dilution H2O flow (gpm): 10.00 9.00 8.50 6.00 7.00 8.100Polymer Dosage (lbs/ton): 74.14 63.37 59.79 47.26 58.86 60.684as ate essu e (ps g) # /0 (gp )Centrate TSS (mg/l): 50 80 100 200 50 96.000Thickened/Cake Solids (%TS): 22 14 13.8 13.5 13 15.260Capture (%): 99.9 99.8 99.8 99.6 99.9 99.812

Polymer Dosage Calculation

Changed make up water to warmer REC EFF

Page 20: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

Centrifuge Dewatering

DEWATERING CENTRIFUGE

TO CAKE LOADOUT

BSL BSL

BSC 15.0% TS P and N are mostly particulate form

BSC

BSC

CEN 170 mg/L PO4-P 2,500 mg/L NH4-N

TO EQUALIZATION

TANK

TO PROCESS DRAIN PUMP

STATION

PD

BIOSOLIDS STORAGE CAKE HOPPER

AND PUMP

LYSTEK Rotary Lobe Pump

Polymer

SULFURIC ACID

(optional)

• Dirty centrate diverted to process drain pump station

• Clean centrate to equalization tank

• Cake biosolids processed in thermal hydrolysis process

BS - Biosolids BSC - Biosolids Centrifuge BSL - Biosolids Loadout CEN - Centrate FLT - Filtrate EQ - Equalization PFLT - Process Filtrate PSD – Primary Sludge TS - Thickened Sludge WPR - WAS P Release Sludge WW- Water Wash Drain

BS 4.0% TS 170 mg/L PO4-P Particulate P (Bio and Chem) 2,500 mg/L NH4-N

Page 21: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

NR2 Biosolids

o Biosolids Product Enhancement: Lystek Class A

• Enhance land application logistics

12% Flowable/Pumpable Liquid • Decrease liquid storage needs (increase storage

capacity) • Decrease hauling time and costs

Nutrient Reuse

Nutrient Recovery

Page 22: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

Sludge Storage Conversion

Centrate EQ and Lystek Biosolids Storage

Centrate EQ

Lystek Storage

Page 23: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

Nutrient Recovery Process

• PO4-P and NH4-N converted to struvite

NaOH MgCl2

SLR

PD

~100 dry tons of struvite / year

STRUVITE REACTOR

SRCY

CEN 170 mg/L PO4-P 2,500 mg/L NH4-N

PFLT ~60 mg/L PO4-P Very little Nitrogen

Page 24: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

NR2 Project in the Biosolids Building Biosolids Loadout

Nutrient Harvesting

Chemical Storage

Centrifuge

Lystek

Polymer Storage

Boiler

Page 25: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

NR2 Project in the Biosolids Building

Page 26: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

The Team

Page 27: UNIQUE THICKENING AND DEWATERING OPERATIONS RELATED … · Secondary Target: WASSTRIP HRT of 24 hrs at 2% Solids • Level is continuously monitored and HRT checked periodically •

Thank You