APPENDIX F: FINAL QUALITY ASSURANCE PROJECT PLAN Camp Withycombe MMRP Site Inspection East MRS: WITH-002-R-01 Clackamas, Oregon Prepared for:
Army National Guard Directorate 111 S. George Mason Drive Arlington, Virginia 22202 Prepared by:
AMEC Earth & Environmental, Inc. 7376 SW Durham Road Portland, Oregon 97224 (503) 639-3400 July 2011 Contract No. W9133L-10-F-0193 Project No. 3-2106-0179
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 i
Table of Contents
Page
LIST OF ABBREVIATIONS AND ACRONYMS .......................................................................... iii
Quality Assurance Project Plan (QAPP) Worksheet #1 Title and Approval Page ........................ 1
QAPP Worksheet #2 – QAPP Identifying Information ................................................................. 2
QAPP Worksheet #3 – Distribution List ...................................................................................... 3
QAPP Worksheet #4 – Project Personnel Sign-Off Sheet .......................................................... 5
QAPP Worksheet #5 – Project Organizational Chart .................................................................. 6
QAPP Worksheet #6 – Communication Pathways...................................................................... 7
QAPP Worksheet #7 – Personnel Responsibilities and Qualifications Table .............................. 9
QAPP Worksheet #8 – Special Personnel Training Requirements Table.................................. 13
QAPP Worksheet #9 – Project Scoping Session Participants Sheet......................................... 15
QAPP Worksheet #10 – Problem Definition.............................................................................. 16
QAPP Worksheet #11 – Project Quality Objectives/Systematic Planning Process Statements ................................................................................................................... 18
QAPP Worksheet #12 – Measurement Performance Criteria Table.......................................... 20
QAPP Worksheet #13 – Secondary Data Criteria and Limitations Table .................................. 27
QAPP Worksheet #14 – Summary of Project Tasks ................................................................. 30
QAPP Worksheet #15 – Reference Limits and Evaluation Table .............................................. 32
QAPP Worksheet #16 – Project Schedule Timeline Table ........................................................ 44
QAPP Worksheet #17 – Sampling Design and Rationale ......................................................... 46
QAPP Worksheet #18 – Sampling Locations and Methods/SOP Requirements Table ............. 47
QAPP Worksheet #19 – Sampling Locations and Methods/SOP Requirements Table ............. 48
QAPP Worksheet #20 – Field Quality Control Sample Summary Table .................................... 50
QAPP Worksheet #21 – Project Sampling SOP References Table .......................................... 51
QAPP Worksheet #22 – Field Equipment Maintenance, Testing, and Inspection Table............ 52
QAPP Worksheet #23 – Analytical SOP References Table ...................................................... 54
QAPP Worksheet #24 – Analytical Instrument Calibration Table .............................................. 55
QAPP Worksheet #25 – Analytical Instrument and Equipment Maintenance, Testing, and Inspection Table ........................................................................................................... 58
QAPP Worksheet #26 – Sample Handling System ................................................................... 62
QAPP Worksheet #27 – Sample Custody Requirements Table ................................................ 63
QAPP Worksheet #28 – Laboratory QC Samples Table ........................................................... 64
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 ii
QAPP Worksheet #29 – Project Documents and Records Table .............................................. 73
QAPP Worksheet #30 – Analytical Services Table ................................................................... 74
QAPP Worksheet #31 – Planned Project Assessments Table .................................................. 75
QAPP Worksheet #32 – Assessment Findings and Corrective Action Responses .................... 76
QAPP Worksheet #33 – QA Management Reports Table ......................................................... 77
QAPP Worksheet #34 – Verification (Step I) Process Table ..................................................... 78
QAPP Worksheet #35 – Validation (Steps IIa and IIb) Process Table ...................................... 80
QAPP Worksheet #36 – Analytical Data Validation (Steps IIa and IIb) Summary ..................... 84
QAPP Worksheet #37 – Usability Assessment ......................................................................... 87
Appendix F-1 Laboratory Standard Operating Procedures and Limits
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 iii
LIST OF ABBREVIATIONS AND ACRONYMS
AEDBR Army Environmental Database - Restoration AES atomic emission spectroscopy AMEC AMEC Earth & Environmental, Inc. ARNG Army National Guard BIP blow-in-place bgs below ground surface CAS Chemical Abstracts Service CCAL continuing Calibration CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CFR Code of Federal Regulations CHMM Certified Hazardous Materials Manager CLP Contract Laboratory Program COR Contracting Officer’s Representative CSDGM Content Standard for Digital Geospatial Metadata CSM conceptual site model DDESB Department of Defense Explosives Safety Board DEQ Oregon Department of Environmental Quality DFTPP decafluorotriphenylphosphine DGPS differential global positioning system DGM Digital Geophysical Mapping DID Data Item Description DMM discarded military munitions DoD Department of Defense DQO data quality objective DU Decision Unit EDD electronic data deliverable EM Electromagnetic EOD Explosive Ordnance Disposal ELAP Environmental Laboratory Accreditation Program EP Engineer Pamphlet EPA U.S. Environmental Protection Agency
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 iv
ERA Ecological Risk Assessment ERIS Environmental Restoration Information System FGDC Federal Geographic Data Committee FSP Field Sampling Plan GC gas chromatography gdb Geosoft data base file GIS geographic information system GPS global positioning system HAZWOPER Hazardous Waste Operations and Emergency Response HPLC high performance liquid chromatography HRR Historical Records Review HTRW Hazardous, Toxic, and Radioactive Waste ICAL initial calibration ICP Inductively Coupled Plasma ICV initial calibration verification ID Identification IRT Instrument Response Test IS Incremental Sampling ISO Industry Standard Objects IVS Instrument Verification Strip KD Known Distance kg kilogram KO Contracting Officer LAW light anti-tank weapon LOD limit of detection LOQ limit of quantitation MC munitions constituents MD munitions debris MEC munitions and explosives of concern MDL method detection limit
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 v
mg milligrams mm millimeter MMRP Military Munitions Response Program MPPEH material potentially presenting an explosive hazard MRA Munitions Response Area MRS Munitions Response Site MS mass spectrometry NA not applicable NFA no further action NSSDA National Standard for Spatial Data Accuracy ODOT Oregon Department of Transportation OE Ordnance and Explosives OMD Oregon Military Department ORARNG Oregon Army National Guard OSHA Occupational Safety and Health Administration PAH polycyclic aromatic hydrocarbons PAO Public Affairs Officer PCB polychlorinated biphenyl PM Project Manager POC point of contact QA quality assurance QAPP Quality Assurance Project Plan QC quality control QL Quantitation Limit QSM Quality Systems Manual RBC Risk Based Concentration RDX hexahydro-1,3,5-trinitro-1,3,5-triazine RG Oregon Registered Geologist RI Remedial Investigation RPD relative percent deviation RSL Regional Screening Level RTK Real Time Kinematic
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 vi
SDSFIE Spatial Data Standards for Facilities, Infrastructure, and Environment SI Site Inspection SOP standard operating procedure SSHP Site Safety and Health Plan SUXOS Senior Unexploded Ordinance Supervisor TA TestAmerica Laboratories, Inc. TBD to be determined TCE trichloroethene TNT trinitrotoluene TPH total petroleum hydrocarbon TSA technical systems audit UFP Uniform Federal Policy U.S. United States USACE U.S. Army Corps of Engineers UXO unexploded ordnance UXOSO UXO Safety Officer UXOQCS UXO Quality Control Specialist WGS84 World Geodetic System 1984 VOC volatile organic compound
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 1
Quality Assurance Project Plan (QAPP) Worksheet #1 Title and Approval Page
Title: East Munitions Response Site (MRS) Camp Withycombe Military Munitions Response Program (MMRP)
Site Location: Camp Withycombe, Clackamas, Oregon
Revision Number: Final
Revision Date: 26 July 2011
Lead Organization:
Army National Guard (ARNG) Directorate
111 S. George Mason Drive Arlington, Virginia 22202 Preparer’s Name and Organizational Affiliation
Danille Jorgensen, AMEC Earth & Environmental, Inc. (AMEC)
Preparer’s Address, Telephone Number, and E-mail Address
7376 SW Durham Road Portland, OR 97224 503-639-3400 [email protected]
Preparation Date: 3 January 2011
Contractor Project Lead:
Scott Kranz, P.G., AMEC Signature
Contractor Quality Assurance Officer
Mary Schneider, CMQ/OE, CQA Signature
Approval, Lead Agency:
Kim Harriz, Army National Guard Directorate Signature
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 2
QAPP Worksheet #2 – QAPP Identifying Information
Site Name/Project Name: Site Inspection (SI) at WITH-002-R-01, East MRS MMRP, Camp Withycombe
Site Location: Camp Withycombe, Oregon
Operable Unit Not Applicable (NA)
Work Assignment Number: NA
Revision Number: Final
Revision Date: 23 July 2011
Contractor Name: AMEC.
Contract Number: W9133L-10-F-0193
1. Identify guidance used to prepare this QAPP:
Intergovernmental Data Quality Task Force (IDQTF) Uniform Federal Policy (UFP) for Quality Assurance Project Plans (QAPP) (IDQTF 2005) and United States (US) Environmental Protection Agency (EPA) QA/G-5: EPA Guidance for Quality Assurance Project Plans (EPA, 2002)
2. Identify regulatory program: Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA)
3. Identify approval entity: ARNG Directorate
4. Indicate whether the QAPP is a generic or a project-specific QAPP. (circle one)
5. List dates of scoping sessions that were held: 9/29/2010
6. List dates and titles of QAPP documents written for previous site work, if applicable: NA
7. List organizational partners (stakeholders) and connection with lead organization:
ARNG Directorate, Oregon Military Department (OMD), Oregon Army National Guard (ORARNG), Oregon Department of Environmental Quality (ODEQ), US Army Corps of Engineers (USACE)
8. List data users:
ARNG Directorate, ORARNG, OMD, ODEQ, USACE, Project Chemists, Project Geophysicists, UXO Technicians, Project Managers, Risk Assessors
9. If any required QAPP elements and required information are not applicable to the project, then circle the omitted QAPP elements and required information on the attached table. Provide an explanation for their exclusion below:
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 3
QAPP Worksheet #3 – Distribution List
QAPP Recipients Title/Role Organization Telephone
Number E-mail Address
Kim Harriz MMRP Program Manager, Contracting Officer’s Representative (COR)
ARNG Directorate
(703) 607-7991 [email protected]
Jim Arnold Restoration Manager
OMD Joint Force Headquarters OMD Environmental Branch (AGI-E)
(503) 584-3551
Bob Williams Project Manager (PM)
Oregon ODEQ
(503) 229-5696
Marc Anderson PM USACE – Omaha District
(402) 995-2282 [email protected]
Scott Kranz PM AMEC (503) 639-3400 [email protected]
Paula Bond MMRP Program Manager
AMEC (865) 671-6774
Charles Esler
Senior Scientist AMEC (503) 639-3400 [email protected]
Leonard Farr, Senior Scientist AMEC (503) 639-3400 [email protected]
Maya Taylor SI/RI Lead AMEC (503) 639-3400 [email protected]
Raye Lahti Senior Geophysicist
AMEC (715) 794-5889 [email protected]
Jeremy Haney Geophysical Field Team Lead
AMEC (503) 639-3400 [email protected]
Larry Hudgins UXO Program Manager
AMEC (704) 665-1352 [email protected]
Scott Sigler Senior Unexploded Ordnance Supervisor (SUXOS)
AMEC (318) 332-3265 [email protected]
Jason Kanski UXO Safety Officer/Quality Control Specialist (UXOSO/QCS)
AMEC (859) 815-0970
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 4
QAPP Worksheet #3 Continued – Distribution List
QAPP Recipients Title/Role Organization Telephone
Number E-mail Address
Mary Schneider, CMQ/OE, CQA
QA Officer AMEC (909) 569-7805 [email protected]
Danille Jorgensen
Project Chemist AMEC (503) 639-3400 [email protected]
Mandy Putney Community Relations
EnviroIssues (503) 248-9500 [email protected]
To Be Determined (TBD)
UXO Technicians Environmental Samplers
AMEC TBD TBD
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 5
QAPP Worksheet #4 – Project Personnel Sign-Off Sheet
Project Personnel Title Telephone Number Signature
Date QAPP Read
Danille Jorgensen Project Chemist (503) 639-3400
Raye Lahti Senior Geophysicist (715) 794-5889
Larry Hudgins UXO Program Manager (704) 655-1352
Scott Sigler SUXOS (318) 332-3265
Jason Kanski UXOSO/QCS (859) 815-0970
Maya Taylor SI Coordinator (503) 639-3400
Brett VanDelinder TestAmerica Laboratories, Inc. (TA)-Denver PM
(303) 736-0100
Terri Torres TA-Tacoma PM (253) 922-2310
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 6
QAPP Worksheet #5 – Project Organizational Chart
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 7
QAPP Worksheet #6 – Communication Pathways
Communication Drivers Responsible Entity Name Phone Number Procedure (Timing, Pathways, etc.)
Overall implementation of the project AMEC Scott Kranz (503) 639-3400 • Primary point of contact (POC) for ARNG, ORARNG, DEQ, and OMD
Project Management for the Lead Agency
OMD Restoration Manager
Jim Arnold (503) 584-3551 • OMD Restoration Manager will ensure project scope of work requirements are fulfilled.
Point of Contact with Regulators and Stakeholders
OMD Jim Arnold (503) 584-3551
• OMD Restoration Manager will act as primary point of contact for ODEQ and other stakeholders
Approval of Documents ARNG Directorate, OMD,
ODEQ
Kim Harriz Jim Arnold
Robert Williams
(703) 607-7991 (503) 584-3551 (503) 229-5696
• ODEQ will provide concurrence of documents through letter notification to ARNG Directorate/OMD
• ARNG/OMD will provide concurrence of through approved work plans
Approval of Field Operations OMD Restoration Manager
Jim Arnold (503) 584-3551 • Field manager will submit daily field reports to the OMD Restoration Manager for approval. OMD Restoration Manager will process all requests for changes.
Technical issues during implementation of the project
AMEC PM Scott Kranz
(503) 639-4300
• Field crew will notify the PM, who will notify the ARNG/OMD via phone/email of significant technical or quality-related issues.
Stop Work for Quality or Safety Issue Any site personnel
including but not limited to
SUXOS, ARNG, OMD, USACE
Scott Sigler
(318) 332-3265
• Any project member can call a stop work for safety issues. AMEC team members must notify their supervisor, who in turn notifies the AMEC Project Manager (verbal, electronic). If the ARNG/OMD/USACE calls a ‘stop-work’, the ARNG PM/OMD POC will notify the AMEC PM (electronic or written).
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 8
QAPP Worksheet #6 Continued – Communication Pathways
Communication Drivers Responsible Entity Name Phone Number Procedure (Timing, Pathways, etc.)
Changes to QAPP or other plans, designs, or procedures
AMEC PM Scott Kranz (503) 639-3400 • Will notify ARNG COR prior to implementation for review and approval
Deviation(s) from QAPP AMEC PM Scott Kranz (503) 639-3400 • Will notify the ARNG COR/PM
Field Program Quality Issues SUXOS UXOSO/QCS
Scott Sigler Jason Kanski
(318) 332-3265 • Will notify AMEC PM who in turn will contact the ARNG or OMD as necessary
Corrective Action for field program quality issues
SUXOS Scott Sigler (318) 332-3265 • Will notify AMEC PM to determine corrective action (verbal, written, or electronic)
Analytical Quality Control Issues AMEC QA Officer Mary Schneider (909) 396-1936 • Will notify AMEC PM of any significant quality control issues. AMEC PM will notify the ARNG as appropriate.
Analytical Quality Control Corrective Action
AMEC PM Scott Kranz (503) 639-3400 • Will contact ARNG/OMD PMs with proposed corrective action for review and approval as necessary.
Sample quality issue (e.g., broken sample bottles, incorrect preservation)
TA-Denver Brett VanDelinder
(303) 736-0100 • Will notify the AMEC RI/SI Coordinator and AMEC Project Chemist who will then contact the AMEC PM to determine impacts to the end data use.
Corrective action (s) for sample quality issues
AMEC Project Chemist
Danille Jorgensen
(503) 639-3400 • Will respond to issue from laboratory with potential corrective action to AMEC PM who will contact ARNG for approval as appropriate
Geophysical Quality Control Issues AMEC Project Geophysicist
Raye Lahti (715) 794-5889 • Will notify AMEC PM who will notify the ARNG as appropriate.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 9
QAPP Worksheet #7 – Personnel Responsibilities and Qualifications Table
Name Title Organizational Affiliation Responsibilities
Kim Harriz
MMRP Program Manager ARNG
• Provides project scope and direction • Review and approval of draft and draft final documents • Coordinates with the USACE Omaha District for review of
select documents.
COR ARNG
• Ensures that the project scope of work requirements are fulfilled
• Oversees the project cost and schedule • Provides direction to the project team • Acts as lead interface with agencies • Documents AMEC Performance
Jim Arnold Restoration Manager OMD
• Primary Lead Agency Project Manager • Oversees project execution • Coordinates all activities with contractor and USACE • Review draft and draft final documents • Coordinate with the Public Affairs Office (PAO), Oregon
Department of Transportation (ODOT), and project stakeholders
Marc Anderson Technical Project Manager
USACE – Omaha District
• Provides technical support as requested by ARNG Program Manager
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 10
QAPP Worksheet #7 Continued – Personnel Responsibilities and Qualifications Table
Name Title Organizational Affiliation Responsibilities
Scott Kranz Project Manager AMEC
• Coordinates work activities of AMEC’s personnel and subcontractors, and ensures that all personnel adhere to the administrative and technical requirements of the project
• Monitors and reports the progress of work, and ensures that the project deliverables are completed on time and within project budget
• Monitors the budget and schedule, and notifies the client and Program Lead of any changes that may require administration actions
• Ensures adherence to the quality requirements of the contract, project scope of work, and quality control (QC)
• Ensures that all work meets the requirements of the technical specifications and complies with applicable codes and regulations
• Ensures that all work activities are conducted in a safe manner in accordance with the Site Safety and Health Plan (SSHP)
• Serves as the primary contact between the client, and AMEC for actions and information related to the work and including appropriate technical personnel in the decision-making
• Coordinates satisfactory resolution and completion of nonconformance reports
• Submits the QAPP to the client approval
Mary Schneider Project QA Officer AMEC • Ensures adherence to the quality requirements of the
contract, project scope of work, and quality control
Maya Taylor SI/RI Lead AMEC • Coordinates project deliverables and team assignments
Larry Hudgins AMEC Field Manager AMEC
• Manages/supervises field activities on a daily basis • Routes quality issues to the AMEC Project Manager
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 11
QAPP Worksheet #7 Continued – Personnel Responsibilities and Qualifications Table
Name Title Organizational Affiliation Responsibilities
Scott Sigler SUXOS AMEC
• Overall accountability for all UXO handling activities • Implements project work plans, Standard Operating
Procedures (SOPs) • Oversight of field crews and subcontractors • Ensures compliance with all federal, state, and local statutes
regarding munitions responses
Jason Kanski UXOSO/QCS AMEC
• Oversees all aspects of safety on this project • Documents site conditions and photographs field activities
during site audits • Ensures that all fieldwork is conducted in accordance with
the Work Plan • Provides direction to field staff and subcontractors • Performs reviews and inspections of UXO field teams to
ensure that project procedures are being followed
TBD UXO Technicians (I, II, III) AMEC
• Conduct UXO avoidance activities • Perform analog-instrument-assisted visual surveys (AVS) • Perform intrusive investigation of geophysical anomalies • Reacquire geophysical targets
Raye Lahti Project Geophysicist AMEC
• Submits field information data for upload into the data management database
• Checks electronic data for completeness (e.g., all required fields are entered)
• Submits properly formatted data • Adequately reviews and understands all SOPs and guidance
applicable to their tasking for the project
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 12
QAPP Worksheet #7 Continued – Personnel Responsibilities and Qualifications Table
Name Title Organizational Affiliation Responsibilities
Jeremy Haney
Geophysical Field Team Lead
AMEC
• Directs and oversees field DGM activities • Observes QC activities and validates results • Reviews geophysical data • Reviews and processes geophysical data • Selects target anomalies • Prepares data deliverables
Patrick McCarthy GIS/Database Specialist AMEC
• Manage target anomaly data • Manage intrusive investigation data • Create Anomaly Maps
TBD Geophysical Field Team AMEC
• Performs QC and equipment function tests • Collects DGM data • Reacquires geophysical target anomalies
Danille Jorgensen Project Chemist AMEC
• Acts as a liaison between AMEC and the laboratory • Provides technical project oversight • Coordinates laboratory and administrative activities to meet
project goals.
Breanna O’Connell
Data Validation Specialist AMEC
• Reviews data packages received from the analytical laboratory
• Qualifies analytical results based on validation results
Brett VanDelinder PM/Chemist TA-Denver
• Oversees tasks with the analytical laboratory • Monitors the quality of laboratory operations • Communicates issues to the AMEC Task Manager • Resolves issues and providing resolution document
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 13
QAPP Worksheet #8 – Special Personnel Training Requirements Table
Project Function
Specialized Training –
Title or Description of
Course
Training Provider
Training Date
Personnel/Groups Receiving Training
Personnel Titles/Organizational
Affiliation
Location of Training Records/Certificates
All field personnel Initial 40-hour OSHA
HAZWOPER Certification
and annual 8-hour refresher courses per 29 CFR 1910.120
(e)
Medical Surveillance
Program per 29 CFR
1910.1025
Vendor Prior to arrival at
site
All Field personnel AMEC and subcontractors
Certificates will be maintained on-site with project files
Field Supervisor(s) 8-hour OSHA HAZWOPER Supervisor
Training per 29 CFR
1910.120(e)(4) 1926
Vendor
Prior to arrival at
Site
Field Manager Field Manager/ AMEC
Certificates will be maintained on-site with project files
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 14
QAPP Worksheet #8 Continued – Special Personnel Training Requirements Table
Project Function
Specialized Training –
Title or Description of
Course
Training Provider
Training Date
Personnel/Groups Receiving Training
Personnel Titles/Organizational
Affiliation
Location of Training Records/Certificates
Munitions Response/Recognition
MEC Safety Training
UXOSO, SUXOS
Prior to participation
in field activities
All field personnel AMEC and subcontractors
Documentation will be maintained in daily
field reports
AVS Use of hand-held
electromagnetic instrument
Project Geophysicist,
SUXOS
Prior to participation
in field activities
Geophysical survey teams, UXO Teams
Geophysical Survey Teams, UXO Teams/
AMEC and subcontractors
Documentation will be maintained in
project files
UXO Operations Meets qualifications of
Data Item Description
(DID) OE-025,
Department of Defense
(DoD) Certified
Courses or Schools
Prior to participation
in field activities
UXO Team SUXOS, UXOSO/QCS, Tech I,II,IIIs/AMEC and
subcontractors
Certificates will be maintained on-site with project files
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 15
QAPP Worksheet #9 – Project Scoping Session Participants Sheet
Project Name: Camp Withycombe RI and SI Site Name(s): Camp Withycombe – East MRS and West MRS
Projected Date(s) of Sampling:
3/31/11-6/2/11 Site Locations: Camp Withycombe, OR
Project Manager:
Scott Kranz
Date of Technical Project Planning (TPP) Meeting:
Sept 29, 2010
Name Title Affiliation Telephone Number E-mail Address Project
Role
Ann Wood
Chief, Cleanup & Restoration Branch
ARNG-ILE (703) 607-7199 [email protected]
Chief, Cleanup & Restoration Branch
Kim Harriz MMRP Program Manager
ARNG-ILE (703) 607-7991 [email protected] COR
Jim Arnold Environmental Restoration Manager
OMD-AGI-E (503) 584-3551 [email protected]
OMD Restoration Manager
Scott Kranz Senior PM AMEC (503) 639-3400 [email protected] AMEC PM
Maya Taylor Environmental Scientist AMEC (503) 639-3400 [email protected] SI/RI Lead
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 16
QAPP Worksheet #10 – Problem Definition
The problem to be addressed by the project: The East MRS is located in Camp Withycombe in Clackamas, Oregon and is operated by the Oregon Military Department (OMD) / Oregon Army National Guard (ORARNG). The project area was identified as a potential MRS after MEC and MD were encountered during the investigation and remedial action of several former small arms firing ranges (SAFRs) at Camp Withycombe. The former SAFR restoration project was conducted under the ARNG Directorate Compliance Clean-up (CC) Program. To further evaluate the presence of potential MRSs, The OMD completed a Preliminary Assessment (PA) of Camp Withycombe in December 2009 (OMD, 2009).
Historical research was conducted in 2009 to identify known and potential sources of MEC and MC located on the West MRS resulting from former military training activities, to define the boundary of the MRS, and to compile information to be used in a preliminary Conceptual Site Model (CSM).
The historical research identified former training and waste disposal activities at Camp Withycombe and concluded that the East MRS contains several undocumented waste disposal areas and was used for practice and live-fire of small, medium, and large caliber munitions. The results indicate undocumented waste disposal areas are may contain discarded military munitions (DMM), MC, and other contaminants. The results also indicate MEC and munitions debris (MD), including 40mm smoke grenades, rifle grenades, 60mm mortar rounds, 35mm sub-caliber rockets, 3.5-inch practice rockets, and 37mm projectiles have been found in surface and subsurface soil during previous investigations within the East MRS Figure D-2 (Appendix D). There is a potential for encountering MEC and MC, impact areas, and disposal areas in the East MRS.
The objective of the SI is to evaluate the presence or absence of DMM, MEC, MC, and waste constituents in East MRS and to evaluate if waste constituents from disposal areas impacted the groundwater.
The environmental questions to being asked: • Are MEC and MC present in the East MRS? • What are the boundaries of the East MRS? • What are the approximate boundaries of the disposal areas in the East MRS? • Are waste constituents from disposal areas or present in down gradient groundwater? • Are DMM, MC, and solid waste present in disposal area soil
Observations from any site reconnaissance reports: MEC and MC have been identified in the East MRS during previous investigations. Thirty-six (36) MEC and 325 MD were found and disposed during the small arms firing ranges restoration project. The restoration project area only covered a small portion of the East MRS and it is suspected that more MEC and MD are present throughout the East MRS. Solvents were detected on one monitoring well in the East MRS during an offsite groundwater investigation. Personnel interviews have indicated disposal areas were located on the hillside of the East MRS, and that practice and live-fire small arms, artillery, and mortar training were conducted throughout Camp Withycombe.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 17
QAPP Worksheet #10 Continued – Problem Definition
A synopsis of secondary data or information from site reports: Data and information from previous reports are summarized in Section 2.1 of the SI Work Plan.
The possible classes of contaminants and the affected matrices: Explosives, metals, polycyclic aromatic hydrocarbons (PAHs), total petroleum hydrocarbons (TPH), and volatile organic compounds (VOCs) may be present in East MRS soil from past munitions use and disposal activities. VOCs, explosives, TPH, and perchlorate may be present in groundwater
The rationale for inclusion of chemical and nonchemical analyses: MEC and MD have been observed in the East MRS and interviews with site personnel indicated discarded military munitions (DMM) was buried in the East MRS and the East MRS was an impact area for small arms, artillery, and mortar training. Explosives and metals are associated with MEC, MD and DMM. Analysis of these chemicals in soil may indicate their presence or absence in the East MRS.
Metals, PAHs, TPH, and VOCs are associated with shop waste including parts, batteries and chemicals that were reportedly buried in disposal areas in the East MRS. Analysis of these constituent in soil may indicate the presence or absence of solid waste associated with disposal areas.
VOCs associated with chemicals and explosives associated with DMM suspected in disposal areas may have leached to groundwater. Analysis of these constituents may indicate the presence or absence of DMM and chemicals in disposal areas.
MEC, MD, DMM and some solid waste has a metallic signature. Impact areas may have physical indicators such as visible MEC and MD and craters and disposal areas may have physical indicators such as depressions, waste, and staining. An AVS (non-chemical analyses) will use visual identification and geophysical anomaly detection using analog metal detectors to identify the extent of MEC/ MD throughout the East MRS and estimate the extent of disposal areas in the East MRS.
Information concerning various environmental indicators: Abiotic media samples and visual observations (stressed vegetation, staining, etc.) will be used as indicators for the condition of the environment and as benchmarks to monitor change.
Project decision statement: If visual evidence indicates the presence of MEC in the East MRS, then further investigation or a removal action will be recommended. If the field investigation does not indicate the presence of MEC, then a no further action (NFA) for MEC will be recommended.
If MC or waste constituents are present in soil and groundwater at concentrations above screening levels, then further investigation will be recommended
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 18
QAPP Worksheet #11 – Project Quality Objectives/Systematic Planning Process Statements
Identify the data users: The primary data users are the ARNG Directorate, OMD, ODEQ, Geophysicists, OESS Safety Person, UXO Technicians Risk Assessors, Chemist, project managers
Identify the data uses: • To evaluate the presence or absence of MEC and MD in the East MRS. • To evaluate the presence or absence of MC in the East MRS • To determine the locations and approximate boundaries of the disposal areas in the East MRS • To evaluate the presence or absence of MC and waste constituents in the disposal area • To evaluate the presence or absence of MC and waste constituents in groundwater
Identify the data types: • Analog instrument-assisted visual survey data
o Documentation of observations o Geographic Information System (GIS) Data o EM signal strength in millivolts (mV)
• Analytical Data o Constituent concentrations in soil o Constituent concentrations in groundwater
Data quality required: • AVS field personnel should be able to identify munitions debris greater than 5 cm during AVS. • AVS field personnel should be able to identify evidence of munitions use (craters, berks, etc.) • Field personnel should be able to recognize physical evidence of disposal areas (staining,
changes in topography, evidence of ground disturbance) • 90 percent (%) of validated data not rejected according to criteria in Worksheet #12
Quantity of Data Needed: • Sufficient data to determine presence or absence of MEC in soil, and MC in soil and groundwater • Sufficient data to determine presence and define the approximate boundaries of disposal areas
Sampling Design/Rationale Sampling Design and Rationale are including in Section 6.2 of the SI Work Plan.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 19
QAPP Worksheet #11 Continued – Project Quality Objectives/Systematic Planning Process Statements
Data Collection and Reporting:
Spatial data will follow the Federal Geographic Data Committee (FGDC) National Standard for Spatial Data Accuracy (NSSDA) format. In addition, GIS data sets will be accompanied by metadata, conforming to FGDC’s Content Standard for Digital Geospatial Metadata (CSDGM) and be provided in a geodatabase that is compliant with the Spatial Data Standards for Facilities, Infrastructure, and Environment (SDSFIE). The horizontal accuracy of GIS data will be tested in accordance with the NSSDA and the results shall be recorded in the metadata. All data shall be provided in the Universal Transverse Mercator (UTM) project in the appropriate zone, and shall have a datum of World Geodetic System (WGS) 84.
MEC, MD, and anomaly density data will be collected along meandering transects throughout the East MRS and in areas with suspected disposal areas. Data will be manually recorded on field forms and interpreted using Geosoft Oasis montaj and ESRI ArcGIS. Interpreted density maps with approximate disposal area boundaries will be generated and presented in the final report.
DGM survey methods will be utilized for the majority of data collection in the West MRS. Geophysical data will collected and stored on field computers in the Geonics proprietary binary format. Data will be imported into a Geosoft database (.gdb) using Oasis montaj for review and processing. Final processed data and target anomaly list(s) will be provided in .gdb format as they are completed. Full anomaly lists with intrusive investigation data for select anomalies will be provided with the final report.
Samples will be collected and submitted for laboratory analysis in accordance with Worksheet 18. Analysis will be performed by a laboratory that holds current accreditation through the DoD Environmental Laboratory Accreditation Program (ELAP) and the State of Oregon ELAP. The analytical data generated by the off-site laboratory will be reported in a Contract Laboratory Program (CLP)-equivalent data package format (hardcopy) and electronic data deliverable (EDD) format. The analytical results will be supplied to AMEC in sufficient quality/quantity to facilitate uploading the data into the Environmental Restoration Information System (ERIS) database. The data will be presented in SI and RI Reports.
Data Archiving: Following data validation, project data stored in EQuIS will be converted into the ERIS database deliverable format and uploaded to the ERIS website. The data will be validated by an AMEC chemist. All field forms, field notes, log books, data packages, and validation reports will be included in the RI and SI Reports. All project reports and documentation will be archived in the master project file.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 20
QAPP Worksheet #12 – Measurement Performance Criteria Table
Matrix Soil and Groundwater
Analytical Group Explosives
Concentration Level NA
Sampling Procedure
Analytical Method
Data Quality Indicators (DQIs)
Measurement Performance
Criteria
QC Sample and/or
Activity Used to
Assess Measurement Performance
QC Sample Assesses Error for
Sampling (S), Analytical (A) or both (S&A)
See QAPP Worksheet
#18 EPA Method
88330A
Precision (field)
< 30% RPD when detected concentrations
>5x QL; Difference <QL if concentrations <
5x QL
Field Duplicate
compared to Primary Sample
S&A
Precision (laboratory)
< 20% RPD
(DoD QSM v 4.1)
Matrix Spike Duplicate
Laboratory Duplicate
A
Accuracy DoD QSM v 4.1
(DoD 2009) specified limits
Laboratory Control Sample
A
Accuracy DoD QSM v 4.1 (DoD
2009) specified
limits
Matrix Spike A
Accuracy + 30% of spike concentration
Surrogate Compounds
A
Accuracy No analyte > ½ QL
Method Blank A
Completeness Greater than 90% acceptable
data
Data Validation
S&A
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 21
QAPP Worksheet #12 Continued – Measurement Performance Criteria Table
Matrix Soil
Analytical Group Metals
Concentration Level NA
Sampling Procedure
Analytical Method
Data Quality Indicators
(DQIs)
Measurement Performance
Criteria
QC Sample and/or Activity
Used to Assess
Measurement Performance
QC Sample Assesses Error for Sampling
(S), Analytical (A) or both
(S&A)
See QAPP Worksheet
#18
EPA Methods, 6020 and
7471
Precision (field)
< 30% RPD when detected concentrations
>5x QL; Difference <QL if concentrations <
5x QL
Field Duplicate compared to
Primary Sample S&A
Precision (laboratory)
< 20% RPD
DoD QSM v 4.1
Matrix Spike Duplicate
Laboratory Duplicate
A
Accuracy DoD QSM v 4.1 specified limits
Laboratory Control Sample A
Accuracy DoD QSM v 4.1 specified limits
Matrix Spike A
Accuracy No analyte > ½ QL
Method Blank A
Completeness Greater than 90% acceptable
data
Data Validation S&A
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 22
QAPP Worksheet #12 Continued – Measurement Performance Criteria Table
Matrix Soil and Groundwater
Analytical Group VOCs
Concentration Level NA
Sampling Procedure
Analytical Method
Data Quality Indicators
(DQIs)
Measurement Performance
Criteria
QC Sample and/or Activity
Used to Assess
Measurement Performance
QC Sample Assesses Error for Sampling
(S), Analytical (A) or both
(S&A)
See QAPP Worksheet
#18
EPA Method 8260B
Precision (field)
< 30% RPD when detected concentrations
>5x QL; Difference <QL if concentrations <
5x QL
Field Duplicate compared to
Primary Sample S&A
Precision (laboratory)
< 30% RPD
(DoD QSM v 4.1)
Matrix Spike Duplicate
Laboratory Duplicate
A
Accuracy DoD QSM v 4.1
(DoD 2009) specified limits
Laboratory Control Sample A
Accuracy DoD QSM v 4.1 (DoD 2009)
specified limits
Matrix Spike A
Accuracy (organics)
DoD QSM v 4.1 (DoD 2009)
specified limits
Surrogate Compounds
A
Accuracy No analyte > ½ QL
Method Blank A
Completeness Greater than 90% acceptable
data
Data Validation S&A
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 23
QAPP Worksheet #12 Continued – Measurement Performance Criteria Table
Matrix Groundwater
Analytical Group Perchlorate
Concentration Level NA
Sampling Procedure
Analytical Method
Data Quality Indicators
(DQIs)
Measurement Performance
Criteria
QC Sample and/or Activity
Used to Assess
Measurement Performance
QC Sample Assesses Error for Sampling
(S), Analytical (A) or both
(S&A)
See QAPP Worksheet
#18
EPA Method 6860
Precision (field)
< 30% RPD when detected concentrations
>5x QL; Difference <QL if concentrations <
5x QL
Field Duplicate compared to
Primary Sample S&A
Precision (laboratory)
< 15% RPD
DoD QSM v 4.1
Matrix Spike Duplicate
Laboratory Duplicate
A
Accuracy 80%-120%
DoD QSM v 4.1
Laboratory Control Sample A
Accuracy 80%-120%
DoD QSM v 4.1
Matrix Spike A
Accuracy DoD QSM v 4.1 specified limits
Surrogate Compounds
A
Accuracy No analyte > ½ QL
Method Blank A
Completeness Greater than 90% acceptable
data
Data Validation S&A
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 24
QAPP Worksheet #12 Continued – Measurement Performance Criteria Table
Matrix Soil
Analytical Group PAHs
Concentration Level NA
Sampling Procedure
Analytical Method
Data Quality Indicators
(DQIs)
Measurement Performance
Criteria
QC Sample and/or Activity
Used to Assess
Measurement Performance
QC Sample Assesses Error for Sampling
(S), Analytical (A) or both
(S&A)
See QAPP Worksheet
#18
EPA Method 8270
Precision (field)
< 30% RPD when detected concentrations
>5x QL; Difference <QL if concentrations <
5x QL
Field Duplicate compared to
Primary Sample S&A
Precision (laboratory)
< 30% RPD
DoD QSM v 4.1
Matrix Spike Duplicate
Laboratory Duplicate
A
Accuracy DoD QSM v 4.1 specified limits
Laboratory Control Sample A
Accuracy DoD QSM v 4.1 specified limits
Matrix Spike A
Accuracy DoD QSM v 4.1 specified limits
Surrogate Compounds
A
Accuracy No analyte > ½ QL
Method Blank A
Completeness Greater than 90% acceptable
data
Data Validation S&A
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 25
QAPP Worksheet #12 Continued – Measurement Performance Criteria Table
Matrix Soil
Analytical Group TPH-dx
Concentration Level NA
Sampling Procedure
Analytical Method
Data Quality Indicators
(DQIs)
Measurement Performance
Criteria
QC Sample and/or Activity
Used to Assess
Measurement Performance
QC Sample Assesses Error for Sampling
(S), Analytical (A) or both
(S&A)
See QAPP Worksheet
#18 NWTPH-
dx
Precision (field)
< 30% RPD when detected concentrations
>5x QL; Difference <QL if concentrations <
5x QL
Field Duplicate compared to
Primary Sample S&A
Precision (laboratory) < 35% RPD Matrix Spike
Duplicate A
Accuracy Method specified limits
Laboratory Control Sample A
Accuracy + 30% of spike concentration
Matrix Spike A
Accuracy (organics)
+ 30% of spike concentration
Surrogate Compounds
A
Accuracy No analyte > ½ the QL
Method Blank A
Completeness Greater than 90% acceptable
data
Data Validation S&A
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 26
QAPP Worksheet #12 Continued – Measurement Performance Criteria Table
Analytical Group: Equipment Functionality Tests for Analog Assisted Visual Surveys
Quality Control Parameter Frequency Instrument Measurement
Performance Criteria Activity used to
Assess Measurement Performance
Response Test At least once per day.
White’s, hand-held EM devices
100% of seed items along a test strip must be detected. Instrument responses must free from false-positives, false-negatives, and variable or inconsistent responses.
The operator will verify the instrument response of at least 4 industry standard object (ISO) seed items buried in known locations.
Position Test At least once per day.
Recreational-Grade GPS
100% of 5 recorded measurements must be within 25 feet of the known location
Recorded positions will be checked against a known benchmark.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 27
QAPP Worksheet #13 – Secondary Data Criteria and Limitations Table
Secondary Data Data Source (Originating
Organization, Report Title, and Data)
Data Generator(s) (Originating Org., Data
Types, Data Generation/Collection Dates)
How Data Will Be Used Limitations on Data Use
Soil Analytical Data
• Remedial Investigation Report and Addendum, Camp Withycombe Former Small Arms Firing Ranges, AMEC, 2006 & 2008
• Draft Construction Summary Report, Former Small Arms Firing Ranges, AMEC 2010
• Final Burial Pit Removal Report, Armed Forces Reserve Center, Camp Withycombe, AMEC 2010
• AMEC, Metals & Explosives Soil Analytical Data , Sample collection dates: August – November 2007
• AMEC, metals confirmation soil samples, sample collection dates: July – October 2008
• AMEC, metals confirmation soil samples
• Refine CSM • Determine locations
where MC has been addressed
No limitations noted.
Groundwater Analytical Data • Soil and Groundwater Investigations, Dames & Moore 1991
• Additional Small Arms Firing Ranges Characterization, Hart Crowser, 1996
• Clackamas County Parcel Limited Groundwater Investigation, AGRA, 1998
• Dames & Moore, Dissolved lead groundwater data, sample collection: April 1991
• Hart Crowser, total and dissolved metals groundwater data, sample collection: June 1996
• Refine CSM • Determine current
concentrations of MC in groundwater
• Evaluate trends in concentration levels
No limitations noted.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 28
QAPP Worksheet #13 Continued – Secondary Data Criteria and Limitations Table
Secondary Data Data Source (Originating Organization, Report Title,
and Data)
Data Generator(s) (Originating Org., Data
Types, Data Generation/Collection Dates)
How Data Will Be Used Limitations on Data Use
Groundwater Analytical Data Continued
• Remedial Investigation Report, Camp Withycombe Former Small Arms Firing Ranges, AMEC, 2006
• Groundwater Monitoring Reports, AMEC 2009 - 2011
• AMEC, metals groundwater analytical data, Sample Collection date: July 2006
• AMEC, metals groundwater analytical data: Quarterly sampling event
• Refine CSM • Determine current
concentrations of MC in groundwater
• Evaluate trends in concentration levels
No limitations noted.
Surface Water Analytical Data • Site Investigation, Camp Withycombe Firing ranges, Clackamas, Oregon, 1995
• Hart Crowser, lead surface water data, 1995
• Refine CSM • Identify potential surface
water areas • Determine if lead is present
in surface water
No limitations noted.
Excavated soil volumes • Draft Construction Summary Report, Former Small Arms Firing Ranges, AMEC 2010
• AMEC, soil excavation volumes, final volumes calculated October 2008
• Determine areas that have been remediated for metals already
No limitations noted.
Locations/type of MEC • Draft Construction Summary Report, Former Small Arms Firing Ranges, AMEC 2010
• AMEC, location and characterization of identified MEC/MD items;
• Determine locations were MEC has been addressed
• Refine CSM
No limitations noted
Personnel interviews • Included as Appendix A of the SI WP, March 2011
• Various personnel, interview forms: accounts of past use on the site; Interviews occurred 2008
• Refine CSM • Determine potential
locations of training • Identify locations of
potential disposal areas
No limitations noted.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 29
QAPP Worksheet #13 Continued – Secondary Data Criteria and Limitations Table
Secondary Data Data Source (Originating Organization, Report Title,
and Data)
Data Generator(s) (Originating Org., Data
Types, Data Generation/Collection Dates)
How Data Will Be Used Limitations on Data Use
Aerial photographs • USACE – Portland District, 1936 - 1998
• USACE, aerial photographs, 1936, 1944-1945, 1948, 1956, 1963, 1971, 1980, 1990, 1998
• Determine locations of former ranges, firing points, impact areas.
Resolution of maps varies from year to year
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 30
QAPP Worksheet #14 – Summary of Project Tasks
East MRS: SI Project Tasks
1. Analog Instrument-Assisted Visual Survey
2. MEC Disposal
• MEC Blow –in-place
• MEC Consolidation and Open Detonation
3. MC Sampling Tasks:
• East MRS Investigation – One composite sample will be collected from each of the eight meandering-transects. The composite sample will consist of five individual sub-samples and will be collected approximately 0-6 inches bgs, not to exceed 12 inches. Soil samples from transects will be analyzed for explosives.
• East MRS Disposal Areas – At least 10 discrete soil samples will be collected from within the boundaries of the six disposal areas, with at least one sample collected from each burial. Soil samples collected from the disposal areas will be analyzed for metals, PAHs, VOCs, TPH, and explosives.
• Groundwater Samples – One groundwater samples will be collected from each of the eight monitoring wells and analyzed for VOCs, perchlorate, and explosives.
4. Analysis Tasks:
Soil samples will be analyzed for metals by EPA Methods 6020/7471A, VOCs by EPA Method 8260B, PAHs by EPA Method 8270C, TPH by NWTPH-dx, and explosives by EPA Methods 8330 and 8330B. Groundwater samples will be analyzed for VOCs by EPA Method 8260B, explosives by EPA Method 8330, perchlorate by EPA Method 6860, and TPH by NWTPH-HCID. All analysis will be performed by TA-Denver and TA-Tacoma.
5. Quality Assurance Tasks:
Soil sampling and field activities will follow the guidance outlined in the SOP and FSP. The analysis, review, and validation of analytical data will adhere to QC procedures established in this QAPP.
6. Secondary Data:
See Worksheet #13.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 31
QAPP Worksheet #14 Continued – Summary of Project Tasks
7. Data Management Tasks:
MC and Waste Constituent Analytical Data: EQuIS software will be used to process and store analytical and field data. Data stored in EQuIS will be converted into the ERIS database deliverable format and uploaded to the ERIS website. The data will be validated by AMEC and all field forms, field notes, log books, and data packages will be included in the SI Report and all project documentation will be archived in the master project file.
Geophysical Data: All anomaly data generated from the geophysical data or collected during analog instrument assisted visual surveys and intrusive investigations will be stored in a GIS accessible Access database. QC test results will be documented on the appropriate field forms and tracked in an Access database. All field forms, field notes, log books, and data packages will be included in the SI Report and all project documentation will be archived in the master project file.
8. Documentation and Records:
Sample locations will be surveyed by an Oregon licensed surveyor. Sample collection will be documented in field notes, field sampling logs, and on the chain-of-custody forms. All field forms, field notes, log books, and data packages will be included in the SI Report and all project documentation will be archived in the master project file.
9. Assessment/Audit Tasks:
An internal audit of field activities including sampling and field measurements will be conducted by the ARNG. This field sampling technical systems audit (TSA) will verify that all established procedures are being followed.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 32
QAPP Worksheet #15 – Reference Limits and Evaluation Table
Matrix: Soil Analytical Group: Explosives by 8330A
Compound CAS Number
Project Screening Criteria/
Action Limit1 (mg/kg)
Project Quantitation Limit Goal
(mg/kg)
LOQ (mg/kg)
LOD (mg/kg)
MDL (mg/kg)
HMX 2691-41-0 3800 1200 0.10 0.04 0.0227
RDX 121-82-4 5.5 1.8 0.20 0.08 0.043
1,3,5-TNB 99-35-4 2200 730 0.10 0.04 0.0138
1,3-DNB 99-65-0 6.1 2.0 0.10 0.04 0.0166
Tetryl 479-45-8 240 80 0.20 0.08 0.0439
NB 98-95-3 4.8 1.6 0.30 0.08 0.085
2,4,6-TNT 118-96-7 19 6.0 0.10 0.04 0.0307
4-Am-DNT 19406-51-0 150 50 0.10 0.04 0.0299
2-Am-DNT 355-72-78-2 150 50 0.10 0.04 0.0329
2,4-DNT 121-14-2 1.6 0.50 0.10 0.04 0.0147
2,6-DNT 606-20-2 61 20 0.10 0.04 0.0191
2-NT 88-72-2 2.9 1.0 0.20 0.08 0.0472
3-NT 99-08-1 6.1 2.0 0.20 0.08 0.064
4-NT 99-99-0 30 10 0.20 0.1 0.0365
NG 55-63-0 6.1 2.0 2.0 0.4 0.215
PETN 78-11-5 NA NA 2.0 0.4 0.493
3,5-DNA 618-87-1 NA NA 0.10 0.04 0.009
1Oregon risk based concentrations (RBCs), September 2009, for soil, leaching to groundwater, residential were used for project screening criteria. In the instances where Oregon RBCs were not established for a specific analyte, EPA Regional Screening Levels (RSLs), November 2010, for residential soil were used.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 33
QAPP Worksheet #15 Continued – Reference Limits and Evaluation Table
Matrix: Groundwater Analytical Group: Perchlorate by EPA 6860
Compound CAS Number
Project Screening Criteria/
Action Limit1 (µg/L)
Project Quantitation Limit Goal
(µg/L)
LOQ (µg/L)
LOD (µg/L)
MDL (µg/L)
Perchlorate 14797-73-0 26 8 0.05 0.02 0.0088
1EPA Regional Screening Levels (RSLs), November 2010, for tapwater was used.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 34
QAPP Worksheet #15 Continued – Reference Limits and Evaluation Table
Matrix: Soil Analytical Group: Metals by EPA 6020
Compound CAS Number
Project Screening Criteria/
Action Limit1 (mg/kg)
Project Quantitation Limit Goal
(mg/kg)
LOQ (mg/kg)
LOD (mg/kg)
MDL (mg/kg)
Antimony 7440-36-0 31 10 0.200 0.040 0.014
Arsenic 7440-38-2 22 8 0.500 0.150 0.0506
Barium 7440-39-3 15,000 5,000 0.250 0.200 0.0705
Beryllium 7440-41-7 160 50 0.100 0.065 0.0225
Cadmium 7440-43-9 170 50 0.100 0.025 0.0094
Chromium 7440-47-3 NA NA 0.200 0.200 0.076
Cobalt 7440-48-4 230 75 0.100 0.018 0.0066
Copper 7440-50-8 3,100 1,000 2.50 0.200 0.0711
Lead 7439-92-1 30 10 0.100 0.050 0.0182
Manganese 7439-96-5 1,800 600 0.100 0.090 0.033
Nickel 7440-02-0 1,500 500 0.350 0.075 0.0253
Selenium 7782-49-2 390 120 0.500 0.250 0.133
Silver 7440-22-4 390 120 0.100 0.060 0.0203
Thallium 7440-28-0 NA NA 0.100 0.010 0.0035
Vanadium 7440-62-2 5.5 1.5 0.500 0.100 0.0385
Zinc 7440-66-6 23,000 8,000 2.50 0.900 0.316
1Oregon risk based concentrations (RBCs), September 2009, for soil, leaching to groundwater, residential were used for project screening criteria. In the instances where Oregon RBCs were not established for a specific analyte, EPA Regional Screening Levels (RSLs), November 2010, for residential soil were used.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 35
QAPP Worksheet #15 Continued – Reference Limits and Evaluation Table
Matrix: Soil Analytical Group: PAHs
Compound CAS Number
Project Screening Criteria/
Action Limit1 (mg/kg)
Project Quantitation Limit Goal
(mg/kg)
LOQ (mg/kg)
LOD (mg/kg)
MDL (mg/kg)
Acenaphthene 83-32-9 3,400 1,000 0.005 0.00035 0.00016
Acenaphthylene 208-96-8 NA NA 0.005 0.00035 0.00017
Anthracene 120-12-7 17,000 6,000 0.005 0.00035 0.00013
Benzo(a)anthracene 56-55-3 3.5 1.1 0.005 0.00035 0.00015
Benzo(a)pyrene 50-32-8 0.90 0.30 0.005 0.00035 0.00014
Benzo(b)fluoranthene 205-99-2 0.15 0.04 0.005 0.00035 0.00015
Benzo(ghi)perylene 191-24-2 NA NA 0.005 0.00035 0.0002
Benzo(k)fluoranthene 207-08-9 1.5 0.4 0.005 0.00035 0.00013
Chrysene 218-01-9 15 3 0.005 0.00035 0.00019
Dibenz(a,h)anthracene 53-70-3 3.4 1.1 0.005 0.00035 0.00024
Fluoranthene 206-44-0 2,300 700 0.005 0.00035 0.00021
Fluorene 86-73-7 2,300 700 0.005 0.00035 0.00023
Indeno(123-cd) pyrene 193-39-5 0.15 0.05 0.005 0.00035 0.00024
Naphthalene 91-20-3 0.087 0.087 0.005 0.00035 0.00033
Phenanthrene 86-73-7 NA NA 0.005 0.00035 0.00031
Pyrene 129-00-0 1,700 600 0.005 0.00035 0.00018
1Oregon risk based concentrations (RBCs), September 2009, for soil, leaching to groundwater, residential were used for project screening criteria. In the instances where Oregon RBCs were not established for a specific analyte, EPA Regional Screening Levels (RSLs), November 2010, for residential soil were used.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 36
QAPP Worksheet #15 Continued – Reference Limits and Evaluation Table
Matrix: Soil Analytical Group: VOCs
Compound CAS Number
Project Screening Criteria/ Action Limit1
(mg/kg)
Project Quantitation Limit Goal
(mg/kg)
LOQ (mg/kg)
LOD (mg/kg)
MDL (mg/kg)
1,1,1,2-Tetrachloroethane 630-20-6 1.9 0.5 0.005 0.001 0.0006
1,1,1-Trichloroethane 71-55-6 400 133 0.005 0.001 0.0005
1,1,2,2-Tetrachloroethane 79-34-5 0.56 0.15 0.005 0.001 0.0006
1,1,2-Trichloroethane2 79-00-5 0.0046 0.005 0.005 0.001 0.0009
1,1-Dichloroethane2 75-34-3 0.037 0.037 0.005 0.001 0.0002
1,1-Dichloroethene 75-35-4 11 4 0.005 0.001 0.0006
1,1-Dichloropropene 563-58-6 NA NA 0.005 0.001 0.0005
1,2,3-Trichlorobenzene 87-61-6 49 15 0.005 0.001 0.0008
1,2,3-Trichloropropane 96-18-4 0.005 0.005 0.005 0.001 0.0008
1,2,4-Trichlorobenzene 120-82-1 22 7 0.005 0.001 0.0007
1,2,4-Trimethylbenzene 95-63-6 16 4 0.005 0.001 0.0006
1,2-Dibromo-3-Chloropropane
96-12-8 4.9 1.5 0.01 0.001 0.0006
1,2-Dibromoethane3 106-93-4 0.000081 0.000081 0.005 0.001 0.0005
1,2-Dichlorobenzene 95-50-1 70 25 0.005 0.001 0.0005
1,2-Dichloroethane2 107-06-2 0.0014 0.0014 0.005 0.001 0.0007
1,2-Dichloropropane 78-87-5 0.89 0.3 0.005 0.001 0.0006
1,3,5-Trimethylbenzene 108-67-8 3.1 1 0.005 0.001 0.0006
1,3-Dichlorobenzene 541-73-1 NA NA 0.005 0.001 0.0005
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 37
QAPP Worksheet #15 Continued – Reference Limits and Evaluation Table
Compound CAS Number
Project Screening Criteria/
Action Limit1 (mg/kg)
Project Quantitation Limit Goal
(mg/kg)
LOQ (mg/kg)
LOD (mg/kg)
MDL (mg/kg)
1,3-Dichloropropane 142-28-9 1,600 400 0.005 0.001 0.0005
1,4-Dichlorobenzene 106-46-7 0.081 0.03 0.005 0.001 0.0008
2,2-Dichloropropane 594-20-7 NA NA 0.005 0.001 0.0004
2-Butanone (MEK) 78-93-3 28,000 9,000 0.02 0.01 0.0018
2-Chlorotoluene 95-49-8 1,600 400 0.005 0.001 0.0005
2-Hexanone 591-78-6 210 75 0.02 0.01 0.0049
4-Chlorotoluene 106-43-4 5,500 1,500 0.005 0.001 0.0008
4-Isopropyltoluene 99-87-6 NA NA 0.005 0.001 0.0005
4-Methyl-2-pentanone (MIBK)
108-10-1 5,300 1,500 0.02 0.01 0.0044
Acetone 67-64-1 61,000 20,000 0.02 0.01 0.0054
Benzene 71-43-2 0.0093 0.005 0.005 0.001 0.0005
Bromobenzene 108-86-1 300 100 0.005 0.001 0.0005
Bromochloromethane 74-97-5 NA NA 0.005 0.001 0.0003
Bromodichloromethane2 75-27-4 0.0025 0.0025 0.005 0.001 0.0002
Bromoform 75-25-2 0.22 0.05 0.005 0.001 0.0002
Bromomethane 74-83-9 0.098 0.03 0.01 0.001 0.0005
Carbon Disulfide 75-15-0 820 250 0.005 0.001 0.0004
Carbon Tetrachloride 56-23-5 0.013 0.005 0.005 0.001 0.0006
Chlorobenzene 108-90-7 6.5 2 0.005 0.001 0.0005
Chloroethane 75-00-3 320 100 0.01 0.001 0.0009
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 38
QAPP Worksheet #15 Continued – Reference Limits and Evaluation Table
Compound CAS Number
Project Screening Criteria/ Action Limit1
(mg/kg)
Project Quantitation Limit Goal
(mg/kg)
LOQ (mg/kg)
LOD (mg/kg)
MDL (mg/kg)
Chloroform2 67-66-3 0.0033 0.001 0.01 0.001 0.0003
Chloromethane 74-87-3 2.2 0.5 0.01 0.001 0.0008
cis-1,2-Dichloroethene 156-59-2 6 2 0.005 0.001 0.0006
cis-1,3-Dichloropropene 542-75-6 1.7 0.5 0.005 0.002 0.0013
Dibromochloromethane 124-48-1 0.016 0.05 0.005 0.001 0.0006
Dibromomethane 74-95-3 25 7 0.005 0.001 0.0008
Dichlorodifluoromethane 75-71-8 180 90 0.01 0.001 0.0005
Ethylbenzene 100-41-4 0.16 0.05 0.005 0.001 0.0007
Hexachlorobutadiene 87-68-3 6.2 2 0.005 0.001 0.0006
Iodomethane 74-88-4 NA NA 0.005 0.005 0.0004
Isopropylbenzene 98-82-8 2100 700 0.005 0.001 0.0006
m,p-Xylene 179601-23-1 25 8 0.003 0.002 0.001
Methyl tert-Butyl Ether (MTBE)
1634-04-4 0.092 0.03 0.02 0.001 0.0003
Methylene Chloride 75-09-2 0.038 0.13 0.005 0.001 0.0008
Naphthalene 91-20-3 0.087 0.03 0.005 0.001 0.0006
n-Butylbenzene 104-51-8 NA NA 0.005 0.001 0.0006
n-Propylbenzene 103-65-1 3400 1100 0.005 0.001 0.0006
o-Xylene 95-47-6 25 8 0.005 0.001 0.0006
sec-Butylbenzene 135-98-8 NA NA 0.005 0.001 0.0008
Styrene 100-42-5 390 100 0.005 0.001 0.0006
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 39
QAPP Worksheet #15 Continued – Reference Limits and Evaluation Table
Compound CAS Number
Project Screening Criteria/ Action Limit1
(mg/kg)
Project Quantitation Limit Goal
(mg/kg)
LOQ (mg/kg)
LOD (mg/kg)
MDL (mg/kg)
tert-Butylbenzene 98-06-6 NA NA 0.005 0.001 0.0005
Tetrachloroethene 127-18-4 0.0054 0.005 0.005 0.001 0.0006
Toluene 108-88-3 140 60 0.005 0.001 0.0007
trans-1,2-Dichloroethene 156-60-5 2.5 0.8 0.005 0.001 0.0004
trans-1,3-Dichloropropene 10061-02-6 NA NA 0.005 0.001 0.0007
Trichloroethene2 79-01-6 0.0023 0.0023 0.005 0.001 0.0002
Trichlorofluoromethane 75-69-4 72 25 0.01 0.002 0.001
Vinyl Chloride3 75-01-4 0.00051 0.00051 0.005 0.002 0.0013
Vinyl acetate 108-05-4 970 300 0.01 0.01 0.0011
1Oregon risk based concentrations (RBCs), September 2009, for soil, leaching to groundwater, residential were used for project screening criteria. In the instances where Oregon RBCs were not established for a specific analyte, EPA Regional Screening Levels (RSLs), November 2010, for residential soil were used.
2In instances where the LOQ does meet the Project Quantitation Limit Goal, data will be reported to the MDL. 3The RSL or RBC for this analyte is lower than the best commercially available laboratory detection limit.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 40
QAPP Worksheet #15 Continued – Reference Limits and Evaluation Table
Matrix: Soil Analytical Group: NWTPH-Dx
Compound CAS Number1
Project Screening Criteria/
Action Limit (mg/kg)
Project Quantitation Limit Goal
LOQ (mg/kg)
LOD (mg/kg)
MDL (mg/kg)
#2 Diesel (C10-C24) NA 3,200 1,000
25 12.5 5.7
Motor Oil (C24-C36) NA 100,000 30,000
50 12.5 9.1 1TPH do not have CAS numbers. Matrix: Groundwater Analytical Group: NWTPH-HCID
Compound CAS Number1
Project Screening Criteria/ Action Limit2 (mg/L)
Project Quantitation Limit Goal (mg/L)
LOQ (mg/L)
LOD (mg/L)
MDL ((mg/L)
#2 Diesel (C10-C24) NA 0.360 0.25 0.25 NA NA
Motor Oil (C24-C36) NA NA NA 0.5 NA NA
Gasoline NA 0.420 0.15 0.1 NA NA 1TPH do not have CAS numbers.
2Oregon risk based concentrations (RBCs), September 2009, for groundwater, ingestion and inhalation from tapwater, occupational were used for project screening criteria.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 41
QAPP Worksheet #15 Continued – Reference Limits and Evaluation Table
Compound CAS Number
Project Screening
Criteria (µg/L)1
Project Quantitation Limit Goal
(µg/L)
LOQ(µg/L)
LOD (µg/L)
MDL (µg/L)
1,1,1,2-Tetrachloroethane2 630-20-6 0.52 0.52 1 0.2 0.17 1,1,1-Trichloroethane 71-55-6 9100 2730 1 0.2 0.16 1,1,2-Trichloroethane4 79-00-5 0.23 0.23 1 0.4 0.32 1,1-Dichloroethane 75-34-3 2.3 2.3 1 0.2 0.16 1,1-Dichloroethene 75-35-4 340 102 1 0.2 0.14 1,1-Dichloropropene 563-58-6 NA NA 1 0.4 0.15 1,2,3-Trichlorobenzene 87-61-6 29 8.7 1 0.4 0.18 1,2,3-Trichloropropane4 96-18-4 0.00072 0.00072 3 0.8 0.77 1,2,4-Trichlorobenzene 120-82-1 2.3 2.3 1 0.8 0.32 1,2,4-Trimethylbenzene 95-63-6 15 4.5 1 0.2 0.14 1,2-Dibromo-3-Chloropropane4 96-12-8 0.00032r 0.00032 5 1.6 0.81
1,2-Dibromoethane4 106-93-4 0.0063 0.0063 1 0.2 0.18 1,2-Dichlorobenzene 95-50-1 370 111 1 0.2 0.13 1,2-Dichloroethane3 107-06-2 0.14 0.14 1 0.2 0.13 1,2-Dichloropropane2 78-87-5 0.39 0.39 1 0.2 0.13 1,3,5-Trimethylbenzene 108-67-8 12 3.6 1 0.8 0.14 1,3-Dichlorobenzene 541-73-1 NA NA 1 0.2 0.16 1,3-Dichloropropane 142-28-9 730 219 1 0.2 0.15 1,4-Dichlorobenzene2 106-46-7 0.42 0.42 1 0.4 0.16 2,2-Dichloropropane 594-20-7 NA NA 1 0.4 0.2 2-Butanone (MEK) 78-93-3 7100 2130 6 3.2 1.83 2-Chlorotoluene 95-49-8 730 219 1 0.4 0.17 2-Hexanone 591-78-6 47 14.1 5 3.2 1.4 4-Chlorotoluene 106-43-4 730 219 1 0.4 0.17 4-Isopropyltoluene 99-87-6 NA NA 1 0.4 0.17 4-Methyl-2-pentanone (MIBK) 108-10-1 2000 600 5 3.2 1.04
Acetone 67-64-1 22000 6600 10 6.4 1.9 Benzene2 71-43-2 0.39 0.39 1 0.2 0.16 Bromobenzene 108-86-1 88 26.4 1 0.2 0.17 Bromochloromethane 74-97-5 83 24.9 1 0.2 0.1 Bromodichloromethane4 75-27-4 0.12 0.12 1 0.2 0.17 Bromoform 75-25-2 7.2 2.16 1 0.4 0.19 Bromomethane 74-83-9 8.7 2.61 2 0.4 0.21 Carbon Disulfide 75-15-0 1000 300 2 0.8 0.45 Carbon Tetrachloride3 56-23-5 0.19 0.19 2 0.4 0.19 Chlorobenzene 108-90-7 91 27.3 1 0.2 0.17 Chloroethane 75-00-3 21000 6300 2 1.6 0.41 Chloroform3 67-66-3 0.19 0.19 1 0.2 0.16 Chloromethane 74-87-3 190 57 2 1.6 0.3
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 42
QAPP Worksheet #15 Continued – Reference Limits and Evaluation Table
Compound CAS Number Project
Screening Criteria (µg/L)1
Project Quantitation Limit Goal (µg/L)
LOQ(µg/L)
LOD (µg/L)
MDL (µg/L)
Dibromochloromethane2 124-48-1 0.68 0.68 1 0.4 0.17 Dibromomethane 74-95-3 8.2 2.46 1 0.4 0.17 Dichlorodifluoromethane (Freon 12) 75-71-8 200 60 2 0.8 0.31
Ethylbenzene 100-41-4 1.4 1.4 1 0.2 0.16 Hexachlorobutadiene2 87-68-3 0.86 0.86 1 0.4 0.12 Iodomethane 74-88-4 NA NA 2 0.2 0.23 Isopropylbenzene 98-82-8 680 204 1 0.4 0.19 m,p-Xylene 179601-23-1 200 60 2 0.8 0.34 Methyl tert-Butyl Ether (MTBE) 1634-04-4 12 12 5 0.4 0.25
Methylene Chloride2 75-09-2 4.4 4.4 5 0.4 0.32 Naphthalene4 91-20-3 0.14 0.14 1 0.8 0.22 n-Butylbenzene 104-51-8 1800 540 1 0.4 0.14 n-Propylbenzene 103-65-1 1300 390 1 0.2 0.16 o-Xylene 95-47-6 200 60 1 0.4 0.19 sec-Butylbenzene 135-98-8 NA NA 1 0.4 0.17 Styrene 100-42-5 1600 480 1 0.4 0.17 tert-Butylbenzene 98-06-6 NA NA 1 0.4 0.16 Tetrachloroethene4 127-18-4 0.093 0.093 1 0.4 0.2 Toluene 108-88-3 2300 690 1 0.4 0.17 trans-1,2-Dichloroethene 156-60-5 110 33 1 0.2 0.15 trans-1,3-Dichloropropene 10061-02-6 NA NA 1 0.4 0.19 Trichloroethene4 79-01-6 0.039 0.039 1 0.2 0.16 Trichlorofluoromethane (Freon 11) 75-69-4 1300 390 2 0.8 0.29
Vinyl Chloride4 75-01-4 0.025 0.025 1.5 0.8 0.4 Vinyl acetate 108-05-4 410 123 3 1.6 0.94
1Oregon risk based concentrations (RBCs), September 2009, for groundwater, ingestion and inhalation from tapwater, occupational were used for project screening criteria. In the instances that DEQ RBCs were not established, EPA RSLs (November 2009) were used.
2The project quantitation limit is exceeded by the RL/LOQ, but is achieved by both the LOD and the MDL. Results will be reported to the MDL.
3The project quantitation limit is exceeded by the RL/LOQ, but is achieved by the MDL. Results will be reported to the MDL.
4The project quanitation limit is not achievable by the best available technology.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 43
QAPP Worksheet #15 Continued – Reference Limits and Evaluation Table
Matrix: Groundwater Analytical Group: Explosives by 8330A
Compound CAS Number
Project Screening Criteria/ Action Limit1 (mg/L)
Project Quantitation Limit Goal
(mg/L)
LOQ (mg/L)
LOD (mg/L)
MDL (mg/L)
1,3,5-Trinitrobenzene 99-35-4 1100 400 1 0.4 0.2
1,3-Dinitrobenzene 99-65-0 3.7 1.0 0.4 0.15 0.0887
2,4,6-Trinitrotoluene 118-96-7 2.2 0.75 0.4 0.15 0.0724
2,4-Dinitrotoluene2 121-14-2 0.22 0.22 0.4 0.15 0.0838
2,6-Dinitrotoluene 606-20-2 37 10 0.2 0.15 0.0645
2-Amino-4,6-dinitrotoluene 35572-78-2 73 20 0.2 0.15 0.0507
3,5-Dinitroaniline 618-87-1 NA NA 0.4 0.144 0.1315
4-Amino-2,6-dinitrotoluene 19406-51-0 73 20 0.2 0.15 0.0577
HMX 2691-41-0 1800 600 0.4 0.15 0.0876
m-Nitrotoluene 99-08-1 3.7 1.2 0.4 0.15 0.0834
Nitrobenzene2 98-95-3 0.12 0.12 0.4 0.15 0.091
Nitroglycerin 55-63-0 3.7 3.7 3 1.5 0.921
o-Nitrotoluene2 88-72-2 0.31 0.31 0.4 0.15 0.0855
PETN 78-11-5 NA NA 2 1.5 0.416
p-Nitrotoluene 99-99-0 4.2 1.5 1 0.4 0.2
RDX 121-82-4 0.61 0.2 0.2 0.15 0.0523
Tetryl 479-45-8 150 50 0.24 0.15 0.0793
1EPA Regional Screening Levels (RSLs), November 2010, for tapwater were used.
2In instances where the LOQ does meet the Project Quantitation Limit Goal, data will be reported to the MDL.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 44
QAPP Worksheet #16 – Project Schedule Timeline Table
Activity ID Activity Name OriginalDuration Start Finish
Camp Withycombe MMRP Project 730 15-Sep-10 14-Sep-121000 Notice to Proceed 0 15-Sep-102000 End Project 0 14-Sep-12
Task 1 - Approved Project Management Plan (PMP) and Quality Assurance Surveillance 730 15-Sep-10 14-Sep-12 1.1 PMP and QASP 125 15-Sep-10 17-Jan-11
1010 Prepare Draft PMP and QASP 31 15-Sep-10 13-Dec-101020 Review Draft PMP and QASP (ORARNG/NGB) 10 14-Dec-10 23-Dec-101030 Prepare Final PMP and QASP 15 3-Jan-11 17-Jan-11
1.2 Technical Project Planning (TPP) 730 15-Sep-10 14-Sep-121050 Technical Project Planning (TPP) 730 15-Sep-10 14-Sep-121060 TPP Meeting #1 1 16-Dec-10 17-Dec-101070 TPP Meeting #2 1 14-Apr-11 14-Apr-111080 TPP Meeting #3 1 4-Oct-11 4-Oct-11
1.3 Community Involvement Support 730 15-Sep-10 14-Sep-121090 Community Relations 730 15-Sep-10 14-Sep-12
10100 Prepare Draft Community Relations Plan (CRP) Document 45 15-Sep-10 29-Oct-1010110 Review Draft CRP Document (ORARNG/NGB) 31 30-Oct-10 29-Nov-1010114 Prepare Draft-Final CRP Document 21 4-May-11 20-Jun-1110116 Review Draft-Final CRP Document (ORARNG/NGB) 31 20-Jun-11 20-Jul-1110120 Prepare Final CRP Document 21 20-Jul-11 4-Aug-1110125 Public Open House 1 4-May-11 4-May-1110130 Establish Repository and Administrative Record 610 30-Jun-11 14-Sep-12
Task 2 - Achieve Site Inspection (SI) at WITH-002-R-01: East MRS 486 15-Sep-10 13-Jan-12 2.1 SI Work Plan/QAPP/SSHP 233 15-Sep-10 5-May-11
10140 Prepare Draft SI Work Plan/QAPP/SSHP 46 15-Sep-10 11-Jan-1110150 Review Draft SI Work Plan/QAPP/SSHP (ORARNG/NGB) 31 12-Jan-11 16-Feb-1110160 Prepare Draft-Final SI Work Plan/QAPP/SSHP 21 16-Feb-11 9-Mar-1110170 Review Draft-Final SI Work Plan/QAPP/SSHP 36 10-Mar-11 10-Jun-1110180 Prepare Final SI Work Plan/QAPP/SSHP 21 10-Jun-11 1-Jul-11
2.2 SI Field Investigation 61 11-Jul-11 10-Sep-1110190 Analog Survey and Soil Sampling of Hillside Area 12 11-Jul-11 26-Jul-1110200 Hillside Area Groundwater Sampling 1 27-Jul-11 27-Jul-1110210 Upload Analytical Data to ERIS 1 10-Sep-11 10-Sep-11
2.3 SI Report 367 10-Sep-11 11-Sep-1210220 Prepare Draft SI Report 43 10-Sep-11 9-Nov-1110230 Review Draft SI Report (ORARNG/NGB) 30 9-Nov-11 21-Dec-1110240 Prepare Draft-Final SI Report 24 21-Dec-11 24-Jan-1210250 Review Draft-Final SI Report 30 24-Jan-12 6-Mar-1210260 Prepare Final SI Report 22 6-Mar-12 5-Apr-1210270 Update MRSPP Score 4 5-Sep-12 11-Sep-12
Task 3 - Achieve Remedial Investigation (RI) at WITH-001-R-01: West MRS 695 15-Sep-10 10-Aug-12 3.1 RI Work Plan 289 15-Sep-10 1-Jul-11
10290 Prepare Draft RI Work Plan 60 15-Sep-10 11-Jan-1110300 Review Draft RI Work Plan (ORARNG/NGB) 31 12-Jan-11 14-Feb-1110310 Prepare Draft-Final RI Work Plan 14 14-Feb-11 10-Jun-1110320 Review Draft-Final RI Work Plan 95 7-Mar-11 10-Jun-1110330 Prepare Final RI Work Plan 21 10-Jun-11 1-Jul-11
3.2 Explosives Siting Plan (ESP) 254 15-Sep-10 26-May-1110340 Prepare Draft ESP 31 15-Sep-10 27-Oct-1010350 Review ESP (ORARNG/NGB) 29 28-Oct-10 8-Jun-1110360 Review ESP (USATCES) 30 10-Jun-11 11-Jul-1110370 DDESB Review ESP 30 10-Jun-11 11-Jul-11
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 45
QAPP Worksheet #16 Continued – Project Schedule Timeline Table
Activity ID Activity Name OriginalDuration Start Finish
3.3 Fill Characterization 117 1-Jun-11 26-Sep-1110380 Prepare Draft SAP 5 1-Jun-11 10-Jun-1110390 Review Draft SAP 10 10-Jun-11 24-Jun-1110400 Prepare Final SAP 5 24-Jun-11 1-Jul-1110420 Soil Sampling 1 1-Jul-11 4-Jul-1110430 Laboratory Analysis and Data Validation 10 4-Jul-11 18-Jul-1110440 Prepare Draft Report and SWLA Permit Application 10 18-Jul-11 1-Aug-1110450 Review Draft Report and SWLA Permit Application 10 1-Aug-11 15-Aug-1110460 Prepare Final Report and SWLA Permit Application 5 15-Aug-11 22-Aug-1110470 ODEQ Approval of SWLA Permit 45 22-Aug-11 6-Oct-11
3.4 RI Field Investigation 219 30-Sep-11 6-May-1210480 OMD Preparation of Southeastern Corner of Sunrise Corridor Area 5 30-Sep-11 7-Oct-1110490 Mobilization - Stockpile Area 1 10-Oct-11 11-Oct-1110500 Geophysical System Verification 2 11-Oct-11 12-Oct-1110510 Prepare IVS Report 2 13-Oct-11 15-Oct-1110520 DGM Survey of Stockpile Area 5 17-Oct-11 21-Oct-1110530 Prepare DGM Submittals 5 24-Oct-11 28-Oct-1110540 Review DGM Submittals 5 31-Oct-11 4-Nov-1110550 Intrusive Investigation of Stockpile Area 3 7-Nov-11 9-Nov-1110560 Sockpile Area Soil Sampling 2 10-Nov-11 11-Nov-1110570 OMD Preparation of Sunrise Highway Corridor Area 31 14-Nov-11 14-Dec-1110580 Mobilization - Sunrise Highway Corridor Area 1 15-Dec-11 15-Dec-1110590 Geophysical System Verification 2 15-Dec-11 16-Dec-1110600 Prepare IVS Report 2 16-Dec-11 19-Dec-1110610 DGM Survey of Sunrise Highway Corridor Area 10 19-Dec-11 4-Jan-1210620 Prepare DGM Submittals 10 21-Dec-11 6-Jan-1210630 Review DGM Submittals 5 9-Jan-12 13-Jan-1210640 Intrusive Investigation of Sunrise Highway Corridor Area 10 16-Jan-12 3-Feb-1210650 Sunrise Highway Corridor Area Soil Sampling 5 6-Feb-12 10-Feb-1210660 Laboratory Analysis and Data Validation 30 10-Feb-12 26-Mar-1210670 Analog and Digital Geophysical Survey of Camp Withycombe Area 8 13-Feb-12 22-Feb-1210680 Prepare DGM Submittals 10 15-Feb-12 29-Feb-1210690 Review DGM Subittals 5 29-Feb-12 7-Mar-1210700 Intrusive investigation of Camp Withycombe Area 10 8-Mar-12 21-Mar-1210710 Camp Withycombe Area Soil Sampling 1 22-Mar-12 22-Mar-1210720 Upload Analytical Data to ERIS 1 6-May-12 6-May-12
3.5 RI Report 141 22-Mar-12 10-Aug-1210730 Prepare Draft RI Report 64 22-Mar-12 25-May-1210740 Review Draft RI Report (ORARNG/NGB) 30 25-May-12 24-Jun-1210750 Prepare Draft-Final RI Report 14 24-Jun-12 3-Jul-1210760 Review Draft-Final RI Report 30 3-Jul-12 2-Aug-1210770 Prepare Final RI Report 15 2-Aug-12 23-Aug-1210780 Update MRSPP Score 5 3-Aug-12 10-Aug-12
Task 4 - Achieve Technical Memorandum (TM) at WITH-001-R-01: West MRS 71 28-Jul-11 6-Oct-1110790 Prepare Draft TM 30 13-Feb-12 14-Mar-1210800 Review Draft TM (ORARNG/NGB) 30 14-Mar-12 13-Apr-1210810 Prepare Final TM 5 16-Apr-12 20-Apr-12
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 46
QAPP Worksheet #17 – Sampling Design and Rationale
Sampling Design and Rationale are discussed in Section 6.2 of the SI Work Plan.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 47
QAPP Worksheet #18 – Sampling Locations and Methods/SOP Requirements Table
DU Sampling Location/
ID Number
Sampling SOP
Reference Matrix
Depth (inches
bgs) Analytical
Group Deliverable Deliverable Due Date
East MRS, TBD1
CW-East-TRANSECT-01 Camp
Withycombe E-1, Soil Sampling
Methodology
Soil, Composite
0-6 not to exceed 12
Explosives Level III/IV Data Package and EQuIS
EDDs
14 days after sample receipt
East MRS Disposal Area, TBD2
CW-East-DA TRANSECT-01
Camp Withycombe
E-1, Soil Sampling
Methodology
Soil, Discrete Not to exceed 12
Metals, Explosives, PAHs, TPH-dx, and
VOCs
Level III/IV Data Package and EQuIS
EDDs
14 days after sample receipt
Groundwater wells, MW1-MW8 CW-MW1- 01 thru
CW-MW8- 01
Camp Withycombe
E-2, Groundwater
Sampling Methodology
Groundwater NA VOCs, NWTPH-HCID, perchlorate, explosives
Level III/IV Data Package and EQuIS
EDDs
14 days after sample receipt
1Soil sample locations will be selected based on the results of the analog-assisted visual survey of the East MRS described in the SI Work Plan. MEC, MD, and subsurface anomaly density data collected from each of the meandering transects will be evaluated to indentify one 300-foot segment per transect with the highest potential concentration of MEC. Visual observation indicating impact areas, including pits or craters, will also be considered with selecting sample locations. East MRS sample locations are discussed in Section 3.3.1.1 of the SI FSP.
2At least one sample will be collected from each of the disposal areas. Sample locations will be selected after review of the data from the analog assisted visual survey of the disposal areas described in the work plan. Anomaly concentrations and evidence of contamination will determine where samples will be collected within the disposal areas. East MRS Disposal Area sample locations are discussed in section 3.3.1.2 of the SI FSP.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 48
QAPP Worksheet #19 – Sampling Locations and Methods/SOP Requirements Table
Matrix Analytical Group
Analytical and Preparation Method/SOP Reference1 Containers Sample
Volume Preservation
Requirements Maximum Holding Time (Preparation/Analysis)2
Soil Metals DV-MT-0018 Inductively Coupled Plasma-Mass
Spectrometry by SW846 6020
1 x 4 ounce Glass jar 2 grams Cool ≤6°C 180 days
Soil Mercury DV-MT-0023 Mercury in Solids by Cold Vapor Atomic Absorption SW 7471B
1 x 4 ounce Glass jar 2 grams Cool ≤6°C 28 days
Soil – Discrete/
Composite
Explosives DEN-LC-0002 Nitroaromatic and Nitroamine
Explosive Compunds by HPLC Method 8330A and 8330B
1 x 4 ounce Glass jar 4 grams Cool ≤6°C
protect from light 7 days/40 days
Soil PAH DV-MS-0011 GC/MS Analysis based on Methods 8270C and 625
1x 4 ounce Glass jar 30 grams Cool ≤6°C
14 days/40 days
Soil TPH TA-GS-0339 Semivolatile Petroleum
Products Method for Soil and Water
1 x 4 ounce Glass jar 50 grams Cool ≤6°C 14 days/40 days
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 49
QAPP Worksheet #19 Continued– Sampling Locations and Methods/SOP Requirements Table
Matrix Analytical Group
Analytical and Preparation Method/SOP Reference Containers Sample
Volume Preservation
Requirements Maximum Holding Time (Preparation/Analysis)
Soil VOCs
DEN-MS-0010 Determination of Volatile
Organics by GC/MS Based on Method 8260B, 624, and
524.2
1 x 4 ounce Glass jar 5 grams Cool ≤6°C NA/14 days
Groundwater VOCs
DEN-MS-0010 Determination of Volatile
Organics by GC/MS Based on Method 8260B, 624, and
524.2
3 x 40 ml glass vials with PTFE
lined septum and an open screw
cap1
40 ml
No headspace; pH<2; Cool ≤6°C; protect
from light
NA/14 days Preserve with HCl
Groundwater Explosives
DEN-LC-0002 Nitroaromatic and
Nitroamine Explosive Compunds by HPLC Method
8330A and 8330B
1 L Amber with Teflon lined cap 1 L
Cool ≤6°C protect from
light, Acidify to pH 2 with NaHSO4
7 days/40 days
Groundwater Perchlorate DV-LC-0024, Perchlorate in Water and Solids by IC/MS by SW 846 Method 6860
250 ml glass bottle 100 ml Cool ≤6°C; protect from light 28 days
Groundwater NWTPH-HCID TA-GS-0326, Hydrocarbon Identification Method 1 L Amber 1 L Cool ≤6°C; 7 days/28 days
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 50
QAPP Worksheet #20 – Field Quality Control Sample Summary Table
Matrix Analytical Group
No. of Sampling Locations/
No. of Env. Samples
No. of Field
Duplicate Pairs
No. of Field Triplicate Groups
No. of MS/MSD
No. of Field Blanks/
Equipment Blanks/PT Samples
No. of VOA Trip Blanks Total No.
of Samples to Lab
Soil Metals East MRS: 8 composites 1 (10%) 0 1 (5%) 0 0 33
East MRS Disposal Area: at least 10
1 (10%)
1 (5%)
Soil Explosives (Discrete
and Composite Samples)
East MRS: 8 composites 1 (10%) 0 1 (5%) 0 0 33
East MRS Disposal Area: at least 10
1 (10%)
1 (5%)
Soil TPH East MRS Disposal Area: at least 10
1 (10%) 0 1 (5%) 0 0 13
Soil VOCs East MRS Disposal Area: at least 10
1 (10%) 0 1 (5%) 0 1 14
Groundwater VOCs1 MW1-MW8: 8 samples 1 (10%) 0 1 (5%) 1 1 13
Groundwater Explosives1 MW1-MW8: 8 Samples 1 (10%) 0 1 (5%) 1 0 11
Groundwater Perchlorate1 MW1-MW8: 8 Samples 1 (10%) 0 1 (5%) 1 0 11
Groundwater TPH1 MW1-MW8: 8 Samples 1 (10%) 0 1 (5%) 1 0 11 1One equipment blank sample will be collected during the groundwater sampling event. The equipment blank sample will be collected from the same sampling equipment and in the same manner as the groundwater samples, using deionized water in place of groundwater. The samples will be analyzed for the same analytes as the groundwater samples. If disposable sampling equipment is used, an equipment blank sample is not necessary.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 51
QAPP Worksheet #21 – Project Sampling SOP References Table
Reference Number
Title, Revision Date and/or Number
Originating Organization
Equipment Type
Modified for
Project Work?
Comments
E-2 SOP Groundwater Sampling
Methodology
AMEC Bladder pump No NA
E-1 SOP Soil Sampling Methodology
AMEC Shovel, trowel, hand auger, or
excavator
No NA
E-3 UXOGeo-SOP-0010
Conducting an Analog Instrument
Assisted Visual Survey
AMEC Held-Held metal detector or
magnetometer
No NA
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 52
QAPP Worksheet #22 – Field Equipment Maintenance, Testing, and Inspection Table
Field
Equipment Fu
nctio
nalit
y Te
st A
ctiv
ity
Mai
nten
ance
A
ctiv
ity Testing/
Inspection
Activity
Frequency Acceptance
Criteria Corrective Action
Responsible
Person SOP Reference
Hand-Held Metal Detector
Source verification
in instrument verification strip (IVS)
Initial Daily & End-of-
day
Response and detection of IVS items tested
If source is not detected, the instrument will be subject to maintenance activities onsite, and offsite as necessary
Operator (UXO Technician)
Manufacturer’s operation manual
Hand-Held Metal Detector
Battery check
Daily Batteries above manufacture level of acceptance
If instrument fails the battery test, the battery will be replaced and the test repeated and/or sent offsite for maintenance. Instrument will not be used until it passes the battery test.
Operator (UXO Technician)
Manufacturer’s operation manual
Positioning System (GPS)
Precision and
Accuracy Tests
Morning and Evening or if equipment is
replaced
Offset < 25cm
If offset is >25cm, a root-cause analysis will be performed. Equipment will not be used until the acceptance criteria are met.
Operator (Field Geophysicist)
GPS Accuracy and Precision Tests SOP
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 53
QAPP Worksheet #22 Continued – Field Equipment Maintenance, Testing, and Inspection Table
Field
Equipment Fu
nctio
nalit
y Te
st A
ctiv
ity
Mai
nten
ance
A
ctiv
ity Testing/
Inspection
Activity
Frequency Acceptance
Criteria Corrective Action
Responsible
Person SOP Reference
Positioning System (GPS)
Battery and
cable checks
Morning, Mid Day
Instrument functions according to manufacturer’s specifications
If instrument does not respond, the battery will be replaced or the cable connections will be checked. Check will be performed and passed prior to use.
Operator (Field Geophysicist)
Manufacturer’s operation manual, Cable Shake SOP
Communication Equipment
Verification Daily
Radios and secondary communication devices are operational
Work will not begin until a reliable means of communication is established
Operator (Field Geophysicist)
Manufacturer’s operation manual
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 54
QAPP Worksheet #23 – Analytical SOP References Table
Lab SOP Number1
Title, Revision Date, and/or Number
Definitive or Screening
Data Matrix and
Analytical Group Instrument Organization Performing
Analysis
Modified for
Project
DEN-LC-0002 Nitroaromatic and Nitroamine Explosive Compounds by HPLC
Method 8330A and Method 8330B
Definitive Soil, Explosives HPLC TA-Denver No
DV-MT-0018 Inductively Coupled Plasma-Mass Spectrometry by SW846 6020
Definitive Soil, Metals ICP/MS TA-Denver No
DV-MT-0023 Mercury in Solids by Cold Vapor Atomic Absorption SW 7471A
Definitive Soil, Mercury CVAA TA-Denver No
DV-MS-0010 Determination of Volatile Organics by GC/MS Based on Method
8260B, 624, and 524.2
Definitive Soil and Groundwater,
VOCs
GC/MS TA-Denver No
TA-GS-0339 Semivolatile Petroleum Products Method for Soil and Water
Definitive Soil, TPH GC/MS TA-Tacoma No
DV-GC-0010 Gasoline Range Organics by NWTPH-dx
Definitive Soil, TPH GC/FID TA-Denver No
DV-MS-0002 PAH by GC/MS Selected Ion Monitoring
Definitive Soil, PAHs GC/MS TA-Denver No
DV-LC-0024 Perchlorate in Water and Solids by IC/MS by SW 846 Method 6860
Definitive Groundwater, Perchlorate
IC TA-Denver No
TA-GS-0326 Hydrocarbon Identification Method, Method NWTPH-HCID
Definitive Groundwater, TPH GC TA-Tacoma No
1 Copies of laboratory SOPs are provided in Appendix F-1. The laboratory SOPs are the property of TestAmerica and is to be used only for the duration of and in connection with the implementation of this project. Information presented in hardcopies of the SOPs may be updated at a later date, and therefore, may not contain the most current information.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 55
QAPP Worksheet #24 – Analytical Instrument Calibration Table
Instrument Calibration Procedure Frequency of Calibration
Acceptance Criteria
Corrective Action (CA)
Person Responsible
for CA
SOP Reference
HPLC/ UV detector
Initial Calibration (ICAL)
Initially prior to sample analysis, when calibration
verification standards indicate calibration
relationship is no longer valid, whenever
significant instrument maintenance is
performed.
%RSD<20% or
r ≤0.995
Perform Maintenance
and re-calibrate
Laboratory Analyst
DEN-LC-0002
Continuing Calibration (CCAL) Daily 85%-115%
Repeat CCAL once; repeat ICAL if second CCAL
fails
Laboratory Analyst
ICP-AES (Metals)
ICAL Daily %RSD<30% or r>0.995
Repeat initial calibration
Laboratory Analyst
DV-MT-0018 Initial Calibration Verification
(ICV) 1/curve 90-110%
Repeat ICV once; repeat ICAL if
second ICV fails
Laboratory Analyst
Continuing Calibration Verification (CCV) Every 10 samples 90-110%
Repeat CCV once; repeat ICAL if
second CCV fails
Laboratory Analyst
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 56
QAPP Worksheet #24 – Analytical Instrument Calibration Table
Instrument Calibration Procedure Frequency of Calibration
Acceptance Criteria
Corrective Action (CA)
Person Responsible
for CA
SOP Reference
GC/MS (PAHs)
ICAL Method inception, CCAL fails
RRF ≥ 0.05, %RSD<30%
Repeat initial calibration
Laboratory Analyst
DV-MS-0002
GC/MS decafluorotriphenylphosphine
(DFTPP) Tune Beginning of 12-hour shift Method-
specified Repeat until
criteria are met Laboratory
Analyst
CCAL Prior to start of analysis
and every 12 hours thereafter
RRF ≥ 0.05, %D±25%
Repeat CCAL once; repeat ICAL if second CCAL
fails
Laboratory Analyst
GC/MS (VOCs)
ICAL Method inception, CCAL fails
RRF ≥0.05, %RSD<30%
Repeat initial calibration
Laboratory Analyst
DV-MS-0010
GC/MS BFB Tune Beginning of 12-hour shift Method-specified
Repeat until criteria are met
Laboratory Analyst
CCAL Prior to start of analysis
and every 12 hours thereafter
RRF ≥ 0.05, %D±25%
Repeat CCAL once; repeat ICAL if second CCAL
fails
Laboratory Analyst
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 57
QAPP Worksheet #24 Continued– Analytical Instrument Calibration Table
Instrument Calibration Procedure Frequency of Calibration
Acceptance Criteria
Corrective Action (CA)
Person Responsible
for CA
SOP Reference
IC
ICAL CCAL fails
Method inception,
Retention times
within ±10% Repeat ICAL
Laboratory Analyst
DV-LC-0024 ICV
Once after each ICAL, prior to beginning a
sample run
Retention times and recoveries
within ±10%
Repeat CCAL once; repeat ICAL if second CCAL
fails
Laboratory Analyst
CCV
Each working day, whenever effluent is
changed, and after 10 samples
Retention times and recoveries
within ±10%
Repeat CCAL once; repeat ICAL if second CCAL
fails
Laboratory Analyst
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 58
QAPP Worksheet #25 – Analytical Instrument and Equipment Maintenance, Testing, and Inspection Table
Instrument / Equipment
Maintenance Activity
Testing Activity
Inspection Activity Frequency Acceptance
Criteria Corrective
Action Responsible
Person SOP
Reference
HPLC/ UV detector
Check valves and change
seals
Acquire check standard, observe
retention time stability, and
check for air in system
expressed by cavitations of
baseline.
Passing calibration and check standard
As needed
Acceptable calibration and
stable calibration check standards
Perform
instrument
maintenance
Laboratory Analyst
DEN-LC-0002 Replace Guard
Column and in-line filter
Acquire check standard, observe
chromatography and peak shape.
Passing calibration and check standard
As needed
Acceptable calibration and
stable calibration check standards
Perform
instrument
maintenance
Laboratory Analyst
Back-flush column and/or replace column
Acquire check standard, observe
chromatography and peak shape.
Passing calibration and check standard
As needed
Acceptable calibration and
stable calibration check standards
Perform
instrument
maintenance
Laboratory Analyst
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 59
QAPP Worksheet #25 Continued – Analytical Instrument and Equipment Maintenance, Testing, and Inspection Table
Instrument / Equipment
Maintenance Activity
Testing Activity
Inspection Activity Frequency Acceptance
Criteria Corrective
Action Responsible
Person SOP
Reference
Mass Spectrometer
Pump Oil Level NA
Visual inspection of oil gauge and color
of oil
Check Monthly; Change Annually
Adequate oil level Add oil Laboratory
Analyst
DV-MT-0018, DV-MS-002 DEN-MS-0010
Detector Bake Out
Observation of deteriorating
chromatography NA As needed No interference/
carryover peaks Clean
detector Laboratory
Analyst
Clean source, replace filament
Observation of deteriorating
chromatography
Visual inspection of
filaments As needed
No interference; adequate spectral
resolution
Clean source; replace filament
Laboratory Analyst
Detector Pre-calibration
Resolution adjustment
Observation of tuning spectrum
Every 12 hours
Per method tuning
requirements Adjust optics
Laboratory Analyst
ICP-AES
Check pump tubing
Observation of deteriorating
chromatography
Visual Inspection Daily No defects
Replace worn or leaking tubing
Laboratory Analyst
DV-MT-0018
Check liquid argon supply
Observe tank gauge
Observe tank gauge Daily Adequate level
Replace tank if
necessary
Laboratory Analyst
Check fluid level
in waste container
NA Visual observation Daily No waste
overflow Empty waste
container Laboratory
Analyst
Check filters NA Visual observation Weekly Filters not
clogged Clean or replace
Laboratory Analyst
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 60
QAPP Worksheet #25 Continued – Analytical Instrument and Equipment Maintenance, Testing, and Inspection Table
Instrument / Equipment
Maintenance Activity
Testing Activity
Inspection Activity Frequency Acceptance
Criteria Corrective
Action Responsible
Person SOP
Reference
ICP-AES
Check torch NA Visual observation Daily No issues
Clean or replace torch
Laboratory Analyst
Check spray chamber and
entrance slit for debris
NA Visual observation Monthly No debris
Replace or clean spray
chamber or entrance slit
Laboratory Analyst
Clean and align nebulizer NA Visual
observation Monthly Visual inspection
Clean and align, if needed
Laboratory Analyst
CVAAS
Replace disposables,
flush lines
Visual inspection of
flow
Check connections Daily Visual
Replace accessories,
as needed
Laboratory Analyst
DV-MT-0023
GC
Bake injector/column
Daily observation of
instrument performance
Observation of deteriorating
chromatography As needed No interference/
carryover peaks
Clean injector and/or column
Laboratory Analyst
DEN-MS-0010
DV-MS-0011
DV-GC-0010
Change/remove guard column;
Replace connectors and
liners
Daily observation of
instrument performance
Observation of deteriorating
chromatography As needed
No interference/ carryover peaks
Change guard
column, connectors, and/or liners
Laboratory Analyst
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 61
QAPP Worksheet #25 Continued – Analytical Instrument and Equipment Maintenance, Testing, and Inspection Table
GC
Daily observation of
instrument performance
Compare CCV response to
previous day or ICAL
Identify Shifts in Response Daily
Method requirements Recalibrate
Laboratory Analyst
Daily observation of
instrument performance
Chromato-graphic
resolution, retention time
checks
Observation of deteriorating
chromatography Daily
Adequate resolution of
peaks in accordance with
method requirements or
analyst judgment
Change chromato-
graphic column
Laboratory Analyst
Daily observation of
instrument performance
Observation of deteriorating
chromatography
Carrier gas flow rate Daily
Compound retention time within method requirements
Check for leaks;
adjust flow
Laboratory Analyst
Daily observation of
instrument performance
Observation of deteriorating
chromatography
Check temperature of detector, inlet, column oven
Daily Verify in
accordance withmethod SOP
Adjust if outside limits
Laboratory Analyst
IC
Change Guard columns NA Preventative
Maintenance As needed No
interference/carry over peaks
Replace guard
column
Laboratory Analyst
DV-LC-0024
Replace tubing NA Preventative Maintenance As needed No leaks Replace
worn tubing Laboratory
Analyst
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 62
QAPP Worksheet #26 – Sample Handling System
SAMPLE COLLECTION, PACKAGING, AND SHIPMENT
Sample Collection (Personnel/Organization): AMEC Field Sampling Team
Sample Packaging (Personnel/Organization): AMEC Field Sampling Team
Coordination of Shipment (Personnel/Organization): AMEC Field Sampling Team
Type of Shipment/Carrier: FedEx
SAMPLE RECEIPT AND ANALYSIS
Sample Receipt (Personnel/Organization): AMEC Field Sampling Team
Sample Custody and Storage (Personnel/Organization): AMEC Field Sampling Team
Sample Preparation (Personnel/Organization): AMEC Field Sampling Team
Sample Determinative Analysis (Personnel/Organization AMEC Field Sampling Team
SAMPLE RECEIPT AND ANALYSIS
Sample Receipt (Personnel/Organization): Sample Custodian, TA-Denver/TA-Tacoma
Sample Custody and Storage (Personnel/Organization Sample Custodian, TA-Denver/TA-Tacoma
Sample Preparation (Personnel/Organization): Sample Custodian, TA-Denver/TA-Tacoma
Sample Determinative Analysis (Personnel/Organization): Analytical Chemist, TA-Denver/TA-Tacoma
SAMPLE ARCHIVING
Field Sample Storage (No. of days from sample collection): Samples to be shipped within 24 hours
properly preserved. Sample and Extract/Digestate Storage: Disposal of the samples will occur 90 days after a complete and validated data package is obtained by AMEC. Samples disposal must be approved of by the AMEC project chemist.
Biological Sample Storage (No. of days from sample collection): NA
SAMPLE DISPOSAL
Personnel/Organization: Sample Custodian, TA-Denver/TA-Tacoma Number of Days from Analysis: Disposal of the samples will occur 90 days after a complete and validated data package is obtained by AMEC. Samples disposal must be approved of by the AMEC project chemist.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 63
QAPP Worksheet #27 – Sample Custody Requirements Table
Sample Identification Procedures: The purpose of sample designation is to enable discrete sample tracking. Sample ID codes will be dependent on the sample type, as specified below. Duplicate samples will be identified using a blind naming convention. Primary samples will be designated by adding -01 to the end of the sample ID, equipment blanks will be designated by adding an -02 to the end of the sample ID, and duplicate samples will be designated by adding an -03 to the end of the sample ID.
Soil samples identified using five elements, separated by hyphens, in the following formats: • Site ID – MRS ID – Transect Number –Sample Type. For example the sample ID CW-East-T4-
01 would represent a primary sample (-01) collected from Camp Withycombe, in the East MRS, near semi-fixed transect number T4.
• Site ID – MRS ID – Disposal Area Transect Number – Sample Type. For example the sample ID CW-East-DAN01-01 would represent a primary sample (-01) collected from Camp Withycombe, in the East MRS, from Disposal Area North transaction DAN01.
Groundwater samples will be identified using four elements, separated by hyphens, in the following format: Site ID – Monitoring Well Number –Sample Type. For example the sample ID CW-MW2-02 would represent a duplicate sample (-02) collected from Camp Withycombe monitoring well MW-2.
Sample identification procedures are also discussed in the SI FSPs.
Field Sample Custody Procedures (sample collection, packaging, shipment, and delivery to laboratory): Each sample will be individually identified and labeled after collection, then sealed with custody seals and enclosed in a plastic cooler (see the FSPs). The sample information will be recorded on chain-of-custody forms, and the samples shipped/couriered to the appropriate laboratory via expedited delivery service.
Laboratory Sample Custody Procedures (receipt of samples, archiving, and disposal): A sample custodian at the laboratory will accept custody of the samples, and check them for discrepancies, proper preservation, integrity, etc. If noted, issues will be forwarded to the AMEC Project Lead to determine if corrective action is necessary. The sample custodian will relinquish custody to the appropriate department for analysis. Disposal of the samples will occur 90 days after a complete and validated data package is obtained by AMEC. Samples disposal must be approved of by the AMEC project chemist.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 64
QAPP Worksheet #28 – Laboratory QC Samples Table
Matrix
Discrete and Composite
Soil Samples,
Groundwater
Analytical Group Explosives
Analytical Method /
SOP Reference
EPA 8330A/ DEN-LC-
0002
QC Sample Frequency / Number1
Method / SOP QC
Acceptance Limits2
Corrective Action
Person(s) Responsible
for Corrective
Action
Data Quality
Indicator (DQI)
Measurement Performance Criteria
Method Blank 1/batch No analytes
≥QL
Reanalyze with all associated
samples if there are suspect instrument
performance or loading issues.If instrument is
acceptable then re-prep and reanalyze samples. See note3
Analyst or QA Manager Accuracy No analytes ≥QL
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 65
QAPP Worksheet #28 Continued – Laboratory QC Samples Table
Matrix Soil, Groundwater
Analytical Group Explosives
Analytical Method /
SOP Reference
EPA 8330A/ DEN-LC-
0002
QC Sample Frequency / Number1
Method / SOP QC
Acceptance Limits2
Corrective Action
Person(s) Responsible
for Corrective
Action
Data Quality
Indicator (DQI)
Measurement Performance Criteria
LCS 1/batch DoD QSM v. 4.1-specified
limits
Reanalyze with all associated
samples if there are suspect instrument
performance or loading issues.If instrument is
acceptable then re-prep and reanalyze samples.
Analyst or QA Manager Accuracy DoD QSM v. 4.1-specified
limits
Surrogate
All environmental and laboratory
samples
70%-130%
Reanalyze once to confirm
matrix interference.
Analyst or QA Manager Accuracy 70%-130%
MS 1/batch DoD QSM v. 4.1-specified
limits
Evaluate in consideration of LCS results. If
LCS is acceptable then
narrate indication of
matrix effects in MS present.
Analyst or QA Manager Accuracy DoD QSM v. 4.1-specified
limits
1Batch is equivalent to 20 or fewer samples prepared and analyzed together with common QC samples.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 66
QAPP Worksheet #28 Continued – Laboratory QC Samples Table
Matrix Soil
Analytical Group Metals
Analytical Method /
SOP Reference
EPA 6020/ DV-MT-0018
QC Sample Frequency / Number1
Method / SOP QC
Acceptance Limits2
Corrective Action
Person(s) Responsible
for Corrective
Action
Data Quality
Indicator (DQI)
Measurement Performance
Criteria
Method Blank 1/batch No analytes ≥QL
Reanalyze with all associated
samples if there are suspect instrument
performance or loading issues. If instrument is acceptable then
re-prep and reanalyze samples. See note3
Analyst or QA Manager Accuracy No analytes ≥QL
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 67
QAPP Worksheet #28 Continued – Laboratory QC Samples Table
Matrix Soil
Analytical Group Metals
Analytical Method /
SOP Reference
EPA 6020/ DV-MT-0018
QC Sample Frequency / Number1
Method / SOP QC
Acceptance Limits
Corrective Action
Person(s) Responsible
for Corrective
Action
Data Quality
Indicator (DQI)
Measurement Performance
Criteria
LCS 1/batch DoD QSM v. 4.1-specified
limits
Reanalyze with all associated
samples if there are suspect instrument
performance or loading issues. If instrument is acceptable then
re-prep and reanalyze samples.
Analyst or QA Manager Accuracy DoD QSM v. 4.1-
specified limits
Post-digestion Spike As specified in DoD QSM 4.1
75%-125% Narrate possible reasons.
Analyst or QA Manager Accuracy 75%-125%
Serial Dilution 1/batch
≤10% for analytes with concentration
>50x IDL
Narrate possible reasons.
Analyst or QA Manager Accuracy
≤10% for analytes with concentration
>50x QL
Interference Check Solution (ICS-A and
ICS-AB)
At the beginning of
an analytical run and every 12
hour
ICS-A: Absolute value
of concentration
for all non-spiked
analytes ≥ MDL
ICS-AB: Within ± 20% of true
value.
Terminate analysis;
reanalyze ICS, and all
associated samples.
Analyst or QA Manager Accuracy
ICS-A: Absolute value of
concentration for all non-spiked
analytes ≥ MDLICS-AB: Within ±
20% of true value.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 68
QAPP Worksheet #28 Continued – Laboratory QC Samples Table
Matrix Soil
Analytical Group Metals
Analytical Method /
SOP Reference
EPA 6020/ DV-MT-0018
QC Sample Frequency / Number1
Method / SOP QC
Acceptance Limits
Corrective Action
Person(s) Responsible
for Corrective
Action
Data Quality
Indicator (DQI)
Measurement Performance
Criteria
Method of Standard Additions (MSA)
When matrix
interference is
confirmed.
NA NA Analyst Accuracy NA
MS/MSD 1/batch
75%-125% spike recovery,
and ≤20% RPD between
MS/MSD results
Evaluate in consideration of LCS results. If
LCS is acceptable then
narrate indication of
matrix effects in MS present
Analyst or QA Manager Accuracy
75%-125% spike recovery, and ≤20% RPD
between MS/MSD results
1Batch is equivalent to 20 or fewer samples prepared and analyzed together with common QC samples.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 69
QAPP Worksheet #28 Continued – Laboratory QC Samples Table
Matrix Soil
Analytical Group PAHs
Analytical Method/SOP Reference EPA 8270D/DV-MS-0011
QC Sample
Frequency/ Number1
Method/SOP QC Acceptance Limits
Corrective Action
Person(s) Responsible for Corrective Action
Data Quality Indicator (DQI)
Measurement Performance Criteria
Method Blank 1/batch No analytes ≥
½ QL
Reanalyze with all associated
samples if there are suspect instrument
performance or loading issues. If instrument is ok then re-prep and reanalyze
samples. See Note a.
Analyst or QA Manager Accuracy No analytes ≥ ½
QL
LCS 1/batch DoD QSM v 4.1 specified limits
Reanalyze with all associated
samples if there are suspect instrument
performance or loading issues. If instrument is ok the re-prep and reanalyze
samples.
Analyst or QA Manager Accuracy DoD QSM v 4.1
specified limits
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 70
QAPP Worksheet #28 Continued – Laboratory QC Samples Table
Matrix Soil
Analytical Group PAHs
Analytical Method/SOP Reference EPA 8270D/DV-MS-0011
QC Sample
Frequency/ Number1
Method/SOP QC Acceptance Limits
Corrective Action
Person(s) Responsible for Corrective Action
Data Quality Indicator (DQI)
Measurement Performance Criteria
Surrogate
All environmental and laboratory samples
DoD QSM v 4.1 specified limits
Reanalyze once to confirm matrix interference
Analyst or QA Manager Accuracy
DoD QSM v 4.1 specified limits
Internal Standard
All environmental and laboratory samples
DoD QSM v 4.1 specified limits
Reanalyze once to confirm matrix interference
Analyst or QA Manager Accuracy
DoD QSM v 4.1 specified limits
MS/MSD 1/batch DoD QSM v 4.1 specified limits
Evaluate in consideration of LCS results. If LCS is acceptable then narrate indication of matrix effects in MS/MSD present.
Analyst or QA Manager
Accuracy, Precision
DoD QSM v 4.1 specified limits
1Batch is equivalent to 20 or fewer samples prepared and analyzed together with common QC samples.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 71
QAPP Worksheet #28 Continued – Laboratory QC Samples Table
Matrix Soil
Analytical Group TPH-dx
Analytical
Method/SOP
Reference
NWTPH-dx/
TA-GS-0339
QC Sample
Frequency/ Number1
Method/SOP QC
Acceptance Limits
Corrective Action
Person(s) Responsible
for Corrective
Action
Data Quality
Indicator (DQI)
Measurement Performance
Criteria
Method Blank
1/batch No analytes ≥½ QL
Reanalyze with all associated samples if there are suspect
instrument performance or loading issues.
If instrument is ok then re-prep and
reanalyze samples.
Analyst or QA Manager
Accuracy No analytes ≥½
QL
LCS 1/batch Laboratory
specified limits (Appendix F-1)
Reanalyze with all associated samples if there are suspect
instrument performance or loading issues.
If instrument is ok the re-prep and
reanalyze samples.
Analyst or QA Manager
Accuracy Laboratory
specified limits (Appendix F-1)
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July 2011 72
QAPP Worksheet #28 Continued – Laboratory QC Samples Table
Matrix Soil
Analytical Group TPH-dx
Analytical
Method/SOP
Reference
NWTPH-dx/
TA-GS-0339
QC Sample
Frequency/ Number1
Method/SOP QC
Acceptance Limits
Corrective Action
Person(s) Responsible
for Corrective
Action
Data Quality
Indicator (DQI)
Measurement Performance
Criteria
Surrogate
All environmental and laboratory
samples
50%-150%
Method specified limits
Reanalyze once to confirm matrix interference
Analyst or QA Manager
Accuracy
50%-150%
Method specified limits
MS/MSD 1/batch Laboratory
specified limits (Appendix F-1)
Evaluate in consideration of LCS
results. If LCS is acceptable then
narrate indication of matrix effects in
MS/MSD present.
Analyst or QA Manager
Accuracy, Precision
Laboratory specified limits (Appendix F-1)
1Batch is equivalent to 20 or fewer samples prepared and analyzed together with common QC samples.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 73
QAPP Worksheet #29 – Project Documents and Records Table
Sample Collection
Documents and Records
On-site Analysis
Documents and Records
Off-site Analysis Documents and Records
Data Assessment Documents and
Records
Geophysical QC and Data Collection Forms Other
• Field logbooks
• Chain-of-custody forms
• Sample labels
• Shipping records
• Variance Request Forms
• Field logbooks
• Chain-of-custody forms
• Variance Request Forms
• Laboratory sample receipt logs
• Chain-of-custody form • Standard traceability logs • Instrument calibration logs • Instrument maintenance
logs • Sample preparation
worksheets/logs • Sample analysis
worksheets/run logs • Chromatograms/raw
data/instrument printouts • Sample results/Form Is • QC sample results • Telephone/email logs • Corrective action
documentation
• Laboratory data review checklists
• Corrective action documentation
• Data validation report
• Hand-Held Magnetometer / Metal-Detector Function Check Sheet
• Hand-Held GPS Function Check Sheet
• Telephone/email logs
• Corrective action documentation
• Photographs
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 74
QAPP Worksheet #30 – Analytical Services Table
Matrix Analytical Group
Sample Location/ID Numbers
Analytical SOP
Data Package Turnaround
Time
Laboratory/Organization(Name and Address, Contact Person and Telephone Number)
Backup Laboratory/Organization
(Name and Address, Contact Person and Telephone Number)
Soil Metals, Explosives, VOCs, and PAH
East MRS, East MRS Burial Pit, Sunrise
EPA Methods 6020, 7471, 8330A, 8330B,8270C and 8260B
21 Days
TA-Denver Brett VanDelinder 4955 Yarrow Street Arvada, CO 80002 303.736.0100
NA
TPH NWTPH-dx TA-Tacoma Terri Torries 5755 8th Street East Tacoma, WA 98424 253.922.2310
NA
Groundwater VOCs, Explosives, and Perchlorate,
Monitoring Wells MW1 thru MW8
EPA Methods 8260B, 8330, and 6860,
21 Days
TA-Denver Brett VanDelinder 4955 Yarrow Street Arvada, CO 80002 303.736.0100
NA
TPH NWTPH-HCID TA-Tacoma Terri Torries 5755 8th Street East Tacoma, WA 98424 253.922.2310
NA
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 75
QAPP Worksheet #31 – Planned Project Assessments Table
Assessment Type Frequency
Internal or
External
Organization Performing Assessment
Person(s) responsible for
Performing Assessment
Person(s) Responsible for Responding to Assessment
findings
Person(s) Responsible for Identifying and Implementing
Corrective Action (CA)
Person(s) Responsible
for Monitoring Effectiveness
of CA
Operational Readiness Review
Prior to commencement of field program and prior to initiating major phases of work
Internal AMEC Scott Kranz, AMEC Project Manager
AMEC’s Project Manager/Lead
AMEC’s Project Manager/Lead
AMEC’s Project Manager/Lead
Laboratory Technical Systems/ Performance Audits
As needed External AMEC AMEC Project Lead or MC Field Manager
TA-Denver and Tacoma Quality Managers
TA-Denver and Tacoma Quality Manager
TA-Denver and Tacoma Quality Managers and AMEC Project Lead
On-site Readiness Assessment
Prior to initiation of field activities
Internal AMEC AMEC MC Field Manager
AMEC Project Lead or designee
AMEC Project Lead or designee
AMEC’s Project Manger and/or the AMEC MC Field Manager
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 76
QAPP Worksheet #32 – Assessment Findings and Corrective Action Responses
Assessment Type
Nature of Deficiencies
Documentation
Individual(s) Notified of Findings
(Name, Title, Organization)
Time frame of Notification
Nature of Corrective Action Response Documentation
Individual(s) Receiving Corrective
Action Response (Name, Title, Organization)
Time frame for Response
Operational Readiness Review
Checklist or logbook entry
Scott Kranz, AMEC Project Lead
Immediately to within 24 hours of review
Checklist or logbook entry
TBD, AMEC MC Field Manager and/or Scott Kranz, AMEC Project Lead
Immediately to within 24 hours of review
Field Observations/ Deviations from Technical Management Plan
Logbook or Field Change Request
Scott Kranz, AMEC Project Lead
Immediately to within 24 hours of deviation
Logbook or Field Change Request
Scott Kranz, AMEC Project Lead
Immediately to within 24 hours of deviation
Laboratory Technical Systems/ Performance Audits
E-mail followed by deficiency report
Danille Jorgensen, AMEC Project Chemist
ASAP after identification
Corrective Action Report
Danille Jorgensen, AMEC Project Chemist
Within 14 days of notification to contractor
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 77
QAPP Worksheet #33 – QA Management Reports Table
Type of Report Frequency (daily, weekly,
monthly, quarterly, annually, etc.)
Projected Delivery Dates(s)
Person(s) Responsible for Report Preparation (Title and
Organizational Affiliation) Report Recipient(s) (Title and
Organizational Affiliation)
Data validation report As performed
Up to 15 business days after receipt of data package
Breanna O’Connell, AMEC AMEC QA Manager, Contents summarized in SI Report
Variance Request Form As required per variance/field change
Prior to field change if feasible
Scott Kranz, AMEC Project Lead Contents summarized in SI Report
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 78
QAPP Worksheet #34 – Verification (Step I) Process Table
Verification Input Description Internal/External Responsible for Verification
(Name, Organization)
Field logbooks Field notes will be reviewed periodically to determine completeness, appropriateness, ease of understanding, etc., of information recorded. Logbooks will be placed in the project files.
Internal AMEC RI/SI Lead or designee
Chain-of-custody forms
Chain-of-custody forms will be reviewed against the samples packed in the specific cooler prior to shipment. Original chain-of-custody forms will be sent with the samples to the laboratory, while a copy is retained for the project files.
Internal AMEC RI/SI Lead or designee
Sample receipt and log-ins
Sample receipt and log-in summaries will be reviewed to determine potential receipt issues that may impact data quality and for consistency with the chain-of-custody forms.
Internal/ External TA-Denver and AMEC RI/SI Lead (or designee)
Laboratory analytical data package prior to release
Data packages will be reviewed/verified internally by the laboratory performing the work for completeness and technical accuracy prior to submittal.
External TA-Denver and TA-Tacoma
Laboratory analytical data package
All data packages will be verified by AMEC chemists. The data validation strategy for this project is 10% Level IV data validation and 90% Level III data validation for all laboratory data, excluding waste samples. In Level III data validation, data quality is assessed evaluating parameters by the appropriate criteria (or limits) specified in Worksheets #12, #19, and #28 of the project QAPP, CLP requirements, or the analytical methods. If calculations for quantitation are verified, it is done on a limited basis and may require raw data in addition to the standard data forms normally present in a data package. Level IV data validation follows the EPA protocols and CLP criteria set forth in the National Functional Guidelines for Inorganic Superfund Data Review (EPA 2010) and National Functional Guidelines for Organic Superfund
Internal Breanna O’Connell, AMEC
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 79
QAPP Worksheet #34 Continued – Verification (Step I) Process Table
Verification Input Description Internal/External Responsible for Verification
(Name, Organization)
Laboratory analytical data package continued.
Data Review (EPA 2008). Level IV data validation consists of Level III data validation as well as checking calculations of quantified analytical data including routine field samples and field and laboratory QC samples. Additionally, instrument performance, calibration, and calibration standard data are evaluated to ensure that detection limits and data values are appropriate.
Data validation report
Data validation reports will be reviewed by the AMEC Project Lead.
Internal AMEC Project Lead or designee
Electronic data Electronic laboratory data and field data will be reviewed for consistency with the hardcopy information.
Internal AMEC Project Lead or designee
Data validation report The validated analytical results will be compiled in a tabulated summary. Entries will be reviewed/verified against hardcopy information.
Internal AMEC Project Lead or designee
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 80
QAPP Worksheet #35 – Validation (Steps IIa and IIb) Process Table
Step IIa/IIb Verification Input Description Responsible for Verification
(Name, Organization)
IIa Data Deliverables and QAPP
Ensure that all required information on sampling and analysis from Step I was provided (including planning documents).
Data Validator- Breanna O’Connell/AMEC
IIa Analytes
Ensure that required lists of analytes were reported as specified in governing documents (i.e., method, procedure, or contract).
Data Validator- Breanna O’Connell/AMEC
IIa Chain-of-Custody
Examine the traceability of the data from time of sample collection until reporting of data. Examine chain-of-custody records against contract, method, or procedural requirements.
Data Validator- Breanna O’Connell/AMEC
IIa Holding Times
Ensure that samples were analyzed within holding times specified in method, procedure, or contract requirements (Worksheet #19). If holding times were not met, confirm that deviations were documented, that appropriate notifications were made (consistent with procedural requirements), and that approval to proceed was received prior to analysis.
Data Validator- Breanna O’Connell/AMEC
IIa Sample Handling
Ensure that required sample handling, receipt, and storage procedures were followed, and that any deviations were documented.
Data Validator- Breanna O’Connell/AMEC
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 81
QAPP Worksheet #35 Continued– Validation (Steps IIa and IIb) Process Table
Step IIa/IIb Verification Input Description Responsible for Verification
(Name, Organization)
IIa Sampling Methods and Procedures
Establish that required sampling methods were used and that any deviations were noted. Ensure that the sampling procedures and field measurements met performance criteria and that any deviations were documented.
Data Validator- Breanna O’Connell/AMEC
IIa Field Transcription Authenticate transcription accuracy of sampling data (i.e., from field notebook to reports).
Project Chemist – Danille Jorgensen/AMEC
IIa Analytical Methods and Procedures
Establish that required analytical methods were used and that any deviations were noted. Ensure that the QC samples met performance criteria and that any deviations were documented.
Data Validator- Breanna O’Connell/AMEC
IIa Data Qualifiers
Determine that the laboratory data qualifiers were defined and applied as specified in methods, procedures, or contracts.
Data Validator- Breanna O’Connell/AMEC
IIa Laboratory Transcription
Authenticate accuracy of the transcription of analytical data (i.e., laboratory notebook to reporting form, or instrument to Laboratory Information Management System [LIMS]).
Data Validator- Breanna O’Connell/AMEC
IIa Standards Determine that standards meet contract, method, or procedural requirements.
Data Validator- Breanna O’Connell/AMEC
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 82
QAPP Worksheet #35 Continued– Validation (Steps IIa and IIb) Process Table
Step IIa/IIb Verification Input Description Responsible for Verification
(Name, Organization)
IIa Communication Establish that field or laboratory personnel followed required communication procedures.
Project Chemist - Danille Jorgensen/AMEC
IIa Audits
Review laboratory audit reports, accreditation, and certification records for the laboratory’s performance on specific methods.
Project Chemist - Danille Jorgensen/AMEC
IIa Step IIa Validation Report
Summarize deviations from methods, procedures, or contracts. Include qualified data and explanation of all data qualifiers.
Data Validator- Breanna O’Connell/AMEC
IIb Data Deliverables and QAPP Ensure that the data deliverables from Step IIa were provided.
Data Validator- Breanna O’Connell/AMEC
IIb Deviations
Determine the impacts of any deviations from sampling or analytical methods and SOPs. For example, confirm that the methods given in the QAPP were used and, if they were not, determine if data still meet MPCs. Consider the effectiveness and appropriateness of any corrective action.
Project Chemist - Danille Jorgensen/AMEC
IIb Sampling Plan
Determine whether the sampling plan was executed as specified (i.e., the number, location, and type of field samples were collected, and analyzed as specified in the QAPP).
Project Chemist - Danille Jorgensen/AMEC
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 83
QAPP Worksheet #35 Continued– Validation (Steps IIa and IIb) Process Table
Step IIa/IIb Verification Input Description Responsible for Verification
(Name, Organization)
IIb Sampling Procedures
Evaluate whether sampling procedures were followed with respect to equipment and proper sampling support (e.g., techniques, equipment, decontamination, volume, temperature, preservatives, etc.).
Project Chemist - Danille Jorgensen/AMEC
IIb Field Duplicates Compare results of collocated field duplicates with criteria established in the QAPP.
Project Chemist - Danille Jorgensen/AMEC
IIb Project Quantitation Limits
Determine that quantitation limits were achieved, as outlined in the QAPP and that the laboratory successfully analyzed a standard at the QL.
Project Chemist - Danille Jorgensen/AMEC
IIb Confirmatory Analysis Evaluate agreement of laboratory results.
Project Chemist - Danille Jorgensen/AMEC
IIb Performance Criteria
Evaluate QC data against project-specific performance criteria in the QAPP (i.e., evaluate quality parameters beyond those outlined in the methods).
Project Chemist - Danille Jorgensen/AMEC
IIb Data Qualifiers
Determine that the data qualifiers applied in step IIa were those specified in the QAPP and that any deviations from specifications were justified.
Project Chemist - Danille Jorgensen/AMEC
IIb Step IIb Validation Report
Summarize outcome of comparison of data to MPC in the QAPP. Include qualified data and explanation of all data qualifiers.
Project Chemist - Danille Jorgensen/AMEC
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 84
QAPP Worksheet #36 – Analytical Data Validation (Steps IIa and IIb) Summary
AMEC chemists will perform validation on the data associated with this QAPP. With the exception of waste extent samples, data will be validated at 90 % EPA Level III and 10 % EPA Level IV. Samples will be selected for Level III and Level IV validation on a per method basis (i.e.: 1 sample per 10 samples analyzed for a method) to ensure all methods are appropriately validated. Preferably, entire SDGs or analytical batches will be chosen for Level IV validation to ensure efficiency. Data validation will be performed in accordance with the DoD Quality System Manual, and patterned after the EPA CLP National Functional Guidelines (NFGs) for Superfund Organic and Inorganic Data Review (EPA 2008, 2010), and QC criteria specified in this document.
For Level III data validation, data quality will be assessed by comparing the QC parameters to the appropriate criteria (or limits) as specified in this QAPP. Verification of quantitation calculations may be performed on a limited basis and may require raw data in addition to the standard data forms.
Level IV (full) data validation follows the EPA protocols and CLP criteria as set forth in the functional guidelines for evaluating organic (EPA 2008) and inorganic (EPA 2010) analyses. These guidelines apply to full data packages that include raw data (e.g., instrument spectra and chromatograms), backup documentation for calibration standards, analysis run logs, dilution factors, and additional information necessary to check calculations for quantified analytical data. Calculations are checked for QC samples (e.g., MS/MSD and LCS data) and routine field samples (including field duplicates, field blanks, and equipment blanks). To assure that detection limits and data values are appropriate, an instrument performance, method of calibration, and calibration standards are evaluated.
Analytical data may be qualified based on data validation reviews. Qualifiers will be consistent with the applicable EPA National Functional Guidelines, and will be used to provide data users with an estimate of the level of uncertainty associated with the qualified result.
Data validation results will be evaluated with respect to the attached qualifiers to determine data usability issues, if any. The following qualifiers may be assigned during the validation process.
J – estimated concentration
R – rejected value (unusable)
N – presumed identity
U – not detected (e.g., not present based on blank contamination)
UJ – sample detection limit is estimated.
Data validation will be patterned after CLP National Functional Guidelines (NFG). The objectives, evaluations, and actions employed during the data validation process will follow those outlined in the NFG. Differences between NFG and project validation procedures will include review items and data validation criteria. The laboratory will be permitted to provide CLP-like forms in lieu of true CLP forms. The data validation criteria will not adhere to NFG but will be based on method criteria for preservation, holding times, instrument tuning, calibration, instrument performance checks, internal standard responses, serial dilutions, and target compound identification; laboratory-specified criteria for surrogate, laboratory control samples, laboratory duplicates, and matrix spikes; and the validator’s professional judgment.
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 85
QAPP Worksheet #36 – Analytical Data Validation (Steps IIa and IIb) Summary
Step IIa/IIb Matrix Analytical Group
Concentration Level
Validation Criteria
Data Validator (title and organizational affiliation
IIa/IIb Soil Metals Medium SW-846 Method 6020/7471; DoD QSM v.1 (DoD 2009)
IIa: Breanna O’Connell, Data Validator, AMEC IIb: Danille Jorgensen, Project Chemist, AMEC
IIa/IIb Soil Explosives Medium SW-846 Method 8330A;
DoD QSM v.1 (DoD 2009)
IIa: Breanna O’Connell, Data Validator, AMEC IIb: Danille Jorgensen, Project Chemist, AMEC
IIa/IIb Soil PAHs Medium SW-846 Method 8270C;
DoD QSM v.1 (DoD 2009)
IIa: Breanna O’Connell, Data Validator, AMEC IIb: Danille Jorgensen, Project Chemist, AMEC
IIa/IIb Soil VOCs Low
SW-846 Method 8260B;
DoD QSM v.1 (DoD 2009)
IIa: Breanna O’Connell, Data Validator, AMEC IIb: Danille Jorgensen, Project Chemist, AMEC
IIa/IIb Soil VOCs Low Method NWTPH-dx
IIa: Breanna O’Connell, Data Validator, AMEC IIb: Danille Jorgensen, Project Chemist, AMEC
IIa/IIb Groundwater VOCs Low
SW-846 Method 8260B;
DoD QSM v.1 (DoD 2009)
IIa: Breanna O’Connell, Data Validator, AMEC IIb: Danille Jorgensen, Project Chemist, AMEC
IIa/IIb Groundwater Explosives Low SW-846 Method 8330B;
DoD QSM v.1 (DoD 2009)
IIa: Breanna O’Connell, Data Validator, AMEC IIb: Danille Jorgensen, Project Chemist, AMEC
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 86
Step IIa/IIb Matrix Analytical Group
Concentration Level
Validation Criteria
Data Validator (title and organizational affiliation
IIa/IIb Groundwater Perchlorate Low SW-846 Method 6860;
DoD QSM v.1 (DoD 2009)
IIa: Breanna O’Connell, Data Validator, AMEC IIb: Danille Jorgensen, Project Chemist, AMEC
IIa/IIb Groundwater TPH Low Method NWTPH-HCID
IIa: Breanna O’Connell, Data Validator, AMEC IIb: Danille Jorgensen, Project Chemist, AMEC
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 87
QAPP Worksheet #37 – Usability Assessment
A data usability report will be prepared by AMEC incorporating the findings of the data validation effort, evaluation of the data against the DQOs specified in this QAPP, and other supporting information. Analytical DQOs will be assessed through application of precision, accuracy, representativeness, completeness, and comparability (PARCC) parameters to ensure that the data are of sufficient quality to meet the project objectives. Data validation reports will be reviewed and assessed for meeting DQOs. The project chemist will review the data validation reports for any deviations. This assessment will evaluate data on a matrix-specific, analyte-specific and location-specific basis. The potential impact of any sampling discrepancies or data qualifications (rejected, nondetected, estimated) on the remedial actions will be discussed. Recommendations for further actions will be provided, if necessary and appropriate. The project chemist will prepare a data quality assessment report that will summarize the findings of the data assessment and discuss the usability of the data to be included in the report.
Elements that will be addressed in the usability report include, but are not limited to:
● Compliance of sampling methods with the FSP ● Completeness of sampling effort ● Potential sampling error ● Compliance of analyses with FSP methods and QC requirements ● Completeness of laboratory analyses ● Potential analytical error ● Corrective actions and resolutions ● Validation findings ● Measurement performance criteria ● Remedial options
The following subsections describe each of the PARCC parameters and how they will be assessed within this project.
Precision Precision is the degree of mutual agreement between individual measurements of the same property under similar conditions. Usually, combined field and laboratory precision is evaluated by collecting and analyzing field duplicates and then calculating the variance between the samples, typically as an RPD.
Where:
A = First duplicate concentration
B = Second duplicate concentration
1002/)(×
+
−=
BABA
RPD
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 88
QAPP Worksheet #37 Continued– Usability Assessment
Field sampling precision is evaluated by analyzing field duplicate samples. Field duplicates will be collected and analyzed at a frequency of ten percent for groundwater and vapor samples. Laboratory analytical precision is evaluated by analyzing laboratory duplicates or matrix spikes and matrix spike duplicates (MS/MSD). MS/MSD samples will be generated for all analytes for this project. The results of the analysis of each MS/MSD pair will be used to calculate an RPD for evaluating precision.
Accuracy Field accuracy will be assessed by collecting and analyzing equipment rinsate, trip blank, and source water blank QC samples as appropriate. These QC samples will be used to evaluate the potential for target analytes to enter samples as a result of sampling processes.
A program of sample spiking will be conducted to evaluate laboratory accuracy. This program includes analysis of the MS and MSD samples, LCSs or blank spikes, surrogate standards, and method blanks. MS and MSD samples will be prepared and analyzed at a frequency of 5 % for groundwater samples. LCS or blank spikes are also analyzed at a frequency of 5 %. Surrogate standards, where applicable, are added to every sample analyzed for organic constituents. The results of the spiked samples are used to calculate the % recovery for evaluating accuracy.
Where:
S = Measured spike sample concentration
C = Sample concentration
T = True or actual concentration of the spike
Results that fall outside the accuracy goals will be further evaluated based on the results of other QC samples.
Representativeness Representativeness expresses the degree to which sample data accurately and precisely represent the characteristics of a population, variations in a parameter at a sampling point, or an environmental condition that they are intended to represent. Representative data will be obtained for this project through careful selection of sampling locations and analytical parameters. Representative data will also be obtained through proper collection and handling of samples to avoid interference and minimize contamination.
Representativeness of data will also be ensured through the consistent application of established field and laboratory procedures. Field blanks (if appropriate) and laboratory blank samples will be evaluated for the presence of contaminants to aid in evaluating the representativeness of sample results. Data determined to be nonrepresentative, by comparison with existing data, will be used only if accompanied by appropriate qualifiers and limits of uncertainty.
100% ×−
=T
CSR
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 89
QAPP Worksheet #37 Continued– Usability Assessment
Completeness Completeness is a measure of the percentage of project-specific data that are valid. Valid data are obtained when samples are collected and analyzed in accordance with QC procedures outlined in this QAPP, and when none of the QC criteria that affect data usability is exceeded. When all data validation is completed, the number of valid results divided by the number of possible individual analyte results, expressed as a percentage, determines the completeness of the data set. For completeness requirements, valid results are all results not qualified with a rejected (R) flag. The requirement of completeness is 95 % for samples and is determined using the following equation:
Completeness will also be evaluated as part of the data quality assessment process. This evaluation will help determine whether any limitations are associated with the decisions to be made based on the data collected.
Comparability Comparability expresses the confidence with which one data set can be compared with another. Comparability of data will be achieved by consistently following standard field and laboratory procedures and by using standard measurement units in reporting analytical data.
Assessment activities are presented below.
results possible ofnumber results analyte validofnumber 100% ×=ssCompletene
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 90
QAPP Worksheet #37 Continued– Usability Assessment
Table 37-1. Usability Assessment Activities
Item Assessment Activity
Person Responsible for Activity
Data Deliverables and FSP
Ensure that all necessary information was provided, including but not limited to validation results. Danille Jorgensen, AMEC
Deviations Determine the impact of deviations on the usability of data. Danille Jorgensen, AMEC
Sampling Locations Determine if alterations to sample locations continue to satisfy the project objectives. Scott Kranz, AMEC
Chain-of-Custody Establish that any problems with documentation or custody procedures do not prevent the data from being used for the intended purpose.
Danille Jorgensen, AMEC
Holding Times Determine the acceptability of data where holding times were exceeded. Danille Jorgensen, AMEC
Damaged Samples Determine whether the data from damaged samples are usable. If the data cannot be used, determine whether resampling is necessary.
Danille Jorgensen, AMEC
SOPs and Methods Evaluate the impact of deviations from SOPs and specified methods on data quality. Danille Jorgensen, AMEC
QC Samples Evaluate the implications of unacceptable QC sample results on the data usability for the associated samples. For example, consider the effects of observed blank contamination.
Danille Jorgensen, AMEC
Matrix Evaluate matrix effects (interference or bias). Danille Jorgensen, AMEC
Meteorological Data and Site Conditions
Evaluate matrix effects (interference or bias). Danille Jorgensen, AMEC
Comparability Evaluate the possible effects of meteorological (e.g., wind, rain, temperature) and site conditions on sample results. Review field reports to identify whether any unusual conditions were present and how the sampling plan was executed.
Danille Jorgensen, AMEC
Completeness Evaluate the impact of missing information. Ensure that enough information was obtained for the data to be usable (completeness as defined in PQOs documented in the FSP).
Danille Jorgensen, AMEC
Army National Guard Directorate, Camp Withycombe, Clackamas, Oregon Final Quality Assurance Project Plan
Contract No. W9133L-10-F-0193 27 July2011 91
QAPP Worksheet #37 Continued– Usability Assessment
Table 37-1. Usability Assessment Activities
Item Assessment Activity
Person Responsible for Activity
Critical Samples
Establish that critical samples and critical target analytes/COCs, as defined in the QAPP, were collected and analyzed. Determine if the results meet criteria specified in the QAPP.
Danille Jorgensen, AMEC
Data Restrictions
Describe the exact process for handling data that do not meet PQOs (i.e., when measurement performance criteria are not met). Depending on how those data will be used, specify the restrictions on use of those data for environmental decision-making.
Danille Jorgensen, AMEC
Usability Decision
Determine if the data can be used to make a specific decision considering the implications of all deviations and corrective actions.
Danille Jorgensen, AMEC
Usability Report
Discuss and compare overall precision, accuracy/bias, representativeness, comparability, completeness, and sensitivity for each matrix, analytical group, and concentration level. Describe limitations on the use of project data if criteria for data quality indicators are not met.
Danille Jorgensen, AMEC