Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser - OMICRON

Transcript of Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that...

Page 1: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

Understanding the Value of Electrical Testing for Power Transformers

Charles Sweetser - OMICRON

Page 2: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

Transformers

Page 3: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

Diagnostic Testing - OVERALL

• DGA

• Oil Screen

• Power Factor / Capacitance

• Exciting Current

• Transformer Turns Ratio

• Leakage Reactance

• DC Winding Resistance

• SFRA (Sweep Frequency Response Analysis)

• DFR (Dielectric Frequency Response)

• Thermal Imaging

• Insulation Resistance

• Partial Discharge

Page 4: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

Transformer Tests

Dielectric Thermal Mechanical

DGA DGA SFRAOil Screen Oil Screen Leakage ReactancePF/TD CAP IR PF/TD CAPExciting Ima DC Winding RES Exciting ImaTurns Ratio Tests DC Winding RESDFRInsulation Resistance

Page 5: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

Transformer Test Protocol

1. Overall Power Factor and Capacitance

2. Bushings (C1, C2, Hot Collar)

3. Exciting Current

4. Surge Arresters

5. Insulating Fluids

6. Leakage Reactance

7. Turns Ratio Test

8. Insulation Resistance

9. IR

10. DFR

11. SFRA

12. DC Winding Resistance

Page 6: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

1. Overall Power Factor and Capacitance2. Bushing Power Factor and Capacitance3. Exciting Current Test4. TTR – Transformer Turns Ratio5. Leakage Reactance (3-Phase Equivalent and

Per Phase)6. DC Winding Resistance

Diagnostic Tests

Page 7: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

• IEEE C57.152-2013, "IEEE Guide for Diagnostic Field Testing of Fluid-Filled Power Transformers, Regulators, and Reactors".

• ANSI/NETA MTS-2015, "Standard for Maintenance Testing Specifications for Electrical Power Equipment and Systems".

• IEEE C57.149-2012, "IEEE Guide for the Application and Interpretation of Frequency Response Analysis for Oil-Immersed Transformers".

Industry Guides and Standards

Page 8: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

Delta-Wye (Dyn1)

Page 9: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

Two-Winding Transformer Model

• Windings are short-circuited to remove unwanted inductance• CH, CL and CHL insulation systems• CH includes H-C1• CL includes X-C1

Page 10: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

1) Ensure that the transformer tank and core are solidly grounded, also connect both the test instrument and power source ground to this point. We will refer to this point as the “GROUND” node.

2) Ensure that all bushing surfaces are clean and dry.3) Completely isolate the transformer terminals; remove external

connections and buswork from H1, H2, H3, X1, X2, X3 and X0.4) Bond/short the H1, H2, and H3, making sure that they are isolated. We

will refer to this point as the “HV” node.5) Bond/short the X1, X2, X3, and X0 making sure that they are isolated. We

will refer to this point as the “LV” node.6) Document tap-positions, temperatures, humidity, fluid levels, and

pressures.

Overall Power Factor - Test Preparation

Page 11: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

Overall Power Factor - Test Procedure

Test Insulation Test Voltage * Test Mode Energize Red LV Lead1 CH + CHL 10 kV GST HV LV

2a CH 10 kV GST-gA HV LV2b CH(f) 2 kV (15-400 Hz) GST-gA HV LV3a CHL 10 kV UST-A HV LV3b CHL(f) 2 kV (15-400 Hz) UST-A HV LV

4 CL + CLH 7 kV GST LV HV5a CL 7 kV GST-gA LV HV5b CL(f) 2 kV (15-400 Hz) GST-gA LV HV6a CLH 7 kV UST-A LV HV6b CLH(f) 2 kV (15-400Hz) UST-A LV HV

• The test voltages will be limited and should not exceed the line-to-ground rating of the insulation system.

• When convenient, Variable Frequency Power Factor Tests will be performed on CH, CL, and CHL insulation components, along with Power Factor Tip-Up measurements.

Page 12: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

IEEE C57.152

• PF < 0.5% at 20 °C for “new” liquid filled power transformers rated under 230kV• PF < 0.4% at 20 °C for “new” liquid filled power transformers rated over 230kV • PF < 1.0% at 20 °C for “service aged” liquid filled power transformers• PFs between 0.5% and 1.0% at 20 °C warrant additional testing and investigation

NETA MTS

• PF < 1.0% for liquid filled power transformers• PF < 2.0% for liquid field distribution transformers• PF < 2.0% for dry-type power transformers (CHL insulation)• PF < 5.0% for dry-type distribution transformers (CHL insulation)• PF Tip-Up for dry-type insulation should be < 1.0%

Note: Measured values should also be compared to the manufacturer’s published data.

Overall Power Factor - Expected Results

Page 13: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

Bushing Power Factor

Condenser Bushing with Potential Tap

Condensers Bushing with TestTap Non Condenser

Visual Inspection Visual Inspection Visual Inspection

C1 Power Factor (60 Hz) C1 Power Factor (60 Hz) Energize Collar Test

C1 Capacitance (60 Hz) C1 Capacitance (60 Hz) Infrared Test

C2 Power Factor (2.0 kV) C2 Power Factor (0.5 kV)

C2 Capacitance (2.0 kV) C2 Capacitance (0.5kV)

Advance Power Factor Measurements

Advance Power Factor Measurements

Power Factor Tip Up Test Power Factor Tip Up Test

Infrared Test Infrared Test

Page 14: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

Bushing Power Factor – Test Connections

C2C1

Hot Collar

Page 15: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

• Bushings shall remain shorted, similar to the overall power factor test. Failure to short the bushing terminals, may result in compromised measurements.

• Hot Collar tests are optional; they will not be performed if test taps or potential taps are available.

• Test taps and potential taps can be identified, based on the bushing rating, as follows:

– Test Taps <= 350 kV BIL– Potential Taps > 350 kV BIL

• C2 tests must be performed carefully, ensuring that the “hook” is in the clear, completely.

• The C1 results should compare well with the nameplate data. C1 Power Factor values should not exceed 1.5X to 2.0X nameplate data. C1 capacitance should not exceed +/- 5% of nameplate data.

• C2 values should compare well with the nameplate or amongst similar bushings.

• The hot collar results are analyzed from watts loss. We expect less than 100 mW loss.

Bushing Power Factor - Expected Results

Page 16: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

Transformer Exciting Current Test

Vs

1. Apply Voltage Vs on on primary phase, secondary winding left floating2. Measure currurent Iex3. The current required to force ``transformer action´´ (the use of one

winding to induce a voltage in the second winding).

Page 17: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

Exciting Currents - Analysis Strategy

• Confirm Expected Phase Pattern

• Confirm Expected LTC Pattern(For load tap changing transformers)

• Compare to Previous Results

Page 18: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

Exciting Current - Analyzing ResultsConfirming the Expected Phase Pattern:

1. High – Low – High (HLH) Pattern Expected for a 3-legged core type transformer. Expected for a 5-legged core (or shell) type transformer with a Delta

connected secondary winding.

2. Low – High – Low (LHL) Pattern Will be obtained on a 3-legged core type transformer if the traditional

test protocals are not followed.Neutral on high side Wye-configured transformer is inaccessibleForget to ground 3rd terminal on a Delta-connected transformer

Expected for a 4-legged core type transformer.

3. All 3 Similar Pattern Expected for a 5-legged core (or shell) type transformer with a non-

delta secondary winding.

Page 19: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

Exciting Current Test Results

Transformer: Delta – Wye (Dyn1)

X1

X2

X3

X0

H1 H3

H2

Test HV Lead LV Lead Ground Float Mode Measure Result

1 H1 H3 H2, X0 X1,X2,X3 UST H1-H3 63.8 mA

2 H2 H1 H3, X0 X1,X2,X3 UST H2-H1 48.6 mA

3 H3 H2 H1, X0 X1,X2,X3 UST H3-H2 64.2 mA

Page 20: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

Turn Ratio - Expected Results

Page 21: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

Turn Ratio - Expected Results

The turn ratio measurement results should be within 0.5% of nameplate markings.

Page 23: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

Leakage Reactance

• Short circuit LV winding or “winding pairs”• Inject 0.5 - 1.0% of rated current 60 Hz (Line-to-Line)• A variable 280 VAC source is recommended• Measure Series Current and Terminal Voltage• RESULT - ZΩ, RΩ, and XΩ

• There are two ways to perform the measurement1. 3 Phase Equivalent2. Per Phase

Page 24: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

Leakage Reactance - Example

Phase V I Z R X L

H1-H3 55.22 1.05 51.59 4.38 51.41 136.4H2-H1 54.68 1.05 51.15 4.37 50.96 135.2H3-H2 54.46 1.05 50.96 4.46 50.76 134.2

Nameplate: 6.85% 69 kV 12.5 MVA

Page 25: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

DC Winding Resistance - Failure Modes

A change greater than the criteria mentioned can be indicative of the following:

1. Shorted Circuited Turns

2. Open Turns

3. Defective DETC or LTC (contacts)

4. A Poor Connection Between Terminals Measured

Page 26: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

DC Winding Resistance - Case Study

Page 27: Understanding the Value of Electrical Testing for Power ... · SEPTEMBER 5 - 7, 2018 1) Ensure that the transformer tank and core are solidly grounded, also connect both the test

SEPTEMBER 5 - 7, 2018

Conclusion

• When performed properly, electrical diagnostic testing can provide useful and in depth information regarding the condition of the power transformer. Dielectric, thermal, and mechanical incipient failure modes can be identified.

• Care should be taken to ensure useful results. The test data is only as good as the technician performing the tests. The technician should always know what to expect; utilizing invalid test data can lead to an undesired result in the decision-making process.

• NETA and IEEE standards and guides provide comprehensive information regarding test plans test procedures test preparations, and analysis of the results.