UNDERGROUND DUCT AND STRUCTURES FOR ??? DISTRICT …
Transcript of UNDERGROUND DUCT AND STRUCTURES FOR ??? DISTRICT …
THE CREEKS
PHASE
4
A
R
C
O
L
A
A
V
E
E
C
H
U
K
A
B
L
V
D
S
A
N
D
P
I
P
E
R
C
R
E
S
REGINA,SASKATCHEWAN
SHEET
---- REGION
??? DISTRICT OFFICE
UNDERGROUND DUCT AND STRUCTURES FOR
SaskPower and SaskEnergy Turnkey Template R1 EXAMPLE1 7 D 0
CALL AT LEAST TWO FULL
WORKING DAYS BEFORE
YOU PLAN TO DIG
A FULL DRAFTING PACKAGE SHOULD CONSIST OF:
1. A GEOSPATIALLY ACCURATE BASE DRAWING SHOULD BE OBTAINED FROM THE CIVIL CONSULTANT. IT SHOULD BE IN NAD 83 COORDINATES AND IT SHOULD BE
SPECIFIED WHETHER IN GROUND OR GRID PROJECTION AND STATE THE MONUMENTS USED AND THE SCALING FACTOR USED.
THESE STEPS WILL HELP IMPROVE THE GEOSPATIAL RELIABILITY OF ALL UTILITY DRAWINGS . FOR MORE INFORMATION REFER TO THE CSA S250-11STANDARDS
DOCUMENT WHICH COVERS INFORMATION WHICH WILL HELP STANDARDIZE UNDERGROUND DRAWINGS IN UTILITIES AND MUNICIPALITIES THROUGHOUT CANADA.
2. AN EASEMENT DRAWING WHICH WILL SHOW THE LOCATION AND TYPES OF EASEMENTS FOR THE PROJECT.
3. A PLANVIEW LAYOUT WHICH WILL SHOW THE CENTRELINE OF THE UTILITIES TRENCH BOTH ON PUBLIC ROADWAY AND ON THE PROPOSED EASEMENTS. THERE
SHOULD BE AMPLE DIMENSIONING OF OFFSETS FROM PROPERTY LINE TO THE TRENCH CENTRELINE.
THE DRAWING SHALL IDENTIFY THE AS-BUILT ACCURACY AS DEFINED BY THE FOLLOWING LEVELS:
CSA S-250 DEFINED POSITIONAL ACCURACY OF AS BUILT RECORDSIS AS FOLLOWS:
ACCURACY LEVEL 1 +-25mm IN X,Y, AND Z CORDINATES WITH 95% CONFIDENCE LEVEL (ABSOLUTE - SURVEY GRADE)
ACCURACY LEVEL 2 +- 100mm IN X,Y, AND Z CORDINATES WITH 95% CONFIDENCE LEVEL (ABSOLUTE - SURVEY GRADE)
ACCURACY LEVEL 3 +- 300mm IN X,Y, AND Z CORDINATES WITH 95% CONFIDENCE LEVEL (ABSOLUTEOR RELATIVE)
ACCURACY LEVEL 4 +- 1000mm IN X,Y, AND Z CORDINATES WITH 95% CONFIDENCE LEVEL (ABSOLUTEOR RELATIVE)
THE FOLLOWING ARE FOR
SUPPLEMENTARY ACCURACY LEVEL 5 +- 1000mm BUT NOT EXPOSED IE: U/G LOCATE EQUIPMENT USED BY ACOMPETENT INDIVIDUAL - THERE IS NO Z
COMPONENT
SUPPLEMENTARY ACCURACY LEVEL 0 NO INFORMATION AVAILABLE, THE POSITION SHOWN ON THE DRAWING IS THE BEST POSSIBLE ESTIMATE OF THE
ACTUAL LOCATION.
A MINIMUM ACCURACY LEVEL 5 IS REQUIRED FOR ALL AS-BUILT DRAWINGS. ACCURACY LEVEL 2 IS PREFERRED FOR ABOVE GROUND FACILITIES.
4.A POWER OVERVIEW SHEET
5 A POWER SCHEMATIC SHEET DETAILING THE PRIMARY AND SECONDARY CONDUCTOR INFORMATION AND CONNECTIONS
6. STREET LIGHT LAYOUT SHOWING SUPPLY CONDUIT PEDESTAL DETAILS AND LIGHTING PROFILES AND DESIGN CRITERIA FOR THE SUBDIVISION STREET LIGHTING
INCLUDING THE CONNECTION POINT TO THE ELECTRICAL SYSTEM..
7. SASK ENERGY LAYOUT SHOWING PROPOSED AND EXISTING GAS INFORMATION AS REQUIRED BY THE UTILITY
8. SASK ENERGY LAYOUT STAKER`S COPY (FOR AS-BUILT FIELD NOTES)
NOTE: A SET OF LAYOUTS SUFFIXED _ASB ARE INCLUDED FOR THE AS-BUILT DRAWING PRODUCTS
SASK 1ST CALL LOGO
MUST BE PLACED ON
EACH DRAWING
M
R
1
THE CREEKS
PHASE
4
A
R
C
O
L
A
A
V
E
E
C
H
U
K
A
B
L
V
D
S
A
N
D
P
I
P
E
R
C
R
E
S
REGINA,SASKATCHEWAN
SHEET
---- REGION
??? DISTRICT OFFICE
UNDERGROUND DUCT AND STRUCTURES FOR
SP7890123-RA1 1 D 0
EASEMENT
DRAWING
4 PARTY EASEMENT
4.0 meters
SASK ENERGY EASEMENT
3.0 meters
3 PARTY EASEMENT
3.0 meters
CALL AT LEAST TWO FULL
WORKING DAYS BEFORE
YOU PLAN TO DIG
NOTES:
THE LANDBASE AND EASEMENT PLAN IS
PRELIMINARY AND MAY NOT BE
REGISTERED WITH ISC.
THE EASEMENT DRAWING MUST
INDICATE IF THE EASEMENTS ARE
PROPOSED OR REGISTERED WITH
ISC.
FOR EACH REVISION, INDICATE A
REMARK, DESIGNER, AND DATE
SCALE BAR MUST
MATCH VIEWPORT SCALE
THE CREEKS
PHASE
4
A
R
C
O
L
A
A
V
E
E
C
H
U
K
A
B
L
V
D
S
A
N
D
P
I
P
E
R
C
R
E
S
REGINA,SASKATCHEWAN
LEAVE YELLOW AND BLUE #1 AL COILS AT
EXISTING TEMP PEDESTAL. SASKPOWER
CREWS TO REMOVE PEDESTAL AND
SPLICE BLUE AND YELLOW PRIMARY
CONDUCTORS.
•
•
•
•
•
CALL AT LEAST TWO FULL
WORKING DAYS BEFORE
YOU PLAN TO DIG
SHEET
REGINA
UNDERGROUND DUCT AND STRUCTURES FOR
CREEKS PHASE 4
SERVICE PROVIDER NAME
NOTIFICATION NUMBER 2341235321
U07-23412343 7 D 1
1:500
2012-12-26
SHOWS THE CENTRE OF THE
TRENCH ALIGNMENT
GEO-SPATIALLY CORRECT. THE
PLAN VIEW DOES NOT SHOW WHAT
CABLES ARE INSTALLED IN THE
TRENCH; REFER TO THE
SCHEMATIC.
DIMENSIONED TO TRENCH
CENTERLINE
REPRESENTS THE 4-PARTY
SERVICE STUB BOX IN EACH LOT
ANNOTATE ANY ROAD CROSSINGS
ALL DEEP UTILITIES ARE SHOWN IN
LIGHT GRAY IN THE BACKGROUND
FOR REFERENCE
M
R
1
LEAVE YELLOW AND BLUE #1 AL COILS AT
EXISTING TEMP PEDESTAL. SASKPOWER
CREWS TO REMOVE PEDESTAL AND
SPLICE BLUE AND YELLOW PRIMARY
CONDUCTORS.
THE CREEKS
PHASE
4
A
R
C
O
L
A
A
V
E
E
C
H
U
K
A
B
L
V
D
S
A
N
D
P
I
P
E
R
C
R
E
S
REGINA,SASKATCHEWAN
•
•
•
•
•
CALL AT LEAST TWO FULL
WORKING DAYS BEFORE
YOU PLAN TO DIG
SHEET
REGINA
EAST
UNDERGROUND DUCT AND STRUCTURES FOR
CREEKS PHASE 4
SERVICE PROVIDER NAME
U07-23412344 7 D 1
1:500
2012-12-26
LEAVE YELLOW AND BLUE #1 AL COILS AT
EXISTING TEMP PEDESTAL. SASKPOWER
CREWS TO REMOVE PEDESTAL AND
SPLICE BLUE AND YELLOW PRIMARY
CONDUCTORS.
THE CREEKS
PHASE
4
A
R
C
O
L
A
A
V
E
E
C
H
U
K
A
B
L
V
D
S
A
N
D
P
I
P
E
R
C
R
E
S
REGINA,SASKATCHEWAN
CALL AT LEAST TWO FULL
WORKING DAYS BEFORE
YOU PLAN TO DIG
•
•
SHEET
REGINA
WORK ORDER NUMBER 123298908
PRIMARY AND SECONDARY SCHEMATIC DIAGRAM
CREEKS PHASE 4
NOTIFICATION NUMBER 12344555
U07-23412345 7 D 1
N.T.S.
2012-12-26
PEDESTALS TO BE ORIENTED SUCH
THAT THE SHADED SIDE FACES THE
SOURCE TRANSFORMER
DO NOT ANNOTATE SECONDARY
CABLE. REFER TO THE LEGEND AND
LINE TYPES.
CABLE FORMAT:
[NUMBER OF CABLES][CABLE
TYPE][CABLE PHASE]
I.E.: ONE CABLE OF #1AL ON BLUE
PHASE IS ANNOTATED AS 1X#1ALB
GIVE CREWS DETAILED
INSTRUCTIONS AT TIE-IN POINTS
PEDESTAL NUMBERS ARE FOR
REFERENCE ONLY. THEY WILL NOT
REPRESENT ANY NUMBER IN THE
FIELD OR AS-BUILT. TO BE USED
DURING THE I.F.R. AND
CONSTRUCTION STAGE FOR
CLARIFICATION.
INCLUDE LEGAL BLOCK LETTER
REFERENCES ON SCHEMATIC
INCLUDE STREET NAMES ON
SCHEMATIC FOR APPROXIMATE
REFERENCE
SCHEMATIC SHOULD BE NOT TO
SCALE (N.T.S.). IT SHOULD NOT BE
GEOSPATIALLY PLACED.
LABEL TRANSFORMERS AS AAAA,
BBBB, CCCC, INITIALLY; THE
SASKPOWER DESIGN LEAD WILL
PROVIDE ACTUAL NUMBERS
DURING I.F.R. STAGE.
M
R
1
THE CREEKS
PHASE
4
A
R
C
O
L
A
A
V
E
E
C
H
U
K
A
B
L
V
D
S
A
N
D
P
I
P
E
R
C
R
E
S
REGINA,SASKATCHEWAN
•
•
•
•
•
CALL AT LEAST TWO FULL
WORKING DAYS BEFORE
YOU PLAN TO DIG
SHEET
REGINA
EAST
STREET LIGHTING
SUBDIVISION NAME
SERVICE PROVIDER NAME
U07-23412346 7 D 1
1:750
2012-12-26
CONSTRUCTION NOTES:
1. INSTALL WASHINGTON POSTLIE 150W HPS LUMINAIRE AS PER
B-20-40 COLUMN A
2. ALL LUMINAIRES INCLUDE PHOTO CONTROL (STOCK #31640)
3. MOUNTING HEIGHT IS 4.88 m
4. Include B-20-35 fuse at all street light connections in the transformer.
DESIGN NOTES:
1. IES PHOTOMETRIC FILE IS AW15AHP00X3NXX
2. LIGHT LOSS FACTOR USED IS 0.65 AS PER SEP 4 DRAFT
3. LIGHTING MEETS IES SPECIFICATIONS BASED ON ILLUMINANCE
METHOD
4. MAXIMUM ALLOWED VOLTAGE DROP IS 8%. THERE ARE NO
VOLTAGE DROP ISSUES IN THIS DESIGN.
LUMINAIRE TEMPLATES CAN BE
IMPORTED FROM AGI32 SIMULATION
SOFTWARE IF AVAILABLE
ANNOTATE WORST CASE VOLTAGE
DROP
INDICATE THE LIGHTING LEVELS AS
PER IES AND RP8
INDICATE IF STREET LIGHT CABLE
WILL BE IN A JOINT TRENCH
OFFSET TO THE TRENCH
CENTERLINE
IDENTIFY WHICH LUMINAIRES ARE
USED IN THE DESIGN
M
R
1
THE CREEKS
PHASE
4
A
R
C
O
L
A
A
V
E
E
C
H
U
K
A
B
L
V
D
S
A
N
D
P
I
P
E
R
C
R
E
S
REGINA,SASKATCHEWAN
CALL AT LEAST TWO FULL
WORKING DAYS BEFORE
YOU PLAN TO DIG
SHEET
REGINA
EAST
UNDERGROUND DUCT AND STRUCTURES FOR
SUBDIVISION NAME
SERVICE PROVIDER NAME
E07-12312988
7 7 D 11:750
2012-11-26
REFERENCE EACH
MATERIAL ITEM USED AT
EACH LOCATION
SHOW WHICH SIDE OF THE TRENCH
GAS IS PLACED RELATIVE TO
OTHER 3 PARTIES
ANNOTATE WEHN GAS CROSSES
OVER OTHER FACILITIES
EACH LOT SHOWS A STUB AT THE
LOCATION OF THE 4-PARTY
SERVICE STUB BOX
GIVE DETAILED TESTING
INSTRUCTIONS TO THE CREWS AT
EACH TESTING POINT
OFFSET SHOULD BE TO EXACT
LOCATION OF THE PIPE
ANNOTATE THE EXACT DISTANCE
OF EACH STUB
PROPOSED GAS PIPE IS SHOWN IN
BLUE
EXISTING GAS PIPE SHOWN IN
GREEN
BREAK THE POLYLINE AT THE
EXACT LOCATION OF THE
REDUCER, BUT PLACE THE
REDUCER SYMBOL IN A VISUALLY
DISTINGUISHABLE LOCATION ON
THE LINE
ANNOTATE THE SIZE AND TYPE OF
EACH PIPE
M
R
1
THE CREEKS
PHASE
4
A
R
C
O
L
A
A
V
E
E
C
H
U
K
A
B
L
V
D
S
A
N
D
P
I
P
E
R
C
R
E
S
REGINA,SASKATCHEWAN
CALL AT LEAST TWO FULL
WORKING DAYS BEFORE
YOU PLAN TO DIG
SHEET
REGINA
EAST
UNDERGROUND DUCT AND STRUCTURES FOR
SUBDIVISION NAME
SERVICE PROVIDER NAME
E07-12312988
7 7 D 11:750
2012-11-26
THE STAKER'S COPY IS THE SAME
AS THE CONSTRUCTION DRAWING,
BUT SHOWS ONLY THE PIPE
LAYOUT.