Underground Construction Manual Issue 14
Transcript of Underground Construction Manual Issue 14
UNDERGROUND CONSTRUCTION MANUAL
HV CONSTRUCTION Go to SECTION INDEX Back to MAIN INDEX
DESCRIPTION DWG
INDEX
58 5133 11
CONSTRUCTION CONSTRUCTION DESCRIPTION DWG
C. Noel
A. Bletchly
HV CONSTRUCTION
H
2/6/11
Construction code guide - 11kV cable
Construction code guide - 11kV cable termination
Construction code guide - 22kV cable
5134/1
5134/2
5134/3
5135/1
5135/2
11CTC/ASD
11CTC/MMD
11CTC/TX
22CTC/TX
RMU - F&G GA..C Triplex XLPE cable
22CTC/FGA
11CTP Pole termination cable guard to pole
Pole termination with ABS & EDO’s
Pole termination with ABS & EDO’s
Pole termination direct to mains
5206
5207
5051
5054
5101/1
5101/2
5101/3
5101/4
5101/5
5101/6
5101/7
5101/8
5044/1
5044/2
5120/1
5120/2
11kV RMU AND TRANSFORMER CONSTRUCTION
Substation triplex XLPE cable termination & connection
400mm† 1C Cu. Cable termination & connection
11kV POLE TERMINATION CONSTRUCTION
termination and connection ABB
& connection Magnefix & transformer
Construction code guide - 11kV Pole termination
termination & connection F&G and transformer
Construction code guide - 22kV Pole termination
termination & connection
22kV RMU CONSTRUCTION
termination and connection
22CTC/TX Transformer Triplex XLPE cable
Pole termination with links
Pole termination with links (trident)
400mm† Cu. 1 core XLPE cable
termination and connection
RMU - F&G GA..C triplex XLPE cable
termination and connection
Transformer Triplex XLPE cable termination
and connection
22 kV TRANSFORMER CONSTRUCTION
Construction code guide - 33kV Pole termination 5247/1
11CTC/ASL
11PMCTC/ASL
11PMCTC/ASL
RMU & SFU Magnefix MD & Transformer
Triplex XLPE cable termination & connection
RMU - ABB SafeLink in padmounted
RMU - ABB SafeLink in padmounted substation
RMU - ABB SD series Triplex XLPE cable
RMU - ABB Safelink2 freestanding triplex XLPE
cable termination & connection
5244
11CTC/ASL RMU - ABB Safelink2 freestanding 400mm† 1C Cu.
cable termination & connection
5245
5270/1FBX RMU - Triplex XLPE cable term. & conn. - material
FBX RMU - Triplex XLPE cable term. & conn. - construction 5270/2
Pole termination 35mm†/185mm†/400mm† Al. and
400mm† Cu XLPE cable
11CTP Pole termination 35mm†/185mm†/400mm† AI.
and 400mm† Cu XLPE cable
35mm†/185mm†/400mm† AI. XLPE
35mm†/185mm†/400mm† AI. XLPE
35mm†/185mm†/400mm† AI. XLPE
35mm†/185mm†/400mm† AI. XLPE
E 17.07.12
22CTC/RM6 5279/2
termination and connection
termination and connection
5279/1RMU - Schneider Electric RM6 Triplex XLPE cable
RMU - Schneider Electric RM6 Triplex XLPE cable
F 14.04.15
T. Borg
G 04.05.17
5373/18DJH RMU - Triplex XLPE cable term. & conn. - material
8DJH RMU - Triplex XLPE cable term. & conn. - construction 5373/2
H 11.04.18
11PMCTC/FBX
11PMCTC/8DJH
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
DESCRIPTION DWG
INDEX
58 5133 22
CONSTRUCTION CONSTRUCTION DESCRIPTION DWG
HARD COPYUNCONTROLLED
C. Noel
A. Bletchly
L. Burton
HV CONSTRUCTIONB 2.6.11
C
2/6/11
22kV POLE TERMINATION CONSTRUCTION
22CTP
22CTP
Pole termination 35mm†/185mm† AI. Triplex
and 630mm† AI. 1 core XLPE cable
Pole termination 35mm†/185mm† AI. Triplex
Pole termination cable guard to pole
Pole termination with links
35mm†/185mm† AI. XLPE cable
Pole termination with links (trident)
35mm†/185mm† AI. XLPE cable
Pole termination with ABS & EDO’s
35mm†/185mm† AI. XLPE cable
Pole termination with ABS & EDO’s
35mm†/185mm† AI. XLPE cable
Pole termination direct to mains
630mm† AI. 1 core XLPE cable
5076/1
5076/2
5076/3
5076/4
5076/6
5076/7
5076/8
5076/5
33kV POLE TERMINATION CONSTRUCTION
and 630mm† AI. 1 core XLPE cable
Pole termination 50mm†/300mm† Al
core XLPE cable - Material
Pole termination 50mm†/300mm† Al
core XLPE cable
5248/2
5248/3Pole termination cable guard to pole
5248/4Pole termination with links 50mm†/300mm† Al 1 core
33CTP
5248/5Pole termination with ABS and EDO’s
50mm†/300mm† Al 1 core
5248/1
C 23.05.16
22/11kV PADMOUNTED AUTO TRANSFORMER
5354/1
5354/2
22/11kV Padmounted Auto Transformer
Triplex XLPE cable termination & connection.
22/11kV Padmounted Auto Transformer
Triplex XLPE cable termination & connection.
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
EXAMPLE:-
58 5134 1C.Lindsay 5134
11kV CONSTRUCTION
CONSTRUCTIONSVOLTAGE
CABLE SIZE
HV SWITCHGEAR
11 = 11kV
CONSTRUCTION CODE GUIDE
1
detail drawings in this manual.
appears on relevant construction
Code shown within dashed box
A
CTC = Cable Termination & Connection
4/2/03
CONSTRUCTIONS
11 CTC/ASD/35T
VOLTAGE
CABLE SIZE
ASD = ABB SD series
HV SWITCHGEAR
11 = 11kV
detail drawings in this manual.
appears on relevant construction
Code shown within dashed box
A
CTC = Cable Termination & Connection
ASL = ABB SafeLink
35T = 35mm† Al Triplex
185T = 185mm† Al Triplex
35TI = 35mm† Al Triplex insect protected
185TI = 185mm† Al Triplex insect protected
400CUI = 400mm† Cu 1 Core insect protected
EXAMPLE:-
11CTC/ASD/35T = 11kV, Cable termination and connection, ABB SD series RMU, 35mm† Al Triplex cable
35T = 35mm† Al Triplex
185T = 185mm† Al Triplex
35TI = 35mm† Al Triplex insect protected
185TI = 185mm† Al Triplex insect protected
B 7.10.05
E
11 PM/CTC/ASL/35T
LOCATION
PM = Padmounted Substation
11PMCTC/ASL/35T = 11kV, Padmounted Substation, Cable termination and connection, ABB SafeLink RMU, 35mm† Al Triplex cable
C 23.3.11
ASL = ABB SafeLink
ASP = ABB SafePlus
ASR = ABB SafeRing
400CUI = 400mm† Cu Triplex insect protected
400T = 400mm† Al Triplex
400TI = 400mm† Al Triplex insect protected
11kV CABLE TERMINATION & CONNECTION CONSTRUCTION CODE
400TI = 400mm† Al Triplex insect protected
400T = 400mm† Al Triplex
C. Noel
A. BletchlyD 13.12.11
CABLE TERMINATION AND CONNECTION
11kV PADMOUNTED SUBSTATION CABLE TERMINATION & CONNECTION RMU CONSTRUCTION CODE
FBXFBX = Schneider Electric
E 04.05.17
8DJH = Siemens 8DJH
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
5134
11kV CONSTRUCTION
EXAMPLE:-
CONSTRUCTIONSVOLTAGE
CABLE SIZE
11 = 11kV
TRANSFORMER
TX = Transformer
11kV CABLE TERMINATION & CONNECTION TRANSFORMER CONSTRUCTION CODE
CONSTRUCTION CODE GUIDE
58 5134 22
detail drawings in this manual.
appears on relevant construction
Code shown within dashed box
A
CABLE TERM. & CONN. MAGNEFIX & TRANSFORMER
CTC = Cable Termination & Connection
11 CTC/TX/35TI
4/2/03
EXAMPLE:-
CONSTRUCTIONSVOLTAGE CABLE SIZEHV SWITCHGEAR
11 = 11kV MMD = Magnefix MD series
11kV CABLE TERMINATION & CONNECTION MAGNEFIX MD SERIES CONSTRUCTION CODE
detail drawings in this manual.
appears on relevant construction
Code shown within dashed box
A
CTC = Cable Ttermination & Connection
11 CTC/MMD/185T
B 23.9.05
D
35T = 35mm† Al Triplex
185T = 185mm† Al Triplex
35TI = 35mm† Al Triplex insect protected
185TI = 185mm† Al Triplex insect protected
35T = 35mm† Al Triplex
185T = 185mm† Al Triplex
35TI = 35mm† Al Triplex insect protected
185TI = 185mm† Al Triplex insect protected
11CTC/TX/35TI = 11kV, Cable termination and connection, Transformer, 35mm† Triplex insect protected cable
11CTC/MMD/185T = 11kV, Cable termination and connection, Magnefix MD series RMU, 185mm† Triplex cable
C 13.12.11
D 31.05.16
C. Noel
A. Bletchly
T. Borg
ATX = Auto Transformer
400TI = 400mm† Al Triplex insect protected
400CUI = 400mm† Cu 1 core insect protected
400TI = 400mm† Al Triplex
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
EXAMPLE:-
C.Lindsay 5134
11kV CONSTRUCTION
CONSTRUCTIONSVOLTAGE CABLE SIZE
11 = 11kV CT = Cable termination
POLE
P = Pole
CABLE GUARD
POLE TERMINATION
11kV POLE TERMINATION CONSTRUCTION CODE
CONSTRUCTION CODE GUIDE
Code shown within dashed box
appears on relevant construction
detail drawings in this manual.A
358 5134 3
M = Metal
P = Polymeric
4/2/03
11CTP/35T/M = 11kV, Cable termination, Pole, 35mm† Triplex cable, Metal cable guard
11 CT P/35T/M
B 24.11.05
D
35T = 35mm† Al Triplex
185T = 185mm† Al Triplex
35TI = 35mm† Al Triplex insect protected
185TI = 185mm† Al Triplex insect protected
400CUI = 400mm† Cu 1 core insect protected
C 13.11.08��
�
�
400T = 400mm† Al Triplex
400TI = 400mm† Al Triplex insect protected
C. Noel
A. Bletchly
D 13.12.11
HARD COPYUNCONTROLLED
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
EXAMPLE:-
5135
22kV CONSTRUCTION
CONSTRUCTIONSVOLTAGE CABLE SIZEHV SWITCHGEAR
2
2
2
22 = 22kV
EXAMPLE:-
CONSTRUCTIONSVOLTAGE CABLE SIZE
2
22 = 22kV
TRANSFORMER
TX = Transformer
22 CTC/FGA/185T
FGA = F & G GA...- C Series
22CTC/FGA/185T = 22kV, Cable termination and connection, F & G GA...-C series RMU, 185mm Triplex cable
22 CTC/TX/35TI
2
2
22kV CABLE TERMINATION & CONNECTION TRANSFORMER CONSTRUCTION CODE
CONSTRUCTION CODE GUIDE
detail drawings in this manual.
appears on relevant construction
Code shown within dashed box
A
detail drawings in this manual.
appears on relevant construction
Code shown within dashed box
A
158 5135 1
CTC = Cable Termination & Connection185T = 185mm Al Triplex
630 = 630mm Al 1C2
CTC = Cable Termination & Connection185T = 185mm Al Triplex
35TI = 35mm Al Triplex insect protected
35TI = 35mm Al Triplex insect protected
22CTC/TX/35TI = 22kV, Cable termination and connection, Transformer, 35mm Triplex insect protected cable
4/2/03B
C
A.Bletchly
12.07.12
C.Noel
T.Borg
CABLE TERM. & CONNECTION & TRANSFORMER
RM6 = Schneider Electric RM6
C 31.05.16
22kV CABLE TERMINATION & CONNECTION HV SWITCHGEAR CONSTRUCTION CODE
ATX = Auto Transformer
630 = 630mm Al 1 core2
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
EXAMPLE:-
CONSTRUCTIONSVOLTAGE CABLE SIZE
CT = Cable termination
POLE
P = Pole
CABLE GUARD
POLE TERMINATION
CONSTRUCTION CODE GUIDE
Code shown within dashed box
appears on relevant construction
detail drawings in this manual.A
M = Metal
P = Polymeric
33 CT P/300/P
5247 158 5247 1
T.Borg
C.Noel
A.Bletchly
22.03.1133kV CONSTRUCTION
33kV POLE TERMINATION CONSTRUCTION CODE
33 = 33kV 50 = 50mm† Al 1 Core
300 = 300mm† Al 1 Core
33CTP/300/P = 33kV, Cable termination, Pole, 300mm† Al 1 Core cable, Polymeric cable guard.
HARD COPYUNCONTROLLED�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
���
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
1
11kV CONSTRUCTION
ASSY DESCRIPTION QTY
1. Construction Type
F
TRIPLEX XLPE CABLE TERMINATION & CONNECTION
Station Earth
F
NOTES:
C.Lindsay
23/9/05
520658 5206 1
571-1 Term. & conn. (ABB SafeLink) 11kV 35mm† cable
571-2 Term. & conn. (ABB SafeLink) 11kV 185mm† cable
571-3 Term. & conn. (ABB SafeLink) 11kV 35mm† cable insect prot.
571-4 Term. & conn. (ABB SafeLink) 11kV 185mm† cable insect prot.
573-2
573-43
Insulate screen wires with PVC tape.
F
clamp on cable.
Do not over tighten
concrete plinth
Unistrut set in
RMU - ABB SAFELINK IN PADMOUNTED SUBSTATION
with HV switchgear.
Bushing Boots supplied
11PMCTC/ASL
MATERIAL
RMU bushings.
Heat must NOT be applied near
Use only cold applied bushing boots.
WARNING:
B 13.11.08
E
C 23.3.11
573-2, 4 or 9
Assy Selection
F
F
573-9Clamp to channel suit 11kV 400mm† Al cable insect protected
Clamp to channel suit 11kV 400mm† Al cable
Clamp to channel suit 11kV 35mm† Al cable
Clamp to channel suit 11kV 35mm† Al cable insect protected
Clamp to channel suit 11kV 185mm† Al cable
Clamp to channel suit 11kV 185mm† Al cable insect protected
571-1 to 9
Assy Selection571-8
571-9 Term. & conn. (ABB SafeLink) 11kV 400mm† Al cable insect prot.
Term. & conn. (ABB SafeLink) 11kV 400mm† Al cable
F
C. Noel
A. BletchlyD 07.02.12
E 19.04.17
Manufacturers installation instructions
boots to be installed in accordance with
Termination and connection kit, and bushing
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
1
11kV CONSTRUCTION
ASSY DESCRIPTION QTY
1. Construction Type
F
Station Earth
F
F
NOTES:
570-1
573-6 3
400mm† 1C Cu. CABLE TERMINATION & CONNECTION
27/9/05
Assy 570-1
11kV 400mm† Cu cable insect protected
Termination & connection (ABB SafeLink)
MATERIAL
Assy 573-6
520758 5207 1
insect protected
Clamp to channel suit 11kV 400mm† Cu cable
to separate holes on station earth.
Connect cable screens and earth straps (braid)
Refer Note 1
Screen earth
Refer Note 1
Braid earth
F
F
F
semi-conductive outer sheath
400mm† 1 core cable with
F
clamp on cable.
Do not over tighten
concrete plinth
Unistrut set in
F
SIDE VIEW 11PMCTC/ASL
RMU - ABB SAFELINK IN PADMOUNTED SUBSTATION
RMU bushings.
Heat must NOT be applied near
Use only cold applied bushing boots.
WARNING:
B 13.11.08
CT. Borg
C. Noel
A. BletchlyC 19.04.17
Manufacturers installation instructions
boots to be installed in accordance with
Termination and connection kit, and bushing
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
NOTES:
20/1/03
2
2
1
11kV CONSTRUCTION
ASSY
514-1
514-2
541-4
DESCRIPTION QTY
5051
RMU - ABB SD SERIES
1.
2.
MATERIAL - ASD
11CTC/ASD
58 5051 1
Construction Type
BACK OF
CABLE BOX
SIDE VIEW
F
F
TRIPLEX XLPE CABLE TERMINATION & CONNECTION
2
1541-7 2
Term. & conn. (ABB SD) 11kV 35mm cable
Term. & conn. (ABB SD) 11kV 185mm cable
2
2
514-3
514-4
Term. & conn. (ABB SD) 11kV 35mm cable insect prot.
Term. & conn. (ABB SD) 11kV 185mm cable insect prot.
Cable trifoil to channel suit 11kV 35mm cable2
Cable trifoil to channel suit 11kV 35mm cable insect prot.
Cable trifoil to channel suit 11kV 185mm cable2
Cable trifoil to channel suit 11kV 185mm cable insect prot.
Locate cable lug and bolt head to rear of bushing.
Insulate screen wires with PVC tape and ensure that
wires DO NOT CONTACT the unistrut bar or any
earth point before reaching the station earth bar.
Station Earth
F
557-21 Spring nut suit P3300 channel 1
Maximum lug width is 35mm.
Machine/file both sides of palm
as necessary and radius edges.
F
Assy 557-21
��
�
�
B 07.02.12
B
A.Bletchly
C.Noel
T.Borg
Assy Selection
541-4 or 7
Assy Selection
514-1 to 4
HARD COPYUNCONTROLLED�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
���
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
NOTES:
17/1/03
���� �������������� ����������
1
1
1
1. Insulate screen wires with PVC tape and ensure that
wires DO NOT CONTACT the unistrut bar or any
earth point before reaching the station earth bar.
11kV CONSTRUCTION
2
541-4
516-2
516-1
ASSY
516-2
516-1
ASSY
MATERIAL - MMD
DESCRIPTION
DESCRIPTION QTY
QTY
5054
Assy Selection
516-1 to 4
F
F
F
Support
Channel
FRONT VIEW - TRANSFORMER
FRONT VIEW - RMU
2
2
2
58 5054 1
Construction Type
11CTC/TX
11CTC/MMD
RMU & SFU - MAGNEFIX MD AND TRANSFORMER
F
F
2
516-4
516-32
2516-3
516-4 2
TRIPLEX XLPE CABLE TERMINATION & CONNECTION
Term. & conn. (Magnefix MD & Transf.) 11kV 35mm cable insect prot.
Term. & conn. (Magnefix MD & Transf.) 11kV 185mm cable
Term. & conn. (Magnefix MD & Transf.) 11kV 35mm cable insect prot.
541-7
2
2
2
2
Clamp trefoil to channel suit 11kV 35mm cable
Clamp trefoil to channel suit 11kV 35mm cable insect prot.
Clamp trefoil to channel suit 11kV 185mm cable
Clamp trefoil to channel suit 11kV 185mm cable insect prot.
557-20 1
Term. & conn. (Magnefix MD & Transf.) 11kV 35mm cable
Term. & conn. (Magnefix MD & Transf.) 11kV 185mm cable insect prot.
Term. & conn. (Magnefix MD & Transf.) 11kV 35mm cable
Term. & conn. (Magnefix MD & Transf.) 11kV 185mm cable
Term. & conn. (Magnefix MD & Transf.) 11kV 185mm cable insect prot.
MATERIAL - TRANSF.
Spring nut suit P1000 channel
Support Channel
HARD COPY
��
�
�
B 07.02.12
B
A.Bletchly
C.Noel
T.Borg
Assy Selection
541-4 or 7
and
557-20
Assy Selection
516-1 to 4
HARD COPYUNCONTROLLED
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
1
11kV CONSTRUCTION
ASSY DESCRIPTION QTY
1. Construction Type
TRIPLEX XLPE CABLE TERMINATION & CONNECTION
Station Earth
NOTES:
L. Burton
17/3/11
524462 5244 1
571-1 Term. & conn. (ABB SafeLink) 11kV 35mm† cable
571-2 Term. & conn. (ABB SafeLink) 11kV 185mm† cable
571-3 Term. & conn. (ABB SafeLink) 11kV 35mm† cable insect prot.
571-4 Term. & conn. (ABB SafeLink) 11kV 185mm† cable insect prot.
Insulate screen wires with PVC tape.
MATERIAL
RMU bushings.
Heat must NOT be applied near
Use only cold applied bushing boots.
WARNING:
C. Noel
A. Bletchly
577-1 1
F
F
F
F
ABB bushing boots
Assy 577-1
11CTC/ASL
B 07.02.12
571-1 to 4
Assy Selection
D
C 12.02.15
AR600-1 Glands to suit 185mm† cable (note 2)
2.Sufficient for 1 switch or fuse.
F
Assy 600-1
RING MAIN UNIT ABB SAFELINK2 FREESTANDING
D 19.04.17
Manufacturers installation instructions
boots to be installed in accordance with
Termination and connection kit, and bushing
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
Construction Type
F
Station Earth
L. Burton
570-1
400mm† 1C Cu. CABLE TERMINATION & CONNECTION
17/3/11
11kV 400mm† Cu cable insect protected
Termination & connection (ABB SafeLink)
524562 5245 1
F
SIDE VIEW
C. Noel
A. Bletchly
Screen earth
Braid earth
F
F
F
F
571-8 or 9
or
570-1
Assy Selection
11CTC/ASL
11kV CONSTRUCTION
RMU - ABB SAFELINK2 FREESTANDING
ASSY DESCRIPTION QTY
571-8
571-9
MATERIAL
577-5 1
Term. & conn. (ABB SafeLink) 11kV 400mm† Al cable
Term. & conn. (ABB SafeLink) 11kV 400mm† Al cable - insect prot.
Raychem bushing boots
1
RMU bushings.
Heat must NOT be applied near
Use only cold applied bushing boots.
WARNING:
F
600-2 or 3
Assy Selection
B 12.02.15
C
AR600-2
AR600-3
Glands to suit 400mm† Al cable (note 1)
1.
NOTES:
Sufficient for 1 switch or fuse.
Glands to suit 400mm† Cu & Al insect protected cable (note 1)
C 19.04.17
Manufacturers installation instructions
boots to be installed in accordance with
Termination and connection kit, and bushingsemi-conductive outer sheath
400mm† 1 core cable with
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
����� �
���������� ����� �
2
2 2ASSY DESCRIPTION
35mm 185mm
QTY
1
1
510-6
2
Earth extension elbow connector to station earth
MATERIAL - INCLUDING CABLE SCREEN EARTH CONNECTION
NOTES:
1. Insulate screen wires with PVC tape and ensure that wires DO NOT CONTACT
any metal before reaching the station earth bar.
1
TRIPLEX XLPE CABLE TERMINATION & CONNECTION
2
1
2 1
58 5270 15270
FBX RMU
11kV CONSTRUCTION
T.Borg
30.12.11
C.Noel
A.Bletchly
588-1
588-4
588-7
Cable termination and connection to RMU 11kV 35mm
Cable termination and connection to RMU 11kV 185mm cable
Cable termination and connection to RMU 11kV 400mm cable
400mm
11
HARD COPYUNCONTROLLED
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
���
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
F
F
Assy 510-6F
F
Screen earth
Construction Type
2
TRIPLEX XLPE CABLE TERMINATION & CONNECTION
F
A.Bletchly
C.Noel
30.12.11
T.Borg58 5270 2
5270
FBX RMU
11kV CONSTRUCTION
Areva FBX RMU
588-7
or
588-4
or
588-1
Assy Selection
B 29.04.14
Earth
To Station
C
C 11.04.18
11PMCTC/FBX
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
2
2 2ASSY DESCRIPTION
35mm 185mm
QTY
1
1
510-6
2
Earth extension elbow connector to station earth
MATERIAL - INCLUDING CABLE SCREEN EARTH CONNECTION
NOTES:
1.
any metal before reaching the station earth bar.
Insulate screen wires with PVC tape and ensure that wires DO NOT CONTACT
1
TRIPLEX XLPE CABLE TERMINATION & CONNECTION
2
1
2 1
58 5373 15373
11kV CONSTRUCTION
T.Borg
04.05.17
C.Noel
A.Bletchly
588-1
588-4
588-7
Cable termination and connection to RMU 11kV 35mm
Cable termination and connection to RMU 11kV 185mm cable
Cable termination and connection to RMU 11kV 400mm cable
400mm
11
HARD COPYUNCONTROLLED
SIEMENS 8DJH RMU
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
F
Earth
To Station
F
Assy 510-6F
F
Screen earth
Construction Type
2
TRIPLEX XLPE CABLE TERMINATION & CONNECTION
F
A.Bletchly
C.Noel
04.05.17
T.Borg58 5373 2
5373
11kV CONSTRUCTION
588-7
or
588-4
or
588-1
Assy Selection
SIEMENS 8DJH RMU
RMU
Siemens 8DJH
B 11.04.18
B
11PMCTC/8DJH
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
����
�
��
��
�
�
��
�
�
�
�
�
��
�
��
��
��
�
�300
00
2100
LV ABC
3900
����
��
�
�����
��
�
�
��
�
�
��
�
�
�
��
�
����� �
��
��
�
�
1800
��
��
���
�����
��
�
�
��
�
�
��
�
�
�
��
�
�����
���
�
�
�
300
1800
00
2450
LV ABC
4250
C.Lindsay 5101
11kV CONSTRUCTION
F
F
F
58 5101 44
F
F
���������
�
�
�
F
4200
LV OPEN
WIRE
4550
LV OPEN
WIRE
����
���
��������
�
���
�
��
��
���
�
���������
�
��
300
1800
00
2450
LV ABC
4250
F
F
F
4550
LV OPEN
WIRE
TERMINATION STRAIN DELTA INTERMEDIATE
POLE TERMINATION WITH LINKS
F
FF
8200
MINIMUM TO GROUND
IF LV CABLE TERM.
REQUIRED
(TYPICAL)
24/3/03
REFER:- Overhead
Construction Manual
CABLE TERM. POLES
for pole top details.
B 24.3.11
C
C. Noel
A. BletchlyC 07.02.12
�
�
�
�
�
�
�
�
�
�
�
�
35/185/400mm† AL XLPE
HARD COPYUNCONTROLLED
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
C.Lindsay 5101
11kV CONSTRUCTION
��
��
���
�����
��
�
�
��
�
�
��
�
�
�
��
�
����� �
���
�
�
�
2100
300
00
1800
LV ABC
3900
��
��
���
�����
����
�
�
��
�
�
�
��
�
����� �
���
F
F
F
558 5101 5
��
��
��
�
�����
��
�
�
��
�
�
��
�
�
�
��
�
����� �
���
�
�
�
��
� �
���
�����
��
�
�
��
�
�
� �
�
�
�
��
�
����� �
���
�
�
�
�����
�
�����
�
������
�
�
��
�
�
�
�
� �
���
�
�
�
2650
300
1800
LV ABC
4450
��������
�
�
�
�
� �
���
F
F
F
��
��
��
�
�����
��
�
�
��
�
�
��
�
�
�
��
�
����� �
���
�
�
�
00
POLE TERMINATION WITH LINKS (TRIDENT)
TRIDENT TERMINATION/STRAINTRIDENT INTERMEDIATE
F
8200
FF
MINIMUM TO GROUND
IF LV CABLE TERM.
REQUIRED
(TYPICAL)
4750
LV OPEN
WIRE
4200
LV OPEN
WIRE
24/3/03
REFER:- Overhead
Construction Manual
CABLE TERM. POLES
for pole top details.
�
B 24.3.11
C
C. Noel
A. Bletchly�
C 07.02.12�
�
�
�
�
�
�
�
�
� 35/185/400mm† AL XLPE
HARD COPYUNCONTROLLED�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
���
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
C.Lindsay 5101
3000
300
00
1800
F
F
F
3700
300
00
1800
FF
F LV ABC
5500
LV ABC
4800
58 5101 66
TRIDENT TERMINATION/STRAIN TRIDENT INTERMEDIATE
F
8200
FF
5/3/03
MINIMUM TO GROUND
IF LV CABLE TERM.
REQUIRED
(TYPICAL)
5800
LV OPEN
WIRE
5100
LV OPEN
WIRE
REFER:- Overhead
Construction Manual
CABLE TERM. POLES
for pole top details.
B 24.3.11
C
POLE TERMINATION WITH ABS AND EDO’S
11kV CONSTRUCTION
C. Noel
A. BletchlyC 07.02.12
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
35/185/400mm† AL XLPE
HARD COPYUNCONTROLLED
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
2700
300
00
LV ABC
4500
1800
F
F
C.Lindsay 5101
11kV CONSTRUCTION
F
2700
300
00
LV ABC
4500
1800
F
FF
58 5101 77
POLE TERMINATION WITH ABS AND EDO’S
TERMINATION/STRAINFLAT INTERMEDIATE
F
8200
FF
4800
LV OPEN
WIRE
4800
LV OPEN
WIRE
MINIMUM TO GROUND
IF LV CABLE TERM.
REQUIRED
(TYPICAL)
25/3/03
REFER:- Overhead
Construction Manual
CABLE TERM. POLES
for pole top details.
�
B 24.3.11
C
C. Noel
A. Bletchly�
C 07.02.12�
�
�
�
�
�
�
�
�
� 35/185/400mm† AL XLPE
HARD COPYUNCONTROLLED
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
���
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
22kV CONSTRUCTION
5044
2
2 2ASSY DESCRIPTION
35mm 185mm
QTY
512-1 1
1
510-6
2512-4
Earth extension elbow connector to station earth
MATERIAL - INCLUDING CABLE SCREEN EARTH CONNECTION
553-1 235mm insect protected cable bonding brass tape to cable screen 3
NOTES:
1.
any metal before reaching the station earth bar.
Insulate screen wires with PVC tape and ensure that wires DO NOT CONTACT
8/2/02
158 5044 1
TRIPLEX XLPE CABLE TERMINATION & CONNECTION
RMU - F&G GA...C
2630mm
1
2512-7 1
510-1 1 1Earth extension elbow connector to station earth
536-5 2 3
Cable termination and connection to RMU 22kV 35mm cable insect protected
Cable termination and connection to RMU 22kV 185mm cable
Cable termination and connection to RMU 22kV 630mm cable
Clamp to suit 3 x 1 core 630mm cable
B
B
11.04.12
T.Borg
C.Noel
A.Bletchly
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
F
Earth
To Station
F
F
22kV CONSTRUCTION
5044
Type GA...C (shown)
F & G RMU
F
F
Screen earth
8/2/02
22CTC/FGA
Construction Type
58 5044 22
RMU F&G GA...C
TRIPLEX XLPE CABLE TERMINATION & CONNECTION
F
B
BT.Borg
C.Noel
A.Bletchly
11.04.12
536-5
Assy Selection
512-7
or
512-4
or
512-1 and 553-1
Assy Selection
Assy 510-1 or 6
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
C.Lindsay
22kV CONSTRUCTION
Clamp cable to wood pole
Guard wildlife to wood pole 1
1
1
3
1
AR
2
2
5076
2
2
MATERIAL - TERMINATION
ASSY DESCRIPTION QTY
511-2
515-4
539-1
540-2
546-10
546-11
531-1
531-6
547-1
511-6
2
21
NOTES:
Do Not Obstruct climbing access.
3.
2.
1.
Guard polymeric to wood pole
158 5076 1
531-7
Guard metal (100) to wood pole
Guard metal (130) to wood pole
2546-12
511-12 2
540-3
Arrester 22kV mounting to bracket (M12)
POLE TERMINATION - 35mm /185mm AL TRIPLEX
AND 630mm AL 1 CORE XLPE CABLE - MATERIAL
2
oncoming traffic where possible.
Locate cable on opposite side of pole to
come into contact with the wood.
shall be greased for the entire length that may
All metalwork that passes through or into wood
Clamp trefoil to pole term. bracket suit 22kV 35mm cable insect protected
Clamp trefoil to pole term. bracket suit 22kV 185mm cable
Clamp trefoil to pole term. bracket suit 22kV 630mm cable
4.
6.
where there is a high likelihood of impact.
where metal bladed brush cutter may be used
subject to grass fire
Polymeric cable guard is not to be use in areas:
on pole.
clearance for an LV underground termination
bracket king bolt allows sufficient ground
Minimum dimension to ground from termination
5.
3C cable termination requires greater dimension.
LV conductor below suits triplex cable termination.
Dimension from termination bracket king bolt to
Clamp trefoil to wood pole to suit 630mm cable2
Termination outdoor 22kV 630mm cable
Termination outdoor 22kV 185mm cable
Termination outdoor 22kV 35mm cable insect protected
MATERIAL - CABLE GUARD
ASSY DESCRIPTION QTY
Arrester 22kV mounting to bracket (M16) - 630mm cable only2
18/2/03
557-12
F
C 02.08.10
7.
cable guard and communication assets.
separation requirements between metal
Construction Manual for minimum
Refer Earthing Section of the Overhead
D 16.03.11
ASSY DESCRIPTION
MATERIAL - TERMINATION
580-1
QTY
35mm† 185mm† 630mm†
1Cable separation mounting bracket for termination leads
Bracket termination (11kV, 22kV & 33kV) mounting to wood pole
A. Bletchly
C. Noel
E 27.11.12
8.
wildlife guard may be installed over the cable.
Where wildlife is a problem an additional
F 23.11.16
531-8 Guard metal (180) to wood pole
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
C.Lindsay
Ground Line
Wood Pole
Cable Support
Refer Overhead Construction
POLE TERMINATION
CABLE GUARD TO POLE
5076
Max
150
Min
2400
Min
100
earthing details.
EARTHING for pole and cable guard
Refer Overhead Construction Manual
Metal cable guard shall be earthed.
22kV CONSTRUCTION
22CTP
Construction Type
58 5076 33
5/3/03B 19.9.12
D
C 23.11.16
C. Noel
A. Bletchly
(Refer note 6)
531-1, 6, 7 or 8
Assy Selection
D 31.05.17
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
��������������
Ground Line
Wood Pole
Cable Support
Refer Overhead Construction
POLE TERMINATION
CABLE GUARD TO POLE
150
Max
2400
Min
100
Min
Metal cable guard shall be earthed.
Refer Overhead Construction Manual
EARTHING for pole and cable guard
earthing details.
Construction Type
3
Assy Selection
531-1, 6 or 7
(Refer note 6)
5/3/03
524858 5248 3
33CTP
33kV CONSTRUCTION
A.Bletchly
C.Noel
T.Borg
HARD COPYUNCONTROLLED�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
���
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
����
�
��
��
�
�
��
�
�
�
�
�
��
�
��
��
��
�
�300
00
2100
����
��
�
�����
��
�
�
��
�
�
��
�
�
�
��
�
����� �
��
��
�
�
��
��
���
�����
��
�
�
��
�
�
��
�
�
�
��
�
�����
���
�
�
�
300
00
2450
L. Burton
F
F
F
4
F
F
���������
�
�
�
F
����
���
��������
�
���
�
��
��
���
�
���������
�
��
300
00
2450
F
F
FTERMINATION STRAIN DELTA INTERMEDIATE
POLE TERMINATION WITH LINKS
F
FF
MINIMUM TO GROUND
IF LV CABLE TERM.
REQUIRED
(TYPICAL)
10/5/11
REFER:- Overhead
Construction Manual
CABLE TERM. POLES
for pole top details.
33kV CONSTRUCTION
50mm† / 300mm† Al 1 COREA. Bletchly
C. Noel
524858 5248 4
8400
2000 2000 2000
LV ABC
4450
4750
LV OPEN
WIRE
LV ABC
4450
4750
LV OPEN
WIRE
LV ABC
4100
4400
LV OPEN
WIRE
HARD COPYUNCONTROLLED
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
2700
300
00
F
F
L. Burton
F
2700
300
00
F
FF
TERMINATION/STRAINFLAT INTERMEDIATE
F
FF
MINIMUM TO GROUND
IF LV CABLE TERM.
REQUIRED
(TYPICAL)
10/5/11
REFER:- Overhead
Construction Manual
CABLE TERM. POLES
for pole top details.
5248 558 5248 5
2000
8400
2000
33kV CONSTRUCTION
POLE TERMINATION WITH ABS AND EDO’S
50mm† / 300mm† Al 1 COREA. Bletchly
C. Noel
LV ABC
4700
5000
LV OPEN
WIRE
LV ABC
4700
5000
LV OPEN
WIRE
HARD COPYUNCONTROLLED�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
���
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
2
ASSY DESCRIPTION
185mm
QTY
1
510-6
2
Earth extension elbow connector to station earth
MATERIAL - INCLUDING CABLE SCREEN EARTH CONNECTION
NOTES:
1.
any metal before reaching the station earth bar.
Insulate screen wires with PVC tape and ensure that wires DO NOT CONTACT
1
TRIPLEX XLPE CABLE TERMINATION & CONNECTION
2
1
2 1
58 5354 15354T.Borg
19.04.16
C.Noel
A.Bletchly
588-4
588-7
Cable termination and connection to RMU 11kV 185mm cable
Cable termination and connection to RMU 11kV 400mm cable
400mm
1
11kV AND 22kV CONSTRUCTION
22kV/11kV PADMOUNTED AUTO TRANSFORMER
11KV2185mm
1
2
1
1
630mm
1
22KV
512-4
512-7
Cable termination and connection to RMU 22kV 185mm† cable
Cable termination and connection to RMU 22kV 630mm† cable
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
F
Construction Type
2
TRIPLEX XLPE CABLE TERMINATION & CONNECTION
F
A.Bletchly
C.Noel
19.04.16
T.Borg58 5354 2
5354
HARD COPYUNCONTROLLED
11kV AND 22kV CONSTRUCTION
22kV/11kV PADMOUNTED AUTO TRANSFORMER
Auto Transformer
(22kV end)
512-7
or
512-4
and
(11kV end)
588-7
or
588-4
Assy Selection
F
Assy 510-6F
F
Screen earth
Earth
To Station11CTC/TX
22CTC/TX
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION