UNCLASSIFIED B UILDING S TRONG 1 Focus on Navigation – deliberate mission analysis Integration...

5
UNCLASSIFIED BUILDING STRONG 1 Focus on Navigation – deliberate mission analysis Integration with MTSRU (Marine Transportation Systems Recovery Unit) Navigation playbook Synchronization of Emergency Support Function (ESF), Navigation, Civil Works (CW) missions Introduction to the transition toward long-term economic recovery Integration with North Atlantic Division (NAD) – two Division fight C2 changes with weight to the main effort – western TN & KY and incorporation of Hurricane Sandy lesson’s learned Synchronized with FEMA’s (Regions IV and V) year strategic planning intent LRD NMSZ Exercise – October 2015 LRD 2015 Mission Planning Focus

Transcript of UNCLASSIFIED B UILDING S TRONG 1 Focus on Navigation – deliberate mission analysis Integration...

Page 1: UNCLASSIFIED B UILDING S TRONG 1 Focus on Navigation – deliberate mission analysis  Integration with MTSRU (Marine Transportation Systems Recovery Unit)

UNCLASSIFIED BUILDING STRONG1

• Focus on Navigation – deliberate mission analysis

Integration with MTSRU (Marine Transportation Systems Recovery Unit)

Navigation playbook• Synchronization of Emergency Support Function (ESF), Navigation, Civil

Works (CW) missions• Introduction to the transition toward long-term economic recovery• Integration with North Atlantic Division (NAD) – two Division fight• C2 changes with weight to the main effort – western TN & KY and

incorporation of Hurricane Sandy lesson’s learned• Synchronized with FEMA’s (Regions IV and V) year strategic planning intent• LRD NMSZ Exercise – October 2015

LRD 2015 Mission Planning Focus

Page 2: UNCLASSIFIED B UILDING S TRONG 1 Focus on Navigation – deliberate mission analysis  Integration with MTSRU (Marine Transportation Systems Recovery Unit)

UNCLASSIFIED BUILDING STRONG2

The Great Lakes and Ohio River Division executes operations following a NMSZ catastrophic earthquake under FEMA, DoD and USACE authorities in order to preserve life, protect property and provide for the long-term recovery of the affected area. On order, LRD integrates assets from NAD and USACE; assesses and repairs flood protection, civil works and navigation infrastructure within civil works boundaries; re-establishes commercial navigation on the Ohio, Cumberland and Tennessee Rivers; executes ESF#3 missions in support of DHS/FEMA within TN, KY, IN and OH; provides temporary emergency power support to DHS/FEMA throughout the entire NMSZ area; initiates actions in support of long-term economic recovery for TN, KY, IN and OH and is prepared to support other organizations repairing critical infrastructure

LRD Draft Mission Statement

Page 3: UNCLASSIFIED B UILDING S TRONG 1 Focus on Navigation – deliberate mission analysis  Integration with MTSRU (Marine Transportation Systems Recovery Unit)

LRD CG

LRD HQ

NAD SupportNAD HQ

NAP SupportNAP

LRB LNO

HQ

LRD – Phase 2A-2B (0 – 72 hours)

249th CDR (TFTEP)

LRP CDR (Power LNO)

Page 4: UNCLASSIFIED B UILDING S TRONG 1 Focus on Navigation – deliberate mission analysis  Integration with MTSRU (Marine Transportation Systems Recovery Unit)

UNCLASSIFIED BUILDING STRONG4

Mission – Main Effort

Inspection and assessment of Civil works projects Inspection and assessment of Navigation missions Executes ESF #3 operations to preserve life, protect property, and provide for the long-term economic recovery of the affected area..

Specified, Implied and Essential tasks

S – Assessment of LRD Civil Works projects S – Assessment of navigation capabilities S – ESF #3 Mission in TN, KY, IN, OH S – Temp emergency Power mission in NMSZ S – Initiate RSOI procedures I – Integrate into TN, KY Decision making processes and response actions I – Integration of NAD/USACE assets I – Initiate planning to set conditions for long-term recovery I – Determinate operational capability of LRN

Movements Phase 2A (0-24 hrs): - LRD FWD (CG) moves to TN - LRN executes COOP if necessary - Districts deploy LNOs to SEOC Phase 2B (24-72 hrs): - NAD support initiates movement towards LRD AO - NAD CDR and support cell to TN SEOC - Integration of NAD into regional planning and response activities - Establish LNOs with USCG MTSRUs - Establish Power LNO (LRP CDR) with HQUSACE - Establish LNOs with HQUSAC FWD (LRB CDR) and MVD

Command, Control, Communication

EQ triggers Silent Movements (No-signal initiation of movement) LRD Forward (CG) to TN NAD initiates movement toward LRD AOR NAD CG and support cell moves to TN SEOC Reorganization of LRD HQ: TF Temp Power, TF Navigation, ESF #3, Civil Works, TF Recovery, TF Special Projects

LRD – Phase 2A-2B (0-72 hrs)

Page 5: UNCLASSIFIED B UILDING S TRONG 1 Focus on Navigation – deliberate mission analysis  Integration with MTSRU (Marine Transportation Systems Recovery Unit)

UNCLASSIFIED BUILDING STRONG5

Constraints

1. Overall mobility of initial reconnaissance assets and follow-on support functions

2. Navigation – Lack of planning in reference to Navigation assessments

3. Lack of habitual association with DoD planning and support

4. Lack of heavy support (fleet activities) contracting capability

5. Land Management in TN and lack of State resources to support unanticipated requirements

6. Communications challenges – requires innovative, new communications

7. Life/Safety issues associated with aftershocks while entering impacted zone

8. DTOS support plan – update to reflect recent planning changes

Gaps/Concerns/Recommendations

1. HQ - Integration of MTOE FEST-As (HMWV mobility) and DoD assets

2. HQ - Establishment of national navigation priorities and focus on navigational impacts

3. HQ - Increased collaboration with 416th TEC and local reserve units (pre-scripted missions)

4. LRD - Mission & gap analysis on contracting capability versus anticipated requirements

5. All - No ad-hoc execution on emergency response operations in TN

6. HQ - Create a robust USACE High Frequency (HF) radio network

7. HQ/LRD - Create rules of engagement for aftershocks

8. LRD – Coordination with HQ to reflect changes and requirments

LRD – Phase 2A-2B (0-72 hrs)