UNCLASSIFIED BUILDING STRONG1
• Focus on Navigation – deliberate mission analysis
Integration with MTSRU (Marine Transportation Systems Recovery Unit)
Navigation playbook• Synchronization of Emergency Support Function (ESF), Navigation, Civil
Works (CW) missions• Introduction to the transition toward long-term economic recovery• Integration with North Atlantic Division (NAD) – two Division fight• C2 changes with weight to the main effort – western TN & KY and
incorporation of Hurricane Sandy lesson’s learned• Synchronized with FEMA’s (Regions IV and V) year strategic planning intent• LRD NMSZ Exercise – October 2015
LRD 2015 Mission Planning Focus
UNCLASSIFIED BUILDING STRONG2
The Great Lakes and Ohio River Division executes operations following a NMSZ catastrophic earthquake under FEMA, DoD and USACE authorities in order to preserve life, protect property and provide for the long-term recovery of the affected area. On order, LRD integrates assets from NAD and USACE; assesses and repairs flood protection, civil works and navigation infrastructure within civil works boundaries; re-establishes commercial navigation on the Ohio, Cumberland and Tennessee Rivers; executes ESF#3 missions in support of DHS/FEMA within TN, KY, IN and OH; provides temporary emergency power support to DHS/FEMA throughout the entire NMSZ area; initiates actions in support of long-term economic recovery for TN, KY, IN and OH and is prepared to support other organizations repairing critical infrastructure
LRD Draft Mission Statement
LRD CG
LRD HQ
NAD SupportNAD HQ
NAP SupportNAP
LRB LNO
HQ
LRD – Phase 2A-2B (0 – 72 hours)
249th CDR (TFTEP)
LRP CDR (Power LNO)
•
UNCLASSIFIED BUILDING STRONG4
Mission – Main Effort
Inspection and assessment of Civil works projects Inspection and assessment of Navigation missions Executes ESF #3 operations to preserve life, protect property, and provide for the long-term economic recovery of the affected area..
Specified, Implied and Essential tasks
S – Assessment of LRD Civil Works projects S – Assessment of navigation capabilities S – ESF #3 Mission in TN, KY, IN, OH S – Temp emergency Power mission in NMSZ S – Initiate RSOI procedures I – Integrate into TN, KY Decision making processes and response actions I – Integration of NAD/USACE assets I – Initiate planning to set conditions for long-term recovery I – Determinate operational capability of LRN
Movements Phase 2A (0-24 hrs): - LRD FWD (CG) moves to TN - LRN executes COOP if necessary - Districts deploy LNOs to SEOC Phase 2B (24-72 hrs): - NAD support initiates movement towards LRD AO - NAD CDR and support cell to TN SEOC - Integration of NAD into regional planning and response activities - Establish LNOs with USCG MTSRUs - Establish Power LNO (LRP CDR) with HQUSACE - Establish LNOs with HQUSAC FWD (LRB CDR) and MVD
Command, Control, Communication
EQ triggers Silent Movements (No-signal initiation of movement) LRD Forward (CG) to TN NAD initiates movement toward LRD AOR NAD CG and support cell moves to TN SEOC Reorganization of LRD HQ: TF Temp Power, TF Navigation, ESF #3, Civil Works, TF Recovery, TF Special Projects
LRD – Phase 2A-2B (0-72 hrs)
UNCLASSIFIED BUILDING STRONG5
Constraints
1. Overall mobility of initial reconnaissance assets and follow-on support functions
2. Navigation – Lack of planning in reference to Navigation assessments
3. Lack of habitual association with DoD planning and support
4. Lack of heavy support (fleet activities) contracting capability
5. Land Management in TN and lack of State resources to support unanticipated requirements
6. Communications challenges – requires innovative, new communications
7. Life/Safety issues associated with aftershocks while entering impacted zone
8. DTOS support plan – update to reflect recent planning changes
Gaps/Concerns/Recommendations
1. HQ - Integration of MTOE FEST-As (HMWV mobility) and DoD assets
2. HQ - Establishment of national navigation priorities and focus on navigational impacts
3. HQ - Increased collaboration with 416th TEC and local reserve units (pre-scripted missions)
4. LRD - Mission & gap analysis on contracting capability versus anticipated requirements
5. All - No ad-hoc execution on emergency response operations in TN
6. HQ - Create a robust USACE High Frequency (HF) radio network
7. HQ/LRD - Create rules of engagement for aftershocks
8. LRD – Coordination with HQ to reflect changes and requirments
LRD – Phase 2A-2B (0-72 hrs)