UNCLASSIFIED LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIED Navy Page 1 of 27 P-1 Line #7 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 8: Periscopes P-1 Line Item Number / Title: 0831 / Sub Periscopes & Imaging Equip ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Item MDAP/MAIS Code(s): N/A Resource Summary Prior Years FY 2015 FY 2016 FY 2017 Base FY 2017 OCO FY 2017 Total FY 2018 FY 2019 FY 2020 FY 2021 To Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) 566.257 57.221 63.109 - - - - - - - - 686.587 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) 566.257 57.221 63.109 - - - - - - - - 686.587 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) 566.257 57.221 63.109 - - - - - - - - 686.587 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 4.791 5.797 - - - - - - - - 10.588 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Note: Submarine Electromagnetic Systems including Imaging, Electronic Warfare and Radar programs are managed by PMS435. Imaging Budget Line Item 0831 and Electronic Warfare Budget Line Item 2560 (including Radar) OPN funds will consolidate under BLI 0840 in FY17 and out. The Submarine Periscopes and Imaging Equipment Program procures the Type 18 and Type 8 periscope upgrades; all variants of Photonics Mast (PM), including Low Profile Photonics Mast (LPPM) and 360 degree imaging capability and incorporates it in the Integrated Submarine Imaging System (ISIS), and VIRGINIA Class imaging upgrades and Photonics land based spares. Commander Naval Submarine Force (CNSF), Operations Review Group (ORG) selected the Periscope Acquisition, Tracking, and Ranging with Improved Observation Techniques (PATRIOT) Type 18 Periscope Rangefinder and the Night Owl Type 8 Infra-Red (IR) Periscope as high priority tactical control technologies to field. By OPNAV Ltr Ser. N77/3U629209, 12 June 2003, OPNAV N87 established the ISIS to rapidly field these systems and integrate existing periscope imagery systems into a single system for installation on board submarines. An ISIS capability development document (CDD) was approved 22 Dec, 2011. The CDD is used to fully integrate the ISIS program of record into the submarine force's rapid insertion technology process and to incorporate Fleet-endorsed requirements such as LPPM that are not levied by the ISIS Operational Requirements Documents. ISIS supports high intensity operations in the littorals, providing the submarine force with the tactical imaging systems necessary to safely and effectively employ its surveillance and weapons capabilities. The IR imaging capability improves imaging at night and in low visibility conditions. The PATRIOT Automated Range Finder provides a 360 degree search independent of the visual search, enhanced situational awareness and provides a collision avoidance capability. Tactical Imagery Technology Insertion (TI) includes the common control and displays hardware and software on all platforms regardless of imaging sensors, an integrated imaging system that provides for operator alerts, imaging enhancement tools and contact analysis tools, and a fully Submarine Warfare Federated Tactical Systems (SWFTS) integrated system providing "any display anywhere." Funding improves submarine imaging capability in the areas of: ship safety, Intelligence, Surveillance and Reconnaissance (ISR), tactical control (contact management in the littorals) to provide high quality imaging 24 hours a day, 7 days a week in all weather conditions to support submarine operations worldwide. ISIS provides for the modernization of imaging systems to improve imaging capabilities for the submarine force in support of ISR requirements. This includes the integration of new capabilities, both inboard hardware and software, into the Type 18 and Type 8 Periscopes for LOS ANGELES Class and SEAWOLF Class submarines, the Photonics Mast Variant (PMV) for SSGN, and Photonics Mast upgrades to the VIRGINIA Class AN/BVS-1 including the AN/BVY-1 ISIS capability and LPPM. PL010 - Imaging ISIS Technical Insertions - Continuing in FY17 funding procures Imaging systems and Technical Insertion kits and spares to upgrade ISIS systems on LOS ANGELES, SEAWOLF, VA and OHIO Class SSGN platforms to allow for Capability Insertion and obsolescence avoidance. FY16 procurement also adds funding for improved copper-fiber optic diploops and hull penetrators required to support advanced Imaging and Early Warning capabilities included in Low Profile Photonics Mast and future 360 degree Imaging masts. Volume 1 - 115

Transcript of UNCLASSIFIED · 2016-02-18 · Years FY 2015 FY 2016 FY 2017 Base ... Sub Periscopes & Imaging...

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 1 of 27 P-1 Line #7

Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 8:Periscopes

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/ALine Item MDAP/MAIS Code: N/A Item MDAP/MAIS Code(s): N/A

Resource SummaryPriorYears FY 2015 FY 2016

FY 2017Base

FY 2017OCO

FY 2017Total FY 2018 FY 2019 FY 2020 FY 2021

ToComplete Total

Procurement Quantity (Units in Each)   -      -      -      -      -      -      -      -      -      -      -      -   Gross/Weapon System Cost ($ in Millions) 566.257 57.221 63.109   -      -      -      -      -      -      -      -    686.587Less PY Advance Procurement ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Net Procurement (P-1) ($ in Millions) 566.257 57.221 63.109   -      -      -      -      -      -      -      -    686.587Plus CY Advance Procurement ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Total Obligation Authority ($ in Millions) 566.257 57.221 63.109 - - - - - - - - 686.587

(The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.)

Initial Spares ($ in Millions)   -    4.791 5.797   -      -      -      -      -      -      -      -    10.588Flyaway Unit Cost ($ in Dollars)   -      -      -      -      -      -      -      -      -      -      -      -   Gross/Weapon System Unit Cost ($ in Dollars)   -      -      -      -      -      -      -      -      -      -      -      -   

Description:Note: Submarine Electromagnetic Systems including Imaging, Electronic Warfare and Radar programs are managed by PMS435. Imaging Budget Line Item 0831 and Electronic Warfare Budget Line Item 2560(including Radar) OPN funds will consolidate under BLI 0840 in FY17 and out.

The Submarine Periscopes and Imaging Equipment Program procures the Type 18 and Type 8 periscope upgrades; all variants of Photonics Mast (PM), including Low Profile Photonics Mast (LPPM) and 360degree imaging capability and incorporates it in the Integrated Submarine Imaging System (ISIS), and VIRGINIA Class imaging upgrades and Photonics land based spares. Commander Naval Submarine Force(CNSF), Operations Review Group (ORG) selected the Periscope Acquisition, Tracking, and Ranging with Improved Observation Techniques (PATRIOT) Type 18 Periscope Rangefinder and the Night Owl Type8 Infra-Red (IR) Periscope as high priority tactical control technologies to field. By OPNAV Ltr Ser. N77/3U629209, 12 June 2003, OPNAV N87 established the ISIS to rapidly field these systems and integrateexisting periscope imagery systems into a single system for installation on board submarines. An ISIS capability development document (CDD) was approved 22 Dec, 2011. The CDD is used to fully integratethe ISIS program of record into the submarine force's rapid insertion technology process and to incorporate Fleet-endorsed requirements such as LPPM that are not levied by the ISIS Operational RequirementsDocuments. ISIS supports high intensity operations in the littorals, providing the submarine force with the tactical imaging systems necessary to safely and effectively employ its surveillance and weaponscapabilities. The IR imaging capability improves imaging at night and in low visibility conditions. The PATRIOT Automated Range Finder provides a 360 degree search independent of the visual search, enhancedsituational awareness and provides a collision avoidance capability. Tactical Imagery Technology Insertion (TI) includes the common control and displays hardware and software on all platforms regardless ofimaging sensors, an integrated imaging system that provides for operator alerts, imaging enhancement tools and contact analysis tools, and a fully Submarine Warfare Federated Tactical Systems (SWFTS)integrated system providing "any display anywhere." Funding improves submarine imaging capability in the areas of: ship safety, Intelligence, Surveillance and Reconnaissance (ISR), tactical control (contactmanagement in the littorals) to provide high quality imaging 24 hours a day, 7 days a week in all weather conditions to support submarine operations worldwide. ISIS provides for the modernization of imagingsystems to improve imaging capabilities for the submarine force in support of ISR requirements. This includes the integration of new capabilities, both inboard hardware and software, into the Type 18 and Type8 Periscopes for LOS ANGELES Class and SEAWOLF Class submarines, the Photonics Mast Variant (PMV) for SSGN, and Photonics Mast upgrades to the VIRGINIA Class AN/BVS-1 including the AN/BVY-1ISIS capability and LPPM.

PL010 - Imaging ISIS Technical Insertions - Continuing in FY17 funding procures Imaging systems and Technical Insertion kits and spares to upgrade ISIS systems on LOS ANGELES, SEAWOLF, VA andOHIO Class SSGN platforms to allow for Capability Insertion and obsolescence avoidance. FY16 procurement also adds funding for improved copper-fiber optic diploops and hull penetrators required to supportadvanced Imaging and Early Warning capabilities included in Low Profile Photonics Mast and future 360 degree Imaging masts.

Volume 1 - 115

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 2 of 27 P-1 Line #7

Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 8:Periscopes

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/ALine Item MDAP/MAIS Code: N/A Item MDAP/MAIS Code(s): N/APL011 - Imaging Block Upgrades - FY17 funding continues procurement of Periscopes and Imaging Equipment reliability, capability, and maintainability upgrades, e.g., Eyepiece Box, periscope mechanicalhoisting mechanism upgrades, inboard electronic processing hardware and associated Integrated Logistics Support (ILS), Robust Surveillance Program, Certification of regional repair centers for Imaging Systemmaintenance and technical data. Variable quantities and types are bought in each fiscal year.

PL012 - Funds procure replacement in support of Special Support Equipment (SSE) for each maintenance level to ensure systems are maintained in a state of operational readiness. Equipment includes Q-BandTest Equipment, Mast Dynamic Collimator, Eyebox/Mast Test Set, and Antenna/Outer Head Simulator required due to obsolescence and age of existing imaging systems SSE.

PL015 - Funding is for Interim Contract Support provided by the periscope manufacturer. The majority of the funding is for Type18 service life extension, depot repair and upgrades for all configurations ofPhotonics Masts. It also funds all levels of repairs for all types of tactical submarine imaging systems.

PL016 - Funding is for imaging systems training requirements to include curriculum development, training materials, and initial factory training pilot course conduct, Navy Training Plans, and instructor advisoryservices.

PL022 - Funding is for the procurement of SSN ISIS Imaging Systems. ISIS provides for the modernization of imaging systems to improve imaging capabilities for the submarine force in support of ISRrequirements. This includes the integration of the Type 18 PATRIOT Automated Range Finder and Type 8 IR Periscope as well as other new capabilities into the Type 18 and Type 8 Periscopes.

PL023 - Funding is for the procurement and support of VIRGINIA Class ISIS Imaging Systems, as well as, Technical Insertions required for sustainment of VIRGINIA Class platforms, including the integrationof the Mast Technical Insertions into the Photonics Mast. These systems support submarine force ISR requirements through the modernization of legacy hardware which allows for Capability Insertion,obsolescence avoidance, and improved system reliability.

PL025 - Funding is for the procurement, support and technical insertion of VIRGINIA Class LPPM production and land based spare masts and associated components. The spares will be used for replacementImaging Masts on VIRGINIA Class Submarines. Quantity of spares will increase with VIRGINIA submarine procurements.

PL830 - Production Engineering funds provide the following functions: value engineering; review and evaluation of production design data and documentation; production configuration control; maintenanceengineering effortsdesigned and incorporated into the production manufacturing process, and other related engineering functions that are integral to all of the Imaging Systems and ancillary components.

PL900 - Imaging Systems engineering, technical and maintenance services funds provide the following functions: In-Service engineering and technical support to deployed Periscope and Imaging Equipment,imaging systeminstallation and integration planning, SHIPALT and TEMPALT technical data preparation, production hardware design review, engineering/technical support for installations, training materials development, fieldengineering andtechnical problem resolution, block upgrade installation planning, configuration management, and maintenance planning including inventory, management, repair, and restoration scheduling.

PL927 - Funding is for the installation of Fleet Modernization Program Equipment.

PL4M7 - Funding is for the installation of non-Fleet Modernization Program Equipment.

Volume 1 - 116

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 3 of 27 P-1 Line #7

Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 8:Periscopes

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/ALine Item MDAP/MAIS Code: N/A Item MDAP/MAIS Code(s): N/A

Exhibits Schedule Prior Years FY 2015 FY 2016 FY 2017 Base FY 2017 OCO FY 2017 TotalExhibitType Title* Subexhibits

IDCD

Quantity / Total Cost(Each) / ($ M)

Quantity / Total Cost(Each) / ($ M)

Quantity / Total Cost(Each) / ($ M)

Quantity / Total Cost(Each) / ($ M)

Quantity / Total Cost(Each) / ($ M)

Quantity / Total Cost(Each) / ($ M)

P-40a SUBMARINE PERISCOPES & IMAGING EQUIPMENT   -    / 107.191   -    / 12.219   -    / 14.033   -    /   -      -    /   -      -    /   -   

P-3a 1 / PL010 - Imaging ISIS Technical Insertion (ORDALT)   -    / 30.623   -    / 27.911   -    / 43.046   -    /   -      -    /   -      -    /   -   

P-3a 2 / PL011 Imaging Block Upgrades/Technical Insertions Imaging: Type 8/Type 18 (ORDALT)   -    / 20.381   -    / 0.357   -    / 0.363   -    /   -      -    /   -      -    /   -   

P-3a 3 / PL011 Imaging Block Upgrades/Technical Insertions Imaging: ISIS(ORDALT)   -    / 45.286   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

P-3a 4 / PL022 Integrated Submarine Imaging System (ISIS) Increment ICapability Insertion (SHIPALT)   -    / 295.911   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

P-3a 5 / PL023 VIRGINIA Class Imaging Modernization AN/BVS-1 ISIS(SHIPALT)   -    / 54.672   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

P-3a 6 / PL023 VIRGINIA Class Imaging Modernization AN/BVS-1 MAST TechInsertion (SHIPALT)   -    / 12.193   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

P-3a 7 / PL025 Low Profile Photonics Mast (LPPM) (SHIPALT)   -    / 0.000   -    / 16.734   -    / 5.667   -    /   -      -    /   -      -    /   -   

P-40 Total Gross/Weapon System Cost - / 566.257 - / 57.221 - / 63.109 - / - - / - - / -

Exhibits Schedule FY 2018 FY 2019 FY 2020 FY 2021 To Complete TotalExhibitType Title* Subexhibits

IDCD

Quantity / Total Cost(Each) / ($ M)

Quantity / Total Cost(Each) / ($ M)

Quantity / Total Cost(Each) / ($ M)

Quantity / Total Cost(Each) / ($ M)

Quantity / Total Cost(Each) / ($ M)

Quantity / Total Cost(Each) / ($ M)

P-40a SUBMARINE PERISCOPES & IMAGING EQUIPMENT   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

P-3a 1 / PL010 - Imaging ISIS Technical Insertion (ORDALT)   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 101.580

P-3a 2 / PL011 Imaging Block Upgrades/Technical Insertions Imaging: Type 8/Type 18 (ORDALT)   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 21.101

P-3a 3 / PL011 Imaging Block Upgrades/Technical Insertions Imaging: ISIS(ORDALT)   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 45.286

P-3a 4 / PL022 Integrated Submarine Imaging System (ISIS) Increment ICapability Insertion (SHIPALT)   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 295.911

P-3a 5 / PL023 VIRGINIA Class Imaging Modernization AN/BVS-1 ISIS(SHIPALT)   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 54.672

P-3a 6 / PL023 VIRGINIA Class Imaging Modernization AN/BVS-1 MAST TechInsertion (SHIPALT)   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 12.193

P-3a 7 / PL025 Low Profile Photonics Mast (LPPM) (SHIPALT)   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 22.401

P-40 Total Gross/Weapon System Cost - / - - / - - / - - / - - / - - / 686.587

*Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown.Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding.

Justification:Note: Submarine Electromagnetic Systems including Imaging, Electronic Warfare and Radar programs are managed by PMS435. Imaging Budget Line Item 0831 and Electronic Warfare Budget Line Item 2560(including Radar) OPN funds will consolidate under BLI 0840 in FY17 and out.

Volume 1 - 117

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 4 of 27 P-1 Line #7

Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Aggregated Items Title:SUBMARINE PERISCOPES & IMAGINGEQUIPMENT

Prior Years FY 2015 FY 2016 FY 2017 Base FY 2017 OCO FY 2017 Total

Item Number /Title [DODIC]

IDCD

MDAP/

MAIS

CodeUnit Cost

($)Qty

(Each)

TotalCost($ M)

Unit Cost($)

Qty(Each)

TotalCost($ M)

Unit Cost($)

Qty(Each)

TotalCost($ M)

Unit Cost($)

Qty(Each)

TotalCost($ M)

Unit Cost($)

Qty(Each)

TotalCost($ M)

Unit Cost($)

Qty(Each)

TotalCost($ M)

1) PL012 PERISCOPE SPECIAL SUPPORT EQIPMENT

1.1) SPECIALSUPPORTEQUIPMENT

A  -      -    5.383   -      -    0.528   -      -    0.536   -      -      -      -      -      -      -      -      -   

Subtotal: 1) PL012 PERISCOPESPECIAL SUPPORT EQIPMENT - - 5.383 - - 0.528 - - 0.536 - - - - - - - - -

2) PL015 PERISCOPE INTERIM CONTRACTOR SUPPORT (1)

2.1) INTERIMCONTRACTORSUPPORT

A  -      -    68.690   -      -    7.598   -      -    9.339   -      -      -      -      -      -      -      -      -   

Subtotal: 2) PL015 PERISCOPEINTERIM CONTRACTOR SUPPORT - - 68.690 - - 7.598 - - 9.339 - - - - - - - - -

3) PL016 PERISCOPE TRAINING

3.1) TRAINING A   -      -    1.451   -      -    0.176   -      -    0.178   -      -      -      -      -      -      -      -      -   

Subtotal: 3) PL016 PERISCOPETRAINING - - 1.451 - - 0.176 - - 0.178 - - - - - - - - -

4) PL830 PERISCOPE PRODUCTION ENGINEERING

4.1) PRODUCTIONENGINEERING

A   -      -    27.235   -      -    3.525   -      -    3.582   -      -      -      -      -      -      -      -      -   

Subtotal: 4) PL830 PERISCOPEPRODUCTION ENGINEERING - - 27.235 - - 3.525 - - 3.582 - - - - - - - - -

5) PL900 PERISCOPE CONSULTING SERVICES

5.1) CONSULTINGSERVICES

A   -      -    4.432   -      -    0.392   -      -    0.398   -      -      -      -      -      -      -      -      -   

Subtotal: 5) PL900 PERISCOPECONSULTING SERVICES - - 4.432 - - 0.392 - - 0.398 - - - - - - - - -

Total - - 107.191 - - 12.219 - - 14.033 - - - - - - - - - Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding.

Footnotes:(1) FY16 increase provides support and repairs for new prototype Low Profile Photonics Masts (LPPM).

Volume 1 - 118

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 5 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:1 / PL010 - Imaging ISIS TechnicalInsertion

Resource SummaryPriorYears FY 2015 FY 2016

FY 2017Base

FY 2017OCO

FY 2017Total FY 2018 FY 2019 FY 2020 FY 2021

ToComplete Total

Procurement Quantity (Units in Each)   -      -      -      -      -      -      -      -      -      -      -      -   Gross/Weapon System Cost ($ in Millions) 30.623 27.911 43.046   -      -      -      -      -      -      -      -    101.580Less PY Advance Procurement ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Net Procurement (P-1) ($ in Millions) 30.623 27.911 43.046   -      -      -      -      -      -      -      -    101.580Plus CY Advance Procurement ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Total Obligation Authority ($ in Millions) 30.623 27.911 43.046 - - - - - - - - 101.580

(The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.)

Initial Spares ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Gross/Weapon System Unit Cost ($ in Dollars)   -      -      -      -      -      -      -      -      -      -      -      -   

Description:Provides for the modernization of Imaging systems and TI kits to upgrade Integrated Submarine Imaging System (ISIS) on LOS ANGELES, SEAWOLF, VIRGINIA and OHIO Class SSGN platforms in supportof Intelligence, Surveillance and Reconnaissance (ISR) requirements. FY16 $4.0 million TI increase to VIRGINIA ISIS backfit cost procures two (2) copper fiber diploop and hull penetrator sets required forVIRGINIA Class Submarines receiving ISIS Backfit Upgrades to field LPPM and future masts. Base VIRGINIA ISIS Backfit cost ($9.991 million) reflects historical VIRGINIA Backfit cost baseline.

Volume 1 - 119

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 6 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:1 / PL010 - Imaging ISIS TechnicalInsertion

Models of Systems Affected: ISIS TI Modification Type: ORDALT Related RDT&E PEs:

Prior Years FY 2015 FY 2016FY 2017

BaseFY 2017

OCOFY 2017

Total FY 2018 FY 2019 FY 2020 FY 2021To

Complete Total

Financial PlanQty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)

Procurement

Modification Item 1 of 1: PL010 - Imaging ISISTechnical Insertion

B KitsRecurring

1.1.1) 688/21 TECHNICAL INSERTION - NonOrganic 2 / 1.932 6 / 5.906 7 / 7.001   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    15 / 14.839

1.1.2) VA ISIS BACKFIT - NonOrganic (2)   -    /   -      -    /   -    2 / 13.991   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    2 / 13.991

1.1.3) SSBN BACKFIT - NonOrganic   -    /   -      -    /   -    2 / 0.380   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    2 / 0.380

1.1.4) ISIS TI CCM - Organic 1 / 0.966   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    1 / 0.966

Subtotal: Recurring - / 2.898 - / 5.906 - / 21.372 - / - - / - - / - - / - - / - - / - - / - - / - - / 30.176

Subtotal: PL010 - Imaging ISIS Technical Insertion 3 / 2.898 6 / 5.906 11 / 21.372 - / - - / - - / - - / - - / - - / - - / - - / - 20 / 30.176

Subtotal: Procurement, All Modification Items - / 2.898 - / 5.906 - / 21.372 - / - - / - - / - - / - - / - - / - - / - - / - - / 30.176

Support (All Modification Items)

2.1) ISIS TECHNICAL INSERTION NRE (3)   -    / 27.725   -    / 21.405   -    / 19.849   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 68.979

Subtotal: Support - / 27.725 - / 21.405 - / 19.849 - / - - / - - / - - / - - / - - / - - / - - / - - / 68.979

Installation

Modification Item 1 of 1: PL010 - Imaging ISIS TechnicalInsertion

  -    / 0.000   -    / 0.600   -    / 1.825   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 2.425

Subtotal: Installation - / 0.000 - / 0.600 - / 1.825 - / - - / - - / - - / - - / - - / - - / - - / - - / 2.425

Total

Total Cost (Procurement + Support + Installation) 30.623 27.911 43.046 - - - - - - - - 101.580

Volume 1 - 120

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 7 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:1 / PL010 - Imaging ISIS TechnicalInsertion

Modification Item 1 of 1: PL010 - Imaging ISIS Technical InsertionManufacturer Information

Manufacturer Name: LMC Manufacturer Location: Manassas, VAAdministrative Leadtime (in Months): 6 Production Leadtime (in Months): 12

Dates FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021Contract Dates Mar 2015 Mar 2016Delivery Dates Mar 2016 Mar 2017

Installation Information

Method of Implementation: AIT:: Installation Name: 688/21 TECHNICAL INSERTION

Prior Years FY 2015 FY 2016FY 2017

BaseFY 2017

OCOFY 2017

Total FY 2018 FY 2019 FY 2020 FY 2021To

Complete Total

Installation CostQty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)

Prior Years   -    /   -    2 / 0.600   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 0.000 2 / 0.600

FY 2015   -    /   -      -    /   -    6 / 1.825   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    6 / 1.825

FY 2016   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2017   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2018   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2019   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2020   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2021   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

To Complete   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

Total   -    /   -    2 / 0.600 6 / 1.825   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    8 / 2.425

Installation ScheduleFY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021

PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC TotIn   -      -    1 1   -      -    2 2 2   -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -    8Out   -      -    1 1   -      -    2 2 2   -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -    8

Method of Implementation: AIT:: Installation Name: VA ISIS BACKFIT

Prior Years FY 2015 FY 2016FY 2017

BaseFY 2017

OCOFY 2017

Total FY 2018 FY 2019 FY 2020 FY 2021To

Complete Total

Installation CostQty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)

Prior Years   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

Volume 1 - 121

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 8 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:1 / PL010 - Imaging ISIS TechnicalInsertion

Modification Item 1 of 1: PL010 - Imaging ISIS Technical InsertionInstallation Information

Method of Implementation: AIT:: Installation Name: VA ISIS BACKFIT

Prior Years FY 2015 FY 2016FY 2017

BaseFY 2017

OCOFY 2017

Total FY 2018 FY 2019 FY 2020 FY 2021To

Complete Total

Installation CostQty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)

FY 2015   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2016   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2017   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2018   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2019   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2020   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2021   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

To Complete   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

Total   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

Installation ScheduleFY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021

PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC TotIn   -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -   Out   -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -   

Method of Implementation: AIT:: Installation Name: SSBN BACKFIT

Prior Years FY 2015 FY 2016FY 2017

BaseFY 2017

OCOFY 2017

Total FY 2018 FY 2019 FY 2020 FY 2021To

Complete Total

Installation CostQty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)

Prior Years   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2015   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2016   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2017   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2018   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2019   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2020   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2021   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

To Complete   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

Total   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

Volume 1 - 122

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 9 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:1 / PL010 - Imaging ISIS TechnicalInsertion

Modification Item 1 of 1: PL010 - Imaging ISIS Technical InsertionInstallation Information

Method of Implementation: AIT:: Installation Name: SSBN BACKFITInstallation Schedule

FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot

In   -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -   Out   -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -   

Method of Implementation (Organic): ISIS TI CCM - Not Installed Installation Quantity: 1

Footnotes:(2) Increase of $4.0 million to fund two (2) copper fiber diploop and hull penetrator sets required for VIRGINIA Class Submarines receiving ISIS Backfit Upgrades to field LPPM and future masts.(3) Increased TI/APB NRE reflects funding required for productionization of externally developed Advanced Processor Build (APB) capabilities and ISIS software stability support.

Volume 1 - 123

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 10 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:2 / PL011 Imaging Block Upgrades/Technical Insertions Imaging: Type 8/Type 18

Resource SummaryPriorYears FY 2015 FY 2016

FY 2017Base

FY 2017OCO

FY 2017Total FY 2018 FY 2019 FY 2020 FY 2021

ToComplete Total

Procurement Quantity (Units in Each)   -      -      -      -      -      -      -      -      -      -      -      -   Gross/Weapon System Cost ($ in Millions) 20.381 0.357 0.363   -      -      -      -      -      -      -      -    21.101Less PY Advance Procurement ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Net Procurement (P-1) ($ in Millions) 20.381 0.357 0.363   -      -      -      -      -      -      -      -    21.101Plus CY Advance Procurement ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Total Obligation Authority ($ in Millions) 20.381 0.357 0.363 - - - - - - - - 21.101

(The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.)

Initial Spares ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Gross/Weapon System Unit Cost ($ in Dollars)   -      -      -      -      -      -      -      -      -      -      -      -   

Description:Provides obsolescence related upgrades for Submarine Periscopes. One (1) set is procured in each fiscal year that includes variable quantities.

Volume 1 - 124

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 11 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:2 / PL011 Imaging Block Upgrades/Technical Insertions Imaging: Type 8/Type 18

Models of Systems Affected: TYPE 8/TYPE 18 Modification Type: ORDALT Related RDT&E PEs:

Prior Years FY 2015 FY 2016FY 2017

BaseFY 2017

OCOFY 2017

Total FY 2018 FY 2019 FY 2020 FY 2021To

Complete Total

Financial PlanQty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)

Procurement

Modification Item 1 of 1: PL011 Imaging BlockUpgrades/Technical Insertions Imaging: Type 8/Type 18

B KitsRecurring

1.1.1) TYPE 8/TYPE 18 - NonOrganic 65 / 15.442 1 / 0.243 1 / 0.247   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    67 / 15.932

Subtotal: Recurring - / 15.442 - / 0.243 - / 0.247 - / - - / - - / - - / - - / - - / - - / - - / - - / 15.932

Subtotal: PL011 Imaging Block Upgrades/TechnicalInsertions Imaging: Type 8/Type 18

65 / 15.442 1 / 0.243 1 / 0.247 - / - - / - - / - - / - - / - - / - - / - - / - 67 / 15.932

Subtotal: Procurement, All Modification Items - / 15.442 - / 0.243 - / 0.247 - / - - / - - / - - / - - / - - / - - / - - / - - / 15.932

Installation

Modification Item 1 of 1: PL011 Imaging BlockUpgrades/Technical Insertions Imaging: Type 8/Type 18

  -    / 4.939   -    / 0.114   -    / 0.116   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 5.169

Subtotal: Installation - / 4.939 - / 0.114 - / 0.116 - / - - / - - / - - / - - / - - / - - / - - / - - / 5.169

Total

Total Cost (Procurement + Support + Installation) 20.381 0.357 0.363 - - - - - - - - 21.101

Volume 1 - 125

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 12 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:2 / PL011 Imaging Block Upgrades/Technical Insertions Imaging: Type 8/Type 18

Modification Item 1 of 1: PL011 Imaging Block Upgrades/Technical Insertions Imaging: Type 8/Type 18Manufacturer Information

Manufacturer Name: Multiple Vendors Manufacturer Location: VariousAdministrative Leadtime (in Months): 6 Production Leadtime (in Months): 14

Dates FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021Contract Dates Mar 2015 Mar 2016Delivery Dates May 2016 May 2017

Installation Information

Method of Implementation: AIT:: Installation Name: TYPE 8/TYPE 18

Prior Years FY 2015 FY 2016FY 2017

BaseFY 2017

OCOFY 2017

Total FY 2018 FY 2019 FY 2020 FY 2021To

Complete Total

Installation CostQty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)

Prior Years 64 / 4.939 1 / 0.114   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 0.000 65 / 5.053

FY 2015   -    /   -      -    /   -    1 / 0.116   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    1 / 0.116

FY 2016   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2017   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2018   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2019   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2020   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2021   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

To Complete   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

Total 64 / 4.939 1 / 0.114 1 / 0.116   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    66 / 5.169

Installation ScheduleFY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021

PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC TotIn 64   -      -    1   -      -      -    1   -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -    66Out 64   -      -    1   -      -      -    1   -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -    66

Volume 1 - 126

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 13 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:3 / PL011 Imaging Block Upgrades/Technical Insertions Imaging: ISIS

Resource SummaryPriorYears FY 2015 FY 2016

FY 2017Base

FY 2017OCO

FY 2017Total FY 2018 FY 2019 FY 2020 FY 2021

ToComplete Total

Procurement Quantity (Units in Each)   -      -      -      -      -      -      -      -      -      -      -      -   Gross/Weapon System Cost ($ in Millions) 45.286   -      -      -      -      -      -      -      -      -      -    45.286Less PY Advance Procurement ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Net Procurement (P-1) ($ in Millions) 45.286   -      -      -      -      -      -      -      -      -      -    45.286Plus CY Advance Procurement ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Total Obligation Authority ($ in Millions) 45.286 - - - - - - - - - - 45.286

(The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.)

Initial Spares ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Gross/Weapon System Unit Cost ($ in Dollars)   -      -      -      -      -      -      -      -      -      -      -      -   

Description:Imaging TI kits upgrade the ISIS on LOS ANGELES, SEAWOLF, and OHIO Class (SSGN) platforms to allow for obsolescence avoidance. FY14 completes TI installations of TI's previously procured underPL011. Procurements were merged into PL010 beginning FY14.

Volume 1 - 127

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 14 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:3 / PL011 Imaging Block Upgrades/Technical Insertions Imaging: ISIS

Models of Systems Affected: ISIS IMAGING BLOCKUPGRADES/TECHNICAL INSERTIONS

Modification Type: ORDALT Related RDT&E PEs:

Prior Years FY 2015 FY 2016FY 2017

BaseFY 2017

OCOFY 2017

Total FY 2018 FY 2019 FY 2020 FY 2021To

Complete Total

Financial PlanQty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)

Procurement

Modification Item 1 of 1: PL011 Imaging BlockUpgrades/Technical Insertions Imaging: ISIS

B KitsRecurring

1.1.1) TECHNICAL INSERTIONS - NonOrganic 17 / 15.937   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    17 / 15.937

Subtotal: Recurring - / 15.937 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 15.937

Subtotal: PL011 Imaging Block Upgrades/TechnicalInsertions Imaging: ISIS

17 / 15.937 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 17 / 15.937

Subtotal: Procurement, All Modification Items - / 15.937 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 15.937

Support (All Modification Items)2.1) TECHNICAL INSERTION NRE   -    / 23.136   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 23.136

Subtotal: Support - / 23.136 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 23.136

Installation

Modification Item 1 of 1: PL011 Imaging BlockUpgrades/Technical Insertions Imaging: ISIS

  -    / 6.213   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 6.213

Subtotal: Installation - / 6.213 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 6.213

Total

Total Cost (Procurement + Support + Installation) 45.286 - - - - - - - - - - 45.286

Volume 1 - 128

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 15 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:3 / PL011 Imaging Block Upgrades/Technical Insertions Imaging: ISIS

Modification Item 1 of 1: PL011 Imaging Block Upgrades/Technical Insertions Imaging: ISISManufacturer Information

Manufacturer Name: LMC Manufacturer Location: Manassas, VAAdministrative Leadtime (in Months): 6 Production Leadtime (in Months): 12

Dates FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021Contract DatesDelivery Dates

Installation Information

Method of Implementation: AIT:: Installation Name: TECHNICAL INSERTIONS

Prior Years FY 2015 FY 2016FY 2017

BaseFY 2017

OCOFY 2017

Total FY 2018 FY 2019 FY 2020 FY 2021To

Complete Total

Installation CostQty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)

Prior Years 17 / 6.213   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 0.000 17 / 6.213

FY 2015   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2016   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2017   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2018   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2019   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2020   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2021   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

To Complete   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

Total 17 / 6.213   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    17 / 6.213

Installation ScheduleFY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021

PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC TotIn 17   -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -    17Out 17   -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -    17

Volume 1 - 129

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 16 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:4 / PL022 Integrated Submarine ImagingSystem (ISIS) Increment I CapabilityInsertion

Resource SummaryPriorYears FY 2015 FY 2016

FY 2017Base

FY 2017OCO

FY 2017Total FY 2018 FY 2019 FY 2020 FY 2021

ToComplete Total

Procurement Quantity (Units in Each)   -      -      -      -      -      -      -      -      -      -      -      -   Gross/Weapon System Cost ($ in Millions) 295.911   -      -      -      -      -      -      -      -      -      -    295.911Less PY Advance Procurement ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Net Procurement (P-1) ($ in Millions) 295.911   -      -      -      -      -      -      -      -      -      -    295.911Plus CY Advance Procurement ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Total Obligation Authority ($ in Millions) 295.911 - - - - - - - - - - 295.911

(The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.)

Initial Spares ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Gross/Weapon System Unit Cost ($ in Dollars)   -      -      -      -      -      -      -      -      -      -      -      -   

Description:Provides for the modernization of submarine imaging systems to improve imaging capabilities in support of ISR requirements. FY14 completes increment I installations of previously procured systems.

Volume 1 - 130

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 17 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:4 / PL022 Integrated Submarine ImagingSystem (ISIS) Increment I CapabilityInsertion

Models of Systems Affected: ISIS INCREMENT I Modification Type: SHIPALT Related RDT&E PEs:

Prior Years FY 2015 FY 2016FY 2017

BaseFY 2017

OCOFY 2017

Total FY 2018 FY 2019 FY 2020 FY 2021To

Complete Total

Financial PlanQty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)

Procurement

Modification Item 1 of 1: PL022 Integrated SubmarineImaging System (ISIS) Increment I Capability Insertion

B KitsRecurring

1.1.1) ISIS CAPABILITY INSERTION - NonOrganic 47 / 213.024   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    47 / 213.024

1.1.2) CAPABLITY INSERTION SPARES/CCM -Organic

8 / 27.357   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    8 / 27.357

Subtotal: Recurring - / 240.381 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 240.381

Subtotal: PL022 Integrated Submarine Imaging System(ISIS) Increment I Capability Insertion

55 / 240.381 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 55 / 240.381

Subtotal: Procurement, All Modification Items - / 240.381 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 240.381

Support (All Modification Items)2.1) ISIS CAPABILITY INSERTION NRE   -    / 14.339   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 14.339

Subtotal: Support - / 14.339 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 14.339

Installation

Modification Item 1 of 1: PL022 Integrated SubmarineImaging System (ISIS) Increment I Capability Insertion

  -    / 41.191   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 41.191

Subtotal: Installation - / 41.191 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 41.191

Total

Total Cost (Procurement + Support + Installation) 295.911 - - - - - - - - - - 295.911

Volume 1 - 131

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 18 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:4 / PL022 Integrated Submarine ImagingSystem (ISIS) Increment I CapabilityInsertion

Modification Item 1 of 1: PL022 Integrated Submarine Imaging System (ISIS) Increment I Capability InsertionManufacturer Information

Manufacturer Name: Multiple Vendors Manufacturer Location: VariousAdministrative Leadtime (in Months): 6 Production Leadtime (in Months): 17

Dates FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021Contract DatesDelivery Dates

Installation Information

Method of Implementation: AIT:: Installation Name: ISIS CAPABILITY INSERTION

Prior Years FY 2015 FY 2016FY 2017

BaseFY 2017

OCOFY 2017

Total FY 2018 FY 2019 FY 2020 FY 2021To

Complete Total

Installation CostQty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)

Prior Years 47 / 41.191   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 0.000 47 / 41.191

FY 2015   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2016   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2017   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2018   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2019   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2020   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2021   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

To Complete   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

Total 47 / 41.191   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    47 / 41.191

Installation ScheduleFY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021

PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC TotIn 47   -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -    47Out 47   -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -    47

Method of Implementation (Organic): CAPABLITY INSERTION SPARES/CCM - Not Installed Installation Quantity: 8

Volume 1 - 132

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 19 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:5 / PL023 VIRGINIA Class ImagingModernization AN/BVS-1 ISIS

Resource SummaryPriorYears FY 2015 FY 2016

FY 2017Base

FY 2017OCO

FY 2017Total FY 2018 FY 2019 FY 2020 FY 2021

ToComplete Total

Procurement Quantity (Units in Each)   -      -      -      -      -      -      -      -      -      -      -      -   Gross/Weapon System Cost ($ in Millions) 54.672   -      -      -      -      -      -      -      -      -      -    54.672Less PY Advance Procurement ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Net Procurement (P-1) ($ in Millions) 54.672   -      -      -      -      -      -      -      -      -      -    54.672Plus CY Advance Procurement ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Total Obligation Authority ($ in Millions) 54.672 - - - - - - - - - - 54.672

(The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.)

Initial Spares ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Gross/Weapon System Unit Cost ($ in Dollars)   -      -      -      -      -      -      -      -      -      -      -      -   

Description:Provides for the modernization of VA Class submarine imaging systems to install the ISIS capabilities in support of ISR requirements. Activities previously funded under PL023 in FY14 and earlier years arefunded under PL010 in FY15 and future years.

Volume 1 - 133

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 20 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:5 / PL023 VIRGINIA Class ImagingModernization AN/BVS-1 ISIS

Models of Systems Affected: VA CLASS ISIS AN/BVS-1

Modification Type: SHIPALT Related RDT&E PEs:

Prior Years FY 2015 FY 2016FY 2017

BaseFY 2017

OCOFY 2017

Total FY 2018 FY 2019 FY 2020 FY 2021To

Complete Total

Financial PlanQty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)

Procurement

Modification Item 1 of 1: PL023 VIRGINIA ClassImaging Modernization AN/BVS-1 ISIS

B KitsRecurring

1.1.1) VA CLASS ISIS - NonOrganic 6 / 30.065   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    6 / 30.065

Subtotal: Recurring - / 30.065 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 30.065

Subtotal: PL023 VIRGINIA Class ImagingModernization AN/BVS-1 ISIS

6 / 30.065 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 30.065

Subtotal: Procurement, All Modification Items - / 30.065 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 30.065

Support (All Modification Items)2.1) VA CLASS ISIS TECHNICIAL INSERTION NRE   -    / 18.760   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 18.760

2.2) VA ISIS PRODUCTION SUPPORT   -    / 2.928   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 2.928

Subtotal: Support - / 21.688 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 21.688

Installation

Modification Item 1 of 1: PL023 VIRGINIA Class ImagingModernization AN/BVS-1 ISIS

  -    / 2.919   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 2.919

Subtotal: Installation - / 2.919 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2.919

Total

Total Cost (Procurement + Support + Installation) 54.672 - - - - - - - - - - 54.672

Volume 1 - 134

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 21 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:5 / PL023 VIRGINIA Class ImagingModernization AN/BVS-1 ISIS

Modification Item 1 of 1: PL023 VIRGINIA Class Imaging Modernization AN/BVS-1 ISISManufacturer Information

Manufacturer Name: LMC Manufacturer Location: Manassas, VAAdministrative Leadtime (in Months): 6 Production Leadtime (in Months): 12

Dates FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021Contract DatesDelivery Dates

Installation Information

Method of Implementation: AIT:: Installation Name: VA CLASS ISIS

Prior Years FY 2015 FY 2016FY 2017

BaseFY 2017

OCOFY 2017

Total FY 2018 FY 2019 FY 2020 FY 2021To

Complete Total

Installation CostQty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)

Prior Years 6 / 2.919   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 0.000 6 / 2.919

FY 2015   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2016   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2017   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2018   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2019   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2020   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2021   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

To Complete   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

Total 6 / 2.919   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    6 / 2.919

Installation ScheduleFY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021

PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC TotIn 6   -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -    6Out 6   -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -    6

Volume 1 - 135

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 22 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:6 / PL023 VIRGINIA Class ImagingModernization AN/BVS-1 MAST TechInsertion

Resource SummaryPriorYears FY 2015 FY 2016

FY 2017Base

FY 2017OCO

FY 2017Total FY 2018 FY 2019 FY 2020 FY 2021

ToComplete Total

Procurement Quantity (Units in Each)   -      -      -      -      -      -      -      -      -      -      -      -   Gross/Weapon System Cost ($ in Millions) 12.193   -      -      -      -      -      -      -      -      -      -    12.193Less PY Advance Procurement ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Net Procurement (P-1) ($ in Millions) 12.193   -      -      -      -      -      -      -      -      -      -    12.193Plus CY Advance Procurement ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Total Obligation Authority ($ in Millions) 12.193 - - - - - - - - - - 12.193

(The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.)

Initial Spares ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Gross/Weapon System Unit Cost ($ in Dollars)   -      -      -      -      -      -      -      -      -      -      -      -   

Description:Provides obsolescence related upgrades for VA Class submarine imaging systems in support of ISR requirements. Activities previously funded under PL023 in FY14 and earlier years are funded under PL010 inFY15 and future years.

Volume 1 - 136

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 23 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:6 / PL023 VIRGINIA Class ImagingModernization AN/BVS-1 MAST TechInsertion

Models of Systems Affected: VA CLASS AN/BVS-1MTI

Modification Type: SHIPALT Related RDT&E PEs:

Prior Years FY 2015 FY 2016FY 2017

BaseFY 2017

OCOFY 2017

Total FY 2018 FY 2019 FY 2020 FY 2021To

Complete Total

Financial PlanQty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)

Procurement

Modification Item 1 of 1: PL023 VIRGINIA ClassImaging Modernization AN/BVS-1 MAST Tech Insertion

B KitsRecurring

1.1.1) VA CLASS MTI - NonOrganic 12 / 7.476   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    12 / 7.476

1.1.2) VA CLASS MTI SPARES - Organic 2 / 1.274   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    2 / 1.274

Subtotal: Recurring - / 8.750 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 8.750

Subtotal: PL023 VIRGINIA Class ImagingModernization AN/BVS-1 MAST Tech Insertion

14 / 8.750 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 14 / 8.750

Subtotal: Procurement, All Modification Items - / 8.750 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 8.750

Support (All Modification Items)2.1) VA CLASS MIT PRODUCTION SUPPORT   -    / 2.929   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 2.929

Subtotal: Support - / 2.929 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2.929

Installation

Modification Item 1 of 1: PL023 VIRGINIA Class ImagingModernization AN/BVS-1 MAST Tech Insertion

  -    / 0.514   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 0.514

Subtotal: Installation - / 0.514 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.514

Total

Total Cost (Procurement + Support + Installation) 12.193 - - - - - - - - - - 12.193

Volume 1 - 137

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 24 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:6 / PL023 VIRGINIA Class ImagingModernization AN/BVS-1 MAST TechInsertion

Modification Item 1 of 1: PL023 VIRGINIA Class Imaging Modernization AN/BVS-1 MAST Tech InsertionManufacturer Information

Manufacturer Name: Seacorp Manufacturer Location: Middletown, RIAdministrative Leadtime (in Months): 6 Production Leadtime (in Months): 12

Dates FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021Contract DatesDelivery Dates

Installation Information

Method of Implementation: AIT:: Installation Name: VA CLASS MTI

Prior Years FY 2015 FY 2016FY 2017

BaseFY 2017

OCOFY 2017

Total FY 2018 FY 2019 FY 2020 FY 2021To

Complete Total

Installation CostQty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)

Prior Years 12 / 0.514   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    / 0.000 12 / 0.514

FY 2015   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2016   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2017   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2018   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2019   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2020   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2021   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

To Complete   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

Total 12 / 0.514   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    12 / 0.514

Installation ScheduleFY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021

PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC TotIn 12   -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -    12Out 12   -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -    12

Method of Implementation (Organic): VA CLASS MTI SPARES - Not Installed Installation Quantity: 2

Volume 1 - 138

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 25 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:7 / PL025 Low Profile Photonics Mast(LPPM)

Resource SummaryPriorYears FY 2015 FY 2016

FY 2017Base

FY 2017OCO

FY 2017Total FY 2018 FY 2019 FY 2020 FY 2021

ToComplete Total

Procurement Quantity (Units in Each)   -      -      -      -      -      -      -      -      -      -      -      -   Gross/Weapon System Cost ($ in Millions) 0.000 16.734 5.667   -      -      -      -      -      -      -      -    22.401Less PY Advance Procurement ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Net Procurement (P-1) ($ in Millions) 0.000 16.734 5.667   -      -      -      -      -      -      -      -    22.401Plus CY Advance Procurement ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Total Obligation Authority ($ in Millions) 0.000 16.734 5.667 - - - - - - - - 22.401

(The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.)

Initial Spares ($ in Millions)   -      -      -      -      -      -      -      -      -      -      -      -   Gross/Weapon System Unit Cost ($ in Dollars)   -      -      -      -      -      -      -      -      -      -      -      -   

Description:VA Class LPPM with high definition color, short wave infrared, and laser range finder capabilities. Procures initial modernization assets as well as spare masts later in FYDP to maintain overall spares ratio forimaging masts as quantity of imaging equipped ships increases. Maintaining sufficient quantities of installed and spare LPPMs is essential to meet PACFLT requirements for all deploying VA class submarines inthe Pacific to be equipped with low profile imaging masts. Install funding starting in FY17 and out will be funded with Line Item 0840 due to Line Item 0831 and 2560 transitioning to budget line item 0840 in FY17.

Volume 1 - 139

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 26 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:7 / PL025 Low Profile Photonics Mast(LPPM)

Models of Systems Affected: Photonics Mast Modification Type: SHIPALT Related RDT&E PEs:

Prior Years FY 2015 FY 2016FY 2017

BaseFY 2017

OCOFY 2017

Total FY 2018 FY 2019 FY 2020 FY 2021To

Complete Total

Financial PlanQty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)

Procurement

Modification Item 1 of 1: PL025 Low Profile PhotonicsMast (LPPM)

B KitsRecurring

1.1.1) LPPM - NonOrganic   -    /   -    2 / 11.156 1 / 5.667   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    3 / 16.823

1.1.2) CCM - Organic   -    /   -    1 / 5.578   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -    1 / 5.578

Subtotal: Recurring - / 0.000 - / 16.734 - / 5.667 - / - - / - - / - - / - - / - - / - - / - - / - - / 22.401

Subtotal: PL025 Low Profile Photonics Mast (LPPM) - / - 3 / 16.734 1 / 5.667 - / - - / - - / - - / - - / - - / - - / - - / - 4 / 22.401

Subtotal: Procurement, All Modification Items - / 0.000 - / 16.734 - / 5.667 - / - - / - - / - - / - - / - - / - - / - - / - - / 22.401

Installation

Modification Item 1 of 1: PL025 Low Profile PhotonicsMast (LPPM)

  -    / 0.000   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

Subtotal: Installation - / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / -

Total

Total Cost (Procurement + Support + Installation) 0.000 16.734 5.667 - - - - - - - - 22.401

Volume 1 - 140

UNCLASSIFIED

LI 0831 - Sub Periscopes & Imaging Equip UNCLASSIFIEDNavy Page 27 of 27 P-1 Line #7

Exhibit P-3a, Individual Modification: PB 2017 Navy Date: February 2016Appropriation / Budget Activity / Budget Sub Activity:1810N / 01 / 8

P-1 Line Item Number / Title:0831 / Sub Periscopes & Imaging Equip

Modification Number / Title:7 / PL025 Low Profile Photonics Mast(LPPM)

Modification Item 1 of 1: PL025 Low Profile Photonics Mast (LPPM)Manufacturer Information

Manufacturer Name: L3 KEO Manufacturer Location: Northhampton, MAAdministrative Leadtime (in Months): 6 Production Leadtime (in Months): 30

Dates FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021Contract Dates Apr 2015 Apr 2016Delivery Dates Oct 2017 Oct 2018

Installation Information

Method of Implementation: AIT:: Installation Name: LPPM

Prior Years FY 2015 FY 2016FY 2017

BaseFY 2017

OCOFY 2017

Total FY 2018 FY 2019 FY 2020 FY 2021To

Complete Total

Installation CostQty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)Qty (Each) /

Total Cost ($ M)

Prior Years   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2015   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2016   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2017   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2018   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2019   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2020   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

FY 2021   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

To Complete   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

Total   -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -      -    /   -   

Installation ScheduleFY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021

PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC TotIn   -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -   Out   -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -      -   

Method of Implementation (Organic): CCM Installation Quantity: 1

Volume 1 - 141

UNCLASSIFIED

THIS PAGE INTENTIONALLY LEFT BLANK

UNCLASSIFIED

Volume 1 - 142