Umoja Brief – UNEPAugust 2013
IPSAS and Umoja
“I keep on hearing about IPSAS and Umoja but I am not sure what they are”
2
IPSAS• IPSAS is an acronym for ‘International Public
Sector Accounting Standards• It is not a system• It is a change in our financial reporting to align
with international best practice• UN Habitat, UNON and UNEP are mandated by
the General Assembly to be fully IPSAS compliant by January 2014
• Umoja will provide a systemised approach to IPSAS compliance by providing an integrated ERP solution as of mid 2014• However for the first 6 months we will rely on
legacy systems for IPSAS compliance• For further information please see this link:
http://ipsas.un.org
Umoja• Umoja is not an acronym• Umoja (meaning unity in Swahili) is the name
given to the new solution that will streamline administrative processes through the implementation of an Enterprise Resource Planning (ERP) system that will revolutionise the way we do business
• Umoja will replace legacy systems such as IMIS (and other stand-alone systems)
• Umoja will provide an integrated and simplified solution
• By 2016, Umoja will be fully operational across the whole Secretariat
• UN Habitat, UNEP and UNON will go live by 1st July 2014
• Umoja will support compliance with IPSAS• For further information please see this link:
https://www.unumoja.net
3
22 October 2012
Deployment (Foundation & Extension 1)
1 Oct 13PK Missions + GSC and HQ support entities
[Foundation]
1 Jan 14PK Missions (RB funded) + SPMs
[Foundation]
Entity
Realization
Phase
Stabilization
Phase
Cluster Cut-Over
- 6 mo. + 3 mo.
UNHQ, UNON (Including UN Habitat and UNEP) & ECA
[Foundation + Extension 1]
PK Missions & SPMs (int’l staff)
[Extension 1]
1 Jul 14
remaining OAHs & Regional Commissions
[Foundation + Extension 1]
1 Jul 15
PK Missions & SPMs (Local Staff)
[Extension 1]
1 Jan 16
Pilot (Haiti)
[Extension 1]
1 Feb 14
Pilot [Extension 1]
Pilot [Foundation]
1 Jul 13
UNIFIL/UNSCOL (Lebanon)
[Foundation]
1Cluster
2Cluster
3Cluster
4Cluster
5Cluster
4
x16
x20
We are currently in the preparation stage for Umoja
The key areas of site preparation activity include the following:
Programme Management and Mobilisation
Process Validation
As-is Data Validation
Local Configuration
Role Mapping and Communications
Data Management
Testing
Technology and Infrastructure
Training
Cutover Preparation
Introduction to Site Realization Activities
We are here
Expected activity over the next 3 months (UNEP)
August• Creation of Umoja
coordination team• Identification of focal points
and agreed matrix• Data collection exercise
• Existing resources• Global Real Estate
September• Identification of process
experts in the organisation to support the coordination team
• Identification of part-time/full-time resources
• Potential involvement in User Verification Testing (UVT)
October• Expanded team briefed and
ready
6
Data verification exercise - summary
Umoja team NY have prepared an Excel Workbook with a staff list from IMIS
We need to clarify which staff have transactional roles
Once those with transactional role have been identified, then it needs to be determined how much of their time is spent on various activities
This will only take approximately 5-10 minutes per staff member
7
Resourcing Update – UNEP & UN-Habitat
Business Process Re-engineering / Change Management
Umoja Nairobi Startup Team
Coordinator
UNEP UNHABITAT
Finance HR
Functional Experts and other Regional or Geographically Located Staff
Supply Chain
Grants Programme Geographic Etc
P3/P4 existing staff (100%)
Experts part/full-tim
eUmoja Nairobi Future Expanded Team
Karan Samani
PaulVrontamitis
Resourcing Update - UNON
STEPHEN STANNAH
PAULVRONTAMITIS
KARAN SAMANI
SIMON BEAMISH
ADMINRESOURCE
2. CORE STARTUP TEAM
3. FOCAL POINTS, PROCESS EXPERTS& TECHNICAL LEADS Divisions
Executive OfficeRegional
Offices
Office for Operations
4. EXPANDED TEAM OF PROCESS EXPERTS
DEWA Sandor FrigyikDEPI Didier SalzmannDTIE Frank LankeitDRC Onesmus ThiongoDELC Sheena ChanaDCPI Cecilia KibareGEFCO Sandeep Bhambra
Onesmus Thiongo (Other names to be inserted)
Darragh Farrell
CHIEFS OFFICE Cecilia MoralesICT Sami DimassiFINANCE/IPSAS Moses TefulaHR Gert PieltjesPROCUREMENT Emmanuelle
CorinoLEGAL Sara Rahman
BranchesBranches
BranchesBranches
Branches
ManagementManagement
ManagementManagement
Management
Regional OfficesRegional
OfficesRegional OfficesRegional
OfficesRegional Offices
1. Umoja Nairobi Steering CommitteeUNON, UN-HABITAT, UNEP (Alexander Barabanov, Chris Kirkaldy, Christophe Bouvier, Sami
Dimassi, Siamak Moghaddam, Jane Nyakairu,.)
1. Communication
2. Passing on communication as required to Section/Unit level through team/staff meetings
3. Data Verification
4. Meetings & Video Conferences
5. User Verification Testing (UVT) & Product Integration Testing (PID)
What Focal Points and Process Experts can Expect
1. Data Collection Exercise - Urgent
2. Real Estate Staging database (valuation / re-measurement)
a. UNEP/UN-Habitat: Offices outside of Nairobi, all real estate valuation, measurement, MoUs, leases etc.
3. Project Management - voluntary trust funds and grants
4. Property Management Group (PMG) – Offices outside NBI
5. Supply Chain Reporting Business Intelligence
Process Expert Focus Areas