UMass Boston Master Plan Project Update
Annual Public Meeting in Accordance with MEPA Certificate
December 5, 2017
![Page 2: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/2.jpg)
Purpose of This Meeting
In accordance with MEPA’s Certificate establishing a Special Review
Procedure (SRP, issued June 2010, updated October 2014) for the
25-Year Campus Master Plan, UMass Boston is required to:
“Hold an annual public meeting to provide an update on progress of
the Master Plan and to engage in a dialogue with constituents and
stakeholders (i.e. local community and neighborhood groups,
elected officials, environmental organizations, etc.) on changes to
the physical campus.”
![Page 3: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/3.jpg)
UMass Boston Campus in 1974
![Page 4: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/4.jpg)
25-Year Campus Master Plan
![Page 5: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/5.jpg)
Completed Projects
ISC (2015)
University Hall (2016)
Monan Park (2016)
HarborWalk (2015)
Fox Point Dock (2017)
![Page 6: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/6.jpg)
Projects Under Construction
![Page 7: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/7.jpg)
Residence Hall
• Adjacent to university’s softball field and Lot D, near Peninsula
Apartments
• 1,077 beds in two-wing complex
• Public ground floor dining, resident rooms on upper floors
![Page 8: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/8.jpg)
Residence Hall
• Brick and windows being placed exterior
• Electrical and plumbing being installed in interior
• Construction on schedule for Fall 2018 occupancy
![Page 9: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/9.jpg)
Residence Hall
• Residential Hall is divided into larger East Wing and smaller West Wing
• Building massing is similar to adjacent Peninsula Apartments and
Harbor Point buildings
• Split site creates inviting environment at Mt. Vernon / University Drive
![Page 10: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/10.jpg)
Residence Hall
• Residential Hall is divided into larger East Wing and smaller West Wing
• Building massing is similar to adjacent Peninsula Apartments and
Harbor Point buildings
• Split site creates inviting environment at Mt. Vernon / University Drive
![Page 11: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/11.jpg)
Residence Hall
![Page 12: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/12.jpg)
Residence Hall
![Page 13: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/13.jpg)
Residence Hall
![Page 14: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/14.jpg)
Residence Hall
![Page 15: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/15.jpg)
Residence Hall
![Page 16: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/16.jpg)
1,400-space Parking Garage
![Page 17: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/17.jpg)
1,400-space Parking Garage
• Eight-story garage with
1,400 vehicle parking
spaces and indoor bicycle
parking
• Under construction at
west end of campus
(along BC High/Peninsula
property lines)
• Approximately 1,100
pieces of precast, being
placed through January
• Construction completion
anticipated in late spring
2018
![Page 18: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/18.jpg)
1,400-space Parking Garage
• Fall 2018 UMass Boston parking to include:
New Parking Garage
Campus Center Garage
Lot D
Bayside
Eliminating Boston Globe and St. Christopher’s
off-campus satellite parking lots
![Page 19: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/19.jpg)
1,400-space Parking Garage
• Fall 2018 UMass Boston parking to include:
New Parking Garage
Campus Center Garage
Lot D
Bayside
Eliminating Boston Globe and St. Christopher’s
off-campus satellite parking lots
![Page 20: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/20.jpg)
1,400-space Parking Garage
West Façade:
View of garage of Monan Park
baseball field (at BC High)
South Façade:
View of garage from
Bianculli Boulevard
(entering off Morrissey)
![Page 21: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/21.jpg)
Utility Corridor and Roadway Relocation
![Page 22: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/22.jpg)
• UCRR construction is expected to be completed in 2018
• The final two-way roadway will have bike lanes, sidewalks, and tree
lawns on each side
• Open spaces will be preserved for future campus uses such as
new buildings
• Storm water management will include bio-retention areas that
become part of the campus landscape and include native plantings
Utility Corridor and Roadway Relocation (UCRR)
![Page 23: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/23.jpg)
Relocated University Drive West-Mt. Vernon Street intersection to
become a campus gateway (as seen from Harbor Point)
Utility Corridor and Roadway Relocation (UCRR)
![Page 24: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/24.jpg)
Utility Corridor and Roadway Relocation (UCRR)
![Page 25: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/25.jpg)
Utility Corridor and Roadway Relocation (UCRR)
![Page 26: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/26.jpg)
Utility Corridor and Roadway Relocation (UCRR)
![Page 27: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/27.jpg)
Utility Corridor and Roadway Relocation (UCRR)
![Page 28: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/28.jpg)
Utility Corridor and Roadway Relocation (UCRR)
• Recent image and rendering in
front of the Campus Center
where landscaping is going in
• UCRR will plant over 600 new
trees around the campus
![Page 29: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/29.jpg)
University Drive North relocated
Saturday December 2
Utility Corridor and Roadway Relocation (UCRR)
![Page 30: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/30.jpg)
Final roadway configuration
(anticipated mid-2018)
Utility Corridor and Roadway Relocation (UCRR)
![Page 31: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/31.jpg)
Ongoing and Upcoming Construction Projects
• Clark Building Envelope (brick, windows, roof)
• Elevator Replacements (14 elevators in 5 original buildings)
• Dunkin Donuts in Campus Center (replacing Atrium Café on Upper Level)
• Wheatley Emergency Generator Replacement
• Repair of Service and Supply Building Loading Dock
• Interim Substructure Stabilization
• Renovations to Existing Academic Buildings (REAB, within Wheatley and
McCormack Halls)
• Department of Public Safety Expansion (Quinn Building in former café)
![Page 32: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/32.jpg)
Substructure, Science Center, Pool Demolition and
Quadrangle Development (“SDQD”) Project
• Prior to project start: relocating Science Center occupants
o Planning for relocations under way
• DCAMM Study completed in 2017
• Proceeding as UMBA project
• AECOM as Owner’s Project Manager
• Designer selection in progress
• Project approved at $155.5M ($78M from MA, $77.5M from campus)
• Will include broad stakeholder input considering on- and
off-campus impacts
![Page 33: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/33.jpg)
Substructure, Science Center, Pool Demolition and
Quadrangle Development (“SDQD”) Project
Campus
Center
Wheatley McCormack
Healey ISC
Quinn S&S
Clark
Pool
Science
Center
Garage
![Page 34: UMass Boston Master Plan Project Update](https://reader033.fdocuments.us/reader033/viewer/2022051204/62784bf6ba499b3f476d0ceb/html5/thumbnails/34.jpg)
Substructure, Science Center, Pool Demolition and
Quadrangle Development (“SDQD”) Project
Campus
Center
Wheatley McCormack
Healey ISC
Quinn S&S
Clark
FUTURE
QUAD
Garage