UK Link Industry Engagement Forum 24 th October 1.

52
UK Link Industry Engagement UK Link Industry Engagement Forum Forum 24 24 th th October October 1

Transcript of UK Link Industry Engagement Forum 24 th October 1.

Page 1: UK Link Industry Engagement Forum 24 th October 1.

UK Link Industry Engagement ForumUK Link Industry Engagement Forum

2424thth October October

1

Page 2: UK Link Industry Engagement Forum 24 th October 1.

Gas Nominations & Allocations End Gas Nominations & Allocations End to End Process Walkthroughto End Process Walkthrough

2424thth October October

2

Page 3: UK Link Industry Engagement Forum 24 th October 1.

Call-outs

An information only call out.

Denotes a change in the process.

A BRD reference.

Page 4: UK Link Industry Engagement Forum 24 th October 1.

Calculate NDM Output Nominations

Weather Correction Factor adjusts for the

difference between the Daily Composite

Weather Variable and the Daily Seasonal Normal Composite

Weather Variable per LDZ.

NDM Demand estimation formula; the formula willl no longer use the Scaling Factor and will apply a Weather Correction Factor calculated from the Forecast Weather data.

Formula: (AQ/365)*ALP*(1+[DAF*WCF])

Settlement BRD Ref:5.1, 5.3

UNC Ref

H2.2- FormulaC2.5 – Principles of NDM Nominations

Note

There are no file formats associated with this Business Process.

Page 5: UK Link Industry Engagement Forum 24 th October 1.

Validate Output Nominations

Applicable to Class 1 & 2 Nominations

Settlement BRD Ref: 5.1.2

Where a Gas Nomination for a Class 1 & 2 is not

submitted, a D-7 estimate will be

generated and applied. The estimate will be

based on a D-7 Output Nomination.

The generation of an estimate will be visible in

Gemini and can be replaced within the Gas Nomination timescales.

UNC Ref

C2.2.6 – D-7

Note

There are no file formats associated with this Business Process.

Page 6: UK Link Industry Engagement Forum 24 th October 1.

Calculate Forecast Unidentified Gas

The LDZ Forecast Unidentified Gas is calculated at D-1 for the Gas Flow Day.

Calculation

LDZ Forecast Demand – (LDZ shrinkage + Total DM Nominations + Total NDM Nominations)

Settlement BRD Ref: 5.4

The Forecast Unidentified Gas will be apportioned to Shippers using the Allocation Adjustment Factors. A Unidentified Gas ‘Meter ID’ will be created per Shipper per LDZ / Exit

Zone.

Forecast Unidentified Gas

Available

UNC Ref

H2.6 – Unidentified Gas

3.4.4.2 Publish Forecast

Unidentified Gas

Page 7: UK Link Industry Engagement Forum 24 th October 1.

Calculate Energy Allocations

New NDM demand calculation. The formula will

no longer include the Scaling Factor and will

apply a Weather Correction Factor calculated from actual weather data.

Unidentified Gas value feeds into imbalance position and cash out

charges.

Unidentified Gas Available

3.5.3 Calculate LDZ unidentified gas

Settlement BRD Ref: 5.3

Weather Correction Factor adjusts the

difference between the daily CWV and the daily seasonal normal CWV

per LDZ.

UNC Ref

E3

Page 8: UK Link Industry Engagement Forum 24 th October 1.

Calculate Unidentified Gas Allocation

Settlement BRD Ref: 5.4

3.5.3.2 Publish Allocated

Unidentified Gas

The LDZ allocated Unidentified Gas is

calculated at D+1 for the Gas Flow Day.

Calculation:LDZ Demand – (LDZ Shrinkage + Total DM

Allocations + Total NDM Allocations)

Allocated Unidentified Gas Available

The Allocated Unidentified Gas will be apportioned to Shippers

using the Allocation Adjustment Factors.

UNC Ref

E1.1.6E1.1.7

Page 9: UK Link Industry Engagement Forum 24 th October 1.

Supply Point Transfer End to Supply Point Transfer End to End Process WalkthroughEnd Process Walkthrough

2424thth October October

9

Page 10: UK Link Industry Engagement Forum 24 th October 1.

Call-outs

An information only call out.

Denotes a change in the process.

A BRD reference.

File Changes - Minor

File Changes – No change

File Changes - Medium

File Changes – Major

File Changes - New

Page 11: UK Link Industry Engagement Forum 24 th October 1.

New feature within the existing enquiry file (S47) to submit a ‘consumption

request’.

Response via (S59):

Response will include:

A maximum 24 months worth of history or the maximum available for the Supply Point. Volume will be provided in kWh

AMR Indicator

Class (prevailing)

Batch Frequency (class 3)

SMP and Formula Year AQ

SOQ for Class 3 & 4

DNI Indicator

Withdrawal Status

Seasonal Indicator

CYM

Enquire against all registered Supply Points via the enquiry file (S47).

Supply Point Enquiry

Note – Files to be used for GT and iGT sites.

NOM S47,S68NOM S47,S68

NMR S78,S68,S72

NMR S78,S68,S72

NMRS59,S70,S75,S98

Q44 & Q51

NMRS59,S70,S75,S98

Q44 & Q51

Supply Point Register BRD Ref:

8.4 11

Page 12: UK Link Industry Engagement Forum 24 th October 1.

Nomination request (S48) will include:

•Class type,•If requesting Class 1 or 2, you have to nominate the SOQ & SHQ, existing capacity validations will be applied•If requesting Class 3 the batch period for submitting reads will need to be provided. This period can be either 7 days, 14 days or 1 month.

Sites may be referred for:

•Class 1 and 2 for capacity•request for short haul•New request for seasonal capacity (subject to mod approval). Note: iGT sites referring for capacity will refer to the iGT & GT.

Response will be via the offer (S64).

Offer now includes:

•Class•CSEP Data•GT Rates•iGT Rates•Short Haul Rates (where appropriate).•CYM (current year minimum; MOD445)•DNI Indicator

Supply Point Nomination

Note – Files to be used for GT and iGT sites.

NOM S48, S69 U70,U72

NOM S48, S69 U70,U72

NMR S21, S69, S72

U70,U72

NMR S21, S69, S72

U70,U72NMR

S21,S69

NMR S21,S69 NRF S21,S69

& S72, Q46

NRF S21,S69 & S72, Q46 NMR,NRF - S64, S70,

S75, K12,K14,S98,Q44, U71,U73,U74,U75,

Q46, K85

NMR,NRF - S64, S70, S75, K12,K14,S98,Q44,

U71,U73,U74,U75, Q46, K85

Supply Point Register BRD Ref:

8.2, 8.3, 8.6 12

Page 13: UK Link Industry Engagement Forum 24 th October 1.

Supply Point Confirmation

Confirmation only sites for SSP’s:•Class•SOQ/SHQ (as recorded at the time) for Class 2 and SMQ in ratio of previous 3 or 4

Class 3 SSP sites will need to provide the batch read frequency.

Confirmation response (S38 LSP / S42 SSP) will include:

•Class •iGT Rates•iGT CSEP data •AMR Indicator•CYM (if applicable)

Note – Files to be used for GT and iGT sites.

Replacement reads to be sent via the U01 file for the transfer date

Transfer of Ownership D-7 (D-2 Faster

Switching) to be provided:

•Gas Nomination ID•AMR•SMSO ID•CYM (if applicable)•Last Read & Read Date

CNF – S38, S42,S66,S67,S83,S84,U70,U72, T05

CNF – S38, S42,S66,S67,S83,S84,U70,U72, T05

CFR – S72, S09, S16,S66,S67,S83,S84,U70,U72

,T06

CFR – S72, S09, S16,S66,S67,S83,S84,U70,U72

,T06WAO -

S39,S40,S74,S41,S54,S

73

WAO -S39,S40,S7

4,S41,S54,S73

TRF – S15,S70, S75,S66,S67,S76,

S98,Q44,Q45,U71,U73,U74,U75,S88,S63,S0

8,S72,K12,K13, K85

TRF – S15,S70, S75,S66,S67,S76,

S98,Q44,Q45,U71,U73,U74,U75,S88,S63,S0

8,S72,K12,K13, K85

CFR – S07,S70,S75,S66,S67,S83,S84,S98,K12,K1

4, K85, Q44,Q45,U71,U73,U

74,U75,S10,S77,T06,T0

7

CFR – S07,S70,S75,S66,S67,S83,S84,S98,K12,K1

4, K85, Q44,Q45,U71,U73,U

74,U75,S10,S77,T06,T0

7

WOR – S11,S12,S26,S13,S14,S30,S65,S72

WOR – S11,S12,S26,S13,S14,S30,S65,S72

DCF – S08,S70,

S76,S63,S72

DCF – S08,S70,

S76,S63,S72

MRI-U06,K15, S98,N90

MRI-U06,K15, S98,N90

Supply Point Register BRD Ref:

8.2, 8.11

13

Page 14: UK Link Industry Engagement Forum 24 th October 1.

Class Change End to End Class Change End to End Process WalkthroughProcess Walkthrough

2424thth October October

14

Page 15: UK Link Industry Engagement Forum 24 th October 1.

Call-outs

An information only call out.

Denotes a change in the process.

A BRD reference.

File Changes - Minor

File Changes – No change

File Changes - Medium

File Changes – Major

File Changes - New

Page 16: UK Link Industry Engagement Forum 24 th October 1.

Manage Class Change

16

D-2 Process: Gemini

Class Change (SPC) record C38minimum 5 business days

(regardless of class)

Provide classif going from Class 2 (from 3 or 4) provide prevailing SOQ & SHQ in

ratio.

If Class 1 or Class 2, the prevailing SOQ/SHQ must be used and the

effective date.

Class 3 Batch Frequency Class 4 MRF

(can cancel 2.12) by D -3

Response: Gas Nomination ID.

SMP AQ/SOQ Class 1/2

SMP AQ/SOQFormula Year AQ/SOQ

Class 3/4

Supply Point Register BRD Ref:

8.10

SPC C38, C39

SPC C38, C39

Page 17: UK Link Industry Engagement Forum 24 th October 1.

Class ChangesClass Changes24th October 201424th October 2014

Page 18: UK Link Industry Engagement Forum 24 th October 1.

18

Introduction

This presentation aims to provide an overview of the process for Class change specifically the reconciliation and Check Read processes.

The presentation also covers scenarios where there is a Shipper Transfer and Class change combined.

Where a combined change of Shipper and Class change is associated with DRE/AMR equipment the focus is around apportioning the drift following a Check Read.

Page 19: UK Link Industry Engagement Forum 24 th October 1.

19

Why have a Check Read

Check Reads are required where equipment (AMR) is installed that derives the reads from the meter.

The Check Read identifies where the meter and the equipment are not synchronised and will detect any drift between the meter and the equipment. Any drift is then apportioned across the relevant period.

Class 1 and 2

Class 3 and 4

CR CR

A A AA A A

Daily Reads

CR CR

AA A

Reconciliation ReconciliationReconciliation

Page 20: UK Link Industry Engagement Forum 24 th October 1.

20

Class Change

Process Description Process for initial Allocation

Process for Energy

Balancing close-out

Read Submission Timescales

Type of Read Submission AQ Calculation Reconciliation

Class 1 – Daily Metered Time Critical Readings Uses daily read Uses daily read By 11am on GFD+1 All reads daily on

GFD+1Monthly using Optimum Read

Meter Point level following a site visit or estimate

Class 2 - Daily Metered not Time Critical Readings

Transporter estimate Uses daily read By end of GFD+1

(05.59 am)All reads daily by

end of GFD+1Monthly using Optimum Read

Meter Point level following a site visit or estimate

Class 3 – Batched Daily Readings

Allocation Profiles

Allocation Profiles

Daily Reads in batches

All daily reads in batches

Monthly using Optimum Read

Daily Rec at Meter Point level on receipt of a batch of reads

Class 4 – Periodic Readings Allocation Profiles

Allocation Profiles Periodic Periodic reads Monthly using

Optimum ReadMeter Point level at receipt of

read

Page 21: UK Link Industry Engagement Forum 24 th October 1.

21

Terms Used

DRE: Daily Read Equipment

AMR: Automatic Read Equipment

GFD: Gas Flow Day

CR: Check Read

A: Actual Read

N: Cyclic Read

E: Estimate Read

D: Effective date of the Class Change

Page 22: UK Link Industry Engagement Forum 24 th October 1.

22

Where DRE/AMR is installed for Class 2, 3 & 4 the kit is not changed on a Class change only event.

For a change in Class an Actual read is required to close out the outgoing Class.

The Actual Read provided for the effective date of the Class change will not be subject to the read tolerance validations only standard asset validation (serial number, dials and units etc.)

This is because the read may not follow on from the previous read due to the difference between the on-site reading and the derivable reads.

On Class Change only event the Check Read will reconcile back to the previous Check Read or AMR/DRE Installation Read.

When AMR/DRE equipment is installed the first Check Read received will reconcile back to the previous Check Read or Installation Read.

General Principles

Page 23: UK Link Industry Engagement Forum 24 th October 1.

23

There are 3 steps for energy allocation/reconciliation for Class 3 and 4 Supply Meter Points where AMR equipment is installed

a) Daily Allocations are based on the Demand Estimation Formula.b) An Actual Read received will trigger reconciliations.

Daily for Class 3 Periodic for Class 4

c) Following receipt of a Check Read reconciliation will be triggered back to the previous Check Read

In the cases of a Shipper Transfer this will be the opening read.

Where AMR/DRE is fitted on a Class 3 or 4 Reconciliation will be processed first followed by the Check Read Reconciliation (apportion the drift across the period).

For Class 1 and 2 any replaced meter readings received outside of close-out will trigger Reconciliation.

General Principles - Reconciliation

Page 24: UK Link Industry Engagement Forum 24 th October 1.

24

General Principles – Shipper Transfer

For Class 1 and 2, any reads received following a Shipper Transfer that fail validation will generate an Estimated Read. On receipt of a valid actual read the Estimated Reads will be

re-calculated (better estimates) back to the Shipper Transfer/Class change day.

If the Check Read is not provided for the Class change date for a Shipper Transfer within the UNC timescales then an Estimate Read will be calculated and treated as a Check Read.

Class 2 within GFD+5 Class 3 & 4 within Month+10

For a Shipper Transfer where the outgoing Class is Class 1 or 2 the D-1 volume will be estimated for Allocation purposes, either using D-7 or AQ/365.

This is to ensure that the drift is allocated to the correct period (previous Check Read) rather than the total drift allocated to the day before the Class change

On Shipper Transfer where AMR/DRE equipment is fitted the Opening Read received will be treated as a Check Read and therefore will trigger Reconciliation back

to the last Check Read. This will close out the position for the Outgoing Shipper.

Page 25: UK Link Industry Engagement Forum 24 th October 1.

25

The reads will be provided on the following communication methods:

Incoming Methods:

Files Formats

Class Type File

Class 2 UDR

Class 3 UBR

Class 4 UMR

Class 2 Site Visit Details Web Services

Class 3 & 4 Site Visit Details SFN

Page 26: UK Link Industry Engagement Forum 24 th October 1.

26

Same Shipper Class change, Class 2 to 3, DRE/AMR fitted.

CR

A A A AA A

Reconcile between CR and CR

CR

D-2 D-1 D

Class 2 Class 3Class Change Day

A

AllocatedEnergy

A

AllocatedEnergy

Reconcile A→A

Scenario A: Opening read provided

Page 27: UK Link Industry Engagement Forum 24 th October 1.

27

Same Shipper Class change, Class 2 to 3, DRE/AMR fitted.

CR

A A A AA E

Reconcile between CR and CR

CR

D-2 D-1 D

Class 2 Class 3Class Change Day

A

AllocatedEnergy

A

AllocatedEnergy

Reconcile E→A

Scenario A: Opening read not provided

D-7

Page 28: UK Link Industry Engagement Forum 24 th October 1.

28

Outgoing Shipper (Class 2) Incoming Shipper (Class 3 )

Transfer/Class Change Day

CR

A A A AA

Reconcile back to last Check ReadCR (A)

Reconcile back to last Check Read CR

D-2 D-1 D

Reconcile A→AA

D-7

E/A A A

AllocatedEnergy

AllocatedEnergy

Shipper Transfer with Class Change, Class 2 to 3, DRE/AMR fitted,

Opening Read provided by Incoming Shipper.

Page 29: UK Link Industry Engagement Forum 24 th October 1.

29

Shipper Transfer with Class Change, Class 2 to 3, DRE/AMR fitted, No

Opening Read provided by Incoming Shipper.

Outgoing Shipper (Class 2) Incoming Shipper (Class 3 )Transfer/Class

Change Day

A A A A

CRSAR Received - Reconcile back to last

Check Read

CR (E)Reconcile back to last Check Read CR

D-2 D-1D

Reconcile E→A and A→A

D-7

E A A

AllocatedEnergy

AllocatedEnergy

Page 30: UK Link Industry Engagement Forum 24 th October 1.

30

Shipper Transfer with Class Change, Class 2 to 3, No DRE/AMR fitted.

A

Outgoing Shipper (Class 2) Incoming Shipper (Class 3)

Transfer/Class Change Day

A

Scenario A: Opening read provided

A A

Scenario B: Opening read Not provided

E

Allocated Energy Process

AA AAllocated Energy Process

AReconciliation

AReconciliation

Page 31: UK Link Industry Engagement Forum 24 th October 1.

31

Same Shipper Class Change, Class 4 to 2

CR

N AN

Reconcile between CR and CR

CR

D

Class 4 Class 2Class Change Day

A AA

Scenario A: Opening read provided – AMR/DRE Fitted

Reconciliation

Page 32: UK Link Industry Engagement Forum 24 th October 1.

32

Same Shipper Class Change, Class 4 to 2

CR

N AN

Reconcile between CR and CR

CR

D

Class 4 Class 2Class Change Day

A AE

Scenario B: Opening read not provided – AMR/DRE Fitted

Reconciliation

Page 33: UK Link Industry Engagement Forum 24 th October 1.

33

Same Shipper Class Change, Class 4 to 2

N AN

D

Class 4 Class 2Class Change Day

A AA

Scenario C: Opening read provided – No AMR/DRE Fitted

Reconciliation

Page 34: UK Link Industry Engagement Forum 24 th October 1.

34

Same Shipper Class Change, Class 4 to 2

N AN

D

Class 4 Class 2Class Change Day

A

Scenario D: Opening read not provided – No AMR/DRE Fitted

E E

BOn receipt of a valid actual read better estimates will be created

back to the transfer/class change

day.

Reconciliation

If subsequent Actual reads following the Class change date fail validation Estimated Reads will be generated. When the next valid Actual is received the estimated reads will be replace with better

estimates.

AAE

B

Page 35: UK Link Industry Engagement Forum 24 th October 1.

35

Shipper Transfer with Class Change, Class 4 to 2, DRE/AMR fitted,

Opening Read provided by Incoming Shipper.

Outgoing Shipper (Class 4) Incoming Shipper (Class 2)Transfer/Class

Change Day

N

CR

Actual volume feeds Allocation

A A A A

Reconcile between CR and CR

A

CR(A)

A read marked as a Check Read

CRReconcile between CR and CR

Page 36: UK Link Industry Engagement Forum 24 th October 1.

36

Shipper Transfer with Class Change, Class 4 to 2, DRE/AMR fitted, No Opening Read provided by Incoming Shipper.

Outgoing Shipper (Class 4) Incoming Shipper (Class 2)Transfer/Class

Change Day

CR

N

Reconciliation

AVolume to feed

Allocation

E

‘E’ Based on NDM Demand Estimation Formula

CR(E) CRReconcile back to the last Check

Read

Page 37: UK Link Industry Engagement Forum 24 th October 1.

37

Shipper Transfer with Class Change, Class 4 to 2, No DRE/AMR fitted.

Outgoing Shipper (Class 4) Incoming Shipper (Class 2)Transfer/Class

Change Day

N

Scenario A: Opening read provided

A

Reconciliation

A A A

Actual read volume feeds Allocation

Scenario B: Opening read not provided

EN

Reconciliation

A A A

Actual read volume feeds Allocation

Page 38: UK Link Industry Engagement Forum 24 th October 1.

38

For Class 2, Consumption Adjustments can be provided for:a) A day b) For a period - per day between two Check Reads

Submission of a Consumption Adjustment for Class 1 and 2 Supply Meter Points will be via:

a) Within Submission of GFD+5 via Web Servicesb) Outside GFD+5 through CMS

Submission of Consumption Adjustments for Class 3 and 4 Supply Meter Points will be submitted via CMS.

a) The Consumption Adjustments are provided as a total between two read dates

Consumption Adjustments

Page 39: UK Link Industry Engagement Forum 24 th October 1.

Faulty Asset Equipment End to Faulty Asset Equipment End to End Process WalkthroughEnd Process Walkthrough

2424thth October October

39

Page 40: UK Link Industry Engagement Forum 24 th October 1.

Call-outs

An information only call out.

Denotes a change in the process.

A BRD reference.

File Changes - Minor

File Changes – No change

File Changes - Medium

File Changes – Major

File Changes - New

40

Page 41: UK Link Industry Engagement Forum 24 th October 1.

Apply Asset Fault Status (Input)

41

Supply Point Register BRD Ref:8.8

SFNSFN

File Changes - MinorFile Changes – No change

File Changes - Medium

File Changes – Major

File Changes - New

SFRSFR

Fault Notified via SFN File for Class 3

& 4.

Class 1 & 2 via web portal.

This process flow is repeated in this presentation to demonstrate input and output.

If fault flagged in error submit a further SFN File (3 & 4) or

portal update (1 & 2) to advise

the Fault Notification was raised in error

41

Page 42: UK Link Industry Engagement Forum 24 th October 1.

Faulty Meter

42

If the fault has been applied in error the ‘suspended’ status is

removed.

Where a fault has been flagged the

next read submissions via the UMR/UDR or UBR

read files will be suspended.

Where a read is suspended a D -7 estimate for Class 1 and 2 will be

generated. If the Shipper has raised the fault the DMSP will be notified.

Read Validations are

applied

Following a fault being flagged any read suspended for Classes 2, 3 & 4 will be notified via URS file. The notification will state: Read suspended due to fault

flag.Settlement BRD Ref:

5.5, 5.6

UMRUMR

UDRUDR

UBRUBR

File Changes - MinorFile Changes – No change

File Changes - Medium

File Changes – Major

File Changes - New

42

Page 43: UK Link Industry Engagement Forum 24 th October 1.

43

Apply Asset Fault Status (Output)

43

Note:If a Meter or Converter

Exchange is updated for a day during the fault

period it will be treated as if the meter is faulty

and a consumption adjustment must be

provided.

Note:If you wish to correct the consumption fault period within Exit Close out you can view the portal for

Class 1 & 2 sites.

Where a Meter Exchange has been updated the meter will be considered to be faulty. To receive a consumption adjustment an RFA contact should

be raised via CMS for fault period between two reads.

Where a Corrector Exchange has been updated the meter

readings and previous check read

will be used to automatically

reconcile the fault period.

Where Daily Read Equipment is

installed automatic reconciliation will

go back to the previous check

read using convertor reads or

meter reads.

Supply Point Register BRD Ref:8.8

The submission of RGMA ONJOB File to update a Meter or Corrector Exchange will end date the fault

against the faulty asset.

If the fault is on the Daily Read Equipment, notification of the site visit information will be required either via the portal or the SFN file in order to end the

fault.

ONJOBONJOB

File Changes - MinorFile Changes – No change

File Changes - Medium

File Changes – Major

File Changes - New

SFNSFN SFRSFR

43

Page 44: UK Link Industry Engagement Forum 24 th October 1.

UK Link Programme Dashboard Report UKLIEF – 24th October 2014

• RAG status for the Programme remains at ‘amber’.• The File Format consultation process remains on track with final approvals targeted for 13/11. • Functional fit currently remains positive at approximately c.80%. • Residual activities to complete Detailed Design are on track. • The UK Link Shipper Engagement Day was held on 02/10; the event was extremely well attended.

Executive summary

Key Milestone High Level DesignComplete

Detailed DesignComplete

Xoserve UATComplete

Industry TestingStart Cutover & Implementation

Baseline Date 18/04/14 26/09/2014 28/05/15 01/06/15 01/10/15

Current Planned Date Complete 30/04/14 24/10/2014 28/06/15 01/06/15 01/10/2015

Programme Milestones

• Phase 1 of the File Format Formal Consultation process commenced, as per plan, on 30/09. The File Format consultation process remains on track with final approvals targeted for 13/11.

• UK Link Shipper Engagement Day was successfully held on 02/10 with over 100 Industry colleagues attending. Feedback received from the event was positive; all Industry questions have been responded to.

• The release plan for non-shipper file formats has been developed; industry engagement approaches are being agreed.• Two Transition mods (mod 514 and 515) have been raised and are being progressed through their respective working groups. Two

further mods are being progressed through the required governance in order to raise to the Industry.

Recent Achievements

• Progress and close out the File Format consultation process through the UK Link Committee.• Progress System Test; investigate and conclude the assessment of whether Market Connectivity Testing and Market Trials can be

decoupled. • Ensure that suitable progress is made in data cleanse activities through the Data Cleanse Forum. • Continue to progress the ‘To Be Process Walk Throughs’; the current schedule will conclude in December 2014.• Continue to work through the Market Trials approach, scheduled for Industry communication during Q1 2015. • Continue to progress the formal raising of Transition mods through PNUNC. • Finalise the approach and plan for Non-Shipper file format release.

Future Priorities

Key DependenciesRisks

Risk Summary Impact Date Mitigation

Industry readiness: Risk that there is a varied understanding within stakeholder organisations of Nexus requirements due to lack of or inconsistent attendance at industry forums.

June 2015

Xoserve’s programme of industry engagement at all levels aims to level-set understanding. Terms of Reference in UKLIEF will avoid re-working topics agreed through PNUNC.

File Formats: There is a risk that any changes to file formats as a result of the UKLC approval process (formal consultation and reps) may impact on the ability of the industry to deliver by Oct 2015 due to design re-work

Nov2014

Draft file formats released in August to give early sight and UKLP Engagement Day set up to focus on file formats in the context of business processes.

Market Testing: Risk that Market Trials is insufficient in length, too late within the programme, and participants may not be ready in time to take part.

June 2015Xoserve are investigating the feasibility of de-coupling Market Connectivity Testing and Market Trials.

Aggregated Programme RAG

DependencyDate

RequiredImpact if missed Status

Industry participants to cleanse Settlement data by December 2014

Dec 2014

Output from the Testing phase may produce unexpected results due to uncleansed data.

Industry (Shipper) agreement on Shipper file formats through UKLC

Nov 2014

The programme will continue build and testing activities at risk.

Industry Stakeholders to complete their internal system builds

Jun 2014

Industry may not be able to fully participate in the Market Trials phase

Industry Engagement Comms

IE Comms.

Reporting Date

01/6Start of

Market Trials,L/L Cutover Plan

30/9File Format Release

Q1 2015Mkt Trials Approach

12/5Test Strategy

18/6Transition Strategy

To-Be Processes

30/11Industry Go, No Go Straw

Man

31/3Imp. Dates

Outage Window31/3

Transition ModsApproved

28/8End of

Market Trials

GO LIVE

02/10Shipper Egt Day

13/11Targeted FF Approval

IDR Updates

1

iGT Single Service Provision – non-effective days to support cutover

A presentation to:

iGT Shipper Workgroup 3rd November 2014UNC Nexus Workgroup 4th November 2014

See also the iGT single service provision data preparation and migration overview report published on the Joint Office website

Page 45: UK Link Industry Engagement Forum 24 th October 1.

45

iGT Single Service Provision – non-effective days to support cutover

A presentation to:

iGT Shipper Workgroup 3rd November 2014UNC Nexus Workgroup 4th November 2014

See also the iGT single service provision data preparation and migration overview report published on the Joint Office website

Page 46: UK Link Industry Engagement Forum 24 th October 1.

46

iGT Single Service Provision – non-effective days to support cutover

To move to the iGT Single Service provision arrangements a number of activities are required

At some point the iGT systems must close There are then a number of activities to prepare arrangements for the UK

Link system – particularly around finalising the data for migration. The UK Link system will then open A period of time is required to prepare the UK Link system. During this

time supply point register updates and supply point administration communications cannot be made.

This does not mean that events cannot occur on these days or that updates cannot be made that are effective on these days.

Page 47: UK Link Industry Engagement Forum 24 th October 1.

47

iGT Single Service Provision – non-effective days to support cutover

Six non-effective days for the purpose of supply point register (SPR) and supply point administration (SPA) communications

This means that SPR and SPA communications cannot be sent to an iGT on these days

The six days are September 25,26,27,28,29,30 The last day a Shipper can send a SPR or SPA

communication to the iGT is Thursday 24th September From 1st October Shippers will send SPR and SPA

communications to the UK Link system

Page 48: UK Link Industry Engagement Forum 24 th October 1.

48

iGT Single Service Provision – non-effective days to support cutover

Why six days are needed Working back from 1st October 05:00 hrs

The data to support Gemini processes (balancing etc) needs to be in Gemini for the start of day D-2. D is 1st October, D-2 is 29th September 06:00

This means the data is loaded to Gemini on 28th September The source of the Gemini data is the Data Preparation Database The Data Preparation Database must have a final position on 28th September

circa 13:00hrs On 27th the data will be subject to check and re-check, no new data will be

added to the Data Preparation Database on this day. (The final shipper portfolio will be issued from this closed-out position)

The last processing of data on the Data Preparation Database is the 26th September

The last date iGTs can submit data is 25th September Therefore the last day the iGT can accept files for processing for them prepare

the final data for submission to Xoserve is 24th September

Page 49: UK Link Industry Engagement Forum 24 th October 1.

49

iGT Single Service Provision – non-effective days to support cutover

What are the implications of this? The “faster switching” timescales, which create the minimum period

for a transfer (14 calendar days starting from the day after the confirmation file is received), will not apply for the six days

To effect a change of shipper event on 9, 10, 11, 12, 13, 14 October the confirmation file must be submitted to the iGT by 24 September

Any updates to the SPR e.g. asset update, meter reading etc that would ordinarily be submitted between 25 and 30 September will need to be submitted to Xoserve from 1st October using the new file formats.

There is no opportunity to “back-date” files. All files processed from 1st October will be processed and validated against the receipt date of the file

Page 50: UK Link Industry Engagement Forum 24 th October 1.

50

iGT Single Service Provision – non-effective days to support cutover

Confirmation of SPA and SPR files processed pre and post cut-over SPA events that start in the iGT system and end in UK Link will be

migrated with no impact to the event. However, Shippers need to be aware that apparent unsolicited files will be received.

The effective date of any SPR updates processed after 1st October will be maintained e.g. a meter exchange on 25th September will be recorded as having happened on the 25th September

Page 51: UK Link Industry Engagement Forum 24 th October 1.

51

Illustration of cutover time period

M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F

7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

RQ RQ RQ RQ CO CO DRQ RQ RQ RQ RQ CO CO DRQ RQ RQ RQ RQ RQ CO CO DRQ RQ RQ RQ RQ RQ RQ CO CO DRQ RQ RQ RQ RQ RQ RQ RQ CO CO DRQ RQ RQ RQ RQ RQ RQ RQ CO CO DCFR RQ RQ RQ RQ RQ RQ RQ CO CO D

CFR RQ RQ RQ RQ RQ RQ RQ CO CO D CFR RQ RQ RQ RQ RQ RQ RQ CO CO D

CFR RQ RQ RQ RQ RQ RQ RQ CO CO D CFR RQ RQ RQ RQ RQ RQ RQ CO CO D CFR RQ RQ RQ RQ RQ RQ RQ CO CO D

CFR RQ RQ RQ RQ RQ RQ RQ CO CO D CFR RQ RQ RQ RQ RQ RQ CO CO D

CFR RQ RQ RQ RQ RQ CO CO D CFR RQ RQ RQ RQ CO CO D

CFR RQ RQ RQ C0 CO D CFR RQ RQ RQ CO CO D

CFR RQ RQ RQ RQ CO CO D CFR RQ RQ RQ RQ CO CO D

CFR RQ RQ RQ CO CO D CFR RQ RQ RQ CO CO D

CFR RQ RQ RQ CO CO D CFR RQ RQ RQ CO CO D

CFR RQ RQ RQ RQ CO CO DCFR RQ RQ RQ RQ RQ CO CO DCFR RQ RQ RQ RQ RQ CO CO DCFR RQ RQ RQ RQ RQ CO CO DCFR RQ RQ RQ RQ RQ RQ CO CO DCFR RQ RQ RQ RQ RQ RQ RQ CO CO D

CFR RQ RQ RQ RQ RQ RQ RQ CO CO D CFR RQ RQ RQ RQ RQ RQ RQ CO CO D

CFR RQ RQ RQ RQ RQ RQ RQ RQ CO CO

Arrow shows the D+10 opening meter reading submission timescale. A supply point registration can go live in the iGT systems and the read can be provided to either the iGT (before 24th September) or Xoserve (from 1st October onwards)

Note: change of shipper timescales show the minimum timescale, longer timescales are available

Non Effective Days (amber shading). The 24th September is the last day SPA and SPR files can be sent to the iGT.Note the diagram only shows the confirmation file to show when D is. Other SPA files e.g. objection files are subject to the same outage

Opening read provision from D (read taken between D-5

and D+5, to be submitted by

D+10)

Page 52: UK Link Industry Engagement Forum 24 th October 1.

52

iGT Single Service Provision – non-effective days to support cutover

Email address for questions

[email protected]