UK Link Industry Engagement ForumUK Link Industry Engagement Forum
2424thth October October
1
Gas Nominations & Allocations End Gas Nominations & Allocations End to End Process Walkthroughto End Process Walkthrough
2424thth October October
2
Call-outs
An information only call out.
Denotes a change in the process.
A BRD reference.
Calculate NDM Output Nominations
Weather Correction Factor adjusts for the
difference between the Daily Composite
Weather Variable and the Daily Seasonal Normal Composite
Weather Variable per LDZ.
NDM Demand estimation formula; the formula willl no longer use the Scaling Factor and will apply a Weather Correction Factor calculated from the Forecast Weather data.
Formula: (AQ/365)*ALP*(1+[DAF*WCF])
Settlement BRD Ref:5.1, 5.3
UNC Ref
H2.2- FormulaC2.5 – Principles of NDM Nominations
Note
There are no file formats associated with this Business Process.
Validate Output Nominations
Applicable to Class 1 & 2 Nominations
Settlement BRD Ref: 5.1.2
Where a Gas Nomination for a Class 1 & 2 is not
submitted, a D-7 estimate will be
generated and applied. The estimate will be
based on a D-7 Output Nomination.
The generation of an estimate will be visible in
Gemini and can be replaced within the Gas Nomination timescales.
UNC Ref
C2.2.6 – D-7
Note
There are no file formats associated with this Business Process.
Calculate Forecast Unidentified Gas
The LDZ Forecast Unidentified Gas is calculated at D-1 for the Gas Flow Day.
Calculation
LDZ Forecast Demand – (LDZ shrinkage + Total DM Nominations + Total NDM Nominations)
Settlement BRD Ref: 5.4
The Forecast Unidentified Gas will be apportioned to Shippers using the Allocation Adjustment Factors. A Unidentified Gas ‘Meter ID’ will be created per Shipper per LDZ / Exit
Zone.
Forecast Unidentified Gas
Available
UNC Ref
H2.6 – Unidentified Gas
3.4.4.2 Publish Forecast
Unidentified Gas
Calculate Energy Allocations
New NDM demand calculation. The formula will
no longer include the Scaling Factor and will
apply a Weather Correction Factor calculated from actual weather data.
Unidentified Gas value feeds into imbalance position and cash out
charges.
Unidentified Gas Available
3.5.3 Calculate LDZ unidentified gas
Settlement BRD Ref: 5.3
Weather Correction Factor adjusts the
difference between the daily CWV and the daily seasonal normal CWV
per LDZ.
UNC Ref
E3
Calculate Unidentified Gas Allocation
Settlement BRD Ref: 5.4
3.5.3.2 Publish Allocated
Unidentified Gas
The LDZ allocated Unidentified Gas is
calculated at D+1 for the Gas Flow Day.
Calculation:LDZ Demand – (LDZ Shrinkage + Total DM
Allocations + Total NDM Allocations)
Allocated Unidentified Gas Available
The Allocated Unidentified Gas will be apportioned to Shippers
using the Allocation Adjustment Factors.
UNC Ref
E1.1.6E1.1.7
Supply Point Transfer End to Supply Point Transfer End to End Process WalkthroughEnd Process Walkthrough
2424thth October October
9
Call-outs
An information only call out.
Denotes a change in the process.
A BRD reference.
File Changes - Minor
File Changes – No change
File Changes - Medium
File Changes – Major
File Changes - New
New feature within the existing enquiry file (S47) to submit a ‘consumption
request’.
Response via (S59):
Response will include:
A maximum 24 months worth of history or the maximum available for the Supply Point. Volume will be provided in kWh
AMR Indicator
Class (prevailing)
Batch Frequency (class 3)
SMP and Formula Year AQ
SOQ for Class 3 & 4
DNI Indicator
Withdrawal Status
Seasonal Indicator
CYM
Enquire against all registered Supply Points via the enquiry file (S47).
Supply Point Enquiry
Note – Files to be used for GT and iGT sites.
NOM S47,S68NOM S47,S68
NMR S78,S68,S72
NMR S78,S68,S72
NMRS59,S70,S75,S98
Q44 & Q51
NMRS59,S70,S75,S98
Q44 & Q51
Supply Point Register BRD Ref:
8.4 11
Nomination request (S48) will include:
•Class type,•If requesting Class 1 or 2, you have to nominate the SOQ & SHQ, existing capacity validations will be applied•If requesting Class 3 the batch period for submitting reads will need to be provided. This period can be either 7 days, 14 days or 1 month.
Sites may be referred for:
•Class 1 and 2 for capacity•request for short haul•New request for seasonal capacity (subject to mod approval). Note: iGT sites referring for capacity will refer to the iGT & GT.
Response will be via the offer (S64).
Offer now includes:
•Class•CSEP Data•GT Rates•iGT Rates•Short Haul Rates (where appropriate).•CYM (current year minimum; MOD445)•DNI Indicator
Supply Point Nomination
Note – Files to be used for GT and iGT sites.
NOM S48, S69 U70,U72
NOM S48, S69 U70,U72
NMR S21, S69, S72
U70,U72
NMR S21, S69, S72
U70,U72NMR
S21,S69
NMR S21,S69 NRF S21,S69
& S72, Q46
NRF S21,S69 & S72, Q46 NMR,NRF - S64, S70,
S75, K12,K14,S98,Q44, U71,U73,U74,U75,
Q46, K85
NMR,NRF - S64, S70, S75, K12,K14,S98,Q44,
U71,U73,U74,U75, Q46, K85
Supply Point Register BRD Ref:
8.2, 8.3, 8.6 12
Supply Point Confirmation
Confirmation only sites for SSP’s:•Class•SOQ/SHQ (as recorded at the time) for Class 2 and SMQ in ratio of previous 3 or 4
Class 3 SSP sites will need to provide the batch read frequency.
Confirmation response (S38 LSP / S42 SSP) will include:
•Class •iGT Rates•iGT CSEP data •AMR Indicator•CYM (if applicable)
Note – Files to be used for GT and iGT sites.
Replacement reads to be sent via the U01 file for the transfer date
Transfer of Ownership D-7 (D-2 Faster
Switching) to be provided:
•Gas Nomination ID•AMR•SMSO ID•CYM (if applicable)•Last Read & Read Date
CNF – S38, S42,S66,S67,S83,S84,U70,U72, T05
CNF – S38, S42,S66,S67,S83,S84,U70,U72, T05
CFR – S72, S09, S16,S66,S67,S83,S84,U70,U72
,T06
CFR – S72, S09, S16,S66,S67,S83,S84,U70,U72
,T06WAO -
S39,S40,S74,S41,S54,S
73
WAO -S39,S40,S7
4,S41,S54,S73
TRF – S15,S70, S75,S66,S67,S76,
S98,Q44,Q45,U71,U73,U74,U75,S88,S63,S0
8,S72,K12,K13, K85
TRF – S15,S70, S75,S66,S67,S76,
S98,Q44,Q45,U71,U73,U74,U75,S88,S63,S0
8,S72,K12,K13, K85
CFR – S07,S70,S75,S66,S67,S83,S84,S98,K12,K1
4, K85, Q44,Q45,U71,U73,U
74,U75,S10,S77,T06,T0
7
CFR – S07,S70,S75,S66,S67,S83,S84,S98,K12,K1
4, K85, Q44,Q45,U71,U73,U
74,U75,S10,S77,T06,T0
7
WOR – S11,S12,S26,S13,S14,S30,S65,S72
WOR – S11,S12,S26,S13,S14,S30,S65,S72
DCF – S08,S70,
S76,S63,S72
DCF – S08,S70,
S76,S63,S72
MRI-U06,K15, S98,N90
MRI-U06,K15, S98,N90
Supply Point Register BRD Ref:
8.2, 8.11
13
Class Change End to End Class Change End to End Process WalkthroughProcess Walkthrough
2424thth October October
14
Call-outs
An information only call out.
Denotes a change in the process.
A BRD reference.
File Changes - Minor
File Changes – No change
File Changes - Medium
File Changes – Major
File Changes - New
Manage Class Change
16
D-2 Process: Gemini
Class Change (SPC) record C38minimum 5 business days
(regardless of class)
Provide classif going from Class 2 (from 3 or 4) provide prevailing SOQ & SHQ in
ratio.
If Class 1 or Class 2, the prevailing SOQ/SHQ must be used and the
effective date.
Class 3 Batch Frequency Class 4 MRF
(can cancel 2.12) by D -3
Response: Gas Nomination ID.
SMP AQ/SOQ Class 1/2
SMP AQ/SOQFormula Year AQ/SOQ
Class 3/4
Supply Point Register BRD Ref:
8.10
SPC C38, C39
SPC C38, C39
Class ChangesClass Changes24th October 201424th October 2014
18
Introduction
This presentation aims to provide an overview of the process for Class change specifically the reconciliation and Check Read processes.
The presentation also covers scenarios where there is a Shipper Transfer and Class change combined.
Where a combined change of Shipper and Class change is associated with DRE/AMR equipment the focus is around apportioning the drift following a Check Read.
19
Why have a Check Read
Check Reads are required where equipment (AMR) is installed that derives the reads from the meter.
The Check Read identifies where the meter and the equipment are not synchronised and will detect any drift between the meter and the equipment. Any drift is then apportioned across the relevant period.
Class 1 and 2
Class 3 and 4
CR CR
A A AA A A
Daily Reads
CR CR
AA A
Reconciliation ReconciliationReconciliation
20
Class Change
Process Description Process for initial Allocation
Process for Energy
Balancing close-out
Read Submission Timescales
Type of Read Submission AQ Calculation Reconciliation
Class 1 – Daily Metered Time Critical Readings Uses daily read Uses daily read By 11am on GFD+1 All reads daily on
GFD+1Monthly using Optimum Read
Meter Point level following a site visit or estimate
Class 2 - Daily Metered not Time Critical Readings
Transporter estimate Uses daily read By end of GFD+1
(05.59 am)All reads daily by
end of GFD+1Monthly using Optimum Read
Meter Point level following a site visit or estimate
Class 3 – Batched Daily Readings
Allocation Profiles
Allocation Profiles
Daily Reads in batches
All daily reads in batches
Monthly using Optimum Read
Daily Rec at Meter Point level on receipt of a batch of reads
Class 4 – Periodic Readings Allocation Profiles
Allocation Profiles Periodic Periodic reads Monthly using
Optimum ReadMeter Point level at receipt of
read
21
Terms Used
DRE: Daily Read Equipment
AMR: Automatic Read Equipment
GFD: Gas Flow Day
CR: Check Read
A: Actual Read
N: Cyclic Read
E: Estimate Read
D: Effective date of the Class Change
22
Where DRE/AMR is installed for Class 2, 3 & 4 the kit is not changed on a Class change only event.
For a change in Class an Actual read is required to close out the outgoing Class.
The Actual Read provided for the effective date of the Class change will not be subject to the read tolerance validations only standard asset validation (serial number, dials and units etc.)
This is because the read may not follow on from the previous read due to the difference between the on-site reading and the derivable reads.
On Class Change only event the Check Read will reconcile back to the previous Check Read or AMR/DRE Installation Read.
When AMR/DRE equipment is installed the first Check Read received will reconcile back to the previous Check Read or Installation Read.
General Principles
23
There are 3 steps for energy allocation/reconciliation for Class 3 and 4 Supply Meter Points where AMR equipment is installed
a) Daily Allocations are based on the Demand Estimation Formula.b) An Actual Read received will trigger reconciliations.
Daily for Class 3 Periodic for Class 4
c) Following receipt of a Check Read reconciliation will be triggered back to the previous Check Read
In the cases of a Shipper Transfer this will be the opening read.
Where AMR/DRE is fitted on a Class 3 or 4 Reconciliation will be processed first followed by the Check Read Reconciliation (apportion the drift across the period).
For Class 1 and 2 any replaced meter readings received outside of close-out will trigger Reconciliation.
General Principles - Reconciliation
24
General Principles – Shipper Transfer
For Class 1 and 2, any reads received following a Shipper Transfer that fail validation will generate an Estimated Read. On receipt of a valid actual read the Estimated Reads will be
re-calculated (better estimates) back to the Shipper Transfer/Class change day.
If the Check Read is not provided for the Class change date for a Shipper Transfer within the UNC timescales then an Estimate Read will be calculated and treated as a Check Read.
Class 2 within GFD+5 Class 3 & 4 within Month+10
For a Shipper Transfer where the outgoing Class is Class 1 or 2 the D-1 volume will be estimated for Allocation purposes, either using D-7 or AQ/365.
This is to ensure that the drift is allocated to the correct period (previous Check Read) rather than the total drift allocated to the day before the Class change
On Shipper Transfer where AMR/DRE equipment is fitted the Opening Read received will be treated as a Check Read and therefore will trigger Reconciliation back
to the last Check Read. This will close out the position for the Outgoing Shipper.
25
The reads will be provided on the following communication methods:
Incoming Methods:
Files Formats
Class Type File
Class 2 UDR
Class 3 UBR
Class 4 UMR
Class 2 Site Visit Details Web Services
Class 3 & 4 Site Visit Details SFN
26
Same Shipper Class change, Class 2 to 3, DRE/AMR fitted.
CR
A A A AA A
Reconcile between CR and CR
CR
D-2 D-1 D
Class 2 Class 3Class Change Day
A
AllocatedEnergy
A
AllocatedEnergy
Reconcile A→A
Scenario A: Opening read provided
27
Same Shipper Class change, Class 2 to 3, DRE/AMR fitted.
CR
A A A AA E
Reconcile between CR and CR
CR
D-2 D-1 D
Class 2 Class 3Class Change Day
A
AllocatedEnergy
A
AllocatedEnergy
Reconcile E→A
Scenario A: Opening read not provided
D-7
28
Outgoing Shipper (Class 2) Incoming Shipper (Class 3 )
Transfer/Class Change Day
CR
A A A AA
Reconcile back to last Check ReadCR (A)
Reconcile back to last Check Read CR
D-2 D-1 D
Reconcile A→AA
D-7
E/A A A
AllocatedEnergy
AllocatedEnergy
Shipper Transfer with Class Change, Class 2 to 3, DRE/AMR fitted,
Opening Read provided by Incoming Shipper.
29
Shipper Transfer with Class Change, Class 2 to 3, DRE/AMR fitted, No
Opening Read provided by Incoming Shipper.
Outgoing Shipper (Class 2) Incoming Shipper (Class 3 )Transfer/Class
Change Day
A A A A
CRSAR Received - Reconcile back to last
Check Read
CR (E)Reconcile back to last Check Read CR
D-2 D-1D
Reconcile E→A and A→A
D-7
E A A
AllocatedEnergy
AllocatedEnergy
30
Shipper Transfer with Class Change, Class 2 to 3, No DRE/AMR fitted.
A
Outgoing Shipper (Class 2) Incoming Shipper (Class 3)
Transfer/Class Change Day
A
Scenario A: Opening read provided
A A
Scenario B: Opening read Not provided
E
Allocated Energy Process
AA AAllocated Energy Process
AReconciliation
AReconciliation
31
Same Shipper Class Change, Class 4 to 2
CR
N AN
Reconcile between CR and CR
CR
D
Class 4 Class 2Class Change Day
A AA
Scenario A: Opening read provided – AMR/DRE Fitted
Reconciliation
32
Same Shipper Class Change, Class 4 to 2
CR
N AN
Reconcile between CR and CR
CR
D
Class 4 Class 2Class Change Day
A AE
Scenario B: Opening read not provided – AMR/DRE Fitted
Reconciliation
33
Same Shipper Class Change, Class 4 to 2
N AN
D
Class 4 Class 2Class Change Day
A AA
Scenario C: Opening read provided – No AMR/DRE Fitted
Reconciliation
34
Same Shipper Class Change, Class 4 to 2
N AN
D
Class 4 Class 2Class Change Day
A
Scenario D: Opening read not provided – No AMR/DRE Fitted
E E
BOn receipt of a valid actual read better estimates will be created
back to the transfer/class change
day.
Reconciliation
If subsequent Actual reads following the Class change date fail validation Estimated Reads will be generated. When the next valid Actual is received the estimated reads will be replace with better
estimates.
AAE
B
35
Shipper Transfer with Class Change, Class 4 to 2, DRE/AMR fitted,
Opening Read provided by Incoming Shipper.
Outgoing Shipper (Class 4) Incoming Shipper (Class 2)Transfer/Class
Change Day
N
CR
Actual volume feeds Allocation
A A A A
Reconcile between CR and CR
A
CR(A)
A read marked as a Check Read
CRReconcile between CR and CR
36
Shipper Transfer with Class Change, Class 4 to 2, DRE/AMR fitted, No Opening Read provided by Incoming Shipper.
Outgoing Shipper (Class 4) Incoming Shipper (Class 2)Transfer/Class
Change Day
CR
N
Reconciliation
AVolume to feed
Allocation
E
‘E’ Based on NDM Demand Estimation Formula
CR(E) CRReconcile back to the last Check
Read
37
Shipper Transfer with Class Change, Class 4 to 2, No DRE/AMR fitted.
Outgoing Shipper (Class 4) Incoming Shipper (Class 2)Transfer/Class
Change Day
N
Scenario A: Opening read provided
A
Reconciliation
A A A
Actual read volume feeds Allocation
Scenario B: Opening read not provided
EN
Reconciliation
A A A
Actual read volume feeds Allocation
38
For Class 2, Consumption Adjustments can be provided for:a) A day b) For a period - per day between two Check Reads
Submission of a Consumption Adjustment for Class 1 and 2 Supply Meter Points will be via:
a) Within Submission of GFD+5 via Web Servicesb) Outside GFD+5 through CMS
Submission of Consumption Adjustments for Class 3 and 4 Supply Meter Points will be submitted via CMS.
a) The Consumption Adjustments are provided as a total between two read dates
Consumption Adjustments
Faulty Asset Equipment End to Faulty Asset Equipment End to End Process WalkthroughEnd Process Walkthrough
2424thth October October
39
Call-outs
An information only call out.
Denotes a change in the process.
A BRD reference.
File Changes - Minor
File Changes – No change
File Changes - Medium
File Changes – Major
File Changes - New
40
Apply Asset Fault Status (Input)
41
Supply Point Register BRD Ref:8.8
SFNSFN
File Changes - MinorFile Changes – No change
File Changes - Medium
File Changes – Major
File Changes - New
SFRSFR
Fault Notified via SFN File for Class 3
& 4.
Class 1 & 2 via web portal.
This process flow is repeated in this presentation to demonstrate input and output.
If fault flagged in error submit a further SFN File (3 & 4) or
portal update (1 & 2) to advise
the Fault Notification was raised in error
41
Faulty Meter
42
If the fault has been applied in error the ‘suspended’ status is
removed.
Where a fault has been flagged the
next read submissions via the UMR/UDR or UBR
read files will be suspended.
Where a read is suspended a D -7 estimate for Class 1 and 2 will be
generated. If the Shipper has raised the fault the DMSP will be notified.
Read Validations are
applied
Following a fault being flagged any read suspended for Classes 2, 3 & 4 will be notified via URS file. The notification will state: Read suspended due to fault
flag.Settlement BRD Ref:
5.5, 5.6
UMRUMR
UDRUDR
UBRUBR
File Changes - MinorFile Changes – No change
File Changes - Medium
File Changes – Major
File Changes - New
42
43
Apply Asset Fault Status (Output)
43
Note:If a Meter or Converter
Exchange is updated for a day during the fault
period it will be treated as if the meter is faulty
and a consumption adjustment must be
provided.
Note:If you wish to correct the consumption fault period within Exit Close out you can view the portal for
Class 1 & 2 sites.
Where a Meter Exchange has been updated the meter will be considered to be faulty. To receive a consumption adjustment an RFA contact should
be raised via CMS for fault period between two reads.
Where a Corrector Exchange has been updated the meter
readings and previous check read
will be used to automatically
reconcile the fault period.
Where Daily Read Equipment is
installed automatic reconciliation will
go back to the previous check
read using convertor reads or
meter reads.
Supply Point Register BRD Ref:8.8
The submission of RGMA ONJOB File to update a Meter or Corrector Exchange will end date the fault
against the faulty asset.
If the fault is on the Daily Read Equipment, notification of the site visit information will be required either via the portal or the SFN file in order to end the
fault.
ONJOBONJOB
File Changes - MinorFile Changes – No change
File Changes - Medium
File Changes – Major
File Changes - New
SFNSFN SFRSFR
43
UK Link Programme Dashboard Report UKLIEF – 24th October 2014
• RAG status for the Programme remains at ‘amber’.• The File Format consultation process remains on track with final approvals targeted for 13/11. • Functional fit currently remains positive at approximately c.80%. • Residual activities to complete Detailed Design are on track. • The UK Link Shipper Engagement Day was held on 02/10; the event was extremely well attended.
Executive summary
Key Milestone High Level DesignComplete
Detailed DesignComplete
Xoserve UATComplete
Industry TestingStart Cutover & Implementation
Baseline Date 18/04/14 26/09/2014 28/05/15 01/06/15 01/10/15
Current Planned Date Complete 30/04/14 24/10/2014 28/06/15 01/06/15 01/10/2015
Programme Milestones
• Phase 1 of the File Format Formal Consultation process commenced, as per plan, on 30/09. The File Format consultation process remains on track with final approvals targeted for 13/11.
• UK Link Shipper Engagement Day was successfully held on 02/10 with over 100 Industry colleagues attending. Feedback received from the event was positive; all Industry questions have been responded to.
• The release plan for non-shipper file formats has been developed; industry engagement approaches are being agreed.• Two Transition mods (mod 514 and 515) have been raised and are being progressed through their respective working groups. Two
further mods are being progressed through the required governance in order to raise to the Industry.
Recent Achievements
• Progress and close out the File Format consultation process through the UK Link Committee.• Progress System Test; investigate and conclude the assessment of whether Market Connectivity Testing and Market Trials can be
decoupled. • Ensure that suitable progress is made in data cleanse activities through the Data Cleanse Forum. • Continue to progress the ‘To Be Process Walk Throughs’; the current schedule will conclude in December 2014.• Continue to work through the Market Trials approach, scheduled for Industry communication during Q1 2015. • Continue to progress the formal raising of Transition mods through PNUNC. • Finalise the approach and plan for Non-Shipper file format release.
Future Priorities
Key DependenciesRisks
Risk Summary Impact Date Mitigation
Industry readiness: Risk that there is a varied understanding within stakeholder organisations of Nexus requirements due to lack of or inconsistent attendance at industry forums.
June 2015
Xoserve’s programme of industry engagement at all levels aims to level-set understanding. Terms of Reference in UKLIEF will avoid re-working topics agreed through PNUNC.
File Formats: There is a risk that any changes to file formats as a result of the UKLC approval process (formal consultation and reps) may impact on the ability of the industry to deliver by Oct 2015 due to design re-work
Nov2014
Draft file formats released in August to give early sight and UKLP Engagement Day set up to focus on file formats in the context of business processes.
Market Testing: Risk that Market Trials is insufficient in length, too late within the programme, and participants may not be ready in time to take part.
June 2015Xoserve are investigating the feasibility of de-coupling Market Connectivity Testing and Market Trials.
Aggregated Programme RAG
DependencyDate
RequiredImpact if missed Status
Industry participants to cleanse Settlement data by December 2014
Dec 2014
Output from the Testing phase may produce unexpected results due to uncleansed data.
Industry (Shipper) agreement on Shipper file formats through UKLC
Nov 2014
The programme will continue build and testing activities at risk.
Industry Stakeholders to complete their internal system builds
Jun 2014
Industry may not be able to fully participate in the Market Trials phase
Industry Engagement Comms
IE Comms.
Reporting Date
01/6Start of
Market Trials,L/L Cutover Plan
30/9File Format Release
Q1 2015Mkt Trials Approach
12/5Test Strategy
18/6Transition Strategy
To-Be Processes
30/11Industry Go, No Go Straw
Man
31/3Imp. Dates
Outage Window31/3
Transition ModsApproved
28/8End of
Market Trials
GO LIVE
02/10Shipper Egt Day
13/11Targeted FF Approval
IDR Updates
1
iGT Single Service Provision – non-effective days to support cutover
A presentation to:
iGT Shipper Workgroup 3rd November 2014UNC Nexus Workgroup 4th November 2014
See also the iGT single service provision data preparation and migration overview report published on the Joint Office website
45
iGT Single Service Provision – non-effective days to support cutover
A presentation to:
iGT Shipper Workgroup 3rd November 2014UNC Nexus Workgroup 4th November 2014
See also the iGT single service provision data preparation and migration overview report published on the Joint Office website
46
iGT Single Service Provision – non-effective days to support cutover
To move to the iGT Single Service provision arrangements a number of activities are required
At some point the iGT systems must close There are then a number of activities to prepare arrangements for the UK
Link system – particularly around finalising the data for migration. The UK Link system will then open A period of time is required to prepare the UK Link system. During this
time supply point register updates and supply point administration communications cannot be made.
This does not mean that events cannot occur on these days or that updates cannot be made that are effective on these days.
47
iGT Single Service Provision – non-effective days to support cutover
Six non-effective days for the purpose of supply point register (SPR) and supply point administration (SPA) communications
This means that SPR and SPA communications cannot be sent to an iGT on these days
The six days are September 25,26,27,28,29,30 The last day a Shipper can send a SPR or SPA
communication to the iGT is Thursday 24th September From 1st October Shippers will send SPR and SPA
communications to the UK Link system
48
iGT Single Service Provision – non-effective days to support cutover
Why six days are needed Working back from 1st October 05:00 hrs
The data to support Gemini processes (balancing etc) needs to be in Gemini for the start of day D-2. D is 1st October, D-2 is 29th September 06:00
This means the data is loaded to Gemini on 28th September The source of the Gemini data is the Data Preparation Database The Data Preparation Database must have a final position on 28th September
circa 13:00hrs On 27th the data will be subject to check and re-check, no new data will be
added to the Data Preparation Database on this day. (The final shipper portfolio will be issued from this closed-out position)
The last processing of data on the Data Preparation Database is the 26th September
The last date iGTs can submit data is 25th September Therefore the last day the iGT can accept files for processing for them prepare
the final data for submission to Xoserve is 24th September
49
iGT Single Service Provision – non-effective days to support cutover
What are the implications of this? The “faster switching” timescales, which create the minimum period
for a transfer (14 calendar days starting from the day after the confirmation file is received), will not apply for the six days
To effect a change of shipper event on 9, 10, 11, 12, 13, 14 October the confirmation file must be submitted to the iGT by 24 September
Any updates to the SPR e.g. asset update, meter reading etc that would ordinarily be submitted between 25 and 30 September will need to be submitted to Xoserve from 1st October using the new file formats.
There is no opportunity to “back-date” files. All files processed from 1st October will be processed and validated against the receipt date of the file
50
iGT Single Service Provision – non-effective days to support cutover
Confirmation of SPA and SPR files processed pre and post cut-over SPA events that start in the iGT system and end in UK Link will be
migrated with no impact to the event. However, Shippers need to be aware that apparent unsolicited files will be received.
The effective date of any SPR updates processed after 1st October will be maintained e.g. a meter exchange on 25th September will be recorded as having happened on the 25th September
51
Illustration of cutover time period
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
RQ RQ RQ RQ CO CO DRQ RQ RQ RQ RQ CO CO DRQ RQ RQ RQ RQ RQ CO CO DRQ RQ RQ RQ RQ RQ RQ CO CO DRQ RQ RQ RQ RQ RQ RQ RQ CO CO DRQ RQ RQ RQ RQ RQ RQ RQ CO CO DCFR RQ RQ RQ RQ RQ RQ RQ CO CO D
CFR RQ RQ RQ RQ RQ RQ RQ CO CO D CFR RQ RQ RQ RQ RQ RQ RQ CO CO D
CFR RQ RQ RQ RQ RQ RQ RQ CO CO D CFR RQ RQ RQ RQ RQ RQ RQ CO CO D CFR RQ RQ RQ RQ RQ RQ RQ CO CO D
CFR RQ RQ RQ RQ RQ RQ RQ CO CO D CFR RQ RQ RQ RQ RQ RQ CO CO D
CFR RQ RQ RQ RQ RQ CO CO D CFR RQ RQ RQ RQ CO CO D
CFR RQ RQ RQ C0 CO D CFR RQ RQ RQ CO CO D
CFR RQ RQ RQ RQ CO CO D CFR RQ RQ RQ RQ CO CO D
CFR RQ RQ RQ CO CO D CFR RQ RQ RQ CO CO D
CFR RQ RQ RQ CO CO D CFR RQ RQ RQ CO CO D
CFR RQ RQ RQ RQ CO CO DCFR RQ RQ RQ RQ RQ CO CO DCFR RQ RQ RQ RQ RQ CO CO DCFR RQ RQ RQ RQ RQ CO CO DCFR RQ RQ RQ RQ RQ RQ CO CO DCFR RQ RQ RQ RQ RQ RQ RQ CO CO D
CFR RQ RQ RQ RQ RQ RQ RQ CO CO D CFR RQ RQ RQ RQ RQ RQ RQ CO CO D
CFR RQ RQ RQ RQ RQ RQ RQ RQ CO CO
Arrow shows the D+10 opening meter reading submission timescale. A supply point registration can go live in the iGT systems and the read can be provided to either the iGT (before 24th September) or Xoserve (from 1st October onwards)
Note: change of shipper timescales show the minimum timescale, longer timescales are available
Non Effective Days (amber shading). The 24th September is the last day SPA and SPR files can be sent to the iGT.Note the diagram only shows the confirmation file to show when D is. Other SPA files e.g. objection files are subject to the same outage
Opening read provision from D (read taken between D-5
and D+5, to be submitted by
D+10)
52
iGT Single Service Provision – non-effective days to support cutover
Email address for questions