Kulhal HEP November 2014 Page 1
Chapter 1. Annual Report on Technical Performance of Kulhal HEP
1.1 Overview
1.1.1 The petitioner in compliance of the Regulations 12 and 13 of UERC (Terms and
Conditions for determination of Tariff) Regulations, 2011 is providing
information with regard to the operational performance related to technical
parameters of Kulhal Hydro Power Station.
1.1.2 The information provided in this chapter relates to actual and expected
performance in FY 2011-12, FY 2012-13, FY 2013-14, FY 2014-15 & FY 2015-16.
The operational parameters considered are:
(a) Gross generation
(b) Auxiliary consumption and Transformation losses
(c) Plant Availability factor (PAF)
1.2 Power Station Description
1.2.1.1 The Kulhal Power Station with an installed capacity of 30 MW (3X10 MW) is
located on the downstream of the Asan Barrage at a distance of 4.0 km on the
power channel which takes off from the Asan Barrage. The Power Station was
commissioned in the year 1975. The surface Power Station comprising 3 units
of 10 MW each with Kaplan turbines is located on the power channel which
terminates in 39.2 m wide and 6.9 m deep fore bay. There are three 30 m long
and 4.5 m dia. steel lined penstocks, one for each unit. In case of tripping of
machines full discharge gets bye-passed through a 21m wide gated bye pass
channel. The water from the tail race flows towards Khara Power Station in UP.
The Kulhal Power Station is a low head scheme located on power channel with
a design head of 18 m and design discharge of 198 cum.
1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled
with synchronous generator. The turbine output is 10.4 MW for a rated net
head of 18 m. The generators are designed for a nominal output of 11.1 MVA
with lagging power factor of 0.9 and class “B” insulation.
Kulhal HEP November 2014 Page 2
1.2.1.3 This Power Station was commissioned in the year 1975. Due to continuous
operations of machines for past 38 years, efficiency of machines has substantially
decreased despite the regular and timely maintenance of the machine by
Petitioner.
1.2.2 Salient features of the Power Station are provided in form F 2.3 of this petition.
1.3 Energy Generation
1.3.1 The actual Gross and Net Energy generated in FY 2011-12, FY 2012-13 & FY
2013-14 is given in the table below:
Table 1:- Actual Generation
Particulars Norms 2011-12 2012-13 2013-14
Design Energy /Actual
Generation (MU)
153.91
157.84
158.08
178.52
Auxiliary Cons. 0.2% 0.3% 0.3% 2.43%
Transformation/ other
losses and
consumption (%)
0.5 % (Tr.
losses)
2.5% 2.1%
Net Saleable Energy
(MU)
152.83 153.48
154.28 174.18
1.3.2 The Gross and Net Energy expected to be generated in FY 2014-15 and FY
2015-16 is given in the table below:
Table 2:- Expected Generation
Particulars Norms 2014-15 (Estimated)
2015-16 (Projected)
Design Energy / Actual
Generation (MU)
153.91
161.79 149.93
Auxiliary Cons. and
Transformation losses (%)
0.7 2.43 2.43
Net Saleable Energy (MU) 152.83 157.85 146.28
Kulhal HEP November 2014 Page 3
1.3.3 From the above table it is evident that gross generation in the FY 2014-15 is
expected to be more than the design energy of the Power Station but it is
expected to be marginally less than DE in 2015-16.
1.3.4 The auxiliary and transformation losses in FY 2014-15 are expected to be more
than the normative level. However, the petitioner is investigating the reasons
for higher losses and will take appropriate steps to bring them to the
normative level.
1.4 Plant Availability Factor
1.4.1 The recovery of the Annual Fixed Charges is dependent on the Plant
Availability achieved by the Power Station. The principle for recovery of fixed
charges on the basis of the availability achieved by the plant has been
introduced by the Hon’ble Commission by its regulations UERC (Terms and
Conditions for Determination of tariff) Regulations, 2011 from the FY 2013-14.
The petitioner has started computing this factor as per the provisions of the
above regulations from FY 2013-14
Table 3:- Plant Availability Factor
Particulars Norms 2011-12 2012-13 2013-14 2014-15
(Expected)
2015-16
(Projected)
NAPAF / PAFM
(%)
65
NA
NA
77.98 72.98 69.62
Planned Outages
(Hrs)
NA 2942 2598 2543 0* -
Forced Outages
(Hrs)
NA 53 410 9 1.5* -
*Upto September 2014
1.4.2 PAFM: Kulhal Hydro Power Station is likely to achieve the normative plant
availability factor determined by the Hon’ble Commission for the FY 2014-15
and FY 2015-16 as well.
The PAFM fixed by Hon’ble UERC during FY 2013-14 could be achieved
through optimum availability of water in the river and performance of Ichari
Kulhal HEP November 2014 Page 4
dam,Dakpathar Barrage & Asan Barrage and no major problems faced in the
machines resulting in better availability of machines.
The Petitioner does not seek any deviation in NAPAF from the norms as
determined by Hon’ble Commission in its order dated 03.09.2013.
Table : Average PAFM from 2008-09 to 2015-16
SI.No. Year Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Average
1 2008-09 6.89 68.92 75.89 77.26 96.02 97.44 90.43 66.22 56.34 33.01 29.88 26.24 60.38
2 2009-10 34.22 49.46 54.00 80.97 87.42 88.78 60.65 51.11 29.68 26.13 30.83 30.32 51.96
3 2010-11 39.00 58.82 68.33 91.08 72.90 71.56 99.46 79.78 66.56 61.61 56.66 56.66 68.54
4 2011-12 53.00 79.68 87.44 95.38 90.11 99.44 86.99 65.56 52.58 45.91 41.15 51.72 70.75
5 2012-13 30.67 65.27 70.78 86.88 94.14 98.44 82.74 59.78 42.58 36.67 66.19 81.94 68.01
6 2013-14 65.79 74.61 70.27 99.08 97.78 99.50 93.23 73.07 59.45 62.91 67.14 72.88 77.98
Avg. 2008-09 to 2012-13 32.76 64.43 71.29 86.31 88.12 91.13 84.05 64.49 49.55 40.67 44.94 49.38 63.93
Avg. 2008-09 to 2013-14 38.26 66.13 71.12 88.44 89.73 92.53 85.58 65.92 51.20 44.37 48.64 53.29 66.27
Expected for FY 2014-15 72.84 81.21 89.46 96.05 94.62 92.53 85.58 65.92 51.20 44.37 48.64 53.29 72.98
Expected for FY 2015-16 55.55 73.67 80.29 92.25 92.17 92.53 85.58 65.92 51.20 44.37 48.64 53.29 69.62
1.4.3 Outages: During FY 2013-14 Machines of Kulhal Power Station remained in
forced outage for 9 hrs only due to best maintenance efforts and expected to
remain within this range for FY 2014-15.
S. No. Description Voucher No. & Date
Particulars of Asset
Capitalisa-
tion
Work Order / P.O.
No. & DateName of Supplier / Contractor
Amount Capita-
lised
Date/
Month of
Capitalisa-
tion
Original Date/
Month of Capitalisa-
tion
Need/ Urgency of CapexHow the Capex has improved
performance of plant/life enhancement
Bill No Bill date
Add cap
3 Rain coat KHL/ME-9 T&P- Others 14/6/2013 M/S Shanu Garments 1269 14/6/2013 3972.50 14/6/2013 14/6/2013 For operation & maintenance
works at site in rainy season.
Working efficiency improved.
7 Nokia KHL/ME-2 T&P- Others 03-01-2013 Virmani Communicatoin 15438 03-01-2013 4000.00 03-01-2013 03-01-2013 To strengthen the
communication facility.
Improving the communication between
different controlling agencies.
8 Nokia KHL/ME-5 T&P- Others 17/10/2013 Sethi Communication 15547 17/10/2013 1400.00 17/10/2013 17/10/2013 To strengthen the
communication facility.
Improving the communication between
different controlling agencies.
9,372.50
Bill No. & Date
Plant& Machinery
Total add cap of Plant & Machinery
ADDITIONAL CAPITALIZATION FOR FY 2013-14 KULHAL
Details of capital Expenditure for FY 2014-15 (1.4.2014 to 30.9.2014)
Name of Poiwer Station:- Kulhal Power House
Sl no
Description Voucher No
Particulars of Asset Capitalization
P/O No Name of supplier
Amount capatilised
Date/Month of
Capitalization
Original date of
Capitalization
Need How the
capex has
improved
1. Nil Nil Nil Nil Nil Nil Nil Nil
Nrapendra kumar Executive Engineer Kulhal Power House
Details of tentative capital Expenditure for FY 2014-15 (1.10.2014 to 31.3.2015)
Name of Power Station:- Kulhal Power House
Sl no
Description Voucher No
Particulars of Asset Capitalization
P/O No Name of supplier
Amount capitalized
Date/Month of
Capitalization
Original date of
Capitalization
Need How the
capex has
improved
1. Godrej make furniture for inspection
house
Nil Nil Nil Nil 3.00 lac Nil Nil
Note: - Above information can be changed subject to start of RMU works at Kulhal Power House