UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal...

58
UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer [email protected] 2016 Joint Meeting CO/WY ITE & ITS Rocky Mountain • Denver, CO • October 20, 2016

Transcript of UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal...

Page 1: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

UDOT Automated Traffic Signal Performance Measures (ATSPMs)

Jamie MackeyUDOT Statewide Signal Engineer

[email protected]

2016 Joint Meeting CO/WY ITE & ITS Rocky Mountain • Denver, CO • October 20, 2016

Page 2: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

55%31%

86% Connected

UDOTPartner Agencies

Traffic Signalsin Utah

60%40%

1995 Traffic Signals

UDOTPartner Agencies

Page 3: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Opportunity from UDOT Executive Leaders (2011)

“What would it take for UDOT’s traffic signals to be world class?”

“What’s the trend – are signal operations improving, staying the

same or getting worse?”

“What are our areas of

most need?”

QualityImprovementTeam

Page 4: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

QIT Recommendations (July 2011)

• Communications and

detection maintained

during projects

• Proactive signal

maintenance

• Real-time monitoring

of system health and

quality of operations

Page 5: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov
Page 6: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

SPM Basic Concept

- Signal controller- Probe source

- Signal- Corridor- System

Automated Data Collection

Useful Information about Performance

Why Model what you can Measure?

Page 7: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Standard Controller Enumerations

http://docs.lib.purdue.edu/jtrpdata/3/

Page 8: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Standard Controller Enumerations

http://docs.lib.purdue.edu/jtrpdata/3/

Page 9: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

High-resolution Data

Detector 5 OFF

Phase 8 GREEN

Detector 5 ON

Timestamp Event Code Event Parameter

6/27/2013 1:29:51.1 10 8

6/27/2013 1:29:51.1 82 5

6/27/2013 1:29:52.2 1 2

6/27/2013 1:29:52.2 1 6

6/27/2013 1:29:52.3 82 2

6/27/2013 1:29:52.8 82 4

6/27/2013 1:29:52.9 81 4

6/27/2013 1:29:53.3 81 6

6/27/2013 1:29:54.5 81 2

6/27/2013 1:30:02.2 8 2

6/27/2013 1:30:02.2 8 6

6/27/2013 1:30:02.2 33 2

6/27/2013 1:30:02.2 33 6

6/27/2013 1:30:02.2 32 2

6/27/2013 1:30:02.2 32 6

6/27/2013 1:30:06.1 10 2

6/27/2013 1:30:06.1 10 6

6/27/2013 1:30:08.1 1 8

6/27/2013 1:30:13.1 32 8

6/27/2013 1:30:15.8 81 5

6/27/2013 1:30:18.5 82 6

6/27/2013 1:30:27.5 81 6

6/27/2013 1:30:30.4 8 8

0.1-second resolution

Page 10: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

System Requirements

SoftwareServer

Communications

Photo courtesy of the Indiana Department of Transportation

Detection(optional)

High-resolution Controller

Page 11: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

System Requirements

SoftwareServer

Communications

Photo courtesy of the Indiana Department of Transportation

Detection(optional)

High-resolution Controller

Does NOT require

Central Traffic Signal Management Software!

Page 12: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Objective: Vendor Neutrality

Page 13: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Metrics & Detection Requirements

Page 14: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Detection Metric

None Phase Termination ChartSplit MonitorPreemption DetailsPedestrian Delay

Advanced Count Purdue Coordination DiagramApproach VolumeApproach Speed (requires detection

with speed service)

Lane-by-lane PresenceLane Group Presence

Purdue Split Failure

Lane-by-laneStop bar Count

Turning Movement Counts

Page 15: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Detection

None

Available Metrics

Phase Termination Chart

Split Monitor

Pedestrian Delay

Preemption Details

Page 16: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Gap out

Max out

Force off

Pedestrian activation

Skip

(shown above phase line)

Metric: Phase Termination Chart

Free FreeCoordination

Coordinated phases

Phase N

um

ber

Time of Day

Page 17: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Metric: Split MonitorPhase 6

Phase D

ura

tion

Time of Day

Page 18: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Detection

Setback Count Zones

Available Metrics

~400ft

Purdue Coordination Diagram

Approach Volume

Arrivals on Red

Approach Delay

Page 19: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Metric: Purdue Coordination Diagram

Vehicles arriving on green

Tim

e in C

ycle

(s)

Time of Day

Vehicles arriving on red

Page 20: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Metric: Approach Volume

Volu

me (

vph)

Time of Day

Dire

ctio

nal S

plit

Page 21: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Detection Available Metrics

~400ft

Setback Count Zoneswith speed

Approach Speed

Page 22: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Metric: Approach Speed

Speed (

MP

H)

Time of Day

Snow storm starts

Page 23: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Detection

Lane-by-lane Presence

Lane Group Presence

Available Metrics

Purdue Split Failure

Page 24: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Metric: Purdue Split Failure

Occupancy (

%)

Time of Day

Page 25: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Detection

Lane-by-lane Count

Available Metrics

Turning Movement Counts

Page 26: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Metric: Turning Movement Counts

Metric: Turning Movement CountsDetection Requirements: Stop Bar Counters

Volu

me (

VP

H)

Time of Day

Page 27: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

System Health with SPMs

Page 28: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

System HealthAlerts

Too many max outs22

No SPM Data11

Too many force offs33

Too many ped calls44

Low PCD detector count55

Page 29: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Metric: Purdue Phase TerminationDetection Requirements: None

Phase 4 starts constant call

4/8/2014 4/9/2014

Alert emailsent

Gap out

Max out

Force off

Pedestrian activation (shown above phase line)

Skip

SPMs evaluated for % max outs

Too many max outs22

0%

100%

3%

5%

100%

Page 30: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

5/21/2016 5/22/2016

SPMs evaluated for Ped Activations

Alert emailsent

Ph6 PedConstant Call

Too many ped calls44

Page 31: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Work Orders for UDOT ATMS

0

200

400

600

800

1000

1200

Dete

ction P

roble

m

Fla

sh

Opera

tions

Dam

aged/B

roken

Equip

ment

No p

ow

er

or

com

m

No p

ow

er

or

com

m

Bad Im

age

No c

ontr

ol

No p

ow

er

or

com

m

Dam

aged/B

roken

Equip

ment

Dete

ction P

roble

m

Sensor

Pro

ble

m

No p

ow

er

or

com

m

No p

ow

er

or

com

m

Dam

aged/B

roken

Equip

ment

No p

ow

er

or

com

m

Dete

ction P

roble

m

Dam

aged/B

roken

Equip

ment

Traffic Signals CCTV VMS, TMS, &VSL

RWIS Cabinet Ramp Meter

Wo

rk O

rders

# Work Orders for ATMS EquipmentJuly 2015 to July 2016

Page 32: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Troubleshooting with SPMs

Page 33: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Video detection not working at night

Complaint: Long red at 2 a.m., no other traffic

Metric: Purdue Phase TerminationDetection Requirements: None

Gap out

Max out

Force off

Pedestrian activation

Skip

(shown above phase line)

Minor street through & left turn max out at night only

Before

Page 34: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

New detection technology installed

Complaint: Long red at 2 a.m., no other traffic

Metric: Purdue Phase TerminationDetection Requirements: None

Phases are rarely used at night

Gap out

Max out

Force off

Pedestrian activation

Skip

(shown above phase line)

After

Page 35: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Signal Optimization with SPMs

Page 36: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Traditional Process Modified Process with SPMs

Collect Data

Model

Optimize

Implement & Fine-tune

Time-of-day

Cycle LengthSplits

Offsets

Review SPMs & Field

Observation

Model

Optimize

Implement & Fine-tune

Time-of-dayCycle Length

Splits

Offsets

Optimization with SPMs

Page 37: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Evaluate Impact of Timing Change

• Before:

1 2 | 3 4

5 6 | 7 8

• After:

1 2 | 4 3

5 6 | 7 8

Ø3WBL

Ø4EBT

Ø3WBL

Ø4EBT

Page 38: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Sunnyside Avenue

1300 S

2300 E

1700 S

2100 S

Foothill Boulevard

+3%

+18%

+13%

+4%

-3%

+8%

+1%

+5%

+20%

+35%

-3%

-2%

-1%

+5%

14%

-1%

Initial Percent Arrival on

Green

Increase in Percent Arrival

on Green

Decrease in Percent Arrival

on Green

Corridor Midday

Arrival on Green

74%

7%

2013Purdue Coordination

Diagrams

Benefits Reporting

Page 39: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Monitor Trends

Retiming Project

Page 40: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

SPM Use Beyond Signal Operations

Page 41: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Allow Lane Closures

Page 42: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Planning Data

Turning movement or Approach counts

Available at 333 signals

24/7/365

28% of State signals!

Page 43: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Active Transportation

Page 44: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

http://udottraffic.utah.gov/signalperformancemetrics

Page 45: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

16 Agencies using SPMs

MnDOT

OverlandPark, KS

All of Utah

INDOT

FDOT

Seminole County, FL

WISDOT

VDOT

GDOT

Tuscon, AZ

College Station, TX

Richardson, TX

PennDOT

Pocatello, ID

Las Vegas (FAST)

Tuscaloosa, AL

ODOT

Page 46: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

SPM Source Code –> Open Source Nov. 2016

Page 47: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Salt Lake SPM Workshop Participants – Jan 2016

170 Representatives from 85 Different Organizations, 28 States, DC, & Canada

20 State & Federal Agencies

25 Public Agencies

5 Universities

35 Private Sector Locations

Page 48: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

ITE 3-part WebinarApril, May, June 2014

ITE Journal, March 2014

ITE Journal, August 2016

Page 49: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov
Page 50: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov
Page 51: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Innovation/Adoption Curve

Purdue

INDOT

UDOT

MnDOT

AASHTO

AII

FHWAEDC-4

Page 52: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

UDOT Signal Timing Focus Group (July 2014)

• How do you feel about UDOT?

• How do traffic signals make you feel?

Page 53: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Focus Group Key Findings (July 2014)

UDOT is perceived positively, with innovation as the primary driver of positive impressions.

Drivers believe traffic signal synchronization is improving.

Drivers feel UDOT should be open about its accomplishments in a way that protects its credibility.

Page 54: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

http://udot.utah.gov/greenlights

60s Commercial – Green Lights

Page 55: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Alert Evaluation

Check for recalls

Consider whether a bandaid is necessary

Check for constant call on a detector channelToo many max

outs22

Check communication to signal

Check controller clock

Check IP address in SPM configuration

Check VOIT Trace Enabled & Saving-wait

Try enabling Upload Current

Create a WO to cold start the controller

No SPM Data11

Should the signal be in coordination?

Is a non-coordinated phase maxing out?

Skip only 2-6 pairs and dummy phases

Too many force

offs33

Check for recalls

Check for constant call on a detector channel

Too many ped

calls44

Is count channel configured correctly in SPM Config Tool?

Is ECPI Log enabled for count channel?

Is the detector working?

Is the detector communicating to the controller?

Try resetting the sensor and VERIFY with Upload Current

Note: Evaluate the VOLUME on the PCD charts, not the phase data

Low PCD

detector count55

Page 56: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

Determine Approach Capacity

Page 57: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

“Can we oversize the peds?”

Metric: Purdue Phase TerminationDetection Requirements: None

Peds for Phases 4 & 8 are called frequentlyRecommendation: Do not oversize peds

Peds for Phases 4 & 8 are rarely calledRecommendation: Oversize peds, if needed

Gap out

Max out

Force off

Pedestrian activation

Skip

(shown above phase line)

Page 58: UDOT Automated Traffic Signal Performance Measures (ATSPMs)€¦ · UDOT Automated Traffic Signal Performance Measures (ATSPMs) Jamie Mackey UDOT Statewide Signal Engineer jamiemackey@utah.gov

“Can we oversize the peds?”

Metric: Purdue Phase TerminationDetection Requirements: None

Peds for Phases 4 & 8 are called frequentlyRecommendation: Do not oversize peds

Peds for Phases 4 & 8 are rarely calledRecommendation: Oversize peds, if needed

Gap out

Max out

Force off

Pedestrian activation

Skip

(shown above phase line)

Pedestrian Delay: