UCNA specs – JWM 9/4/7 Proton beam energy = 800 MeV Peak proton current = 40 uA Duty cycle = 1/10...

4
UCNA specs – JWM 9/4/7 Proton beam energy = 800 MeV Peak proton current = 40 uA Duty cycle = 1/10 (1 sec on, 10 sec off) Therefore time-averaged current is 4 uA. Source is designed to take 10 uA time-averaged. Spallation target is tungsten, 2cm diameter, 10 cm long. Cooling of spallation target achieved by flowing compressed He gas. The length of the red “beta spectrometer” at bottom center of next slide is about 5.5 m long Shielding is 9’ of steel and 6’ of concrete. People can walk around area when beam is on (provided shielding is all in place) Remote extraction handled by removing one shield block, then pulling out a package from custom-made block. (see picture) Thanks to M. Makela and A. Saunders from LANL for providing the numbers
  • date post

    19-Dec-2015
  • Category

    Documents

  • view

    217
  • download

    3

Transcript of UCNA specs – JWM 9/4/7 Proton beam energy = 800 MeV Peak proton current = 40 uA Duty cycle = 1/10...

Page 1: UCNA specs – JWM 9/4/7 Proton beam energy = 800 MeV Peak proton current = 40 uA Duty cycle = 1/10 (1 sec on, 10 sec off) Therefore time-averaged current.

UCNA specs – JWM 9/4/7• Proton beam energy = 800 MeV• Peak proton current = 40 uA• Duty cycle = 1/10 (1 sec on, 10 sec off)• Therefore time-averaged current is 4 uA.• Source is designed to take 10 uA time-averaged.• Spallation target is tungsten, 2cm diameter, 10 cm long.

• Cooling of spallation target achieved by flowing compressed He gas.

• The length of the red “beta spectrometer” at bottom center of next slide is about 5.5 m long

• Shielding is 9’ of steel and 6’ of concrete.• People can walk around area when beam is on (provided shielding

is all in place)• Remote extraction handled by removing one shield block, then

pulling out a package from custom-made block. (see picture)

Thanks to M. Makela and A. Saunders from LANL for providing the numbers

Page 2: UCNA specs – JWM 9/4/7 Proton beam energy = 800 MeV Peak proton current = 40 uA Duty cycle = 1/10 (1 sec on, 10 sec off) Therefore time-averaged current.

Layout in Area B800 MeVprotons

UCNSource

beta-spectrometer

polarizermagnet

Page 3: UCNA specs – JWM 9/4/7 Proton beam energy = 800 MeV Peak proton current = 40 uA Duty cycle = 1/10 (1 sec on, 10 sec off) Therefore time-averaged current.

proton beamdirection

shield package

UCN port

remote extraction

Page 4: UCNA specs – JWM 9/4/7 Proton beam energy = 800 MeV Peak proton current = 40 uA Duty cycle = 1/10 (1 sec on, 10 sec off) Therefore time-averaged current.

UCNto expt

“prepolarizer” magnet

polarizer magnet

beta-spectrometer magnet

UCN guideinsertion

future UCNguide path

Status