The Evolution to Dry Ash Handling
What is Dry?
INDUSTRY TRENDS
IncreasIng government regulatIons
ash pond capacIty constraInts
Water avaIlabIlIty
groWIng demand For reuse oF ash
pi i, i i i f if
i w i i. I f i
w i x ii . s-f-- i
f ucc ff i iii f iz
i i.
d i f i i i , i
f i. t i f iii i ii w f w f i f . hw, wi
iiiz ii w f i ii w
i . t ii f i i, wi f
i f w 100% iii f w.
Ash Handling Solutions
r i- ii i fi fi w
- w i i. uii i i i i
- i i k w wi i.
o fw ui c ci (ucc) i iii i
i f w k f:
I i wi pw ri bi f-wii iiii
a k , i f i
t x if f f i-i .
a f 2008, 67% f wi , wi
10% f .
-
8/10/2019 UCC_Wet-To-Dry_Brochure.pdf
3/12
Experience Matters
ui c ci i i f ,
f - w . a iz i , w wi
iii, i ii w i i wwi i -
i k ii i f.
si 1920, ucc f ii, f i. W
ffi i i i i i
f f .
One Company...the Right Solution
Fly Ash Systems
v s (nuveyor
) p s (nuva Feeder, depac midactm)
cii v/p s
hi di s s
Bottom Ash Systems
rii s s Fi c (sFctm)
pi a ex (paXtm)
vii a ex (vaXtm)
UCC ASH HANDLING SOLUTIONS ARE...
specIFIcally engIneered For each plant
desIgned to Improve plant perFormance
envIronmentally FrIendly solutIons
-
8/10/2019 UCC_Wet-To-Dry_Brochure.pdf
4/12
Fly Ash Choices
d i f w ii fw
si 1920, ucc i f ii i 50 i. ri
xii w hydroveyor i i wi ii f fw
.
ui i xi, f , ucc wk i wi
i i f i i i. t i
i nuveyorv s, cii v/p s (nuva Feederf
i depacf i) p s.
t f z w ii wi f i w
i f .
Conversion Utilizes Existing HydroveyorVacuum System
Common Criteria Used to Evaluate Fly Ash Choices:
c F F a f ?
exii pi W i iz i?
h hw i i ?
v/p tf si If i, w i i ?
li W wi i ?
di/ri hw f i i/i?
ci W i i w f i i?
Fi di m Wi i f ii ?
afk cii W ki/ ii?
NUMBER OFINSTALLATIONS
2000+NUVEYOR 1000+NUVA FEEDER
400+DEPAC 50+MultiDAC
Phase Dilute Medium Dense Dense
Maximum Distance 1500 feet 8000 feet 5200 feet 1500 feet(450 meters) (2400 meters) (1600 meters) (450 meters)
Maximum Capacity 80 TPH 175 TPH 200 TPH 130 TPH(75 mTPH) (155 mTPH) (180 mTPH) (120 mTPH)
Material Ratio 5-22 5-22 25-60 25-60Ash : Air Ash : Air Ash : Air Ash : Air
Air Velocity 3000-5200 ft/min 2400-4800 ft/min 900-2700 ft/min 900-2700 ft/min(16-27 m/sec) (12-25 m/sec) (5-15 m/sec) (5-15 m/sec)
Maximum Conveyor 20 inches Hg 40 psi 60 psi 60 psiLine Pressure (530 mm Hg) (275 kPa) (415 kPa) (415 kPa)
Fly Ash Systems
NUVEYOR NUVA FEEDER DEPAC MultiDACTM
(Vacuum) (Pressure) (Pressure) (Pressure)
-
8/10/2019 UCC_Wet-To-Dry_Brochure.pdf
5/12
Vacuum System
t nuveyor i i f fi,
i i f 1500 f. (450) i
ii 80 tph. W i f w-- i,
xii i i i .
t ii f fw ii i i i:
Fi/s
s bi ui ei
mi ex v p
nw y si ci pii
NUVEYOR SYSTEM
reuse eXIstIng vacuum system
ease oF retroFIt In lImIted space
cii / w i
i x iii f . t
i k f iii w f xii
ik , wi ii
f i i i i
i. I / , x
i f ii
i f k. F i, nuva Feeder
depac i i.
NUVA FEEDER SYSTEM
abIlIty to convey long dIstances
can handle economIZer ash
DEPAC SYSTEM
dense phase - loW velocIty
Combination Vacuum/Pressure Systems
v s
wi si
Pressure SystemsWi fi i , xii
wi nuva Feeder, depac
midac , iii f ii f k.
Fi/s p s
-
8/10/2019 UCC_Wet-To-Dry_Brochure.pdf
6/12
Choosing The Right Dry Bottom Ash System
Bottom Ash Choices
ui c ff f -f-- i
i. F iff hi, mi, pi vi
i ii f iii w
. Wi f ii 90 f xi, ucc i
f i .
e i f iff ii w i i
.
Common Criteria Used to Evaluate Bottom Ash Choices:
pi s ci W i i?
di, mi Ii c W i ?
mi c W i 20- if- ?
ti ai f Ii hw i ?
W u/aiii hw w i i f i i?
oi c W w i i?
mi ui si c k i f i i?
s/di hw wi /?
t ifi i ii.
Total Installed Cost $$$$ $ $$ $
Lead Time 9 months 9 months 12 months 12 m
Outage
Pre-Outage Construction 6 months 2 months 3 months 3 m
Requirement Outage Construction 5 days 3 4 weeks 8 weeks 6 w
Outage Start-Up 2 3 days 1 2 days 3 4 days 1
Water
Make-Up Water 600 gpm 50 gpm None N
Consumption
Cooling Water 200 gpm 400 gpm None N
Conveying Water 400 gpm None None N(recirculating)
Power
Pumps 600 HP 50 HP None N
Consumption Blowers/Fans None None 200 HP 50
Mechanical Drives 50 HP 100 HP 50 HP 75
Boiler and Yard Yard Piping Corridor Yes No Yes
Space Boiler House Exit Corridor No Yes No Y
Yard Footprint 6500 sq. ft. 1000 sq. ft. 1500 sq. ft. 1500
Pumps Yes No No
Operations and
Blowers/Fans No No Yes Y
Maintenance Refractory Yes existing Usually none Yes Usual
Costs Conveyor Chain Replacement No Yes No
Crushers Yes existing Usually none Yes (2 3) Ye
Conveying Pipeline/Valves Yes No Yes
Bottom Ash Systems Recirculation SFC PAX V (Hydraulic) (Mechanical) (Pneumatic) (Vibr
-
8/10/2019 UCC_Wet-To-Dry_Brochure.pdf
7/12
t wi i iii wi
ik i w i.
F x, if ii
i x 12-24 i f -wk i i,
i hi rii
s. If 100% iii f w i i,
w i: i
i (paX) i i (vaX).
BOTTOM ASH SYSTEMS
recIrculatIon system
submerged FlIght conveyor (sFctm)
pneumatIc ash eXtractor (paXtm)
vIbratory ash eXtractor (vaXtm)
NUMBER OF INSTALLATIONS
75+100+200+
1,000+
RECIRCULATION SYSTEM
SUBMERGED FLIGHT CONVEYOR
PNEUMATIC ASH EXTRACTOR
HEAVY-DUTY HOT INDUSTRIALAPPLICATIONS UTILIZING
VIBRATORY TECHNOLOGY
-
8/10/2019 UCC_Wet-To-Dry_Brochure.pdf
8/12
Simple Conversion with a Successful Track Record
a rii s w i i wi
xii . ti i w
i f k- w. a ii
wi wi i, ifi (i) k () k.
ti i f i w w i i ii
i i i k i. o i,
rii s i fw f i i.
Recirculation System
shortest outage tIme For conversIon
contInued use oF eXIstIng bottom ash hoppers
easIly Incorporates mIll rejects
elImInates ash storage ponds
System Operation
I i , w wi i i; i wi i
w i k i . W w i k
k. I i k, f
i wi i.
W i i k i i
k w ii w
xii i .
-
8/10/2019 UCC_Wet-To-Dry_Brochure.pdf
9/12
System Operation
contInuous removal oF ash
loW poWer consumptIon
easIly Incorporates mIll rejects
elImInates ash storage ponds
Submerged Flight Conveyor (SFCtm)
The Industry Leader with Proven Performance
t s Fi c (sFc) i -ffi
i w i wi i . W i w i i
ii f, i sFc i w i. Wi ii
i w, i f iii.
t i f i i wi, ki i i i
iz. t sFc i i wi iz - (pc) i, w (i)
i, k-f i i ii.
oi f s Fi c i i. a f f
i i w-, . ci
i iz wi .
a f , f
i i k, w
i i k f i.
t i i w () f
.
-
8/10/2019 UCC_Wet-To-Dry_Brochure.pdf
10/12
Time Proven Technology with Routing Flexibility
t pi a ex (paX) s i f
i w iii f w i i. t paX
iiz i- i f
i . ti i i i fi.
t i i paX s:
a w i , f .
a f i.
a i i i f i.
System Operation
s w i i i w f w .
gi f w ik
i ; w , i i w i
i -i . ti i .
F , w i i
i.
Pneumatic Ash Extractor (PAXtm)
easIly retroFItted around structural barrIers
provIdes Improved heat recovery and boIler eFFIcIency
does not requIre Water
elImInates ash storage ponds
-
8/10/2019 UCC_Wet-To-Dry_Brochure.pdf
11/12
Next Generation Technology for Dry Bottom Ash Handling
System Operation
di f iii f wi i i , vaX s
i i i i i i i i.
ui i i , i i f i
w i i -- i. c f f i
i k i f i i w
w, i iiz f . t i i i i.
Vibratory Ash Extractor (VAXtm)
proven technology
hIghest heat recovery
loWer operatIng cost
elImInates ash storage ponds
t vi a ex (vaX) s i i f ,
i i i fi . I i i, - -ffi
i k.
t vaX f i i x i
ii f - w . uik i ,
i i i f f fi i
w i. t i iii ik f .
-
8/10/2019 UCC_Wet-To-Dry_Brochure.pdf
12/12
ucc i f f i i
UCC Material Handling Solutions
Fly Ash (di, mi d p)
v s
p s
Bottom Ash (W d si)
hi s
pi s
mi s
vi s
Mill Rejects
hi s
pi s
Reagent Handling Systems
Pulverized Fuel
System Components
c
tk/v
Fi/s
g/v
mix/ u
pi/Fii
a i i, w ff f i . W iz i f ii
wi i i i
i .
Wi w i , w i
i i f i. t
i i i f f .
o i f i, , i i- i
i ix i, i w i
xi i w . ti i i .
The UCC Commitment
u n i t e d c o n v e y o r . c o m
Global Operations in:
United States Europe China India
Over 50 Offices Worldwide