UCC_Wet-To-Dry_Brochure.pdf

download UCC_Wet-To-Dry_Brochure.pdf

of 12

Transcript of UCC_Wet-To-Dry_Brochure.pdf

  • 8/10/2019 UCC_Wet-To-Dry_Brochure.pdf

    1/12

  • 8/10/2019 UCC_Wet-To-Dry_Brochure.pdf

    2/12

    The Evolution to Dry Ash Handling

    What is Dry?

    INDUSTRY TRENDS

    IncreasIng government regulatIons

    ash pond capacIty constraInts

    Water avaIlabIlIty

    groWIng demand For reuse oF ash

    pi i, i i i f if

    i w i i. I f i

    w i x ii . s-f-- i

    f ucc ff i iii f iz

    i i.

    d i f i i i , i

    f i. t i f iii i ii w f w f i f . hw, wi

    iiiz ii w f i ii w

    i . t ii f i i, wi f

    i f w 100% iii f w.

    Ash Handling Solutions

    r i- ii i fi fi w

    - w i i. uii i i i i

    - i i k w wi i.

    o fw ui c ci (ucc) i iii i

    i f w k f:

    I i wi pw ri bi f-wii iiii

    a k , i f i

    t x if f f i-i .

    a f 2008, 67% f wi , wi

    10% f .

  • 8/10/2019 UCC_Wet-To-Dry_Brochure.pdf

    3/12

    Experience Matters

    ui c ci i i f ,

    f - w . a iz i , w wi

    iii, i ii w i i wwi i -

    i k ii i f.

    si 1920, ucc f ii, f i. W

    ffi i i i i i

    f f .

    One Company...the Right Solution

    Fly Ash Systems

    v s (nuveyor

    ) p s (nuva Feeder, depac midactm)

    cii v/p s

    hi di s s

    Bottom Ash Systems

    rii s s Fi c (sFctm)

    pi a ex (paXtm)

    vii a ex (vaXtm)

    UCC ASH HANDLING SOLUTIONS ARE...

    specIFIcally engIneered For each plant

    desIgned to Improve plant perFormance

    envIronmentally FrIendly solutIons

  • 8/10/2019 UCC_Wet-To-Dry_Brochure.pdf

    4/12

    Fly Ash Choices

    d i f w ii fw

    si 1920, ucc i f ii i 50 i. ri

    xii w hydroveyor i i wi ii f fw

    .

    ui i xi, f , ucc wk i wi

    i i f i i i. t i

    i nuveyorv s, cii v/p s (nuva Feederf

    i depacf i) p s.

    t f z w ii wi f i w

    i f .

    Conversion Utilizes Existing HydroveyorVacuum System

    Common Criteria Used to Evaluate Fly Ash Choices:

    c F F a f ?

    exii pi W i iz i?

    h hw i i ?

    v/p tf si If i, w i i ?

    li W wi i ?

    di/ri hw f i i/i?

    ci W i i w f i i?

    Fi di m Wi i f ii ?

    afk cii W ki/ ii?

    NUMBER OFINSTALLATIONS

    2000+NUVEYOR 1000+NUVA FEEDER

    400+DEPAC 50+MultiDAC

    Phase Dilute Medium Dense Dense

    Maximum Distance 1500 feet 8000 feet 5200 feet 1500 feet(450 meters) (2400 meters) (1600 meters) (450 meters)

    Maximum Capacity 80 TPH 175 TPH 200 TPH 130 TPH(75 mTPH) (155 mTPH) (180 mTPH) (120 mTPH)

    Material Ratio 5-22 5-22 25-60 25-60Ash : Air Ash : Air Ash : Air Ash : Air

    Air Velocity 3000-5200 ft/min 2400-4800 ft/min 900-2700 ft/min 900-2700 ft/min(16-27 m/sec) (12-25 m/sec) (5-15 m/sec) (5-15 m/sec)

    Maximum Conveyor 20 inches Hg 40 psi 60 psi 60 psiLine Pressure (530 mm Hg) (275 kPa) (415 kPa) (415 kPa)

    Fly Ash Systems

    NUVEYOR NUVA FEEDER DEPAC MultiDACTM

    (Vacuum) (Pressure) (Pressure) (Pressure)

  • 8/10/2019 UCC_Wet-To-Dry_Brochure.pdf

    5/12

    Vacuum System

    t nuveyor i i f fi,

    i i f 1500 f. (450) i

    ii 80 tph. W i f w-- i,

    xii i i i .

    t ii f fw ii i i i:

    Fi/s

    s bi ui ei

    mi ex v p

    nw y si ci pii

    NUVEYOR SYSTEM

    reuse eXIstIng vacuum system

    ease oF retroFIt In lImIted space

    cii / w i

    i x iii f . t

    i k f iii w f xii

    ik , wi ii

    f i i i i

    i. I / , x

    i f ii

    i f k. F i, nuva Feeder

    depac i i.

    NUVA FEEDER SYSTEM

    abIlIty to convey long dIstances

    can handle economIZer ash

    DEPAC SYSTEM

    dense phase - loW velocIty

    Combination Vacuum/Pressure Systems

    v s

    wi si

    Pressure SystemsWi fi i , xii

    wi nuva Feeder, depac

    midac , iii f ii f k.

    Fi/s p s

  • 8/10/2019 UCC_Wet-To-Dry_Brochure.pdf

    6/12

    Choosing The Right Dry Bottom Ash System

    Bottom Ash Choices

    ui c ff f -f-- i

    i. F iff hi, mi, pi vi

    i ii f iii w

    . Wi f ii 90 f xi, ucc i

    f i .

    e i f iff ii w i i

    .

    Common Criteria Used to Evaluate Bottom Ash Choices:

    pi s ci W i i?

    di, mi Ii c W i ?

    mi c W i 20- if- ?

    ti ai f Ii hw i ?

    W u/aiii hw w i i f i i?

    oi c W w i i?

    mi ui si c k i f i i?

    s/di hw wi /?

    t ifi i ii.

    Total Installed Cost $$$$ $ $$ $

    Lead Time 9 months 9 months 12 months 12 m

    Outage

    Pre-Outage Construction 6 months 2 months 3 months 3 m

    Requirement Outage Construction 5 days 3 4 weeks 8 weeks 6 w

    Outage Start-Up 2 3 days 1 2 days 3 4 days 1

    Water

    Make-Up Water 600 gpm 50 gpm None N

    Consumption

    Cooling Water 200 gpm 400 gpm None N

    Conveying Water 400 gpm None None N(recirculating)

    Power

    Pumps 600 HP 50 HP None N

    Consumption Blowers/Fans None None 200 HP 50

    Mechanical Drives 50 HP 100 HP 50 HP 75

    Boiler and Yard Yard Piping Corridor Yes No Yes

    Space Boiler House Exit Corridor No Yes No Y

    Yard Footprint 6500 sq. ft. 1000 sq. ft. 1500 sq. ft. 1500

    Pumps Yes No No

    Operations and

    Blowers/Fans No No Yes Y

    Maintenance Refractory Yes existing Usually none Yes Usual

    Costs Conveyor Chain Replacement No Yes No

    Crushers Yes existing Usually none Yes (2 3) Ye

    Conveying Pipeline/Valves Yes No Yes

    Bottom Ash Systems Recirculation SFC PAX V (Hydraulic) (Mechanical) (Pneumatic) (Vibr

  • 8/10/2019 UCC_Wet-To-Dry_Brochure.pdf

    7/12

    t wi i iii wi

    ik i w i.

    F x, if ii

    i x 12-24 i f -wk i i,

    i hi rii

    s. If 100% iii f w i i,

    w i: i

    i (paX) i i (vaX).

    BOTTOM ASH SYSTEMS

    recIrculatIon system

    submerged FlIght conveyor (sFctm)

    pneumatIc ash eXtractor (paXtm)

    vIbratory ash eXtractor (vaXtm)

    NUMBER OF INSTALLATIONS

    75+100+200+

    1,000+

    RECIRCULATION SYSTEM

    SUBMERGED FLIGHT CONVEYOR

    PNEUMATIC ASH EXTRACTOR

    HEAVY-DUTY HOT INDUSTRIALAPPLICATIONS UTILIZING

    VIBRATORY TECHNOLOGY

  • 8/10/2019 UCC_Wet-To-Dry_Brochure.pdf

    8/12

    Simple Conversion with a Successful Track Record

    a rii s w i i wi

    xii . ti i w

    i f k- w. a ii

    wi wi i, ifi (i) k () k.

    ti i f i w w i i ii

    i i i k i. o i,

    rii s i fw f i i.

    Recirculation System

    shortest outage tIme For conversIon

    contInued use oF eXIstIng bottom ash hoppers

    easIly Incorporates mIll rejects

    elImInates ash storage ponds

    System Operation

    I i , w wi i i; i wi i

    w i k i . W w i k

    k. I i k, f

    i wi i.

    W i i k i i

    k w ii w

    xii i .

  • 8/10/2019 UCC_Wet-To-Dry_Brochure.pdf

    9/12

    System Operation

    contInuous removal oF ash

    loW poWer consumptIon

    easIly Incorporates mIll rejects

    elImInates ash storage ponds

    Submerged Flight Conveyor (SFCtm)

    The Industry Leader with Proven Performance

    t s Fi c (sFc) i -ffi

    i w i wi i . W i w i i

    ii f, i sFc i w i. Wi ii

    i w, i f iii.

    t i f i i wi, ki i i i

    iz. t sFc i i wi iz - (pc) i, w (i)

    i, k-f i i ii.

    oi f s Fi c i i. a f f

    i i w-, . ci

    i iz wi .

    a f , f

    i i k, w

    i i k f i.

    t i i w () f

    .

  • 8/10/2019 UCC_Wet-To-Dry_Brochure.pdf

    10/12

    Time Proven Technology with Routing Flexibility

    t pi a ex (paX) s i f

    i w iii f w i i. t paX

    iiz i- i f

    i . ti i i i fi.

    t i i paX s:

    a w i , f .

    a f i.

    a i i i f i.

    System Operation

    s w i i i w f w .

    gi f w ik

    i ; w , i i w i

    i -i . ti i .

    F , w i i

    i.

    Pneumatic Ash Extractor (PAXtm)

    easIly retroFItted around structural barrIers

    provIdes Improved heat recovery and boIler eFFIcIency

    does not requIre Water

    elImInates ash storage ponds

  • 8/10/2019 UCC_Wet-To-Dry_Brochure.pdf

    11/12

    Next Generation Technology for Dry Bottom Ash Handling

    System Operation

    di f iii f wi i i , vaX s

    i i i i i i i i.

    ui i i , i i f i

    w i i -- i. c f f i

    i k i f i i w

    w, i iiz f . t i i i i.

    Vibratory Ash Extractor (VAXtm)

    proven technology

    hIghest heat recovery

    loWer operatIng cost

    elImInates ash storage ponds

    t vi a ex (vaX) s i i f ,

    i i i fi . I i i, - -ffi

    i k.

    t vaX f i i x i

    ii f - w . uik i ,

    i i i f f fi i

    w i. t i iii ik f .

  • 8/10/2019 UCC_Wet-To-Dry_Brochure.pdf

    12/12

    ucc i f f i i

    UCC Material Handling Solutions

    Fly Ash (di, mi d p)

    v s

    p s

    Bottom Ash (W d si)

    hi s

    pi s

    mi s

    vi s

    Mill Rejects

    hi s

    pi s

    Reagent Handling Systems

    Pulverized Fuel

    System Components

    c

    tk/v

    Fi/s

    g/v

    mix/ u

    pi/Fii

    a i i, w ff f i . W iz i f ii

    wi i i i

    i .

    Wi w i , w i

    i i f i. t

    i i i f f .

    o i f i, , i i- i

    i ix i, i w i

    xi i w . ti i i .

    The UCC Commitment

    u n i t e d c o n v e y o r . c o m

    Global Operations in:

    United States Europe China India

    Over 50 Offices Worldwide