UCAIug HAN SRS v2.0 Summary

15
UCAIug HAN SRS v2.0 Summary August 12, 2010

description

UCAIug HAN SRS v2.0 Summary. August 12, 2010. Scope of HAN SRS in the NIST conceptual model. 2. 2008. 2007. 2009. 2010. August 2008 UtilityAMI 2008 HAN SRS v1.04 released. OpenHAN TF is formed to develop system requirements for the HAN. June 2009 - PowerPoint PPT Presentation

Transcript of UCAIug HAN SRS v2.0 Summary

Page 1: UCAIug HAN SRS v2.0 Summary

UCAIug HAN SRS v2.0 Summary

August 12, 2010

Page 2: UCAIug HAN SRS v2.0 Summary

2

Scope of HAN SRS in the NIST conceptual model

Page 3: UCAIug HAN SRS v2.0 Summary

3

OpenHAN History

2008

August 2008 UtilityAMI 2008 HAN SRS v1.04 released

2007

OpenHAN TF is formed to develop system requirements for the HAN

2009

June 2009Utility AMI 2008 HAN SRS v1.04 selected as a customer domain standard in the NIST Smart Grid Interoperability Standards Roadmap

October 2009OpenHAN 2.0 formed to develop the next version of the HAN SRS

2010

July 2010UCAIug HAN SRS v1.98 released

August 2010UCAIug HAN SRS v2.0 ratified

Page 4: UCAIug HAN SRS v2.0 Summary

Participating Companies

4home DTE Energy I’m in Control Proto6

Aclara Duke Infineon Technologies PSU

AEP Eaton Invaluable Technologies Reliant Energy

APS Ecologic Analytics, LLC Itron RIM

Aridhio Technologies Emerson /White-Rogers Kaapco / ASR Systems Sacramento Municipal Utility District

AT&T emeter KCP&L SCE

BC Hydro Enernex Konnected Universe LLC Schneider Electric

BGE EPRI LG Electronics USA. Inc. Southern Company

BSH FPL LonMark International Subzero

CPUC Ford MicroSoft SunSpec Alliance

Capgemini GE MultiSpeak Tendril

Carrier General Motors NextGEN Consultancy Pvt. Ltd. Trilliant

CenterPoint Georgia Power Co. N-Dimensions Solutions UISOL

Cisco google NV Energy U-SNAP Alliance

Coincident, Inc Granitekey Oncor Electric Delivery Visible Energy

Comverge, Inc. Gridata Inc PA Consulting Xtensible.net

Consumers Energy heyCoop, LLC Panasonic ZigBee Alliance

Certicom Corp Home Automation, Inc Pentair Water Pool & Spa

Deloitte Consulting Honeywell People Power

DotUI HP PG&E

Drummond Group Hypertek Inc Portland General Electric

DS2 IBM Progress Energy

OpenHAN 2.0 Effort Over 130 individuals representing over 80 companies participated in the

development of the HAN SRS v 2.0 over a 10 month period

Page 5: UCAIug HAN SRS v2.0 Summary

Industry use cases reviewed to identify any HAN SRS gapso ZigBee+HomePlug SEP MRDo SAE J2836/1™ J2836/2™ and J2836/3™ Use Cases o NAESB Draft Requirements Specifications for NIST PAP03, PAP04, and PAP09o EIS Alliance Customer Domain Use Cases v1.0o CEC Requirements Engineering for the Advance Metering Infrastructure and the

Home Automation Network (AMI-HAN) interface – February 2008o AHAM Smart Grid White Papero DER Contribution to OpenHAN; EPRI/DOE PV/Storage Communication Projecto Summary of Use Cases: For Demand Response Appliances Interface (EPRI

Adapters)

February 2010 NISTIR 7628 Smart Grid Cyber Security Strategy and Requirements

Documents Reviewed

Page 6: UCAIug HAN SRS v2.0 Summary

6

UCAIug HAN SRS v2.0Purpose

Define the system requirements for an open standard Home Area Network system

Promote open standards-based HANs that are interoperable Provide the vendor community with a common set of principles

and requirements around which to build products Ensure reliable and sustainable HAN platforms Support various energy policies in a variety of states,

provinces, and countries Empower consumers to manage their electricity consumption

by giving them the information and control they need to make decisions on their energy use

Page 7: UCAIug HAN SRS v2.0 Summary

7

UCAIug HAN SRS v2.0The audiences for the HAN SRS are:

Utilities considering deploying AMI systems that interact with HANs Vendors that make AMI systems for Utilities that interact with HANs Vendors that make consumer products (e.g. programmable communicating

thermostats, energy management systems, load control switches, in-home displays, smart appliances, Plug-in Electric Vehicles (PEV), distributed energy resources (DER), etc.)

Service Providers developing smart grid enabled programs for consumers (e.g. demand response, energy management, pre-pay, PEV programs, DER programs, etc.)

Policy makers looking to understand how Utility AMI deployments that interact with HANs benefit and impact consumers

Industry alliances and standards organizations NIST Smart Grid Interoperability Panel (SGIP) activities (e.g. Smart Grid

Architectural Committee (SGAC), Cyber Security Working Group (CSWG), Smart Grid Testing and Certification Committee (SGTCC), etc.)

Page 8: UCAIug HAN SRS v2.0 Summary

8

UCAIug HAN SRS v2.0Guiding Principles

Capabilities1. Supports Two-way Communication Between HAN Devices and Service

Providers2. Supports load control integration3. The AMI meter provides the HAN with direct access to Consumer-

specific usage data4. Provides a growth platform for future products which leverage the HAN

and meter data5. Supports three types of messaging: Public Information, Consumer-

Specific Information, and Control Signals6. Supports end-use metering and other utility meters7. Supports distributed energy resources

Assumptions8. Consumer owns the HAN9. HAN devices present additional security considerations10. The HAN is enabled by open and interoperable standards

Page 9: UCAIug HAN SRS v2.0 Summary

9

UCAIug HAN SRS v2.0

Architectural Considerations HAN SRS applies from the edge of the AMI System, where the

Energy Services Interface (ESI) resides, to all relevant HAN Devices in the premises

Energy Services Interface (ESI)o An interface which enables communication between authorized parties

and HAN devices that are registered to ito There may be more than one ESI in the premise (e.g. Utility ESI, 3rd

party ESI)o Utility ESI – provides interface between the Utility AMI network and HAN

devices, including the AMI metero Other ESI – provides interface between other communication media

(e.g. internet, cell phone, EMS, etc.) and HAN devices registered to it

Page 10: UCAIug HAN SRS v2.0 Summary

10

Architectural Considerations, continued Commissioning, Registration, Enrollment

o Commissioning is the process by which a HAN device obtains access to a specific physical network and allows the device to be discovered on that network

o Registration is the process by which a Commissioned HAN device is authorized to communicate on a logical network by exchanging security credentials with an ESI

o Enrollment is the process by which a Consumer enrolls a Registered HAN device in a Service Provider program (e.g. demand response, energy management, PEV program, etc.)

UCAIug HAN SRS v2.0

Page 11: UCAIug HAN SRS v2.0 Summary

11

CommissionedNetwork admission of HAN

device on HAN

CommissionedNetwork admission of HAN

device on HAN

RegisteredAuthentication established

between HAN device and ESI

RegisteredAuthentication established

between HAN device and ESI

Pre-commissionedNon-HAN operation of devicePre-commissioned

Non-HAN operation of device

EnrolledService Provider granted rights

to access HAN device

EnrolledService Provider granted rights

to access HAN device

UCAIug HAN SRS v2.0

Page 12: UCAIug HAN SRS v2.0 Summary

12

Architectural Considerations, continued

HAN SRS is agnostic to device ownership Some HAN devices may reside on more than one ESI HAN SRS is agnostic to electric market structure and may

be used in integrated utility markets as well as consumer choice electric markets

There may be multiple communication paths into the HAN (e.g. Utility AMI, internet, cell phone network, EMS, etc.)

HAN SRS addresses the following special applicationso Plug-in-Electric Vehicle (PEV) o Energy Management System (EMS)o Distributed Energy Resources (DER)

UCAIug HAN SRS v2.0

Page 13: UCAIug HAN SRS v2.0 Summary

13

HAN System Requirements Application Requirements

Control applications respond to control signals Measurement and Monitor applications provide internal data and status Processing applications consume, process, and act on external and

internal data Human Machine Interface (HMI) provides Consumers a means to

provide input into an application or to view information from an application

Communication Requirements Commissioning is the network process of adding a HAN device on the

HAN to allow the device to communicate with other devices and involves network scanning, selection, admission, and configuration

Control of a node involving self-organization, path selection, mitigation

UCAIug HAN SRS v2.0

Page 14: UCAIug HAN SRS v2.0 Summary

14

HAN System Requirements, continued Security Requirements

Access Controls and Confidentiality address data protection for data-at-rest and data-in-transit

Registration is the network process to authenticate and authorize HAN device participation with an ESI and includes initialization, authentication, correlation, authorization, and de-register

Enrollment is the process by which a Consumer enrolls a HAN device in a Service Provider’s program (e.g. demand response, energy management, pre-pay, PEV programs, distributed generation, pricing, messaging, etc.) and gives certain rights to the Service Provider to communicate with their HAN device

Integrity preserves the HAN operating environment through resistance and recovery

Accountability will allow for monitoring malicious activities through audit and non-repudiation

UCAIug HAN SRS v2.0

Page 15: UCAIug HAN SRS v2.0 Summary

15

HAN System Requirements, continued Performance Requirements

Ensure applications or other factors do not limit the performance of the system, which is dependent upon availability, reliability, maintainability, scalability, upgradeability, quality and latency

Operations, Maintenance, and Logistics Requirements Manufacturing and Distribution - Vendor’s pre-installation activities

including pre-Commissioning settings, application configuration, labeling, support for multiple distribution channels

Installation – Documentation for the physical placement of the device and support systems

Manage, Maintain – ensure HAN device diagnostic, management and trouble shooting capabilities including alarming, logging, testing, device reset, and monitoring

UCAIug HAN SRS v2.0