SITE
Telegraph Ave
Dwight Way
Bancroft Way
Durant AveDana St
Haste St
M.L.K. Jr Way
Site
Jobsite office Sproul hall
Truck Exit Route Truck Access Route
Offsite Concrete Truck Staging
LEGEND
Alternate Truck Exit Route
1751 Harbor Bay PkwyAlameda, CA 94502
Phone: (510) 748-1900Fax: (510) 748-7800
Sheet Title
Checked By:Drawn By:
Date:Date:
Job No.:
Rev.# Date Description
Revision Block
TR.001
I. Lytvynenko 01/04/2016
Truck Route
UC
Berk
eley
- St
iles H
all
Berk
eley
, CA
1751 Harbor Bay PkwyAlameda, CA 94502
Phone: (510) 748-1900Fax: (510) 748-7800
Sheet Title
Checked By:Drawn By:
Date:Date:
Job No.:
Rev.# Date Description
Revision Block
LP.001A
I. Lytvynenko 01/21/2016
Site Logistics Plan
UC
Berk
eley
- St
iles H
all
Berk
eley
, CA
��
��
��
���������
Gate 4
Fire
Lan
e
Gate 1
Gate 3Gate 2
Prop
osed
mid
bloc
k Si
dew
alk
Placing Boom 115' Radius
Placing Boom 115' Radius
Durant Avenue
Bancroft Way
Dan
a St
reet
Closed to trafficduring construction HRs
Powers lines are assumed to be relocated prior to construction
Tower Crane - Liebherr 281 H
C 197' Radius
DRAFT
No Bicycle traffic
For fire trucks
AC Transit Bus StopPrivate Bus Drop-off
Truck Staging during work hours
High voltage lines
LEGEND
Pedestrian canopy
Dual Man-lift
Truck ConcretePump
Concrete Truck
Debris Boxes
Staging Area
Flagger
Cone
8’ Fence20’ Gates
Truck Access RouteTruck Exit RouteAlternate Truck Exit Route
Concrete Pump Area
1751 Harbor Bay PkwyAlameda, CA 94502
Phone: (510) 748-1900Fax: (510) 748-7800
Sheet Title
Checked By:Drawn By:
Date:Date:
Job No.:
Rev.# Date Description
Revision Block
LP.001B
I. Lytvynenko 01/21/2016
Site Logistics Plan
UC
Berk
eley
- St
iles H
all
Berk
eley
, CA
��
��
��
���������
Fire
Lan
e
Gate 1
Gate 3Gate 2
Prop
osed
mid
bloc
k Si
dew
alk
Placing Boom 115' Radius
Placing Boom 115' Radius
Durant Avenue
Bancroft Way
Dan
a St
reet
Closed to trafficduring construction HRs
Powers lines are assumed to be relocated prior to construction
Tower Crane - Liebherr 281 H
C 197' Radius
DRAFT
No Bicycle traffic
For fire trucks
AC Transit Bus StopPrivate Bus Drop-off
Truck Staging during work hours
High voltage lines
LEGEND
Pedestrian canopy
Dual Man-lift
Truck ConcretePump
Concrete Truck
Debris Boxes
Staging Area
Flagger
Cone
8’ Fence20’ Gates
Truck Access RouteTruck Exit RouteAlternate Truck Exit Route
Concrete Pump Area
Gate 4