Anaerobic Process

Fats, proteins, polysaccharides

Step -1 Facultative & anaerobic bacteria: Very slow for grasses, agriculture residue

Fatty acids, amino acids, sugars

Step -2 Fermentation & beta Oxidation (Grow rapidly)

Simple Organic compounds-- short chain fatty acids, alcohols,

BOD converted to bacterial cells

Step- 3, Methanogenesis Strict Anaerobic Bacteria. Grow slowly (Intolerant to pH & Temp )

CH3COOH ---- CH4 + CO2

Page 4: UASB 2009
Page 5: UASB 2009

UASB Reactor

gas collector

biogasgas dome

inlet point

sludge blanket

sludge outlets

bafflesettlingzone

effluentgutter

deflector

biogas

inlet box

Page 6: UASB 2009
Page 7: UASB 2009

Granules

Page 8: UASB 2009

Removal Efficiencies

TSS 60-80%

BOD 60-70%

COD 60-70%

Page 9: UASB 2009

River Discharge Standards

TSS <50 mg/l

BOD <30 mg/l

Faecal Coliform <10,000 MPN/100 ml

Page 10: UASB 2009

DESIGN OF UASB REACTOR(Case Study of Karnal STP)

WASTWATER DATA USED

FLOW = 40 MLDBOD = 250 mg/LCOD = 400 mg/LTSS = 270 mg/LVSS = 70% of TSS = 189 mg/LInert SS = 270-189 = 81 mg/L

Page 11: UASB 2009

DESIGN PROCEDUREDesign Conditions:

Yield Coef. (Yobs) = 0.01 Kg SS/Kg BOD Upflow Velocity = 0.52-0.58 m3/m2/h or m/h Max Peak Upflow Velocity = 1.5 m/h HRT (Hydraulic Retention Time)= 8-12 Hrs. Height of the Reactor = 5.0 m Volumetric Loading = 0.8-1.2 Kg COD/m3/day Sludge Bed Concentration = 65 Kg TSS/m3 or 65000 mg/L

(Conc. 6.5 %)

Page 12: UASB 2009

No. of Reactors = 4 Nos.

Flow in each Reactor = 10 MLD = 10,000m3/d

= 416.67m3/hr

Peak Factor = 2.25

Peak Flow = 416.67 x 2.25

= 937.50 m3/h

Page 13: UASB 2009

Adopt Upflow Velocity = 0.54 m3/m2/h

Surface Area of the Reactor= 416.67/0.54

= 771.6 m2

Provide Reactor Size = 32 m x 24 m

Check for Peak Upflow

Velocity = 937.50/771.6

= 1.21 m/h < 1.5 m/h

Select Height of the Reactor

(to full-fill Sludge Bed & GLSS)= 5.0 m

Page 14: UASB 2009

Volume of the Reactor = 32 x 24 x 5.0= 3840 m3

Volumetric Loading = Q x COD/Vol.= 10,000 m3/d x 400 x10-3/

3840= 1.04 Kg COD/m3/d, OK

Calculated HRT = 3840/416.67= 9.21 hrs, OK.

Page 15: UASB 2009

Sludge Production

Considerations: A = Yield of biomass is 10 % of BOD degraded B = Fractions of VSS remain: (60 % VSS degraded) C = Inert solids (TSS-VSS) influent

Page 16: UASB 2009

Sludge Production

Expected BOD Removal Eff. = 70%Ash Content in TSS = 30%VSS Content = 70% of TSSNew VSS Produced in BOD rem. = 10% of BOD removed

= 0.1 x 0.7 x 250= 17 mg/L

Sludge Produced (A) = 40,000 x 0.017 kg/m3 = 680 Kg/d

Non-Degradable VSS = 40% VSS= 0.4 x 189= 75.6 mg/L

Sludge Produced (B) = 40,000 x 0.76 kg/m3 = 3024 Kg/d

Ash/Inert SS Received in flow = 30% TSS= 0.3 x 270= 81 mg/l

Sludge Produced (C) = 40,000 x 0.081 kg/m3 = 3240 Kg/d

Total Sludge Production = 680+3024+3240= 6944 kg/d

Page 17: UASB 2009

Methane Generation (COD basis)

Quantity of methane estimated from oxygen equivalent of methane gas.

CH4 + 2 O2 CO2 + 2 H2O. 16 g or 1 mole of CH4 equivalent to 64 g

COD. 1 g of COD = 1/64 mole of methane. 1 mole of methane = 22.4 liters of volume. 1 g COD = 22.4/64 = 0.35 Liters CH4

Page 18: UASB 2009

Energy/Electricity Production

Energy Equivalent of methane 33810 kJ/m3 of methane COD removed 11200 kg/d (70 %) Methane generated = 0.35 x 11200 = 3920 m3/d Energy produced = 3920 m3/d x 33810 kJ/m3 = 1533 KJ/s Theoretical Electricity produced = 1533 KW Efficiency of generator = 10 % - 20 % (generally 10 %) Actual Electricity Produced: 3679 kW-h/d

Page 19: UASB 2009

-Low Energy Consumption-Good removal Efficiencies-Generation of Methane Gas (Energy Recovery)-Small Land Area Requirements-Low Surplus Sludge Production-N,P,K Conc. Are Retained in Treated Eff.-Simple Construction, Operation & Maintenance

Salient Features of UASB Technology

Page 20: UASB 2009

Post-Treatment Options

Final Polishing Ponds Aerated Lagoons Combination of Aerated Lagoon & Ponds Down Hanging Sponged Media System

Page 21: UASB 2009

Final Polishing Ponds (FPP)

Aerobic Ponds having not less than 1 day HRT Water Depth 1.5 m Large area requirements Max. Removal Eff. 50% for TSS, 60 % for Total BOD Algal Growth Sludge Accumulation (desludging is required) No Feacal Coliform removal is expected

Page 22: UASB 2009

View of FPP

Page 23: UASB 2009
Page 24: UASB 2009

Facultative Aerated Lagoon (FAL)

Power is Required for Aerators Water Depth 3.0 to 3.5m Settling Tank is required (Solids-Liquid) Moderate HRT (12 hrs) No Feacal Coliform Removal is expected

Page 25: UASB 2009

View showing FAL