u-remote Commissioning Weidmüller ENERGY METER 700-PN …

22
u-remote Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens 1200 PLC and TIA Portal V14 Ordering data: 2500890000

Transcript of u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Page 1: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

u-remote

Commissioning Weidmüller ENERGY METER 700-PN-230 with

Siemens 1200 PLC and TIA Portal V14

Ordering data: 2500890000

Page 2: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

2

Revisions

Version Date Changes

01 04.2018 First edition

Contact

Weidmüller Interface GmbH & Co. KG

Klingenbergstraße 16

32758 Detmold, Germany

Phone +49 5231 14-0

Fax +49 5231 14-292083

[email protected]

www.weidmueller.com

Page 3: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

3

Contents

1. Disclaimer 4

2. Warning 4

3. Note 4

4. Security notes 5

5. Preamble 5

6. Downloading and installing the required files (GSDML) 6

7. Creating a new project with Siemens TIA-Portal V14 9

8. Add Parameters to the watch_table 17

Page 4: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

4

1. Disclaimer

This Application Note does not relieve you of the obligation to handle it safely during

use, installation, operation and maintenance. Each user is responsible for the correct

operation of his control system. By using this program application note prepared by

Weidmüller, you accept that Weidmüller cannot be held liable for any damage to

property and / or personal injury that may occur because of the use.

2. Warning

Controls may fail in unsafe operating conditions, causing uncontrolled operation of the

controlled devices. Such hazardous events can result in death and / or serious injury

and / or property damage. Therefore, there must be provide safety equipment/ electri-

cal safety design or other redundant safety features that are independent from the au-

tomation system.

3. Note

The application examples do not represent customer-specific solutions, they are

simply intended to help for typical tasks. The user is responsible for the proper opera-

tion of the described products. This application example does not relieve you of the

obligation of safe use, installation, operation and maintenance.

Application examples are not binding and do not claim to be complete in terms of con-

figuration as well as any contingencies. By using this Application Example, you

acknowledge that we cannot be held liable for any damages beyond the described li-

ability regime. We reserve the right to make changes to this sample application at any

time without notice. In case of discrepancies between the proposals in the application

example and other Weidmueller publications, like manuals, such contents always

have more priority to the examples.

We assume no liability for the information contained in this document.

Our liability, for whatever legal reason, for damages caused by the use of the exam-

ples, instructions, programs, project planning and performance data, etc. described in

this application example is excluded.

Page 5: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

5

4. Security notes

In order to protect equipment, systems, machines and networks against cyber threats,

it is necessary to implement (and maintain) a complete state-of-the-art industrial se-

curity concept. The customer is responsible for preventing unauthorized access to his

equipment, systems, machines and networks. Systems, machines and components

should only be connected to the corporate network or the Internet if necessary and

appropriate safeguards (such as firewalls and network segmentation) have been tak-

en.

5. Preamble

This document is a quick start-up guideline for the Weidmueller ENERGY METER

700-PN-230.

It is written for planers, programmers and service-personal.

Page 6: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

6

6. Downloading and installing the required files

(GSDML)

1. Follow the link to the Weidmueller Website.

http://catalog.weidmueller.com/catalog/Start.do?localeId=de&ObjectID=2500890000

2. Download the marked files.

3. You need the GSDML file for your Siemens TIA V14 engineering tool. With this

file you can make a device configuration as shown in chapter 7.

4. Start TIA Portal V14 from the desktop.

Page 7: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

7

5. Go to the “Project view” Window.

6. Open the Options tab and start the “Manage general station description files

(GSD)”.

Page 8: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

8

7. Choose the downloaded GSDML file and click “Install”. This takes a few moments.

Page 9: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

9

7. Creating a new project with Siemens TIA-Portal V14

1. Go to the Portal view.

2. Choose “create new project”.

3. Label the project with a name, for example “Test” and click “Create”.

Page 10: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

10

4. Configure a device. Click “Configure a device”.

5. “Add new device” and choose the CPU. Take care you select the correct version.

Page 11: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

11

6. Device configuration and Ethernet settings.

1. Go to “Device configuration”.

2. Go to “PROFINET interface [X1]”.

Check if all components are in the same Subnet as your PC.

3. Check if your CPU PROFINET device name is correct (plc_1).

Page 12: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

12

7. Add an ENERGY-METER 700-PN-230.

1. Go to “Devices & networks” (Double-click on it).

2. Open Catalog and choose ENERGY-METER 700-PN-230.

3. Paste it next to the CPU (Double-click on “EM700-PN”).

8. Connecting the Energy Meter with the CPU.

1. Draw the line (green) from Port to Port. Click therefore on the first green

Port hold the left mouse button till the second green Port from your Energy

Meter.

2. Make sure that the Coupler is networked with PLC_1.

Page 13: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

13

9. Download the settings to the device.

1. Click on PLC_1 [CPU_1212FC_DC/DC/DC]

2. Download settings to device.

3. Start searching for devices.

4. Select the CPU.

5. Click “Load” to load the settings into the CPU.

Page 14: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

14

6. Click on “Continue without synchronization”.

7. “Load” the settings.

8. Click “Finish” to close the window.

Page 15: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

15

10. Assign PROFINET device name.

1. Select EM700-PN. (Double-click on it)

2. Go to Online & diagnostics with right mouse button.

3. Functions -> Assign PROFINET device name

4. Update list.

5. Click “Assign name” to give correct device name to the Energy Meter.

Page 16: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

16

11. Settings of the ENERGY METER 700-PN-230.

1. Go to “Devices & networks” (Double-click on it.)

2. Double-click 2 times on the EM700-PN.

3. Go to “PROFINET interface [X1]”.

4. Energy Meter needs the same Subnet as the CPU.

5. The device name must be adapted to the existing name.

6. Click on “PLC_1[CPU 1212FC DC/DC/DC]”.

7. Compile it now.

8. Download all settings to the device.

Click on “Load” in the next window and close it with “Finish” finally.

Page 17: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

17

8. Add Parameters to the watch_table

1. Open Catalog/Module and choose for example parameter “Frequency”.

Double-click to add it to your device.

2. Go to “IO tags”.

3. Name the Parameter definitely.

4. Double-click on “Default tag table [38]”.

5. Choose Data type “Real” for the Frequency.

Page 18: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

18

6. Double click on “Add new watch table”.

7. Search for the parameter name.

8. Click on “Hardware (rebuild all)”.

Page 19: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

19

9. Click on “Software (rebuild all)”.

10. Click on “Hardware configuration”.

Page 20: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

20

11. Download settings to the device.

1. Use “PN/IE_1” for the Connection to interface/subnet.

2. Click “Start search”.

3. Select your current CPU.

4. Click “Load” to load the settings into the CPU.

5. “Load” the settings.

6. Click “Finish” to close the window.

Page 21: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

21

12. Download the Software to the device.

1. Click “Load” to load the Software.

2. Click “Finish” to close the window.

Page 22: u-remote Commissioning Weidmüller ENERGY METER 700-PN …

Commissioning Weidmüller ENERGY METER 700-PN-230 with Siemens TIA V14

22

13. Set CPU to RUN mode.

1. Click “Go online”.

2. Start the CPU.

3. Accept the run with “OK”.

14. Watch the parameter value.

1. Double-click “Watch_table_1”.

2. Click “Monitor all” to see current value in the orange box.