85
The Arroyo Group The Mobility Group Stanley R Hoffman Associates Waronzof Associates EPT DESIGN JMC 2 Katherine Padilla and Associates May 7, 2013 CITY OF SOUTH GATE Tweedy Boulevard Specific Plan November 22, 2014

Transcript of Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background...

Page 1: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

The Arroyo Group The Mobility Group

Stanley R Hoffman Associates Waronzof Associates

EPT DESIGN JMC2

Katherine Padilla and Associates

May 7, 2013

CITY OF SOUTH GATE

Tweedy Boulevard Specific Plan

November 22, 2014

Page 2: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

SPECIFIC PLAN AREA

Page 3: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Specific Plan Area

Page 4: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

BACKGROUND AND PURPOSE

Page 5: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

“main street’ in the City of South Gate in the 1950-60’s. Over the succeeding decades, with the development of other retail

areas and the closure of major employment centers within the city, Tweedy Boulevard has been in decline.

The City established the revitalization of Tweedy Boulevard as a priority in its 2035 General Plan.

Page 6: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

What’s a Specific Plan?

Long-term vision, priorities and rules for the public environment as well as future development

Private development – What types of housing, businesses, and public facilities should be

allowed and where? – Design standards and guidelines for existing and future buildings

Public realm – Circulation network improvements (cars, bicycles, transit, etc.) – Infrastructure improvements – Pedestrian improvements (sidewalk, landscaping etc.) – How to finance and implement the vision

Page 7: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Project Schedule September 2014 Existing Conditions and Opportunities

and Constraints November 2014 Preliminary Land Use and Design Plan Spring/Summer 2015 Public Review Draft Specific Plan Summer/Fall 2015 Public Hearings Fall 2015 Final Specific Plan

Page 8: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Community Feedback to date

General agreement that long range planning for Tweedy Boulevard offers a prime opportunity for Tweedy to once again become the “heart” of South Gate.

Desired types of land uses along Tweedy Mile: – More choices for restaurants and retail, unique stores, local and smaller uses,

farmers market (at a more convenient time), banquet hall, art galleries, live events, entertainment and recreation uses for the younger population

Urban Design Issues: – Better connections between the west end and the rest of the Blvd. – More street trees; better landscaping, street lighting and streetscape amenities – Connection to the Los Angeles River – Improved street maintenance and cleanliness

Page 9: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Community Feedback to date Private Development Issues:

– Improvements to building facades – Need for affordable housing and assisted living uses – Consider mixed uses in selected areas along the Blvd.

Traffic Issues: – High vehicular speeds along Tweedy Blvd. – Hard to make left turns on Tweedy Blvd. – Difficult to ride a bike

Parking Issues: – Lack of time limit, use of parking by employees, insufficient supply for shoppers – Visibility and safe access to off-site parking lots – Need better signage to off-site parking lots – Need a holistic look at parking

Page 10: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

PRELIMINARY LAND USE PLAN

Page 11: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

v

“Main Street” Pedestrian focused retail

and environment

Transition Zones (Retail, Residential,

Offices)

Services / Businesses / Residential

Multi-Family Residential

Atlantic Corridor - Mixed Use /

Business / Light Industrial / R &D /

Incubator Uses

Educational Uses

Page 12: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

PRELIMINARY LAND USE PLAN – TWEEDY MILE

Page 13: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

v

“Main Street” Pedestrian focused retail

and environment

Page 14: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Tweedy Mile Subarea – Elizabeth to Hunt

Preserve and build upon existing retail Maintain the walkability of small scale, pedestrian-oriented retail uses on

ground floor Continue buildings at edge of sidewalk forming a continuous street wall

Page 15: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Tweedy Mile Subarea – Elizabeth to Hunt

Office, medical and/or residential uses allowed on upper floors Parking primarily to the rear of the properties Pedestrian access to parking through mid-block walkways and/or secondary

entrances

Page 16: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Tweedy Mile – Existing Land Uses

Page 17: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Tweedy Mile - “Main Street”

Page 18: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Before

After

Page 19: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Before

After

Page 20: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Tweedy Mile - “Main Street”

Page 21: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

PRELIMINARY LAND USE PLAN – TWEEDY WEST

Page 22: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

v Transition Zone

(Retail, Residential, Offices)

Services / Businesses / Residential

Page 23: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Tweedy West – Stanford to Elizabeth

Transition to less intense retail uses westward from Tweedy Mile

Focus on mixed uses Retail, office, medical

and/or residential uses allowed on all floors

Buildings primarily built at edge of sidewalk or pushed back to provide space for gathering places such as plazas

Page 24: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Tweedy West – Stanford to Elizabeth

Page 25: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Tweedy West – Alameda to Stanford

Service uses, business and employment uses, and residential uses

Accommodate existing uses Allow for higher-density

residential uses

Page 26: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Tweedy West – Alameda to Stanford

Page 27: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

PRELIMINARY LAND USE PLAN – TWEEDY EAST

Page 28: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

v

Multi-Family Residential

Atlantic Corridor: Mixed Use /

Business / Light Industrial / R &D /

Incubator Uses

Educational Uses

Page 29: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Tweedy East Subarea–Hunt to Pinehurst

Build on existing residential uses

Focus on medium density residential uses along Tweedy, adjacent to and across from South Gate Park

Stoops, porches, setbacks to ensure privacy

Page 30: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Tweedy East – Residential

Page 31: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Tweedy East–Atlantic Corridor

Atlantic Corridor (west): – Mixed Uses - Retail and

residential uses Atlantic Corridor (east):

– Mixed Uses - Retail, light industrial uses, incubator, R&D uses

Page 32: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Tweedy East–Atlantic Corridor

Page 33: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Tweedy East–Atlantic Corridor

Page 34: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Tweedy East Subarea–Atlantic to LA River

Educational uses

Page 35: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

PRELIMINARY MOBILITY PLAN – TWEEDY MILE

Page 36: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Mobility Goals

Tweedy Boulevard as a Community Street

A Complete Street with convenient access from the neighborhoods Walkable Bikable Good transit access Convenient parking

A street with a good walking and biking environment

Calm traffic on Tweedy

Page 37: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

How Can We Improve the Tweedy Street Environment ?

Tweedy Mile carries 26,000 ADT Has 9’ sidewalks

Great streets are defined more by the sidewalk environment than

the number of traffic lanes or traffic volumes.

Page 38: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

How Can We Improve the Tweedy Street Environment ?

Key issue on Tweedy Mile is the 9’ sidewalks.

A lot of pedestrian infrastructure is already in place between State and Hunt: 20 intersections (every 300’) 10 traffic signals (every 600’) 10 unsignalized intersections 20 crosswalks (every 300’) 14 blocks with mid-block curb extensions 12 intersections with curb extensions

But ineffective – not substantial enough to calm traffic or enhance

pedestrian environment.

Page 39: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Existing – Four Lanes

Page 40: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Existing Tweedy Street Environment

Page 41: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Existing Tweedy Street Environment

Page 42: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Option 1 – Retain Four Lane Street

Many examples of successful four lane streets in Southern California

Some over 30,000 ADT Most have 12 – 15’ sidewalks A few have 10’ sidewalks.

East 2nd Street, Long Beach Colorado Boulevard, Old Pasadena Coast Highway, Laguna Beach Whittier Boulevard, East Los Angeles

Page 43: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

4L Example: East 2nd Street, Belmont Shores

Page 44: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

4L Example: Colorado Boulevard, Old Pasadena

Page 45: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

4L Example: Coast Highway, Laguna Beach

Page 46: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

4L Example: Santa Monica Blvd., West Hollywood

Page 47: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

4L Example: Whittier Boulevard, East Los Angeles

Page 48: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Option 2 – Road Diet, 3 Lanes, Add Bike Lanes

In City’s Bicycle Plan Provides 6’ Bike Lanes Retains Parking Retains 9’ sidewalks – does not improve Not recommended

Page 49: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Option 2 – Road Diet, 3 Lanes, Add Bike Lanes

Page 50: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Option 3 – Road Diet, 3 Lanes, Widen Sidewalks

No Bike Lanes Retains Parking Provides 15’ sidewalks

Page 51: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Option 3 – Road Diet, 3 Lanes, Widen Sidewalks

Page 52: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

2 Lane Examples

Examples of two-lane streets:

Generally less than 17,500 ADT Typically in 9,000 to 15,000 ADT range Typically 12 – 15’ sidewalks A few have 10’ sidewalks A few have >15’ sidewalks

Greenleaf Avenue, Whittier Glassell Avenue, Orange Larchmont Boulevard, Los Angeles

Page 53: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

2L Example: Greenleaf Avenue, Whittier

Page 54: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

2L Example: Glassell Avenue, Orange

Page 55: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

2L Example: Larchmont Boulevard, Los Angeles

Page 56: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Team Recommendation

A road diet is not necessarily the right solution Volumes on Tweedy are at high end of range for road diets. Potential impacts on adjacent residential streets from diverted traffic.

Widening sidewalks for over a mile of street is a major project – cost and implementation issues.

Recommending a “hybrid alternative” to focus on enhancing the pedestrian

environment.

Page 57: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Team Recommendation – Hybrid Solution

The “hybrid solution”

Retain 4 Lanes Install Bike Route (Sharrows, not Bike Lane) Extend depth and length of mid-block bulbouts (three times current length) Extend depth of intersection bulbouts at intersections Widen and replace all paved crosswalks with more visible crossing treatments. Add pedestrian countdowns at traffic signals Time and sign traffic signals for 25mph progression

Improves sidewalk environment to 15’ in many places Calms traffic Can be implemented incrementally Does not preclude road diet in future.

Page 58: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Proposed Hybrid Solution

Page 59: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Sidewalk Extensions

Page 60: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Sidewalk Extensions

Page 61: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Sidewalk Extensions

Page 62: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Santa Monica Boulevard, West Hollywood

Page 63: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Sharrow Bike Route

Page 64: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Parking

Improve utilization and efficiency of “rear lot” parking Improve alleys Improve lighting in lots Restripe where feasible for greater efficiency

Improve access to rear lot parking

Add mid-block access corridors and plazas Add sidewalk bulb-outs on north-south streets

Allow shared parking. Allow parking requirements to be met within 1,000 ft.

Consolidate operations of parking lots in Community District?

Add new lots as sites available and demand warrants

Page 65: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Tweedy Mile – Alleys and City-owned Parking

Page 66: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Tweedy Mile – Alleys and City-owned Parking

Page 67: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Alley Walkway Network

Page 68: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Mid-Block Parking Access with Plaza

Page 69: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

PRELIMINARY BICYCLE PLAN

Page 70: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Bicycles

Implement bicycle network in City Bicycle Plan, with some modifications

Bike Route not Bike Lanes on Tweedy

Bike Boulevards on Missouri and Michigan

Bike facilities on north-south streets per Bicycle Plan or modified.

Page 71: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original
Page 72: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

PRELIMINARY TRANSIT PLAN

Page 73: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Transit

The Tweedy Shuttle From LA River to Alameda Street

Ties together numerous destinations and activity nodes along the

corridor.

Page 74: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original
Page 75: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

PRELIMINARY STREETSCAPE PLAN

Page 76: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Streetscape Improvements - Goals Improve pedestrian safety Enhance pedestrian environment Enhance neighborhood identity Improve neighborhood and school connectivity Improve storm water retention Contribute to increased economic activity

Page 77: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

v

Page 78: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Streetscape Improvements Improved crosswalk visibility Warning light systems (where necessary) Curb bulb-outs Street trees Streetscape amenities – lighting, benches, trash cans Wayfinding and signage system Planting areas along street edge

Page 79: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Improved Crosswalk visibility

Existing

Page 80: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Street Trees

Page 81: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Streetscape Amenities

Page 82: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Planting areas along the street edge

Page 83: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Signage and Wayfinding System

Page 84: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

Implementation

New image for Tweedy based on urban design opportunities.

Potential to obtain grants for pedestrian network improvements.

Signage and banners – early phase public improvements can help create the desired image of the area.

Art fairs and music events/community gatherings in public spaces to introduce the desired image of the area.

Marketing and developer/tenant solicitation.

Opportunities to prioritize catalytic sites and public improvements.

Zoning incentives for private assembly of development sites.

Page 85: Tweedy Boulevard Specific Plantweedy.arroyogroup.com/wp-content/uploads/2014/12/... · Background and Purpose Tweedy Boulevard, especially the Tweedy Mile section, was the original

For More Information

Please visit our project website:

www.cityofsouthgate.org

Click on the Tweedy Boulevard Specific Plan Link