Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals...

130
Tutorial | Project Close & Delivery IT METHODOLOGY WEBINAR

Transcript of Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals...

Page 1: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Tutorial | Project Close & Delivery

IT METHODOLOGY WEBINAR

Page 2: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Things to know…

▪ All participants will be on mute

▪ Questions are welcome

▪ Ask questions in the question box

▪ We DO NOT send out PDU certificates

▪ May be valid for PDU credit (self-report session)

▪ For more information check out article on Webinars and PDUs

Page 3: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

© 2017 Project Insight | www.projectinsight.com

Alexa Ortega-Mendoza

Project InsightMarketing Assistant

[email protected]

www.projectinsight.net

Moderator

Page 4: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

© 2017 Project Insight | www.projectinsight.com

Project Insight

Work Better Together™ with Project Insight!

▪ Request FREE DEMO: www.projectinsight.net/trial

▪ Sign up for PI#team for FREE! www.projectinsight.net/team

Our PI#pros are here for you!

▪ +1 (949) 476-6499 x3

[email protected]

Page 5: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

© 2017 Project Insight | www.projectinsight.com

Cameron Watson

President, QAIassist

[email protected]

www.qaiassist.com

Presenter

Page 6: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

I am a Project Manager

I am a Business or Operational Manager

I am a software developer or software tester

I am a member of an organizational PMO, governance or quality

assurance function

I want a better understanding of IT Methodology

Who’s on the call?

Page 7: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Established 2007 – Ottawa, Canada

Nurturing organizational efficiency through IT Methodology knowledge & expertise

Support and promote a community with evolving IT Methodology knowledge and expertise

Maintain, optimize, promote and support the delivery of IT methodology products and

lifecycles proven to increase operational performance

Administration and oversight of QAIassist Integrated Methodology (QAIassist-IM) and formal

certifications – “Foundation” & “Practitioner”

Support practitioners and authorized affiliates in acquiring and delivering IT Methodology

knowledge and expertise

Who is QAIassist?

Page 8: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Nurturing efficiency through IT Methodology knowledge & expertise across the globe

▪ Over 200 countries

▪ Wide array of industries (manufacturing, banking, health, insurance, consulting)

▪ More than 50 unique webinars

Over 10,000 webinar registrants

▪ Executives

▪ Operational & Delivery Managers

▪ Project Managers

▪ Business Analysts and Architects

▪ Application Developers & Testers

▪ Corporate PMO, Quality Assurance, Continuous Improvement

▪ Consultants

IT Methodology Webinar Audience

Page 9: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Share IT Methodology knowledge

Develop IT methodology understanding &

expertise

Provide additional insight into several IT (project

management, software development, software

testing) methodologies

Discuss best practices on incorporating an

organizational IT methodology

Promote ongoing dialog and feedback with

webinar audience (questions, email, survey)

QAIassist 2017 Series - Goals

Page 10: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

The 3rd Wednesday of Every Month

▪ 8:00 am Pacific - 11:00 am Eastern Time

IT Methodology Concepts (60 mins)

▪ This series of six webinars will be presented on a bi-monthly basis. Each webinar will provide you with a context, overview, terminology and general understanding of information technology (IT) methodology.

IT Methodology – Tutorials (45 mins)

▪ This series of five webinars will be presented on a bi-monthly basis. Each session is designed to offer a more “hands on” perspective – bridging the concepts into a practical utilization.

2017 Schedule

Page 11: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Tutorial V- Project Close & DeliveryGoals

Understand previously delivered tutorials (Feb, Apr, Jun, Aug)

Discuss Project CloseOut objectives

Identify Project CloseOut roles

Review Project CloseOut deliverable

Page 12: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 13: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 14: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Terms, Terms and more Terms

IT Framework, IT Methodology, IT Lifecycle

▪ Non Standard usage in terminology

▪ Terms are used interchangeably between organizations and across the IT industry

▪ Examples include

• Project Management Methodology/Lifecycle/Framework

• Software Development Methodology/Lifecycle (SDLC)/Framework

• Software Testing Methodology/Lifecycle/Framework

▪ Every IT organization is using an IT Methodology or IT Lifecycle or IT Framework

Page 15: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology – Map & Journey

Methodologies/Lifecycles - “noun”

▪ The roadmap

▪ Rational Unified Process (RUP),

QAIassist (IM) , PMI, Prince2

Methodologies/Lifecycles - “verb”

▪ The journey taken along the road

▪ Waterfall, Spiral, Agile, RAD ,

Prototyping, etc

Page 16: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology/Lifecycle - Noun

All Methodologies/Lifecycles (RUP, QAIassist-IM, PMI, Prince2) define, utilize and

rely on their own pre-defined structure, naming conventions, and terminology

Hierarchy/Structure

▪ Methodology/Lifecycle (ie Project Management, Software Development , Software Testing)

▪ Phase/Stage (ie Initiate, Planning, Design, Closeout)

▪ Deliverable/Artifact/Work Product (ie Project Charter, Testing Strategy)

▪ Activity (tasks performed to complete deliverables, artifacts, work products)

Page 17: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

“Deliverable/Artifact/Work Product”versus “Activity”

Building an IT Application

Deliverable (Artifact, Work Product)

▪ Business Case

▪ Project Plan

▪ User Acceptance Test Plan

Activity (non-Deliverable, non-Artifact, non Work Product)

▪ Reviewing business need with Operational Management, Business Analysts and End-Users

▪ Meeting with Stakeholders to acquire approval of Project Plan

▪ Discussing User Acceptance Testing objectives and priorities with testing team

Page 18: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

“Deliverable/Artifact/Work Product”Attributes

Tangible (pre-defined informational requirements)

▪ can be identified and defined (resource, completion dates, cost) on Project Schedule

▪ can be assigned (populating information requirements) to project team member(s)

▪ can be referenced by project team members to support creation of other deliverables

▪ can be formally reviewed and officially authorized

▪ will alter in status (authored, reviewed, approved, archived, referenced) throughout life of project

▪ Project Schedule used to reflect evolving deliverable status/progress (risks, issues, percentage complete)

▪ can be placed under formal configuration management – re: with evolving status

▪ can be accessed for future reference (application support and maintenance)

Page 19: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 20: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut
Page 21: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut
Page 22: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut
Page 23: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Methodology/Lifecycle - Verb

“Waterfall” Methodology/Lifecycle

▪ a single iteration through the methodology/lifecycle (noun)

▪ deliverables/artifacts defined, assigned, and documented

▪ formal structure required

“Agile” Methodology/Lifecycle

▪ more than a single iteration through a methodology/lifecycle (noun)

▪ limited deliverable creation

▪ formal structure not required

Page 24: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 25: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 26: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 27: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 28: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 29: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 30: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 31: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 32: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 33: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 34: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 35: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Tutorial Context – Sample Project

ABC Company (mid sized)

Strategic Direction - incorporate outsourcing option into existing operations

Existing Accounting Application functionality does not

▪ meet evolving regulatory legislation (for outsourcing)

▪ deliver functionality necessary to administer outsourcing & vendor relations

▪ provide stability (up time) to the business users

▪ allow for expansion

Project Name – “ Extended Accounting System (EAS)”

Page 36: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Tutorial Context – Resource Availability

▪ System Owner

▪ Stakeholders

▪ Business/Line Managers

▪ Project Manager

▪ Business Analysts

▪ Architects (Functional/Technical)

▪ Programmers

▪ Testers

▪ End Users

Page 37: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 38: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 39: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology - Context, overview, review

Tutorial Context - Sample Project Definition

Project Initiation - Identifying the Business Need

Project Initiation - Initiate Project Management Lifecycle

Project Initiation - Initiate Software Development Lifecycle

Project Initiation - Initiate Software Testing Lifecycle

Recap

Applying IT Methodology to Project Initiation (Feb)Tutorial I- Agenda

Page 40: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Applying IT Methodology to Project Initiation (Feb)Tutorial I- Deliverables

Project Management Lifecycle Deliverables

▪ Project Charter

▪ Roles & Responsibilities

Software Development Lifecycle Deliverables

▪ Business Case

▪ Detailed Business Requirements

Software Testing Lifecycle Deliverables

▪ Testing Strategy

Page 41: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 42: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 43: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Project Planning & Design with IT in Mind (Apr) Tutorial II – Agenda

IT Methodology Context - (noun/verb), hierarchy, depictions, concept of deliverable

Tutorial Context – review Sample Project Definition & Previous Tutorial (Feb 2017)

Project Management Lifecycle – Plan Phase

▪ Understand project context (previously created project deliverables)

▪ Analyze/Align project scope and objectives with methodology (noun and verb) to be utilized

▪ Create initial draft for required Project Plan Phase deliverables

▪ Prepare required/potential/additional project management deliverables

Recap

Page 44: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 45: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 46: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 47: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Project Planning & Design with IT in Mind (Apr) Tutorial II – Deliverables

Project Management Lifecycle Deliverables

▪ Project Plan

▪ Project Schedule (WBS)

▪ Roles & Responsibilities

▪ Project Deliverables

▪ Configuration Management Plan

▪ Quality Assurance Plan

▪ Project Procedures

Page 48: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Project Planning & Design with IT in Mind (Apr) Tutorial II – “Potential” Deliverables

Potential/Associated Project Management Lifecycle Deliverables

▪ Issue & Issue Log NA

▪ Risk & Risk Log NA

▪ Change Request & Change Request Log NA

▪ Project Status Report NA

▪ Team Status Report NA

▪ Unit Test Defect Log NA

▪ System Integration Test Defect Log NA

▪ User Acceptance Test Defect Log NA

Page 49: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 50: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 51: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - (noun/verb), hierarchy, depictions, concept of deliverable

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun 2017)

“Hiccup-Less” Project – Dependencies, Dynamics and Deliverables

▪ Scope of Requirements (Conceptual)

▪ Requirements Definition

▪ Requirements Identification & Traceability

▪ Requirements Definition – mandatory pre-requisite for creation of all Testing Plans and Testing Evaluation Criteria (User Acceptance Testing, System Integration Testing, Unit Testing)

▪ Testing Execution (User Acceptance, System Integration, Unit Testing) and Authorizations

Recap

Tutorial III - Executing Projects with IT Methodologies Agenda (June)

Page 52: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 53: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 54: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 55: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 56: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 57: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 58: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 59: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 60: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 61: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - (noun/verb), hierarchy, depictions, concept of deliverable

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun 2017)

“Hiccup-Less” Project – Dependencies, Dynamics and Deliverables

▪ Scope of Requirements (Conceptual)

▪ Requirements Definition

▪ Requirements Identification & Traceability

▪ Requirements Definition – mandatory pre-requisite for creation of all Testing Plans and Testing Evaluation Criteria (User Acceptance Testing, System Integration Testing, Unit Testing)

▪ Testing Execution (User Acceptance, System Integration, Unit Testing) and Authorizations

Recap

Tutorial III - Executing Projects with IT Methodologies Agenda (June)

Page 62: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - (noun/verb), hierarchy, depictions, concept of deliverable

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun 2017)

“Hiccup-Less” Project – Dependencies, Dynamics and Deliverables

▪ Scope of Requirements (Conceptual)

▪ Requirements Definition

▪ Requirements Identification & Traceability

▪ Requirements Definition – mandatory pre-requisite for creation of all Testing Plans and Testing Evaluation Criteria (User Acceptance Testing, System Integration Testing, Unit Testing)

▪ Testing Execution (User Acceptance, System Integration, Unit Testing) and Authorizations

Recap

Tutorial III - Executing Projects with IT Methodologies Agenda (June)

Page 63: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - (noun/verb), hierarchy, depictions, concept of deliverable

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun 2017)

“Hiccup-Less” Project – Dependencies, Dynamics and Deliverables

▪ Scope of Requirements (Conceptual)

▪ Requirements Definition

▪ Requirements Identification & Traceability

▪ Requirements Definition – mandatory pre-requisite for creation of all Testing Plans and Testing Evaluation Criteria (User Acceptance Testing, System Integration Testing, Unit Testing)

▪ Testing Execution (User Acceptance, System Integration, Unit Testing) and Authorizations

Recap

Tutorial III - Executing Projects with IT Methodologies Agenda (June)

Page 64: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - (noun/verb), hierarchy, depictions, concept of deliverable

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun 2017)

“Hiccup-Less” Project – Dependencies, Dynamics and Deliverables

▪ Scope of Requirements (Conceptual)

▪ Requirements Definition

▪ Requirements Identification & Traceability

▪ Requirements Definition – mandatory pre-requisite for creation of all Testing Plans and Testing Evaluation Criteria (User Acceptance Testing, System Integration Testing, Unit Testing)

▪ Testing Execution (User Acceptance, System Integration, Unit Testing) and Authorizations

Recap

Tutorial III - Executing Projects with IT Methodologies Agenda (June)

Page 65: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - (noun/verb), hierarchy, depictions, concept of deliverable

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun 2017)

“Hiccup-Less” Project – Dependencies, Dynamics and Deliverables

▪ Scope of Requirements (Conceptual)

▪ Requirements Definition

▪ Requirements Identification & Traceability

▪ Requirements Definition – mandatory pre-requisite for creation of all Testing Plans and Testing Evaluation Criteria (User Acceptance Testing, System Integration Testing, Unit Testing)

▪ Testing Execution (User Acceptance, System Integration, Unit Testing) and Authorizations

Recap

Tutorial III - Executing Projects with IT Methodologies Agenda (June)

Page 66: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Project Planning & Design with IT in Mind (Apr) Tutorial II – Deliverables

Project Management Lifecycle Deliverables

▪ Project Plan

▪ Project Schedule (WBS)

▪ Roles & Responsibilities

▪ Project Deliverables

▪ Configuration Management Plan

▪ Quality Assurance Plan

▪ Project Procedures

Page 67: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Project Planning & Design with IT in Mind (Apr) Tutorial II – “Potential” Deliverables

Potential/Associated Project Management Lifecycle Deliverables

▪ Issue & Issue Log

▪ Risk & Risk Log

▪ Change Request & Change Request Log

▪ Project Status Report

▪ Team Status Report

▪ Unit Test Defect Log

▪ System Integration Test Defect Log

▪ User Acceptance Test Defect Log

Page 68: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 69: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 70: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - (noun/verb), hierarchy, depictions, concept of deliverable

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun 2017)

“Hiccup Filled” Project – Dependencies, Dynamics and Deliverables

▪ Issue & Issue Log

▪ Risk & Risk Log

▪ Change Request & Change Request Log

▪ Status Reporting

▪ Testing Defects & Authorizations (Unit, System Integration, User Acceptance)

Recap

Tutorial IV – Project Control & Verification Agenda

Page 71: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 72: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 73: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 74: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 75: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 76: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 77: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 78: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 79: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 80: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Project Planning & Design with IT in Mind (Apr) Tutorial II – “Potential” Deliverables

Potential/Associated Project Management Lifecycle Deliverables

▪ Issue & Issue Log

▪ Risk & Risk Log

▪ Change Request & Change Request Log

▪ Project Status Report

▪ Team Status Report

▪ Unit Test Defect Log

▪ System Integration Test Defect Log

▪ User Acceptance Test Defect Log

Page 81: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Project Planning & Design with IT in Mind (Apr) Tutorial II – Deliverables

Project Management Lifecycle Deliverables

▪ Project Plan

▪ Project Schedule (WBS)

▪ Roles & Responsibilities

▪ Project Deliverables

▪ Configuration Management Plan

▪ Quality Assurance Plan

▪ Project Procedures

Page 82: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 83: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 84: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 85: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Project Close Out

Objectives

▪ ensure all planned project deliverables (work products/artifacts) are completed,

have received proper authorization, and are available for future reference

▪ prepare a Project Closeout Report that provides a summary of the project, how it

was performed, the positives, recommendations on how the project could be

improved upon (aim is to help other project teams in the future)

Iterations

▪ iterative within itself

Page 86: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 87: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 88: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

“Deliverable/Artifact/Work Product”Attributes

Tangible (pre-defined informational requirements)

▪ can be identified and defined (resource, completion dates, cost) on Project Schedule

▪ can be assigned (populating information requirements) to project team member(s)

▪ can be referenced by project team members to support creation of other deliverables

▪ can be formally reviewed and officially authorized

▪ will alter in status (authored, reviewed, approved, archived, referenced) throughout life of project

▪ Project Schedule used to reflect evolving deliverable status/progress (risks, issues, percentage complete)

▪ can be placed under formal configuration management – re: with evolving status

▪ can be accessed for future reference (application support and maintenance)

Page 89: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

“Deliverable/Artifact/Work Product”Attributes

Tangible (pre-defined informational requirements)

▪ can be identified and defined (resource, completion dates, cost) on Project Schedule

▪ can be assigned (populating information requirements) to project team member(s)

▪ can be referenced by project team members to support creation of other deliverables

▪ can be formally reviewed and officially authorized

▪ will alter in status (authored, reviewed, approved, archived, referenced) throughout life of project

▪ Project Schedule used to reflect evolving deliverable status/progress (risks, issues, percentage complete)

▪ can be placed under formal configuration management – re: with evolving status

▪ can be accessed for future reference (application support and maintenance)

Page 90: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 91: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 92: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 93: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 94: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 95: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 96: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 97: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 98: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 99: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Deliverable Administration

Deliverable Status

▪ Identified/Assigned

▪ Drafted

▪ Reviewed

▪ Approved/Authorized

Deliverable Configuration Management

▪ Why, how and where deliverables (identified, drafted, reviewed, authorized/approved) are maintained and administered

Page 100: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 101: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Applying IT Methodology Deliverable – Project Roles & Responsibilities

Project Roles & Responsibilities deliverable identifies and describes the specific roles required to complete

the project . It defines the project organizational structure , the titles of the project resources, and the roles

and responsibilities of the project team - variable informational requirements may include

▪ Hierarchy Structure

▪ Project Role Definitions and Responsibilities

▪ RACI (responsible, accountable, consulted, informed) Matrix

View Sample

Page 102: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 103: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Applying IT Methodology Deliverable – Project Procedures

Project Procedures deliverable is used to define all of the procedures the project team will utilize

throughout the life of the project. Project Procedures are used to guide how the project team will work

together to complete the project. Depending on the needs of the project team, project procedures can

range from approving deliverables to migrating code to reporting status. The Project Procedures ensure the

project team applies an appropriate level of rigor in administering the project - “variable” informational

requirements may include

▪ Time and Status reporting▪ Project Deliverables administration and review▪ Configuration Management of project deliverables▪ Risk and Issue reporting

View Sample

Page 104: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 105: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 106: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Project Close Out - Owner

Role

▪ Authorize the product/application being placed into production

Primary Deliverables

▪ Project Status Report

▪ User Acceptance Test Authorization

▪ Project Closeout Report

Page 107: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Project Close Out - Business Stakeholder

Role

▪ Authorize the product/application satisfies the requirements and the business need

Primary Deliverables

▪ Requirements Traceability Matrix

▪ Testing Defect Logs (Unit, System Integration, User Acceptance)

▪ Change Request Log

Page 108: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Project Close Out - Project Manager

Role

▪ Deliver the product/application based on the authorized plan

▪ Complete formal authorization and administration of all project deliverables and activity

Primary Deliverables

▪ Logs (Issue, Risk, Change Request)

▪ Testing Authorizations (Unit, System Integration, User Acceptance)

▪ Project CloseOut Report

Page 109: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Project Close Out - Business Analyst

Role

▪ Ensure the business requirements are incorporated (built and tested) into the product/application

Primary Deliverables

▪ Detailed Solution Design

▪ Requirements Traceability Matrix

▪ Testing Defect Logs (Unit, System Integration, User Acceptance)

Page 110: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Project Close Out - Architect

Role

▪ Ensure the product/application has been developed to satisfy the requirements and designed to be leveraged in the business environment

Primary Deliverables

▪ High Level Solution Design

▪ Detailed Solution Design

Page 111: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Project Close Out - Developer

Role

▪ Build the product/application according to the authorized business requirements

Primary Deliverables

▪ Detailed Solution Design

▪ Programming Specifications

▪ Code

▪ Testing Defect Logs (Unit, System Integration, User Acceptance)

Page 112: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Project Close Out - Testers

Role

▪ Ensure the product/application is built according to the authorized business requirements

Primary Deliverables

▪ Testing Plans (Strategy, Unit, System Integration, User Acceptance)

▪ Testing Evaluation Criteria (Unit, System Integration, User Acceptance)

▪ Testing Defect Logs (Unit, System Integration, User Acceptance)

Page 113: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Project Close Out - Governance / QA

Role

▪ Identifying and supporting project teams in applying “authorized” corporate process

Primary Deliverables

▪ Quality Assurance Plan

▪ Project CloseOut Report

Page 114: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Project Close Out - End User

Role

▪ Utilize authorized product/application

Primary Deliverable

▪ Training and Support Plan

Page 115: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 116: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 117: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

QAIassist Integrated Methodology

Page 118: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Applying IT Methodology Deliverable – Project CloseOut Report

Project CloseOut Report

This deliverable is used to provide an objective assessment of how the project evolved. It documents the "favorable" and "unfavorable" aspects of the project. The Project CloseOut Report is intended to assist future project teams with "lessons learned".

View Sample Deliverable

Page 119: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 120: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

IT Methodology Context - terminology, fundamentals, hierarchy, deliverable construct

Tutorial Context – review Sample Project & Previous Tutorials (Feb, Apr, Jun, Aug 2017)

▪ Project Initiation - Identifying the Project Need (Feb 2017)

▪ Project Planning and Design (Apr 2017)

▪ Executing Projects (Jun 2017)

▪ Project Control & Verification (Aug 2017)

Project Close & Delivery

▪ Deliverable Administration

▪ By Role (Owner, Stakeholder, Project Manager, Business Analyst, Architect, Developer, Tester, Governance/QA, End User)

▪ Project CloseOut Deliverable

Recap

Tutorial IV – Project Close & DeliveryAgenda

Page 121: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Body of Knowledge

Methodology/Lifecycle/Deliverables – www.qaiassist.com

▪ Project Management, Software Development, Software Testing

Body of Knowledge (Library) – www.qaiassist.com

▪ Methodology Origin – origins of methodology – identifies the differences

between the path we take (noun) and how we proceed (verb) down that path

▪ Context & Overview – provides a general overview of IT Methodology and how

it can be applied within an organization

▪ Deliverable Descriptions - provides general descriptions for all the deliverables

of the QAIassist Integrated Methodology

Page 122: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

Until Next Session…

Keep Posing your Questions – call or send your questions in (Alexa and/or Cameron)

Explore the QAIassist Body of Knowledge – refer to the QAIassist Body of Knowledge (sample deliverables, whitepapers, blog articles) – (www-qaiassist.com)

QAIassist Practitioner - find out more about becoming QAIassist certified “Foundation”, “Practitioner”

Tell your friends - tell your friends, coworkers and colleagues about the Project Insight/QAIassist webinars – invite them to join us at the next session

Continuing Follow Up – send out a survey at the completion of every webinar, follow up with attendees to obtain their suggestions and recommendation

Page 123: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

2017 Schedule

The 3rd Wednesday of Every Month

▪ 8:00 am Pacific - 11:00 am Eastern Time

IT Methodology Concepts (60 mins)

▪ This series of six webinars will be presented on a bi-monthly basis. Each webinar will provide you with a context, overview, terminology and general understanding of information technology (IT) methodology.

IT Methodology – Tutorials (60 mins)

▪ This series of five webinars will be presented on a bi-monthly basis. Each session is designed to offer a more “hands on” perspective – bridging the concepts into a practical utilization.

Page 124: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

2017 “Tutorials” Schedule

The 3rd Wednesday of Month (Feb, Apr, Jun, Aug, Oct)

▪ 8:00 am Pacific - 11:00 am Eastern Time

IT Methodology Tutorials (60 mins)

▪ Applying IT Methodology to Project Initiation - (Feb)

▪ Project Planning & Design with IT in Mind - (Apr)

▪ Executing Projects with IT Methodologies - (Jun)

▪ Project Control & Verification - (Aug)

▪ Project Close & Delivery - ( Oct)

Page 125: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

2017 “Concepts” Schedule

The 3rd Wednesday of Month (Jan, Mar, May, Jul, Sept, Nov)

▪ 8:00 am Pacific - 11:00 am Eastern Time

IT Methodology Concepts (60 mins)

▪ Methodology for the IT Landscape - (Jan)

▪ Apply PM Fundamentals to IT - (Mar)

▪ Leverage the Software Development Lifecycle - (May)

▪ Explore the Software Testing Lifecycle - (Jul)

▪ Incorporate Organizational Process Governance - ( Sept)

▪ Implementing IT Methodology - (Nov)

Page 126: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

© 2017 Project Insight | www.projectinsight.com

Alexa Ortega-Mendoza

Project InsightMarketing Assistant

[email protected]

www.projectinsight.net

Moderator

Page 127: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

© 2017 Project Insight | www.projectinsight.com

Schedule a customized demo today

▪ +1 (949) 476-6499 x3

[email protected]

▪ Request info: www.projectinsight.net

Contact QAIassist

▪ +1 (613) 523-0052

[email protected]

▪ Request info: www.qaiassist.com

Learn more!

Page 128: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

social media

join us

connect

sharefollow like

networknews

information

project management

software

blogs

tech videos

business

leadership

friends

messagetweet

projects

comment

Follow, like, subscribe!

Page 129: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

LeadershipProduct Training

Project Insight Community

▪ Sign up for more

▪ They are all FREE

▪ Check them out today!

IT Methodology

and AgilePM Training

Page 130: Tutorial | Project Close & Delivery...2017/10/18  · Tutorial V- Project Close & Delivery Goals Understand previously delivered tutorials (Feb, Apr, Jun, Aug) Discuss Project CloseOut

See you next time!