Turnover Index for piping (Alberta)
-
Upload
bala-singam -
Category
Documents
-
view
221 -
download
0
Transcript of Turnover Index for piping (Alberta)
-
8/10/2019 Turnover Index for piping (Alberta)
1/1
QC TurnoverIndex
1)
Scope of Work
2) Provincial Documents (AB-83, AB-81, AQP, PP # & CWB Certs )
3)
Inspection Test Plans (ITP)
4)
Drawings (Plot Plan, GA, P&ID ISOs and Cut sheets)
5)
As Built / Redlines Drawings
6)
Welding Procedures
7)
Welder Log with Qualification Records
8)
Weld Map
9)
Weld / NDE Log
10)
NDE Procedure Copies
11)
NDE Technicians Qualifications12)
NDE Reports (RT, UT, PT, MT, FT, HT, PMI etc)
13)
PWHT Reports
14)
Pre-Hydro checklists
15)
Hydro Test Certificates
16)
Gauge Calibration Certificates
17)
Post Hydro check list (Reinstatement)
18)
Bolt Torque reports
19)
NCR Log and NCRs
20)
RFI Log and RFIs
21)
Punchlists / Deficiency lists
22)
MTRs / MRIRs
23)
Painting / Coating reports (If applicable)
24)
Miscellaneous