How to make your community complete with Complete Streets

Oklahoma Turning Point CouncilOctober 18, 2012

James Wagner, AICP

Page 2: Turning Point Complete Streets 10/18/2012

Who is INCOG?

A Council of Governments (COG) is a voluntary

regional association of local governments, led by local

elected officials, formed to promote intergovernmental

communication and cooperation.

Page 3: Turning Point Complete Streets 10/18/2012

COGs in Oklahoma

OEDA

NODA

SODA

KEDDO

ASCOG

SWODA

EODDCOEDD

INCOG

ACOG

GGEDA

Texas

Osage

Ellis

BeaverKay

Cimarron

Le Flore

Caddo

McCurtain

Woods

Grady

Grant

Atoka

Major

Kiowa

Bryan

Creek

Pittsburg

Custer

Harper

Blaine

Dewey

CraigAlfalfa

Lincoln

Garfield

Carter

Noble

Washita

Tillman

Garvin

Logan

Woodward

Pushmataha

Coal

Greer

Adair

Love

PayneTulsa

Hughes

Mayes

Roger Mills

Comanche

Rogers

Jackson

Latimer

Cotton

Beckham

Stephens

Canadian

Choctaw

Kingfisher

Haskell

Jefferson

Delaware

Pontotoc

Muskogee

Cherokee

McIntosh

Nowata

Pawnee

Johnston

McClain

SequoyahOklahoma

Okmulgee

Seminole

Ottawa

Harmon

Okfuskee

Wagoner

Murray

Cleveland

Marshall

Pottawatomie

Washington

Page 4: Turning Point Complete Streets 10/18/2012

Introduction to Complete Streets

Safe access for all users: pedestrians, bicyclists, motorists, and transit users

Routine Design of these elements

Context Sensitive design means different approaches for different land use types

Page 5: Turning Point Complete Streets 10/18/2012

A “complete street” accommodates many uses and provides for all purposes of a street: Mobility (pedestrians, bicyclists, motorists, transit users) Access to destinations Thriving businesses Aesthetics

Page 6: Turning Point Complete Streets 10/18/2012

Incomplete Streets are Unsafe

More than 40% of pedestrian deaths in 2007 and 2008 occurred where no crosswalk was available.

National Highway Traffic Safety Administration’s Fatality Reporting System

Page 7: Turning Point Complete Streets 10/18/2012

Current Conditions

One quarter of walking trips take on place on roads without sidewalks or shoulders.

Bike lanes are available for only about 5% of of bicycle trips.

Page 8: Turning Point Complete Streets 10/18/2012

8

No sidewalks…

Current Conditions

Page 9: Turning Point Complete Streets 10/18/2012

9

Current Conditions

No sidewalks…

Page 10: Turning Point Complete Streets 10/18/2012

10

Current Conditions

Sidewalk Squeezed in (40mph speed limit)

Page 11: Turning Point Complete Streets 10/18/2012

11

Streets Are Inadequate

Too dangerous to cross on foot..

Page 12: Turning Point Complete Streets 10/18/2012

12

Current Conditions

Inaccessible for wheelchair users…

Page 13: Turning Point Complete Streets 10/18/2012

Streets Are Inadequate

There’s no room for people

Page 14: Turning Point Complete Streets 10/18/2012

Connectivity creates a walkable street system by: Reducing walking distances; Offering more route choices on quiet local streets; Dispersing traffic – reducing reliance on arterials for all trips

Connected Streets – Pre WWII Lollipop pattern (1960s- Today

<- 1 mile square -> <- 1 mile square ->

3 left turns!

Page 15: Turning Point Complete Streets 10/18/2012

High Connectivity Travel Lanes Required

Moderate Connectivity

Low Connectivity

Page 16: Turning Point Complete Streets 10/18/2012

Designing for Pedestrian Safety - Introduction

1-16

Page 17: Turning Point Complete Streets 10/18/2012

Designing for Pedestrian Safety - Introduction

1-17

Page 18: Turning Point Complete Streets 10/18/2012
Page 19: Turning Point Complete Streets 10/18/2012

Drainage ditch separate

apartments from Wal-Mart

Wal-Mart

Page 20: Turning Point Complete Streets 10/18/2012
Page 21: Turning Point Complete Streets 10/18/2012

Narrow lanes; add bike lanes, median, trees, texture

Page 22: Turning Point Complete Streets 10/18/2012

Bring in buildings that face the street

Page 23: Turning Point Complete Streets 10/18/2012

More buildings: Infill

Page 24: Turning Point Complete Streets 10/18/2012

The street now has life and is safer for pedestrians

Page 25: Turning Point Complete Streets 10/18/2012

25

Benefits: Capacity

Page 26: Turning Point Complete Streets 10/18/2012

26

Benefits: Capacity

Page 27: Turning Point Complete Streets 10/18/2012

27

Benefits: Capacity

Page 28: Turning Point Complete Streets 10/18/2012

28

Benefits: Capacity

Page 29: Turning Point Complete Streets 10/18/2012

2. Which road produces the higher speed?• With a 4-lane road a fast driver can pass others• With a 2-lane road the slower driver sets the speed

3. Which road produces the higher crash rate?

4. Which is better for bicyclists, pedestrians, businesses?

1. Which road carries more traffic?

San Antonio TX

Page 30: Turning Point Complete Streets 10/18/2012

Road Diet

Designing for Pedestrian Safety – Road Diets

Orlando FL

Page 31: Turning Point Complete Streets 10/18/2012

Before

Reclaiming road space creates room for ped islandsCharlotte NC

Page 32: Turning Point Complete Streets 10/18/2012

BeforeAfter

Reclaiming road space creates room for ped islands

Page 33: Turning Point Complete Streets 10/18/2012

This 5-lane Main Street was converted to…

Pottstown PA

Page 34: Turning Point Complete Streets 10/18/2012

Name 4 things that changed

Fewer travel lanes; added bike lanes; parallel to back-in diagonal parking on one side; new pavement

Pottstown PA

Page 35: Turning Point Complete Streets 10/18/2012

There’s potential on one-way streets too:Is this street operating at capacity?

Page 36: Turning Point Complete Streets 10/18/2012

Sacramento CA

Example of one way street converted from 3 lanes to 2 lanes (plus 2 bike lanes)

Page 37: Turning Point Complete Streets 10/18/2012
Page 38: Turning Point Complete Streets 10/18/2012

Bike Lanes

Page 39: Turning Point Complete Streets 10/18/2012

Conventional Bike Lane

Page 40: Turning Point Complete Streets 10/18/2012

Buffered Bike Lanes

Page 41: Turning Point Complete Streets 10/18/2012

12th Street and 7th StreetMuskogee, OK

On street parking (8’)

On street parking (8’)

Travel Lane (11’)

Travel Lane (11’)

Bike Lane(6’)Bike Lane

(6’)

Page 42: Turning Point Complete Streets 10/18/2012

4th Place Yale to SheridanTulsa, OK

Page 43: Turning Point Complete Streets 10/18/2012

4th Place – Yale to Sheridan, Tulsa, OK

Current conditions New design

Page 44: Turning Point Complete Streets 10/18/2012

Bike Lanes

Page 45: Turning Point Complete Streets 10/18/2012

Cycle Tracks

Page 46: Turning Point Complete Streets 10/18/2012

Better Visibility – Curb Extensions

Page 47: Turning Point Complete Streets 10/18/2012

Pedestrians wait where they can see, in front of parked cars

Curb ext. places pedestrian where he can see and be seen

Page 48: Turning Point Complete Streets 10/18/2012

Before: high speed right-turns

Page 49: Turning Point Complete Streets 10/18/2012

After: slow speed right-turns

Curb extension and new corner radius must be designed together

Page 50: Turning Point Complete Streets 10/18/2012

Pedestrian Hybrid Beacon (HAWK)

Page 51: Turning Point Complete Streets 10/18/2012

Designing for Pedestrian Safety – Crossing Countermeasures

Hybrid Beacon Sequence1

2

3

4

5

Returnto 1

Flashing yellow

Blank fordrivers

Steady yellow

Steady red

Wig-Wag

2009 MUTCD Section 4F.3

Page 52: Turning Point Complete Streets 10/18/2012

In-street pedestrian crossing signs

R1-6aR1-6MUTCD signs

Yield or Stop depends on state

law

Page 53: Turning Point Complete Streets 10/18/2012

Federal PolicyUSDOT Policy Statement on Bicycle & Pedestrian Accommodation (Announced March 15, 2010)• Every transportation agency, including DOT, has

the responsibility to improve conditions and opportunities for walking and bicycling and to integrate walking and bicycling into their transportation systems.

Page 54: Turning Point Complete Streets 10/18/2012

Regional Partners – Regional Solutions

Transportation Alternatives (TA)

50% 50%

By Population

>200K5K – 200K

<5K

Regional Competitive GrantsACOG & INCOG

State Competitive GrantsODOT

State DOT may transfer this half to highway projects (opt-out provision)

Any area of the state

$14M/year

Population

Page 55: Turning Point Complete Streets 10/18/2012

What can Turning Point do?

• Add physical infrastructure to Okla. Certified Healthy Communities criteria

• Participate in design of local public works department’s street projects

• Start a Bicycle & Pedestrian Advisory Committee (BPAC) in your community

• Create a community Bicycle/Pedestrian Master Plan

Page 56: Turning Point Complete Streets 10/18/2012

What else can Turning Point do?

• Help setup training on Complete Streets principles & design guidance

• Advocate for Complete Streets Policy & Ordinances

• Understand state & federal transportation funding policy & programs

Page 57: Turning Point Complete Streets 10/18/2012

James Wagner, AICPTransportation Projects

Coordinator

Indian Nations Council of Governments (INCOG)

2 W. 2nd Street, Suite 800 Tulsa, OK 74103

(918) [email protected]

Tulsa Metro

James Wagner, AICPPrincipal

Skyline Planning+Design(918) 640-8923

[email protected]

Outside Tulsa Metro