(NTPC) / (TSTPP)4X500 MW UNITS , Stage- II OPERATION DEPARTMENT
PROTECTION & INTERLOCKS CHECKING PROTOCOLTS - II /OPN/R/P&I/TG/01
AREA : Turbine Rev 0.0 (01/01/2006)
Unit - 3 EQUIPMENT NAME : MAIN TURBINE Date Of Checking : 03-01-2006
SoNo
DescriptionLogi
cSet. Pt. Field Switches Method of
CheckingChannel acting
CRT Trip
Status
BHEL CRT
LVS alarm
SOE Point in THL CRT
1.LUB OIL PR.V.LOW Behind the Filter
2 / 3<1.2Kg/
Cm2
MAV 42 CP 016MAV 42 CP 017MAV 42 CP 018
By draining the pr.
switches in combination
Ch- 1
Ch- 2
2.AXIAL SHIFT VERY HIGH
2 / 3± 1.0 mm
MAD 11 CY 011MAD 12 CY 011MAD 13 CY 011(0-50%-100%)
Simulation DONE FROM THE Panel. 16% &84%
Ch- 1
Ch- 2
3.HP outer casing Exhaust Steam temp HI .
2 / 3500 0C
(0-600 0C)
MAA 50 CT 021MAA 50 CT 022MAA 50 CT 023
Simulation DONE FROM THE Panel.
(84% )
Ch- 1
Ch- 2
4.COND. PR. VACUUM TRIP(VSP)
2 / 3As per the
curve
- MAC 11 CP 001 + MAG 10 CP 002- MAC 11 CP 002+ MAG 10 CP 003- MAC 11 CP 003+ MAG 10 CP 004
Speed signal & LPT inlet pr. Simulation in
Panel
Ch- 1
Ch- 2
5. 2 / 3 Ch- 1
P&I Checked By Approved By
Signature: Name: R.N.Das D.Sarkar Desig: Sr. Supdt (O) DGM (O)
(Operation Dept.)
P&I Checked By Approved By
Signature: Name: A. Bhowmic A.N.Sar Desig: Supdt (C&I) DGM(C&I)
( C&I Dept.)
Page 1 of 7
(NTPC) / (TSTPP)4X500 MW UNITS , Stage- II OPERATION DEPARTMENT
PROTECTION & INTERLOCKS CHECKING PROTOCOLTS - II /OPN/R/P&I/TG/01
AREA : Turbine Rev 0.0 (01/01/2006)
Unit - 3 EQUIPMENT NAME : MAIN TURBINE Date Of Checking : 03-01-2006
SoNo
DescriptionLogi
cSet. Pt. Field Switches Method of
CheckingChannel acting
CRT Trip
Status
BHEL CRT
LVS alarm
SOE Point in THL CRT
COND. PR. VACUUM TRIP (FSP)
> - 0.70 KSC &
turbine speed > 6.67% of 3600 RPM
MAG 10 CP 002 MAG 10 CP 003 MAG 10 CP 004
Speed simulation in Panel. & Vac
sim 30 %
Ch- 2
6.
HP CASING TOP-BOT Diff temp Very high
2 / 3
> 100 0
C&
actual load >
100 mw(16.67%
of 600MW )
MAA 50 CT 051 A/B (Top) MAA 50 CT 052 A/B (Bot)MAA 50 CT 053 A/B (Top)MAA 50 CT 054 A/B (Bot)MAA 50 CT 055 A/B (Top)MAA 50 CT 056 A/B (Bot)
By simulation from Panel
both Load & Temp points
Ch- 1
Ch- 2
7.
IP CASING TOP-BOTTOM Diff temp Very high (FRONT)
2 / 3
> 45 0 C&
actual load > 45
mw(7.5% of 600MW )
MAB 50 CT 041 A/B (Top)MAB 50 CT 042 A/B (Bot)MAB 50 CT 043 A/B (Top)MAB 50 CT 044 A/B (Bot)
Simulation in Panel
Ch- 1
Ch- 2
P&I Checked By Approved By
Signature: Name: R.N.Das D.Sarkar Desig: Sr. Supdt (O) DGM (O)
(Operation Dept.)
P&I Checked By Approved By
Signature: Name: A. Bhowmic A.N.Sar Desig: Supdt (C&I) DGM(C&I)
( C&I Dept.)
Page 2 of 7
(NTPC) / (TSTPP)4X500 MW UNITS , Stage- II OPERATION DEPARTMENT
PROTECTION & INTERLOCKS CHECKING PROTOCOLTS - II /OPN/R/P&I/TG/01
AREA : Turbine Rev 0.0 (01/01/2006)
Unit - 3 EQUIPMENT NAME : MAIN TURBINE Date Of Checking : 03-01-2006
SoNo
DescriptionLogi
cSet. Pt. Field Switches Method of
CheckingChannel acting
CRT Trip
Status
BHEL CRT
LVS alarm
SOE Point in THL CRT
8.
IP CASING TOP-BOTTOM Diff temp Very high (REAR)
2 / 3
> 45 0 C&
actual load > 45
mw(7.5% of 600MW )
MAB 50 CT 061 A/B (Top)MAB 50 CT 062 A/B (Bot)MAB 50 CT 063 A/B (Top)MAB 50 CT 064 A/B (Bot)
Simulation in Panel
Ch- 1
Ch- 2
Ch- 2
9.FIRE PROT'N CHECK 1 & 2
2 / 3
1050 MM MOT level
(0-1600mm)From Top
MAV10CL021MAV10CL022MAV10CL023
FP PB AT LOCAL
By Simulating the level &
also by pressing the push button.
Ch- 1
Ch- 2
GENERATOR MECHANICAL PROTECTIONS ( Sl no 10-19)
10. LIQUID MAIN LEADS TOP
2 / 3Level >
MAXMKA 24 CL 001 MKA 24 CL 011 MKA 24 CL 021
By simulating the level
switches from local.
Ch- 1
Ch- 2
P&I Checked By Approved By
Signature: Name: R.N.Das D.Sarkar Desig: Sr. Supdt (O) DGM (O)
(Operation Dept.)
P&I Checked By Approved By
Signature: Name: A. Bhowmic A.N.Sar Desig: Supdt (C&I) DGM(C&I)
( C&I Dept.)
Page 3 of 7
(NTPC) / (TSTPP)4X500 MW UNITS , Stage- II OPERATION DEPARTMENT
PROTECTION & INTERLOCKS CHECKING PROTOCOLTS - II /OPN/R/P&I/TG/01
AREA : Turbine Rev 0.0 (01/01/2006)
Unit - 3 EQUIPMENT NAME : MAIN TURBINE Date Of Checking : 03-01-2006
SoNo
DescriptionLogi
cSet. Pt. Field Switches Method of
CheckingChannel acting
CRT Trip
Status
BHEL CRT
LVS alarm
SOE Point in THL CRT
11.
SO TEMP AFT CLR AIR SIDE V. HIGH
2 / 3 > 55 0 CMKW 71 CT 001 MKW 71 CT 004 MKW 71 CT 005
By Simulating the temp. switches.
Ch- 1
Ch- 2
12.HOT AIR MAIN EXCITER V. HIGH
2 / 3 > 80 0 CMKC 09 CT 001 MKC 09 CT 004 MKC 09 CT 005
By Simulating the temp. Switches.
Ch- 1
13.COLD GAS AFT CLR A/B V. HIGH
2 / 3 > 60 0 CMKA 75 CT 001
MKA 75 CT 002AMKA 75 CT 003A
By Simulating the temp. RTDs AT LOCAL
Ch- 1
Ch- 2
14.COLD GAS AFT CLR C/D V. HIGH
2 / 3 > 60 0 CMKA 78 CT 001
MKA 78 CT 002 AMKA 78 CT 003 A
By Simulating the temp.
RTDs.
Ch- 1
Ch- 2
15. 2 / 3 < 70 % MKF 82 CF 001 A Ch- 1
P&I Checked By Approved By
Signature: Name: R.N.Das D.Sarkar Desig: Sr. Supdt (O) DGM (O)
(Operation Dept.)
P&I Checked By Approved By
Signature: Name: A. Bhowmic A.N.Sar Desig: Supdt (C&I) DGM(C&I)
( C&I Dept.)
Page 4 of 7
(NTPC) / (TSTPP)4X500 MW UNITS , Stage- II OPERATION DEPARTMENT
PROTECTION & INTERLOCKS CHECKING PROTOCOLTS - II /OPN/R/P&I/TG/01
AREA : Turbine Rev 0.0 (01/01/2006)
Unit - 3 EQUIPMENT NAME : MAIN TURBINE Date Of Checking : 03-01-2006
SoNo
DescriptionLogi
cSet. Pt. Field Switches Method of
CheckingChannel acting
CRT Trip
Status
BHEL CRT
LVS alarm
SOE Point in THL CRT
STATOR WNDG. FLOW V. LOW
<48 M3/hr
MKF 82 CF 001 BMKF 82 CF 001 C
by reducing the the actual
flowCh- 2
16.PRIM WATER TEMP. AFT CLR V. HIGH
2 / 3 > 55 0 CMKF 80 CT 001 MKF 80 CT 005 MKF 80 CT 006
By Simulating the temp.
Switches AT LOCAL
Ch- 1 Ch- 2
17.FLOW MAIN BUSH 'R' V. LOW 2 / 3
< 73.88 %
<1.33 M3/hr
MKF 83 CF 001 A MKF 83 CF 001 B MKF 83 CF 001 C
By draining the flow switches in combination &
also by reducing the flow.
Ch- 1
Ch- 2
18.FLOW MAIN BUSH 'S' V. LOW
2 / 3
< 73.88 %
<1.33 M3/hr
MKF 83 CF 011 A MKF 83 CF 011 B MKF 83 CF 011 C
By draining the flow switches in combination &
also by reducing the flow.
Ch- 1
Ch- 2
19.FLOW MAIN BUSH 'T' V. LOW 2 / 3
< 73.88 %
<1.33 M3/hr
MKF 83 CF 021 A MKF 83 CF 021 B MKF 83 CF 021 C
By draining the flow switches in combination &
also by reducing the flow.
Ch- 1
Ch- 2
P&I Checked By Approved By
Signature: Name: R.N.Das D.Sarkar Desig: Sr. Supdt (O) DGM (O)
(Operation Dept.)
P&I Checked By Approved By
Signature: Name: A. Bhowmic A.N.Sar Desig: Supdt (C&I) DGM(C&I)
( C&I Dept.)
Page 5 of 7
(NTPC) / (TSTPP)4X500 MW UNITS , Stage- II OPERATION DEPARTMENT
PROTECTION & INTERLOCKS CHECKING PROTOCOLTS - II /OPN/R/P&I/TG/01
AREA : Turbine Rev 0.0 (01/01/2006)
Unit - 3 EQUIPMENT NAME : MAIN TURBINE Date Of Checking : 03-01-2006
SoNo
DescriptionLogi
cSet. Pt. Field Switches Method of
CheckingChannel acting
CRT Trip
Status
BHEL CRT
LVS alarm
SOE Point in THL CRT
20.GEN PROTECTION
2 / 3
Relay 186/286 GROUP
Operated
MKY 01 EZ 000 A X 401MKY 01 EZ 000 B X 401MKY 01 EZ 000 C X 401
By simulating the concant in
GRP.
Ch- 1
Ch- 2
21. MFT 1/3
MFT took place
From FSSS
Checked by actually tripping
the boiler.
Ch- 1
Ch- 2
22.ELECTRICAL OVERSPEED
2 / 33270 RPM
(109%)Speed transmitters Speed signal
simulation
Ch- 1
Ch- 2
23.
EMERGENCY TRIP FROM THE PB PROVIDED IN TG DESK (both)
2 / 3
Both PB pressed
simultaneously
PB from TG desk
By pressing both push buttons
simultaneously
Ch- 1
Ch- 2 24. 2 / 3 PB in Vertical Panel Ch- 1
P&I Checked By Approved By
Signature: Name: R.N.Das D.Sarkar Desig: Sr. Supdt (O) DGM (O)
(Operation Dept.)
P&I Checked By Approved By
Signature: Name: A. Bhowmic A.N.Sar Desig: Supdt (C&I) DGM(C&I)
( C&I Dept.)
Page 6 of 7
(NTPC) / (TSTPP)4X500 MW UNITS , Stage- II OPERATION DEPARTMENT
PROTECTION & INTERLOCKS CHECKING PROTOCOLTS - II /OPN/R/P&I/TG/01
AREA : Turbine Rev 0.0 (01/01/2006)
Unit - 3 EQUIPMENT NAME : MAIN TURBINE Date Of Checking : 03-01-2006
SoNo
DescriptionLogi
cSet. Pt. Field Switches Method of
CheckingChannel acting
CRT Trip
Status
BHEL CRT
LVS alarm
SOE Point in THL CRT
EMERGENCY TRIP from Vertical Panel in CCR
Trip from Vertical Panel
Console
By pressing the push button in vertical panel. Ch- 2
25.MANUAL TRIP from Local protection Rack
1 / 1 Pressed Local Trip PB
By operating the trip lever in
main trip device.
Mech Trip
26.Emergency Trip from VPC
1/1Pressed
from CRTCRT VPC By pressing
from CRT
Both Channe
l
N:B :- After checking all the simulations are normalized by C&I .
The interlocks are checked by observibg opeartion of TTR Ch- 1 Ch- 2 . Only once the actual operation of SV is checked in each channel .
P&I Checked By Approved By
Signature: Name: R.N.Das D.Sarkar Desig: Sr. Supdt (O) DGM (O)
(Operation Dept.)
P&I Checked By Approved By
Signature: Name: A. Bhowmic A.N.Sar Desig: Supdt (C&I) DGM(C&I)
( C&I Dept.)
Page 7 of 7