TURBINE DATA
Transcript of TURBINE DATA
-
7/25/2019 TURBINE DATA
1/2
BHEL, Hardwar 6.1-0101-97/1
Steam Turbine Technical DataDescr ipt ion Steam & Casing Temperatures
Steam Temperatures
Rated Value,Annual
Average
Long-TermValue, Subject
to Annual
Average
400 hrs.Per Year
80 hrs. Per YearMax. 15 min inIndividual Case Unit
Main Steam atHP Stop Valve inLet
537.0 545.3 551.0 565.0 C
HRH Steam atIP Stop Valve inLet
537.0 545.3 551.0 565.0 C
Steam Temperatures
Rated Value
Long TermOperation
80 hrs. Per Year,Max. 15 min. in
Individual Case
In SpecialCases at
No LoadUnit
HP Turbine Exhaust 337.9 339.9 429.9500.0
C
Extraction 6 337.9 339.9 429.9 500.0
C
Extraction 5 410.0 415.0 450.0 C
Extraction 4 297.2 307.2 347.2 C
Extraction 3 183.8 196.8 243.8 C
Extraction 2 99.3 119.3 164.3 C
Extraction 1 75.4 95.4 145.4C
LP Turbine Exhaust 46.1 70.0 70.0 C
Long-Term Operation: Upper Limit Value Permissible Without Time Limit.
These Values Correspond To 600 MW Load With 3% Makeup and 0.1013 bar Back PressureWith all Heaters in Service and Rated Steam Conditions.
Only Valid For The No Load Period With High Reheat Pressure After Trip-Out From Full LoadOperation. For Individual Case Approx. 15 Minutes.
The Turbine Is Immediately Re-Loaded Or The Boiler Immediately Reduced To Minimum LoadIf No Load Operation Is Maintained.
Casing Metal Temperatures
Wall Temperatures Alarm At Machine Must Be Shut Down At Unit
HP Turbine Casing Exhaust 485 500 C
Outer Casing of LP Cylinder 90 110 C
Spray Water To LP Turbine Must Be Switched On At 900C
-
7/25/2019 TURBINE DATA
2/2
BHEL, Hardwar 6.1-0101-97/2
Casing Metal Temperature Differences
Temperature Difference Alarm At Machine Must Be Tripped At Unit
Between Upper & Lower CasingHalves of HP Turbine, Middle
90 100 C
Between Upper & Lower CasingHalves of IP Turbine, Front
30 45 C
Between Upper & Lower CasingHalves of IP Turbine, Rear
30 45 C
Permissible Differential Temperature between Parallel Steam Supply Lines
No Time Limitation 17 C
Short Time Period (15 min) 28 C
In the Hottest Line the Limitations Indicated for Main and Reheat Steam Temperature must not be Exceeded
Feed Water Heater out of Service
Operation With Feed Water Heaters Out of Service Main Steam Flow, Kg/s(Indicative)
Load,MW
Extraction A6, A5 (Both Strings Out) 454.95 600
Output Limit du ring Testing with Automatic Turbine Tester
Testing of Main Steam Stop and Control Valves < 300 MW
Testing of HRH Steam Stop and Control Valves 300 MW
MotoringMotoring is the condition in which the turbine is driven by the generator at rated speed with thestop and control valves closed. In this operating mode, certain turbine components are heated upby wind age power of the blading.To prevent heat-up beyond permissible temperatures, motoring must not be allowed to continuefor longer than one minute. If the condenser low vacuum limit of 0.3 bars is exceeded, motoringmust not be allowed to continue for more than 4 seconds.