TUNNELING IN ROCK MASS:(NECESSITY, SYSTEMATIC APPROACH, PLANNING AND CONSTRUCTION)
1
APPLIED MECHANICS DEPARTMENTSVNIT,SURAT
GUIDED BY : SUBMITTED BY:PROF S.KUMAR JOSHI AKSHAY p16SM006
![Page 2: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/2.jpg)
TUNNEL: A TUNNEL IS AN UNDERGROUND OR UNDERWATER PASSAGE WAY, DUG THROUGH THE SURROUNDING SOIL/EARTH/ROCK AND ENCLOSED EXCEPT FOR ENTRANCE AND EXIT,
TYPE BASED ON APPLICATION
2
VEHICULAR TUNNEL
RAIL TUNNEL
CANAL TUNNEL
![Page 3: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/3.jpg)
NECESSITY
3
To minimize land acquisition costsTo minimize land acquisition costs
To avoid steep grades and longer To avoid steep grades and longer routes.routes.
To avoid impact on environmentally sensitive areas.
To avoid impact on cultural heritage
![Page 4: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/4.jpg)
SYSTEMATIC APPROACH & PLANNING
STAGES OF PLANNING
4
PRE-PLANNING
DETAIL PLANNING
MONITARING AND CONTROL
![Page 5: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/5.jpg)
PRE-PLANNING
Justification for taking up the project Objectives of the project Alignment Selection Investigation Examining alternatives Cost benefit analysis Financial planning
5
![Page 6: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/6.jpg)
ALIGNMENTALIGNMENT SELECTIONSELECTION
The Alignment of the Tunnel must be consistent with the alignment of the roadway leading to it.
The Alignment must consider factors like the sight distances, minimum turning radius and design speeds in its design.
Except for maintenance reasons, two way roads should be discouraged in a single tube of tunnel, for safety reasons.
Pedestrian and Cyclist use of tunnels should be discouraged except a special passage is designed for them.
6
![Page 7: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/7.jpg)
INVESTIGATIONSINVESTIGATIONS
Several investigations are required at the preliminary, design and construction phases of a tunnel project. The processes are highlighted below: Collection and Review of Available Information for a general knowledge of the area (Existing Topographical, hydrological, Geological, Geotechnical, Seismic, Environmental, Zoning etc) Topographic and Aerial PhotographsPreliminary Surveys Water Well Logs Hydrographic Surveys
7
![Page 8: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/8.jpg)
Identification of Underground Structures and Obstacles
Geologic Mapping Subsurface Investigations Test Borings and Sampling Soil and Rock Identification and Classification In - situ Tests •Geophysical Tests •Seismic Wave
Propagation •Laboratory Tests •Groundwater Investigation •Pumping Tests
8
![Page 9: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/9.jpg)
COSTRUCTION
9
![Page 10: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/10.jpg)
10
11 . . TUNNEL CONSTRUCTION SYSTEMSTUNNEL CONSTRUCTION SYSTEMS
(a)(a) Cut and Cover System.Cut and Cover System.
(b)(b) Pipe Jacking System (Micro Tunneling).Pipe Jacking System (Micro Tunneling).
(c)(c) Shield Tunneling (TBM).Shield Tunneling (TBM).
(d)(d) New Austrian Tunneling Method New Austrian Tunneling Method (NATM).(NATM).
(e)(e) Immersed-Tube Tunneling System.Immersed-Tube Tunneling System.
Tunnel Construction
![Page 11: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/11.jpg)
11
(a) Cut and Cover System(a) Cut and Cover System
Sequence of Construction (Stages 1 to 3Sequence of Construction (Stages 1 to 3 ))
Tunnel Construction
![Page 12: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/12.jpg)
12
(a) Cut and Cover System(a) Cut and Cover System
Sequence of Construction (Stages 4 to 6)Sequence of Construction (Stages 4 to 6)
Tunnel Construction
![Page 13: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/13.jpg)
13
Cut and Cover SystemCut and Cover System
AdvantagesAdvantages ::• Economy for shallow depths (4 - 10 m) and for
shorter applications.
• Un-sophisticated labor and equipment required.
• Adaptability to different conditions.
• Simple structural & geotechnical analyses required.
• Safe environment (ventilation and fire hazard)
• DisadvantagesDisadvantages ::• Possible disturbances to existing facilities.• Practical limitations of depth.• Unsuitability under buildings or water.
Tunnel Construction
![Page 14: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/14.jpg)
14
Soil Grouting TechniquesSoil Grouting Techniques
Jet Grouting: Soil Replacement ProcessJet Grouting: Soil Replacement Process
Tunnel Construction
![Page 15: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/15.jpg)
15
Soil Grouting TechniquesSoil Grouting Techniques
Slurry Wall ConceptSlurry Wall Concept
Tunnel Construction
![Page 16: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/16.jpg)
16
(( bb ) Pipe Jacking System (Micro Tunneling)) Pipe Jacking System (Micro Tunneling)
Schematic RepresentationSchematic Representation
Tunnel Construction
![Page 17: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/17.jpg)
STAGES OF BORING
17
![Page 18: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/18.jpg)
GUIDANCE AND POSITIONING USINGLASER-GUIDED STEERING SYSTEM
18
Laser Guide &Laser Guide &Control Control MonitorMonitor
Screen CaptureScreen Capture
Tunnel Construction
![Page 19: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/19.jpg)
MTBM - SHIELDS OF DIFFERENT SIZES
DIA. RANGES FROM 0.5M TO 3M
19
Tunnel Construction
![Page 20: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/20.jpg)
MTBM - DIFFERENT SHAPES OF CUTTING HEADS
20
Dirt cutter headDirt cutter head(clay and silty (clay and silty
sand)sand)
Sand shelves Sand shelves
Carbide cutter headCarbide cutter head(soft to medium hard (soft to medium hard
rockrock) )
Tunnel Construction
![Page 21: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/21.jpg)
21
Pipe Jacking System (Micro Tunneling)Pipe Jacking System (Micro Tunneling)AdvantagesAdvantages ::
• Suitability for almost all types of soil.
• Large depths with unlimited lengths of drive.
• High levels of accuracy and safety.
• Wide choice of pipe and joint materials.
• High construction rates.
• Reduced manpower requirements.
• Reduced environmental disturbance.
• DisadvantagesDisadvantages ::• Sophisticated equipment and highly skilled
labor.• Inability to make rapid changes in line or level.• Very expensive corrective actions, if required
Tunnel Construction
![Page 22: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/22.jpg)
22
(c) Shield Tunneling (TBM) (c) Shield Tunneling (TBM)
Cutter Head Tunnel Tube
Tunnel Construction
![Page 23: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/23.jpg)
CONSTRUCTION SEQUENCE
23
Tunnel Construction
![Page 24: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/24.jpg)
24
Shield Tunneling (TBM)Shield Tunneling (TBM)
AdvantagesAdvantages ::
• Suitability for almost all types of soil.
• Suitability for wide tunnels (highway, railway, etc.).
• Large depths ( > 10 m), with unlimited lengths of drive.
• Reducing environmental disturbance and utilities diversions.
Tunnel Construction
![Page 25: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/25.jpg)
DisadvantagesDisadvantages ::
• Sophisticated equipment and highly skilled labor.
• Inability to make rapid changes in line or level.
• Very expensive corrective actions, if required.
• Difficult structural and geotechnical analyses reqd..
25
![Page 26: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/26.jpg)
26
(d) (d) New Austrian Tunneling Method (New Austrian Tunneling Method (NATM)NATM)Tunnel Construction
![Page 27: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/27.jpg)
27
NATMNATMAdvantagesAdvantages ::
• Best alternative for non-circular roadway tunnels.
• Suitability for almost all stable to strong ground types, including rock.
• Suitability for a variety of soil conditions.
• Small thickness of tunnel lining, reducing the amount of excavation.
• Economy and speed of construction.
Tunnel Construction
![Page 28: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/28.jpg)
DisadvantagesDisadvantages ::
• Highly skilled workers and expert engineers.
• Safety measures for shotcrete application.
• Ground water freezing and/or soil strengthening (in case of water-bearing cohesionless soil).
28
![Page 29: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/29.jpg)
29
(e) Immersed-Tube Tunneling System(e) Immersed-Tube Tunneling SystemTunnel Construction
![Page 30: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/30.jpg)
30
(E) Immersed-Tube Tunneling System(E) Immersed-Tube Tunneling System
Construction SequenceConstruction Sequence ::
1. Dredging the trench in river or sea bottom.2. Prefabrication of tunnel sections, and sealing
ends with bulkheads.3. Floating the sections to the tunnel trench.4. Lowering the sections to seabed.5. Joining the sections together underwater.6. Removing the temporary bulkheads.7. Backfilling the trench.
Tunnel Construction
![Page 31: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/31.jpg)
31
Immersed-Tube Tunneling SystemImmersed-Tube Tunneling System
AdvantagesAdvantages ::
• Economy (most economical alternative for any type of underwater tunnel crossing).
• High construction rates (particularly for steel tube tunnels).
• Wide variety of different conditions.
DisadvantagesDisadvantages ::• Highly skilled and experienced workers.
• Safety measures for underwater construction..
Tunnel Construction
![Page 32: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/32.jpg)
32
DEVELOPMENTS & FUTURE TRENDSDEVELOPMENTS & FUTURE TRENDSIN TUNNEL CONSTRUCTIONIN TUNNEL CONSTRUCTION
Conventional TunnelingConventional Tunneling ::
Areas Developments
Blast Tunneling • Drilling techniques. • Blasting technology. • Re-use of excavated material.
Tunneling in Loose
Sand
• Injection. • High-pressure injection. • Soil freezing.
Shotcrete Safety Measures
• Special shotcretes without accelerators that reduce concrete solidity.
General Equipment Developments
• Advances in diesel motor technology (less pollutants in exhausted gases).
Handling of Groundwater
• Two-layer plastic sealing tracks (double water-pressure resistance).
Final Lining in Concrete
• Measures for protecting inner concrete linings (to prevent tears).
Tunnel Construction
![Page 33: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/33.jpg)
REFERANCES
http://terratec.co/files/TERRATEC-Microtunnelling-Brochure.pdf http://www.railsystem.net/natm/ http://www.dr-sauer.com/technical-info/906 https://en.wikipedia.org/wiki/Tunnel
33
![Page 34: tunnelling scope, construction techniques and necessity](https://reader033.fdocuments.us/reader033/viewer/2022051404/58e9a86c1a28ab9c318b5a73/html5/thumbnails/34.jpg)
Thank you Thank you
34
Tunnel Construction