1 Tuen Mun District Council Paper No. 32/2016 For discussion on 1 November 2016 Tuen Mun District Council Meeting Tuen Mun District Public Housing Development Purpose This paper updates Tuen Mun District Council (TMDC) on the latest progress of the public housing development in Tuen Mun under the Hong Kong Housing Authority (HA). Progress Report of Public Housing Development in Tuen Mun 2. On 23 November 2012, the Housing Department (HD) introduced the overall public housing development in Tuen Mun to the Environment, Hygiene and District Development Committee (EHDDC) of TMDC. On 6 January 2015, the Development Bureau (DevB) and Planning Department (PlanD) jointly presented the sites suitable for conversion to housing development in the short to medium terms in Tuen Mun. The latest progress of public housing development in the district is set out below and in Table 1. Tuen Mun Area 54 (Annex 1 (Plan 1) and Annex 2) 3. According to Tuen Mun Outline Zoning Plan (OZP), the domestic plot ratio of the housing sites in Tuen Mun Area 54 is 5. In view of the community pressing need for public housing, HD proposes to increase the plot ratio of Sites 1 & 1A and Sites 3 & 4 (East) to 6. HD has been conducting technical assessments on the proposal, which is considered feasible. After the DC consultation, HD will submit the proposal to the Town Planning Board (TPB) for consideration. HD will also timely review the plot ratio for Site 4A (South) & Site 5 to address the pressing need for public housing, and will further consult DC if required. 3.1 Tuen Mun Area 54 Site 2 (Plan 2) The building works for public rental housing (PRH) at Tuen Mun Area 54 Site 2 was commenced on 24 June 2014 and is anticipated for completion in mid-2017, providing about 4,600 flats.

Transcript of Tuen Mun District Council Meeting Tuen Mun District Public … · 1 Tuen Mun District Council Paper...

Page 1: Tuen Mun District Council Meeting Tuen Mun District Public … · 1 Tuen Mun District Council Paper No. 32/2016 For discussion on 1 November 2016. Tuen Mun District Council Meeting

1

Tuen Mun District Council Paper No. 32/2016

For discussion on 1 November 2016

Tuen Mun District Council Meeting

Tuen Mun District Public Housing Development

Purpose This paper updates Tuen Mun District Council (TMDC) on the latest progress of the public housing development in Tuen Mun under the Hong Kong Housing Authority (HA). Progress Report of Public Housing Development in Tuen Mun 2. On 23 November 2012, the Housing Department (HD) introduced the overall public housing development in Tuen Mun to the Environment, Hygiene and District Development Committee (EHDDC) of TMDC. On 6 January 2015, the Development Bureau (DevB) and Planning Department (PlanD) jointly presented the sites suitable for conversion to housing development in the short to medium terms in Tuen Mun. The latest progress of public housing development in the district is set out below and in Table 1. Tuen Mun Area 54 (Annex 1 (Plan 1) and Annex 2) 3. According to Tuen Mun Outline Zoning Plan (OZP), the domestic plot ratio of the housing sites in Tuen Mun Area 54 is 5. In view of the community pressing need for public housing, HD proposes to increase the plot ratio of Sites 1 & 1A and Sites 3 & 4 (East) to 6. HD has been conducting technical assessments on the proposal, which is considered feasible. After the DC consultation, HD will submit the proposal to the Town Planning Board (TPB) for consideration. HD will also timely review the plot ratio for Site 4A (South) & Site 5 to address the pressing need for public housing, and will further consult DC if required. 3.1 Tuen Mun Area 54 Site 2 (Plan 2)

The building works for public rental housing (PRH) at Tuen Mun Area 54 Site 2 was commenced on 24 June 2014 and is anticipated for completion in mid-2017, providing about 4,600 flats.

Page 2: Tuen Mun District Council Meeting Tuen Mun District Public … · 1 Tuen Mun District Council Paper No. 32/2016 For discussion on 1 November 2016. Tuen Mun District Council Meeting

2

3.2 Tuen Mun Area 54 Sites 1 & 1A (Plan 3) The site formation and related road works for Tuen Mun Area 54 Sites

1 & 1A were commenced in November 2015. It is anticipated that the sites will be handed over to HD for PRH development by end-2017 for completion in 2021/22.

Upon the increase of plot ratio to 6, the number of flats provided at the site will increase from about 3,000 to about 4,300, with population increasing from about 9,000 to about 11,000. The building height will increase from 120 mPD to 140 mPD.

3.3 Tuen Mun Area 54 Sites 3 & 4 (East) (Plan 4) The site formation and related road works for Tuen Mun Area 54 Sites

3 & 4 (East) were commenced in November 2015. It is anticipated that the sites will be handed over to HD for PRH development by end-2017 for completion in 2021/22.

Upon the increase of the plot ratio to 6, the number of flats provided at the sites will increase from about 4,000 to about 5,200, with population increasing from about 12,000 to about 13,000. The building height will increase from 120 mPD to 135 mPD.

3.4 Tuen Mun Area 54 Site 4A (South) (Plan 5) The procedure to rezone Site 4A (South) to “Residential (Group A)24”

was completed in 2015. It is anticipated that about 1,000 PRH units will be provided, with completion in 2024/25.

3.5 Tuen Mun Area 54 Site 5 (Plan 6) The procedure to rezone Site 5 to “Residential (Group A)25” was

completed in 2015. It is anticipated that about 700 subsidised sale flats (SSF) will be provided, with completion in 2024/25.

Tuen Mun Area 29 (West) (Plan 7 and Annex 2) 4. The procedure to rezone the site in Tuen Mun Area 29 (West) to “Residential (Group A)21” was completed in 2015. It is anticipated that about 990 PRH units will be provided, with completion in 2023/24. The development will include facilities such as a 5-storey community health centre and a 1-storey residential care home for the elderly, etc.

Page 3: Tuen Mun District Council Meeting Tuen Mun District Public … · 1 Tuen Mun District Council Paper No. 32/2016 For discussion on 1 November 2016. Tuen Mun District Council Meeting

3

Other Potential Public Housing Sites1 (Plan 1, Annex 3 and Annex 4) 5. On 2 September 2014, HD, PlanD, and relevant Government departments consulted TMDC on the public housing development at San Hing Road in Tuen Mun, and the relevant OZP amendment. At the meeting, members expressed concerns including traffic and transport etc. Subsequently, the Government has been investigating proactively on the adjustment of the site and the surrounding area for public housing development, and following up with members’ concerns. Currently developing the site in two portions is under consideration. According to latest estimation, the two portions may produce 1,700 and 5,600 flats respectively, with a total of 7,300 flats. Since it is still under study, with a lot of variables for consideration, the details of the proposal including the number of flats have yet to be determined. 6. Hong Po Road site is located to the west of the original scheme of the public housing development at San Hing Road in 2014. Relevant Government departments are conducting study on the feasibility of public housing development at this site in parallel. 7. Among the other potential public housing sites which DevB and PlanD consulted TMDC on 6 January 2015, some are still under study while studies for the remaining sites are yet to commence. Conclusion 8. For better utilisation of land resources and meeting the pressing need of the community for public housing, HA has to develop public housing in Tuen Mun according to the above plan, will continue to liaise with relevant Government departments in identifying suitable land for public housing development in response to the housing needs of the low- and middle-income families. Housing Department October 2016 1 San Hing Road Extension will also be examined in the current study on San Hing Road and Hong Po Road. See Annex 3 and Annex 4.

Page 4: Tuen Mun District Council Meeting Tuen Mun District Public … · 1 Tuen Mun District Council Paper No. 32/2016 For discussion on 1 November 2016. Tuen Mun District Council Meeting

4

Table 1: Basic information of public housing development in Tuen Mun

Public housing development projects

Number of flats proposed in

2012* (about)

Current number of flats proposed

(about)

Type Anticipated completion

Tuen Mun Area 54 Site 2 Sites 1 & 1A Sites 3 & 4 (East) Site 4A (South) Site 5

4,600 3,000 4,000 1,000 700

4,600 4,300 5,200 1,000 700

PRH PRH PRH PRH SSF

2017

2021/2022 2021/2022 2024/2025 2024/2025

Tuen Mun Area 29 (West) 690 990 PRH 2023/2024 *based on paper submitted to EHDDC on 23 November 2012 by HD Annex 1: Plan 1 – Public housing development in Tuen Mun (Location Plan) Plan 2 – Tuen Mun Area 54 Site 2 PRH (Site Layout Plan) Plan 3 – Tuen Mun Area 54 Sites 1 & 1A PRH (Conceptual Layout Plan) Plan 4 – Tuen Mun Area 54 Sites 3 & 4 (East) PRH (Conceptual Layout Plan) Plan 5 – Tuen Mun Area 54 Site 4A (South) PRH (Conceptual Layout Plan) Plan 6 – Tuen Mun Area 54 Site 5 SSF (Conceptual Layout Plan) Plan 7 – Tuen Mun Area 29 (West) Site PRH (Conceptual Layout Plan) Annex 2: Details of public housing development in Tuen Mun Annex 3: Other potential public housing sites in Tuen Mun (Location Plan) Annex 4: The latest progress of other potential public housing sites in Tuen Mun

Page 5: Tuen Mun District Council Meeting Tuen Mun District Public … · 1 Tuen Mun District Council Paper No. 32/2016 For discussion on 1 November 2016. Tuen Mun District Council Meeting
stella_hk_tsui
文字方塊
Page 6: Tuen Mun District Council Meeting Tuen Mun District Public … · 1 Tuen Mun District Council Paper No. 32/2016 For discussion on 1 November 2016. Tuen Mun District Council Meeting
stella_hk_tsui
文字方塊
Page 7: Tuen Mun District Council Meeting Tuen Mun District Public … · 1 Tuen Mun District Council Paper No. 32/2016 For discussion on 1 November 2016. Tuen Mun District Council Meeting
stella_hk_tsui
文字方塊
Page 8: Tuen Mun District Council Meeting Tuen Mun District Public … · 1 Tuen Mun District Council Paper No. 32/2016 For discussion on 1 November 2016. Tuen Mun District Council Meeting
stella_hk_tsui
文字方塊
Page 9: Tuen Mun District Council Meeting Tuen Mun District Public … · 1 Tuen Mun District Council Paper No. 32/2016 For discussion on 1 November 2016. Tuen Mun District Council Meeting
stella_hk_tsui
文字方塊
Page 10: Tuen Mun District Council Meeting Tuen Mun District Public … · 1 Tuen Mun District Council Paper No. 32/2016 For discussion on 1 November 2016. Tuen Mun District Council Meeting
stella_hk_tsui
文字方塊
Page 11: Tuen Mun District Council Meeting Tuen Mun District Public … · 1 Tuen Mun District Council Paper No. 32/2016 For discussion on 1 November 2016. Tuen Mun District Council Meeting
stella_hk_tsui
文字方塊
Page 12: Tuen Mun District Council Meeting Tuen Mun District Public … · 1 Tuen Mun District Council Paper No. 32/2016 For discussion on 1 November 2016. Tuen Mun District Council Meeting

Annex 2 Public housing development in Tuen Mun

(1) Tuen Mun Area 54 Site 2

Site Location : Located in Tuen Mun Area 54, near Tsz Tin Tsuen Site Area : About 4.2 ha Land use zoning : Residential (Group A) Plot Ratio : 5 (domestic) & 9.5 (non-domestic) Current Site Status : Under construction Type of development : PRH Number of units : About 4,600 Estimated population About 13,000 Facilities : Shopping centre, day care centre for the elderly, car

park, kindergarten, etc. Anticipated completion : Mid-2017 (2) Tuen Mun Area 54 Sites 1&1A

Site Location : Located in Tuen Mun Area 54, near Po Tong Ha Tsuen Site Area : About 2.9 ha Land use zoning : Residential (Group A) Plot Ratio : Proposed to increase from 5 to 6 (domestic) &

9.5 (non-domestic) Current Site Status : Under site formation works Type of development : PRH Number of units : Proposed to increase from 3,000 to 4,300 Estimated population : Proposed to increase from 9,000 to 11,000 Facilities : Kindergarten, day care centre for the elderly,

neighbourhood elderly centre, shopping centre, car park, etc. Anticipated completion : 2021/2022

Page 13: Tuen Mun District Council Meeting Tuen Mun District Public … · 1 Tuen Mun District Council Paper No. 32/2016 For discussion on 1 November 2016. Tuen Mun District Council Meeting

(3) Tuen Mun Area 54 Sites 3&4(East)

Site Location : Located in Tuen Mun Area 54, near Siu Hang Tsuen

Site Area : About 3.5 ha Land use zoning : Residential (Group A) Plot Ratio : Proposed to increase from 5 to 6 (domestic) &

9.5 (non-domestic) Current Site Status : Under site formation works Type of development : PRH Number of units : Proposed to increase from 4,000 to 5,200 Estimated population : Proposed to increase from 12,000 to 13,000 Facilities : Kindergarten, child care centre, special child care centre,

early education and training centre, shopping centre, car park, etc.

Anticipated completion : 2021/2022

(4) Tuen Mun Area 54 Site 4A(South)

Site Location : Located in Tuen Mun Area 54, near Siu Hang Tsuen Site Area : About 1 ha Land use zoning : Residential (Group A)24 Plot Ratio : 5 (domestic) & 9.5 (non-domestic) Current Site Status : Private land and Government land Type of development : PRH Number of units : About 1,000 Estimated population : About 3,000 Facilities : Kindergarten, car park, etc. Anticipated completion : 2024/2025

Page 14: Tuen Mun District Council Meeting Tuen Mun District Public … · 1 Tuen Mun District Council Paper No. 32/2016 For discussion on 1 November 2016. Tuen Mun District Council Meeting

(5) Tuen Mun Area 54 Site 5

Site Location : Located in Tuen Mun Area 54, near Po Tin Estate Site Area : About 0.8 ha Land use zoning : Residential (Group A)25 Plot Ratio : 5 (domestic) & 9.5 (non-domestic) Current Site Status : Private land and Government land Type of development : SSF Number of units : About 700 Estimated population : About 2,300 Facilities : Neighbourhood elderly centre, integrated children and

youth services centre, car park, etc. Anticipated completion : 2024/2025 (6) Tuen Mun Area 29(West)

Site Location : Located in Tuen Mun Area 29(West), near Po Tin Estate

and Leung King Estate Site Area : About 0.75 ha Land use zoning : Residential (Group A)21 Plot Ratio : 6 (domestic) & 2 (non-domestic) Current Site Status : Vacant Government land Type of development : PRH Number of units : About 990 Estimated population : About 2,400 Facilities : Community health centre, residential care home for the

elderly, car park, etc. Anticipated completion : 2023/2024

Page 15: Tuen Mun District Council Meeting Tuen Mun District Public … · 1 Tuen Mun District Council Paper No. 32/2016 For discussion on 1 November 2016. Tuen Mun District Council Meeting
stella_hk_tsui
文字方塊
Page 16: Tuen Mun District Council Meeting Tuen Mun District Public … · 1 Tuen Mun District Council Paper No. 32/2016 For discussion on 1 November 2016. Tuen Mun District Council Meeting

Annex 4

屯門區目前其他具潛力作公營房屋用地的最新進展

Latest Status of Other Potential Public Housing Sites in Tuen Mun District

地點 Location 最新進展 Latest Status

1. 屯門新慶路*

San Hing Road, Tuen Mun*

政府部門研究進行中

Under Study by

Government departments

2. 屯門新慶路延伸*

San Hing Road Extension, Tuen Mun*

政府部門研究進行中

Under Study by

Government departments

3. 屯門康寶路

Hong Po Road, Tuen Mun

政府部門研究進行中

Under Study by

Government departments

4. 屯門屯門舊墟及天后路

Tuen Mun Kau Hui and Tin Hau Road, Tuen Mun

政府部門研究進行中

Under Study by

Government departments

5.

屯門湖山路及龍門路湖山遊樂場

Wu Shan Recreational Park at Wu Shan Road and Lung Mun Road,

Tuen Mun

政府部門研究進行中

Under Study by

Government departments

6. 屯門第 39 區前香港基督教服務處培愛學校校舍

Ex-Hong Kong Christian Service Pui Oi School, Area 39, Tuen Mun

政府部門研究進行中

Under Study by

Government departments

7. 屯門第 23 區屯興路以東

East of Tuen Hing Road, Area 23, Tuen Mun

政府部門研究進行中

Under Study by

Government departments

8. 屯門順德聯誼總會李金小學以西

West of Lee Kam STFA Primary School, Tuen Mun

有待政府部門開展研究

To be Studied by

Government departments

9.

屯門大欖涌德邦危險品貨倉及路政署維修廠

Tak Bond Dangerous Godowns and Highways Department Maintenance

Depot, Tai Lam Chung, Tuen Mun

有待政府部門開展研究

To be Studied by

Government departments

10. 屯門掃管笏小秀(北面部份)

Siu Sau (Northern Portion), So Kwun Wat, Tuen Mun

有待政府部門開展研究

To be Studied by

Government departments

*新慶路延伸會於現時新慶路及康寶路的研究中一併探討。

* San Hing Road Extension will also be examined in the current study on San Hing Road and Hong Po Road.

**以上地點 1-10根據發展局及規劃署提交屯門區議會文件 2015 年第 2 號 (供屯門區議會於 6.1.2015 討論)

**Locations 1-10 based on TMDC Paper No.2/2015 submitted by DevB and PlanD (for TMDC discussion on 6.1.2015)