TUBOS METHOD - Vent Pipe Extensions · P.O. Box 4663, Clearwater, FL 33758 • Fax 727.213.6391...

1
STAINLESS INSERT METHOD MATERIAL COST $18 approx. (22 Ga. Stainless Steel rolled and PVC) TIME TO INSTALL 30-40 minutes www.Tubos.biz P.O. Box 4663, Clearwater, FL 33758 • Fax 727.213.6391 Patent Pending • Insert your stainless steel sleeve into existing vent pipe. • Apply caulking on top of existing pipe. • Cut & slide your new PVC over stainless steel. • Cut notches into exposed stainless steel. • Fold down stainless steel over new PVC to hold. Only good for lead boot application. • Attach No-Hub to existing vent pipe, tighten to 60 inch lbs torque or it will leak. • Measure and cut your PVC to specified height. • Attach PVC to No-Hub, again at 60 inch lbs torque. • Now fit your larger lead boot over pipe and no-hub then stuff all excess lead into smaller PVC. Not applicable for TPO or PVC roofs unless going below the roof deck. NO-HUB METHOD #1 - Insert your Tubos. #2 - Cut your Tubos at code height. #3 - Apply caulking to keep methane gas in. Done... and you still have one Tubos application left. Now apply lead boot, or adhere TPO or PVC, good for all roofing applications. MATERIAL COST $22 approx. (No-Hub and Larger Lead Boot to Fit Over No Hub) TIME TO INSTALL 15-20 minutes MATERIAL COST $16.70 avg. per extension TIME TO INSTALL 3 MINUTES OR LESS ! TUBOS METHOD

Transcript of TUBOS METHOD - Vent Pipe Extensions · P.O. Box 4663, Clearwater, FL 33758 • Fax 727.213.6391...

Page 1: TUBOS METHOD - Vent Pipe Extensions · P.O. Box 4663, Clearwater, FL 33758 • Fax 727.213.6391 Patent Pending • Insert your stainless steel sleeve into existing vent pipe. •

STAINLESS INSERT METHOD

MATERIAL COST $18 approx.

(22 Ga. Stainless Steel rolled and PVC)

TIME TO INSTALL 30-40 minutes

www.Tubos.bizP.O. Box 4663, Clearwater, FL 33758 • Fax 727.213.6391

Patent Pending

• Insert your stainless steel sleeve into existing vent pipe.

• Apply caulking on top of existing pipe.

• Cut & slide your new PVC over stainless steel.

• Cut notches into exposed stainless steel.

• Fold down stainless steel over new PVC to hold. Only good for lead boot application.

• Attach No-Hub to existing vent pipe, tighten to 60 inch lbs torque or it will leak.

• Measure and cut your PVC to specifi ed height.

• Attach PVC to No-Hub, again at 60 inch lbs torque.

• Now fi t your larger lead boot over pipe and no-hub then stuff all excess lead into smaller PVC. Not applicable for TPO or PVC roofs unless going below the roof deck.

NO-HUB METHOD

#1 - Insert your Tubos.

#2 - Cut your Tubos at code height.

#3 - Apply caulking to keep methane gas in.

Done... and you still haveone Tubos application left. Now apply lead boot, oradhere TPO or PVC, goodfor all roofi ng applications.

MATERIAL COST $22 approx.

(No-Hub and Larger Lead Boot to Fit Over No Hub)

TIME TO INSTALL 15-20 minutes

MATERIAL COST $16.70 avg. per extension

TIME TO INSTALL 3 MINUTES OR LESS !

TUBOS METHOD