Tuan Minh Le Patricia Palale ([email protected])[email protected] Gael Raballand...

21
Public Investment Management in Zambia Tuan Minh Le Patricia Palale ( [email protected] ) Gael Raballand ([email protected] ) 1

Transcript of Tuan Minh Le Patricia Palale ([email protected])[email protected] Gael Raballand...

Page 1: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

1

Public Investment Management in Zambia

Tuan Minh LePatricia Palale ([email protected])

Gael Raballand ([email protected])

Page 2: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

2

Outline1. Context

2. PIM Diagnostic

3. A Way Forward?

Page 3: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

3

ContextMacroPolitical EconomyInstitutionalGovernance

Page 4: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

4

Macro Context Zambia is a large country with low density and

sparse population: geographical and demographic impediments to PIM efficiency.

Donor dependent country though the trend is slowly shifting.

Low level of capital expenditures (app. 4% of GDP 2009), while capital/recurrent expenditures persistently decrease.

Strong economic growth during 1999-2008 but still not translated into significant decline in poverty, especially in rural areas.

Page 5: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

5

Political Economy ContextWide-scale ambitious reforms do not fare

well.First best solutions have usually not worked

well.Governance challenges do not explain all the

negative outcomes. There is also sometimes:neglect, in which actual public policy does not

follow stated policy priorities, andlack of capacity to implement, or simply well-

intentioned incompetence.

Page 6: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

6

Institutional ContextThere is a great fragmentation of institutions and

there is usually an absence of accountability.Ministry of Finance is relatively weak and does not

usually play its challenging role. The Ministry of Works and Supply, which according to

the law, is supposed to be in charge of physical investments, has lost some control of this function.

Sectors are playing a greater role in making PIM decisions, from prescreening of project proposals to implementation and supervision & monitoring.

Recent PFM reforms have not necessarily addressed some key PIM challenges.

Page 7: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

7

PIM DiagnosticInvestment guidance and preliminary screeningFormal Project AppraisalBudgeting and Project SelectionProject ImplementationProject AdjustmentFacility OperationProject Evaluation

Page 8: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

8

Investment guidance and preliminary screeningA number of long to medium term planning

instruments developed and intended for guiding annual budgeting in general and prioritization in capital budgeting in particular.The National Long Term Vision 2030.The Fifth National Development Plan (FNDP)

2006-10 -to be succeeded by the Sixth National Development Plan (SNDP).

Sector-specific development strategies.MTEF.

Page 9: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

9

Investment guidance and preliminary screening (2)But the poor quality of strategic/medium

term guidance leads to inefficient investment prioritization and investment screening.FNDP lacked a robust macro fiscal framework

or guidance for sector and regional development policies and strategies.

Sector strategies – typically used to pre-screen project proposals – reflect optimism bias with no credible link with revenue estimation.

Page 10: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

10

Formal Project AppraisalDual modalities for donor financed and

government financed project proposals.Highly decentralized appraisal process while

key challenges long existing:Inadequate legal framework and lack of

centrally publicized/transparent guidance for project appraisal.

Weak institutional capacity in appraisal function.

Page 11: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

11

Formal project appraisal (2)The whole process of prescreening and

appraisal managed exclusively by Sectors.No integrated central guidance on project

appraisal and selection developed. Planning and Budgeting Bill still under preparation.

CBA/CEA for deemed significant projects, but no transparent threshold for conducting such analyses or no formal guidance for methodology.

The core functions of independent review of appraisal de facto are missing – no challenge function.

Page 12: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

12

Budgeting and Project SelectionAlthough MTEF was one of the biggest strides in

PFM, quality of MTEF still needs to be improved.Complete disconnect of the MoFNP from project

planning and evaluation by sectors, breaking link between the budget cycle and the specific project appraisal and selection process.

MoFNP active role remains confined to establishing sector envelopes with no downstream follow-up.

Disconnect between strategic capital planning, budgeting, and project selection -- in effect heavily discount the gate keeper function.

Page 13: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

13

Project ImplementationBudgeting focuses more on annual cost control rather than on

total cost control. The absence of central guidelines for project implementation.Implementing agencies not under pressure - nor do they have

any vested incentives-- to prepare periodic progress reports and to establish a comprehensive database that could have helped trace progress and detect early symptoms of project delays and incompleteness.

MoFNP and Ministry of Works and Supply have no capacity/mechanisms to identify and analyze the root causes of incompleteness or cost overrun.

Reforms in procurement are being conducted, but competitive bidding is either not strictly feasible or enforceable due to a number of challenges.

Page 14: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

14

Project AdjustmentUpdating project financial or economic analysis is not

mandatory for receiving the next tranche of project financing. Change in completion plan or investment costs is usually done

or presented on an ad hoc basis.M&E Department at MoFNP is responsible for monitoring and

facilitating the development of M&E systems project implementation in sectors. But it faces numerous challenges:Understaffed (with only 6 officials) to carry its ambitious

mandates. Coordination, internally in MoFNP, or externally with MPSAs, is

particularly difficult. Active monitoring of project implementation does not exist – no

links with sector planning units. What appears to be a duplication of roles with the Project

Implementation department within MoFNP

Page 15: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

15

Facility OperationA mechanism to undertake inventory and

registration of public property being developed. The process was significantly delayed. (The mechanism is planned to be developed and implemented by December 2006 but until late 2008, only 80% of the work has been completed.)

The establishment of a database of government property – which is scheduled to be operational by 2007—has also been postponed: by the end of 2008, only 10% of the work plan was completed.

Donors tend to undermine national systems where they exist – e.g. motor vehicle registration.

Page 16: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

16

Project EvaluationNo formal institutional arrangement to allow

for effective central monitoring and feeding the evaluation results into learning, communicating and drawing lessons for new project cycles.

MPSAs are responsible for making all decisions on project selection, implementation and tracking service deliveries whereas M&E, Budget and Planning Departments in the MoFNP do not play a direct role in their evaluation.

Page 17: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

17

Summary Findings- Predominant role of line Ministries in

appraising project and implementation, - Weak challenging role and unclear

institutional mandates of the MoFNP, - Lack of vertical and horizontal coordination

and cross-institutional misaligned incentives=> Leading to low public investment efficiency

and rampant corruption in some sectors.

Page 18: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

18

Way forward? Focus engagement narrowly is preferable

Þ Need to consider feasible steps that will concentrate on institutional building that will call attention to promoting accountability systems

………..keeping in mind that first best solutions will probably not work …………………..

Page 19: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

19

What can be the way forward? The First Best… (guiding light….)1. Legal reform constitutes a critical institutional

development to strengthen PIM in Zambia, 2. The MoFNP should be mandated with preparing

central, uniform guidelines for public investment evaluation.

3. The MoFNP should publish standard guidance on appropriate format of project proposals and techniques applicable to evaluate economic and social values as appropriate to the scale and scope of proposed projects and commensurate to appraisal capacity at MPSAs.

4. Basic architecture for de facto missing functions (e.g., independent review and ex-post evaluation) needs to be established.

Page 20: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

20

What can be the way forward? The feasible way….. Pilot experiments in some sectors/Ministries

(where there is an explicit link with beneficiaries, such as access to health, education, water) by:reviewing strategies,develop monitoring and evaluation systems,change project implementation,develop impact evaluation.

Strengthen MoFNP (M&E department??). Initial step could be to work with Office of the Auditor General —to carry out an ex post review of recently completed projects in several sectors…….

Page 21: Tuan Minh Le Patricia Palale (ppalale@worldbank.org)ppalale@worldbank.org Gael Raballand (graballand@worldbank.org)graballand@worldbank.org 1.

21

ConclusionsPIM in Zambia embedded in the political

economy context,

Intrinsic weak role of the MoFNP on PIM issues could continue in the near future,

However, some experiments / pilots in some sectors / Ministries should be undertaken to strengthen the MoFNP at the margin.