PROCEEDINGS OF THE 8TH DMF TRUST BOARD MEETING HELD ON15.11.2018 AT 11.OO AM rN DURBAR HALL, COLLECTORATE, KEONJHAR.
The 8th Trust Board Meeting of DMF was held on 15.11.2O 18 at 11.00
AM in Durbar Hall, Collectorate, Keonjhar under the chairmanship of Sri Ashish
Thakare, IAS, Collector-cum-Chairman & Managing Trustee, DMF. The list of
participants is enclosed in the Annexure-I.
At the outset, the Collector welcomed all the members and
participants who attended the meeting. P.D., DRDA-cum-Chief Executive Officer,
DMF elaborated the list of projects approved in the last Trust Board meeting held
on 27.06.2018 and the corresponding proceedings sent to all members was
confirmed & approved by the members, unanimously.
Then as per the agenda note, various matter were discussed
sequentially. In the frrst instance, the project-wise progress of various executing
agencies was discussed.
The Power Point prepared by the PMU was presented in the house.
The receipt of funds under DMF, its utilisation, approval of projects & sanction of
funds as on 31.10.2018 is as follows:
Total Receipt of funds: Rs. 2218.68 Cr
Sanction of funds:
Utilisation of funds:
Rs. 1 191.53 Cr
Rs. 262.57 Cr
The P.D., DRDA-cum-Chief Executive Officer, Keonjhar narrated the
executing agencies-wise expenditure position for the information of the members. It
was revealed that the pace of expenditure is low in comparison to the funds
sanctioned. The Collector directed the executing agencies to expedite the
expenditure by means of regular monitoring and supervision. He also appraised the
members about the steps taken by the PMU to facilitate co-ordination between
NESCO, Revenue and Forest Departments to expedite utility shifting, land
acquisition and forest clearance, from time to time.
Hon'ble MLA, Sadar Sj. Abhiram Naik proposed that the roads which
are under construction in the mining affected areas under DMF by R&B need to be
double-laned, considering the continuous increase in vehicular traftic. The
Executive Engineer, R&B responded that the possibility of double laning has been
considered during the design and construction of bridges and culverts in the
current road projects and after the completion of current works, for which
agreements have already been signed with the contractors, further decision
regarding widening of BT section may be taken.
$pproval of new Proiects.
52 No.s of new proposals received from different quarters were placed
before the Trust Board by the Chief Executive Officer, DMF which was read out one
by one, all of which were unanimously approved. The list of proposals is placed at
Annexure-2.
The Hon'ble M.L.A., Anandapur, Sj. Mayadhar Jena proposed to
implement social security pension scheme under DMF to cover the left out
beneficiaries of the district for ensuring dignity of vulnerable persons. In this
connection, the Collector said that the proposal shall be forwarded to the Govt. and
as per Govt.'s decision, the proposal shall be implemented.
As per the proposal of Water Resource Department, a mega Lift
Irrigation (LI) project in 4 locations in the district was placed in the Trust Board for
approval. The EE, Mega Lift Projects, Bhubaneswar who was present in the meeting
briefed the necessity & expected outcome of the proposal. The proposal was
una-rrimously approved for implementation at an estimated cost of Rs. 254.71 Cr.
Further, Collector added that the Mega Piped Water Supply project under DMF will
be extended to ensure 1007o coverage of all households in the district, which was
welcomed by all the members.
The Collector-cum-Managing Trustee intimated to the house that amicro planning exercise will be carried out in all the mining affected villages in the
district in a participatory manl1er, using mobile based application and rea.l-time
digita-l data platform. Subsequently, a Village level Development Plan (VDP) will be
formulated for each mining affected village and after due approval, will be
implemented in a phased manner.
The P.D.-cum-C.E.O. intimated the house about the adoption of logo
under DMF by the Govt. in Planning & Convergence Department. The logo with the
nerme of the district shall be used in all signboards/communications for
display/ letterhead for projects/ schemes undertaken by DMF.
At last, the P.D., DRDA-cum-C.E. thanked all the members and
participants for their valuable suggestions and the meeting ended with a vote of
thanks to the Chair.At )lrrbu4l?
COLLEC{OR.CUM-CHAIRPERSON& MANAGING TRUSTEE, DMF,
KEONJHAR.
DISTRICT MINERAL FOUNDATIONS, KEONJHAR.(2ND Floor, DRDA, Building, Keonjhar-7s80Ol)
(email: [email protected])
Memo No. 33Copy forwarded to
invitees for favour of information
information
Date: lll 0-1 1)_'rl3,f the DMF Tnist Boar
/DMF. Date: lll 0-1 1}'rl3all the members of the DMF Tnlst Board/DMF.
andand necessar5r action. \
>\:r\-*oChief Executive Offrc\', \
DMF, Keonjhar.
MemoNo. 34 /DMF. Date: l\lr\l>11Copy to the Principal Secretary to Governmer\t, Steel & Mines
Department, Odisha, Bhubaneswar for favour of kind iq(mation.,
=rr'\',\ q.or
"^'"J,H:",**:#1""\ I
MemoNo. 39 /DMF. Date: \llGll2-;'l?Copy to the Additional Secretary to Governrient,' Planning &
Convergence Department, Odisha, Bhubaneswar for fagour of kind igformation.\\
chiern*""HOE&}\-1Memo No. bL /DMF. "H#:"".,f,T *r },rCopy to the Director of Mines, Odisha, Bhubhneswar for kind
DMF, Keonjhar.
MemoNo. BT /DMF. Date: l\\s\l -1fCopy to the District Informatics Officer, NIC, 'District Unit forinformation and necessary action. He is requested to upload the proceedings in thedistrict website.
\ \Rls.r.\ -.chief Executive oriiil' EaDMF, Keonjhar.
Anne'ote-L
MEMBERS PRESENT IN TIIE Ath TRUST BOARD MEETING OF DISTRICT MINERAL FOUNDATION, EEONJHAR( HELD oN 15.11.2o1aAT 11.ooaM IN DUREa.R HAILr coLLEcroRATE, KEoNJTTAR-
Si.No.
NameDesignation Mobile/
Contact No. e-mail id Signature
1 Collector, KeonjharChiarperson & Managing
Trustee trSrY2 P.D., DRDA, Keonjhar
Member-cum-ChiefExecutive *-,rlJ4<
3Smt. Sakuntala Laguri, Hon'ble M.P.(LokSabha), Keonjhar.
Member
=q\a\)\s: q a-*\--^L]) L=4
Sj. Sanatan Mahakud, Hon'ble M.L.A.,Champua
Member
5Sj. Abhiram Naik, Hon'ble M.L.A., Sadar,Keonjhar
Member rr?qfiqqq$ &bt";-ari /'l^r<6
Sj. Mayadhar Jena, Hon'ble M.L.A.,Annadapur. 'i.- Member
.t 1+ ?+I 92-' Rqg 1- rt .'--Xcra ll^c"r ]l )"c u
7 Sj. Bedabyasa Nayak, Hon'ble MLA, Telkoi Member
8Sri Basudev Naik, Zilla Parishad Member,Zone No. -27, Joda Block.
Member
9Sri Dillip Mishra, Chairperson, BarbilMunicipality
Member 7K1fr212fti0 Smt. Pramila Fuhan, P.S., Member,
Suakati G.P. of Banspal BlockMember
11Smt. Kamini Naik, Sarapanch, NayagarhG.P. of Jhumpura Block.
Member 44?6t?5t {L l\c$r1'rfi'r l1:lyy.
12 D.F.O., Keonjhar Division, Keonjhar. Member gr{370- 55 3 5 -A%l,l)Ki3 Deputy Director of Mines, Joda Member g6qs5\qSlj : ---'---4--..- --*=ti=16OI,79
14 Executive Engineer, RWD-I, Keonjhar Member 71t1>sYlb 1 (l ttlr, ArIrIl. l)istricl Mrr1,,istr':rte, Keonjhar. Member *1lu.-ti-t'*
dt
l6 Executive Engineer, RWSS Division,Keonjhar.
Member +l3€qrae\tJ' @)a:,-t7(
Executive Engineer, R&B Division,Keonjhar
Member lq) L\ (5 i") t$1--.,,r.,1.1,3:
IN District welfare Offrcer, Keonjhar Member *(nt+t>t'r^-- ilw-t!ul-a'19 Chief District Medical Officer, Keonjhar Member
20 Depuqy Director(P&S), DPMU, Keonjhar. Member 717stu?o? K N"2&,,h"2! Adl.P.D.(Finance), DRDA, Keonjhar. Invitee
22 Project Administrator, ITDA, Keonjhar Inyitee
23 District Education Officei, Keonjhar lnvitee- -t \ o('
24 D.P.C., SSA, Keonjhar Invitee 1u>tt'sxY> 5\V)KL{Y\25 PA-' trDA' chamoua I q^'l^ ' *tl "a-' | (Atu^^'Dv'A
Inyitee f{,,ro26
D.F.O., (eonjhar Wildlife Divisiion,Anandapur
Invitee
27 Executive Engineer, RWD-lI, Keonjhar Invitee "L\17 \-,titL- -ff--'a-,',12A Executive Engineer, RWD, Anandapur In't/itee qq3>aanEqt
\Ba.}- \r-r.-e.-r_ - er ..s .[,.o^J->.-_
29 Executive Engineer, RWS&S, Anandapur Invitee;: > IJS 'u---1tr-rqr
30Executive Engineer, R&B Division,Ghatgaon
Invitee
31 Executive Engineer, OLIC, Keonjhar. lnvitee ?Y)++DY'SF O ltc hvCo+rr.rl"(l,, QlY.s'Executive Engineer, MI Division,Keonjhar.
Invitee{ r\
Dct, Cr",[a,t {' e - ^^'lp.J aue*a
l,;x,'<:trlivc Ilngineer, MI Division'
Art:rtt<l:tPur.
1,x,,.',ttive Engineer, PH Division'
l(r:otrjhar.
DeveloPment Officer, BanaPal
l llor l. l )r'\'t'lrrlrtll( tlt ( )lllr ll '
l.rt t, lt,ttt'l'tlr1'tlt
,^+1a\,h tt.\
Ittr tl,,
lr I' tl' '
t' ,, .
j
;f,u,<
I
1q91la 1+"(().D., Watershed, Keonjhar'
Iixr:cu tive O fficer, Keonjhargarh
9+)733836Yli.,it:<:tttive Officer, Joda Municipality
71sll s78'ls"Officer, Barbil MuniciPaiitY
DeveloPment Off,rcer, Joda
I3lock Development Officer, Jhumpura
List of ncw proposals for 8th Trust Board Meet
Sl \o Name of thc ProjectMining/
NonMinins
Block/Municipality CP Villagc
Priority/OtherPriority
Sector Sub-ScctorAmount
ProposcdExecuting AgencyiLine Department
IInstallation of Dialysis Unit at BarbilCIIC Mining Barbil Muncipality Prioritv Health Care
Creation of Primary andSecondary Health CareFacility
CDMO
2
Establishment of Bio Medical WasteManagement system at DHH,Kconjhar
Mining Kconjhar Muncipality Prioritv Health CareCreation of Primary andSecondary Health CareFacility
CDMO
3Computerized Patient Registration(Centrally) at DHH Mining Keonjhar Muncipality Priority Ilcalth Care
Creation of Primary andSecondary Health CareFacility
CDMO
4Filling up of vacancies of Paramedicsto improve health service delivery inhealth institutions of the disrrict
MiningrNonMining
[)istrict levcl Priority llealth CareCreation of Primary andSecondary Hcalth CareFacility
CDMO
5Construction AJpgradation of casualitycomplex at DHH Keonjhar Mining Keonjhar Muncipality Priority llealth Care
Creation of Primary andSecondary Health CareFacility
(.DMO
6Installation of Cold Chamber Mortuaryat DHH Keonjhar Mining Kconjhar Muncipality Priority Ilcalth Care
Creation of Primary andSecondary Health CareFacility
CDMO
7Mechanized Floor cleaner at DHHKeonjhar Mining Keonjhar Muncipality Prioritv Health Care
Provision of necessaryequipment required formaking healthcareinfiastructure effective
5,00,000 CDMO
8
Support to frontline healthfunctionaries for improvement olhealth service delivery
Mining/NonMining
District level Priority Health Care
Provision of necessaryequipment required formaking healthcareinfr astructure effective
CDMO
9Mega lift Irrigation Project ar fivelocations in mining affected areas ofthe district
Mining JodaOthcrPriority
IrrigationDeveloping alternatesources of irrigation
254,71,65,000EE, MegaliftProjects,Bhubaneswar
l0 Operation of Old Age Home in Joda Mining Joda Priority
Welfare ofaged anddisabledpeople
Special programmes forwelfare of aged anddisabled
DSSO, Keonjhar
lt Provision of improved cookingimplemcnts and cookware to AWCs
Mining/NonMinins
Drslrict level PriorityWelfare ofWomen andChildren
Special programmes DSWO, Keonjhar
'iu"m-t! ilgfu rrusteeColloct)ii,lhar
I-ist of new 'oposals for 8th Trust Board Meet
Sl No Namc of the ProjcctN{ining/
Non)Iininc
Block/Municipality CP Village
Priority/OtherPrio rity
Sector Sub-Scctor AmountProposcd
Executing Agencv/Linc Dcpartment
t2Mega Watcr Supply Project in Telkoi,Patna, Saharapada, Ghasipura andAnadapur
Nonmining Priority
DrinkingWater
Pcrmancnt waterdistributron nctworks
885, I 8,00,000EIl RWSSKeonjhar
l3Construction of toilet complex(Sulabh) and drinking water facility atDllll Keonjhar
Mining Keonjhar Munctpaltty Priority Health CareCreation of Primary andSecondary Health CareFacility
EO Keonjhar
t4Enhanccmcnt ol livclihood of miningall'ccted peoplc through livestockmanagemenl
Mining Priority Livelihood Support lor livelihood 25,00,00,000 OLM
l5Assistance for dillercntial cost ofAutomatrc Milk Collcction Unit Mining Priority Livclihood Support 1br livelihood 24,00,000 GM.OMI.ED
l6Assistance towards 500/o cost forpurchasc ol 5 Bulk Milk Cooler
Mining Priority Livelihood Support fbr livelihood 25,00,000 GM,OMFED
t7 Construction ofcattlc feed store Mining Anandpur, Sadar Prioriw Livelihood Support for livelihood 72,00.000 OMI--ED
l8Augmentation of storage capacity ofoverhead rcsenoirs lor BarbilMunicipality
Mining Barbil Municipalrty Prioriw DrinkingWater
Pcmranent waterdistribution networks
2,86,00,000 PtlD, Keonjhar
l9Construction of toilet for girls andboys at Kcndriya Vidyalaya inChanrpua NAC
NonMining Champua Prioriry Education Toilet Blocks 9,65,000 PHD, Kconjhar
20Sewcrage treatment plant at DHH,Keonjhar Mining Keonjhar Muncipaliry Prioriry Health Care
Creation of Primary andSecondary Health CarcFacility
I 00,00,000 PHD, Kconjhar
2tInstallation of 3 I 5 KVA transformer inDHH Keonjhar Mining Keonjhar Muncipality Prioriry Health Care
Creation of Primary andSecondary Health CareFacility
70,000,00SE, NI]SCOKeonjhar
22Complction of boundary wall andaltematc road-backside of DHH,Kconjhar
Mining Keonjhar Muncipality Priority Hcalth CarcCreation of Primary andSecondary Ilealth CareFacility
20,00,000R & B DivisionKeonjhar
23 Constructron of gate at DHH, Keonjhar Mining Keonjhar Muncipality Priority Hcalth CarcCreation of Primary andSecondary Health CareFacility
6,00,000R & Il DrvisronKconjhar
Construction of Staff Quarter atvarious health institutions in miningaffected arcas ofthe district
Mining All mining blocks Prioriw Health CarcCreation of Primary andSecondary Health CareF-aci lity
150,00.000R&B Division,Keonjhar
25Installation of High Mast Light atDI II I, Kconjhar Mining Keonjhar Muncipality Priority Hcalth Carc
Creation o[ Primary andSecondary Health CareFacility
R&B Division,Keonjhar
,*.*&'ln"re,,nTrusteo
[,ist of new, I'or 8th Trust Board Mect
Sl No Name of the ProjectMining/
NonMining
Illock/Municipality CP Village
l'riori1v/O(hcrPriority
Scctor Sub-ScctorAmount
ProposedExecuting Agency/Line Dcpartmcnt
26Construction of mini stadium at
ChampuaNonMinine
Clhampua Priority Education Sports [nfrastructure R&B Kconjhar
27 Construction of mini stadium at Barbil Minins Barbil Municipality Priority Education Sports Infrastructure R&B Kconjhar
28
Construction of BT road with guardwall liom Banspani station road toKhuntapani School in ward no l3(Rcach I)
Mining Joda Municipality OthcrPriority
Physicallnliastructure Construction of road 99,80,700
EO JodaMunicipality
29Construction of BT road fromKhuntapani School to Sargitalia inward no l3 (Reach II)
Mining Joda Municipality OthcrPriority
Physicallnfraslructure Construction of road 62.t2.500
EO JodaMunicipality
30Construction of road from Sai MandirChhak via Bachhu hutting to old agehome
Mining Joda Municipality OtherPrioriry
Physicallnfiastnlcture Construction of road 60,00.000
EO JodaMunicipality
3tConstruction of bridge from shastriroad to old age home
Mining Joda Municipality OtherPriority
PhysicalInlraslructure Construction of bridge R&B Kconjhar
-32Construction of mini stadium atAnandpur
NonMining
Anandpur Prioritv Education Sports Infrastructure 1,03,16,400 R&B, Chatgaon
JJConstnrction of mini stadium at JNVHadagarh
Mining Hatadihi Prioritv Educalion Sports Infrastructure I , 19,60,400 R&8, Ghatgaon
34Installation ofdedicated sub station atKeonjhar Medical College
Mining Sadar Priorrty llealth Care
Provision ofnecessaryequipment required formaking healthcareinfrastructure effective
R&B, Keonjhar
35Improvement of road from fagu(Baitarani bridge) to women's college,champua lrom 0/0 km to 2/0 km
NonMining
ChampuaOthcrPriority
Physicallnliaslruclure
Conscruction of bridge 4,1 1,04,000 R&ts, Kconjhar
36Construction of road from Bhatuniatota sahi to huditala sahi
Mining SadarOtherPriority
PhysicalInfrastructure
Construction of roads 2,35,65,000 R&B. Keonjhar
37Construction of road from NH-20 toBaliagoda village Mining Sadar
OtherPrioriry
PhysicalInfrastructure
Construction of roads I ,16.12,000 R&B, Keonjhar
38Improvement of road lrom NH 20 nearSathighar sahi to NH 49 near firestation
Mining SadarOtherPriority
PhysicalInfrastructure
Construction ol roads 2,34,92,000 R&B, Keonjhar
39Improvement to NH-20 to tangaranivillage road
Mining JodaOtherPriority
Physicallnfrastructure
Constnrction of roads 8,57,99,000 R&B, Keonjhar
.,,*/$,h}ftfudh I ru ste e/ D.$1,, Keonlhr
3
List of new Is for 8th Trust Board Meet
Sl No Name of the ProjectNlining/
NonMining
Block/Municipality GP Village
Priority/OthcrPriority
Sector Sub-Sector AmountProposcd
Flxecuting Agency/Line Departmcnt
40Construction olpanchayat road fromNH-20 (Banajodi) to MachhakhandanaNallah (Bhatunia)
Mining Sadar/Jhumpura OtherPriority
PhysicalInfrastructure Construction of roads 5,4q.45.000 R&B, Keonjhar
4tConstruction ofroads identified as
unconnected habitations in the miningaffected areas ofthe district
Mining All mining blocks PriorityRoad
ConnectivityRoad Connectivity tounconnected habitations
Rural WorksDepartment
42Installation of Separate transformer in4 nos. PHC
Mining/NonMining
Sadar, Telkoi, Anandpur,Ghatgaon Priority Health Care
Creation of Primary andSecondary Health CareFacility
30.00.000RW (ElectricalDivision),Bhubaneswar
43Construction of l3 nos. Sub-Centrcbuilding
Mining/NonMining
Telkoi, Champua,Jhumpura, Hatadihi,Ananpur
Priority l{calth CarcCreation of Primary andSecondary Health CareFacility
396.00.000 RW Division-I, II& Anandapur
44Water supply with bore well to 7 nosSub-Centre
Mining/NonMining
Banspal, Telkoi,Jhumpura &Joda Priority I{ealth Care
Creation of Primary andSecondary Health CareFacility
28.()0.000RWD (PH)DivisionBhubaneswar
45Water supply with 2 bore well ar SDH,Champua
NonMining Champua Priority Health Care
Creation of Primary andSecondary Health CareFacility
RWD (PH)DivisionBhubaneswar
46Provision of water supply to HealthFacility at Gonasika PHC(N) Mining Banspal Prioriry Health Care
Creation of Primary andSecondary Health CareFacility
RwD (PH)DivisionBhubaneswar
47
Construction of Pump House,Compound Wall, OHR, Laying ofPipeline lor Rural Piped Water Supplyto Thakurpatna (Under Ranki RevenueVillage) under Sirishpal GP ofKeonjhar block
Mining Sadar Priority DrinkingWater
Permanent waterdistribution networks
I,65.77.000 RWSS, Keonjhar
48Provision for gap filling in OdishaAdarsh Vidyalayas in district
Mining/NonMining
District Level Priority Education To be decided
49 Improvement of ITI Barbil Mining Barbil Municipality Priority L,ducation Institution of higher andtechnical education To be decided
50
lnstallation of Labroratory andUpgradation of facilities atGovemment College ol Enginccring.Keonjhar
Mining Sadar Priority EducationInstitution of higher andtechnical education To be decided
5l Upgradation of facilities at OSME,Keonjhar Mining Sadar Priority Education
Institution of higher andtechnical education To be decided
c o r r..tow[]#-\Hf,a4nt]-lru s t e e
b.u,F.. Keotilhar
List of ncw proposals for 8th Trust Board Meet
Establishment of Basudevpur PrimarySchool at new location
'"""'&k#kTrustee
5
l*o Name of the ProjectMining/
NonMinins
Block/Municipalitl'
(;P !'illagcPriority/OthcrPrioritv
Sector Sub-SectorAmountProposcd
ixecuting Agency/Line Department
52 Mining Joda Priority EducationConstruction of schoolbuildins DPC, SSA