Agile Vendor Management Manifesto : Presented by Gaurav Rastogi
TRR/ARB Presentation Yanomamo Interactive DVD System Team 06 - December 4, 2013 ●Reetika Rastogi -...
-
Upload
teagan-hewlett -
Category
Documents
-
view
215 -
download
1
Transcript of TRR/ARB Presentation Yanomamo Interactive DVD System Team 06 - December 4, 2013 ●Reetika Rastogi -...
TRR/ARB PresentationYanomamo Interactive DVD
SystemTeam 06 - December 4, 2013
● Reetika Rastogi - Project Manager, Life Cycle Planner
● Tushar Saxena - Operational Concept Engineer,
Requirements Engineer
● Cristina Cano - Prototyper, Feasibility Analyst
● Rohit Mani - Requirements Engineer, Life Cycle Planner
● Sanjay Kutty - Feasibility Analyst, Software Architect
● Shruti Sannabhadti - Software Architect, Prototyper
Operational Concept OverviewTushar Saxena
1
• Anthropological case study tool cataloging an ax-fight incident of the Yanomamö tribe
• Enables users to watch the incident video while reading various incident related texts
• Users can also look at pictures of tribe members, genealogical information, and other graphs and charts
• Old system (on CD-ROM) only worked on classic Mac machines
• New system is implemented on a DVD and browser-dependent
Operational Concept Overview
2
Win Conditions● Play Time Based Media (TBM)● Link genealogies to TBM● Link statistics to TBM● Link stills to TBM● Link text to TBM
● Provide written text for reading
● Increased availability and wider outreach of course material
● Better learning environment for students● Facilitates deeper learning and information
access about the culture
● Increased academic prestige
Organizational Goals
3
TRR Outline
1. Demo of Initial Operational Capability (Product status demonstration) -- Cristina
2. Support Plan -- Rohit
3. Test Cases, Procedure and Results -- Rohit
4. Quality Focal Point -- Reetika
5. Summary of Transition Plan -- Sanjay & Shruti
4
Transition Objective● Full operation of the capabilities provided
to the client
● Provide the system on a DVD
● System functionality replicates the original system
● Testing on different browsers on our local machines
5
Transition Objective
● Testing along with client to ensure operational satisfaction
● Creating test data to ensure that the functionalities are working as expected
● Test the system at the client’s site
● Ensuring ease of use for the client as it is a new system
6
Transition Strategy
• Development of the system
• Testing the systemo Look and feelo Functionalityo Different machines and browsers
7
Transition Strategy
• Provide training to the client using the training document
• Create user manual
• Obtain feedback
8
Demo of Initial Operational Capability
Cristina Cano
9
Support PlanRohit Mani
10
Support Plan
• The system has been tested by implementation team and is ready for use
• Remaining bugs and further feature development will be handled by the client
• The development team will not be making any additional changes to the system 11
Test Cases, Procedures, and Results
Rohit Mani
12
Testing
• Testing by implementation team
• Testing by the client
• Final testing will be done at the client site and the implementation team will be present to document any known issues and bugs
13
Test Cases
• TC-01-01: Media Playback
• TC-01-02: Video Skipping
• TC-01-03: Fullscreen video
• TC-02-01: Text Linking
• TC-02-02: Genealogies
• TC-02-03: Stills
• TC-02-04: Maps
• TC-02-05: Rolling Text
14
Test Procedures
• An acceptance test script is used to guide the testers as they interact with the system
• All the test cases in the test plan will be covered by this script
• Any bugs encountered will be documented
15
Test Results
Test #1 - 11/18/2013Rolling Text not implemented - Bug #834
Test #2 - 12/02/2013All capabilities implemented
Test #3 - 12/05/2013Final Training and Testing
16
Quality Focal PointReetika Rastogi
17
18
19
20
Technical Debt
• Not choosing to auto-detect faces
• Text hard-coded into the HTML file -- working on resolving now
21
Traceability MatrixOCD WinWin Agreement SSAD Test Case(s)
OC-1Play Time-Based
Media
WC_2328, WC_2327, WC_2326
UC-01, UC-04 TC-01-01, TC-01-02, TC-01-03
OC-2Link text to TBM
WC_2337, WC_2335, WC_2334, WC_2332, WC_2330, WC_2326
UC-01, UC-02, UC-05, UC-06, UC-09
TC-02-01
OC-3Link stills to TBM
WC_2338, WC_2331, WC_2323, WC_2332
UC-02, UC-07, UC-08
TC-02-03, TC-02-04
OC-4Link statistics to
TBM
WC_2332, WC_2325 UC-02 TC-02-01
OC-5Link genealogies to
TBM
WC_2324, WC_2779 UC-02, UC-03 TC-02-02
OC-6Provide written
text
WC_2322 UC-09 TC-02-0122
Transition PlanSanjay Kutty &Shruti Sannabhadti
23
Hardware preparations
• Any operating system o Ex: Windows, Mac, Linux
• The computer should also have an operational DVD drive
• No extra hardware
24
Software PreparationsModern web browser is required
o IE 11+, Mozilla Firefox 9+, Google Chrome and Safari 10+
• The browser should be HTML5 compliant
25
Site and Staff Plan
• No specific site preparation is required
• A desktop or laptop with the mentioned requirements
• No staff required
26
Training
Date Time Location Contents
Person being trained
Responsible Personnel
Training Materials
12/5/2013
2 pm GFS 204 System Professor Gary Seamen
Team Training doc,User manual
12/5/2013
4 pm GFS & University Gateway
System Students Team Training doc,User manual
27
Stakeholder Roles & Responsibilities
Date Role Responsibility Location
12/04/13 Team,Client, TA’s Transition Readiness Review ARB evaluation
USC
12/02/13 –12/05/13
Prototyper, Tester, Project Manager
Perform final requirements checks and testing, resolve any issues.
USC
12/02/13 –12/05/13
Team, Client Client training and feedback
USC
12/06/13 Team, Client Deliver the system on a DVD
USC
28
Milestone Plan
Milestones Date for completion
1) Drive through major features developed, by client
11/18/13
2) Final Testing by Implementation Team 12/04/13
3) Client Training and acceptance testing 12/05/13
4) Delivery of final, completed DVD to Client
12/06/13
29
Required Resources
• The entire implementation team, has to be present during client training, testing and final delivery of the project
• Basic hardware and software requirements as enumerated earlier
• No additional staff or personnel required for installation or maintenance
30
Software Product Elements
• All the libraries, images and other necessary files required for the working of the Yanomamö Interactive project
• The tool for mapping the tribe members will be given to the client for future use
• User Manual will be included along with the rest of the files
31
Thank you!We welcome any questions or comments :)