Saint Regis Resort and Residences Bal Harbour, FL The Saint Regis Resort and Residences is a joint venture between Starwood Hotels and The Related Group. Replacing the iconic Sheraton Bal Harbour, the project profiles three separate towers located on famous Miami Beach. Two condominium towers with 268 separate private residences as well the 5 Star rated hotel tower operated by the exclusive Saint Regis. Amenities include; a full service spa, recreation areas, multiple restaurants and bars, as well as a variety of specialty shops. Total Square Footage: Total Cost: 990 million Mechanical Package: 50 million Project Duration: 30 months Stories: 30 stories

description

PROJECT LIST

Transcript of Troy Norris.Project List

Page 1: Troy Norris.Project List

Saint Regis Resort and Residences Bal Harbour, FL The Saint Regis Resort and Residences is a joint venture between Starwood Hotels and The Related Group. Replacing the iconic Sheraton Bal Harbour, the project profiles three separate towers located on famous Miami Beach. Two condominium towers with 268 separate private residences as well the 5 Star rated hotel tower operated by the exclusive Saint Regis. Amenities include; a full service spa, recreation areas, multiple restaurants and bars, as well as a variety of specialty shops. Total Square Footage: Total Cost: 990 million Mechanical Package: 50 million Project Duration: 30 months Stories: 30 stories

Page 2: Troy Norris.Project List

One Bal Harbour Miami Beach, FL One Bal Harbour is an ultra exclusive property located on the 2 mile stretch of Miami Beach; One Bal Harbour is the 30 story flag ship property for WCI Communities. The building concept includes 185 customized luxury condominium units as well as the 5 star Regent hotel offering 128 luxury suites, a full service SPA, Restaurant, Patio Grilles, and amenities’, etc… The total construction package exceeded 200 million dollars. Total Square Footage: 1,650,000 Total Cost: 210 million Plumbing Package: 11.2 million Project Duration: 34 months Stories: 33 stories

Highlights: Plumbing: 3 + million dollar fixture package Heaters: Qty (8) 1.5 million BTUH Lochinvar Boilers Booster Pumps; Qty (2) Delta P Multi-Stage Pump Packages

Page 3: Troy Norris.Project List

The Plaza at Oceanside Pompano Beach, FL Oceanside is a 19 story luxury Condominium property located on Pompano Beach, the concept of Beam Architects. The project includes 186 condominium suites, 7 loft units, 8 penthouses, a full amenities level, expansive pool deck, and the entire ground level was designed for retail spaces and restaurant tenant build-outs. The construction manager BCBE orchestrated the project and the construction schedule ran 28 months as anticipated, ending in late 2007. The total construction package finished out at nearly 64 million dollars. Total Square Footage: Total Cost: 64 million Plumbing Package: 6.3 million Project Duration: 24 months Stories: 42 stories

Page 4: Troy Norris.Project List

La Perla Sunny Isles, FL The La Perla is a 42 story luxury Condominium property located directly on Miami Beach, the concept of Kobi Karp Architects. This project included 420 condominium suites, atop 12 levels of elevated parking in addition to 24 private luxury townhouses. The construction manager Alliance Construction was the headed the construction team and the construction schedule endured 7 named storms throughout the 2004 and 2005 hurricane season and still finished ahead of schedule. The logistic of the site located on busy Collins Avenue offered little staging area and the lot restrictions offered no onsite lay down storage. The preparation and coordination on behalf of the entire team were an intrickle part in the success of this project. The total construction package finished out at nearly 64 million dollars. Total Square Footage: Total Cost: 64 million Plumbing Package: 3.8 million Project Duration: 24 months Stories: 42 stories

Page 5: Troy Norris.Project List

IL Lugano at the Village Fort Lauderdale, FL The IL Lugano is a 16 story luxury Hotel / Condominium property located in the heart of the boutique district of Ft Lauderdale situated across the street from famous Ft. Lauderdale beach. This project included 120 hotel guest suites, and 38 private luxury condominiums. The project was a joint venture with Suffolk Construction; mechanically the project included 120 individual fan coil units, and 46 separate air handling units supplied by 2 40 ton roof top Carrier chillers. This includes 64 oceanfront private condominiums in addition to 220 guest suites serviced by the famous Starwood Hotels. The amenities include a full service SPA, a variety of restaurants, multiple pools, and a list of guest services. The total construction package exceeded 160 million dollars. Total Square Footage: 800,000 Total Cost: 95 million Mechanical Package: 5.2 million Project Duration: 23 months Stories: 16 stories

Page 6: Troy Norris.Project List

Resort at Singer Island Singer Island, FL The Resort at Singer Island is another WCI Property located on the exclusive 2 mile stretch of Singer Island just north of West Palm Beach. The 18 story property includes 64 oceanfront private condominiums in addition to 220 guest suites serviced by the famous Starwood Hotels. The amenities include a full service SPA, a variety of restaurants, multiple pools, and a list of guest services. The total construction package exceeded 160 million dollars. Total Square Footage: 1,500,000 Total Cost: 161 million Plumbing Package: 7.3 million Project Duration: 26 months Stories: 19 stories

Page 7: Troy Norris.Project List

University of Iowa Hospital & Clinics Hospital Dentistry Clinic University of Iowa, Iowa City IA The Clinic of Hospital Dentistry relocated from across campus to this beautiful new expansion on the Pomerantz Pavilion of the University of Iowa Hospitals. The new clinic showcases 35 patient rooms and 25 new state of the art dental operator suites. Total Square Footage: 160,000 Total Cost: 12 million Mechanical Package: 1.7 million Project Duration: 18 months Stories: 1 level located on 5th floor

Systems: Heating: Hospital Central plant provided HWS/HWR Cooling: Campus Chilled Water Ducted Air: 2 McQuay AHU’s and 90 Variable Air Volume boxes with reheat Plumbing: Medical Gas, Plumbing Fixtures, 40 Dental Chair connections, 20 operatory tables

Page 8: Troy Norris.Project List

University of Iowa Children’s Hospital Pediatric Bone Marrow Transplant University of Iowa, Iowa City IA The new Pediatric Bone Marrow Transplant wing houses some of the most delicate patients within the University Hospital. These immnio suppressed children can now recover safely in state of art positive pressure wing. The project included a new Buffalo Air Handler equipped with pre and post UV lighting, HEPA filters, and steam sterilization. The construction was done under 2 phases with patients in adjoining wings through out the project. The use of negative air machines as well as infection control was paramount for the safety of the children during the project. Total Square Footage: 102,000 Total Cost: 15 million Mechanical Package: 2.2million Project Duration: 34 months Stories: 2 levels located on 2nd and 3rd th floor

Systems: Heating: Hospital Central plant provided HWS/HWR with radiant panels Cooling: Campus Chilled Water with radiant panels HVAC: 1 new Buffalo AHU with 17 V.A.V. boxes, cross tie into existing AHU”s Plumbing: Medical Gas, Plumbing Fixtures, Hill-Rom Patient head wall units

Page 9: Troy Norris.Project List

The University of Iowa Hospitals Carver Pavilion AHU Surgical Upgrade University of Iowa, Iowa City IA The installation of a new air handling unit in the sub-basement of the hospital which was serving the Cardiac surgical suites 5 stories above. The challenge of this project was to install the new AHU unit and 5 stories of ductwork, certify and crosstie into the existing systems while the existing unit remained uninterrupted. Total Square Footage: N/A Total Cost: 1.2 million Mechanical Package: 1.2million Project Duration: 8 months Stories: 1level located in sub-basement (5 levels of ductwork)

Systems: Heating: Hospital Central plant provided HWS/HWR Cooling: Campus Chilled Water Ducted Air: Trane AHU with 25 V.A.V. boxes Plumbing: none

Page 10: Troy Norris.Project List

The University of Iowa Hospitals College of Public Health University of Iowa, Iowa City IA This administration office renovation and expansion project normally would not represent any unusual obstacles. However, located in the heart of the University Hospitals, the integration into existing piping systems and its effect on adjoining areas of the hospital presented a unique challenge. To minimize the impact the project required detailed coordination as well as extensive prefabrication. Total Square Footage: 73,000 Total Cost: 7 million Mechanical Package: 1.5million Project Duration: 18 months Stories: 1level located on 3rd th floor

Systems: Heating: Hospital Central plant provided HWS/HWR with Fan Coil Units Cooling: Campus Chilled Water with Fan Coil Units Ducted Air: Trane AHU with 25 V.A.V. boxes Plumbing: 2 restrooms and 22 plumbing fixtures

Page 11: Troy Norris.Project List

Oaknoll Long-term Care Facility Iowa City IA Oaknoll is a retirement community offering full care amenities which includes a newly renovated 35 patient assisted living center. The 2 phase project incorporated condominiums above with a nursing center below. The total project included 15 custom condo units as well as 35 patient rooms. Total Square Footage: 60,000 Total Cost: 8 million Mechanical Package: 1.9million Project Duration: 30 months Stories: 2 stories

Systems: Heating: 2- 1 million BTUH Burnham boilers with HWS/HWR loop w V.A.V. boxes Cooling: 50 ton Trane DX chiller and 2 RTU’s Ducted Air: Trane AHU Plumbing: Residential and institutional applications with 93 fixtures

Page 12: Troy Norris.Project List

University of Iowa Services Building University of Iowa, Iowa City IA This new Facility was one of the University of Iowa’s fast track programs. The 3 story building was to be the new home for the campuses Design and Construction offices, as well all the campus infrastructure administration. Total Square Footage: 167,000 Total Cost: 17 million Mechanical Package: 4.7 million Project Duration: 8 months from ground breaking to punch out Stories: 3 finished + (4th level penthouse mechanical room)

Systems: Heating: 2 -1million BTUH boilers and a HWS//HWR loop with over 75 reheat coils. Cooling: 200 ton Trane Chiller Ducted Air: 2 Marcraft AHU’s and 75 Variable Air Volume boxes with reheat Plumbing: 3 stacked bathrooms with over 90 plumbing fixtures and a full cafeteria

Page 13: Troy Norris.Project List

University of Iowa Arts Building University of Iowa, Iowa City IA This is the latest addition to the University of Iowa Campus. This contemporary structure is the creation of the award winning HLKB Architects NYC. It will be the home for the new U of I Art Museum as well as Administration offices for the campus Art Department. Total Square Footage: 106,000 Total Cost: 18 million Mechanical Package: 2.7 million Project Duration: 28 months Stories: 3 finished + (full mechanical lower level)

Systems: Heating: Campus Medium Pressure steam to HWS/HWR heat exchangers Cooling: 12” Campus Chilled Water Ducted Air: 3 Temptrol AHU’s and 84 Variable Air Volume boxes with reheat Plumbing: Multiple restrooms located on all floors with 117 fixtures

Page 14: Troy Norris.Project List

ALPLA Manufacturing Iowa City IA This Austrian based plastic manufacturer provides bottling for the Proctor & Gamble Company another large manufacturing plant located in Iowa City. This 320,00 sq ft plant came to Iowa City in 2001 we were able to negotiate with Alpla Industries for the initial building, and have continued to serve their needs with many expansion projects, line changes and renovations not only at the Iowa City plant but at their Atlanta Facility as well. Total Square Footage: 320,000 Total Cost: 10 million Mechanical Package: Multiple projects total expenditures > 1 million Project Duration: Ongoing Stories: 1level

Systems: Heating: Multiple Roof top units Cooling: DX coils via RTU’s Ducted Air: Concentric Duct packages Plumbing: 2 gang locker rooms Process Piping: Chilled water, Condenser water, Compressed air, High pressure air