Triptico Consulting

2
OptimaIntegra Operational Excellence Solid experience in Industrial consumption (B2B), and Massive consumption (B2C): Luis Thayer Ojeda 0180, Of. 1702, Providencia, Santiago, Chile. www.optimaintegra.cl [email protected] Procurement Implementation: Category Analysis Supplier Assessment & Tenders. Negotiation & Selection. Contracting and Implementation. Purchases to Pay flow. Triple Match. Lean Six Sigma projects for Efficiencies: Business Case. Pre-Feasibility. Feasibility. Implementation. Preparation & Maintenance Order Intake Prepare Delivery Billing Distribute Cash In Customer/ Material Master Data Pricing Planning Credit Management Capture Orders Process Orders Changes Back Orders Delivery Due List processing Picking Transport Call Off Loading Billing Method Create a Billing document Monitor Billing Rebates & Commissions Payment Methods Banking Structure Payments Dunning CUSTOMERS Delivery Customer Service Centre (CSC) Logistic units at Sites Finance 1 2 3 4 5 6 CSC Consultancy Services for Processes Optimization and Integration. Cost Reduction on Transport, Fuel Consumption, Warehousing, Cost to Serve. Inventory Management & Policies. The Right Inventory. SLOBs reduction. ABC and Cycle Counting. Analysis on Logistic Foot Prints: Localization, Infrastructure, Savings. Diagnosis on Supply Chain: Processes, Organization, Technology. Change Management. Project Management: Pre-Feasibility, Feasibility, Implementation. Lean Six Sigma methodologies. Training & Implementation of Best Practices: S&OP, Order to Cash, Inventory Management, Warehousing, Purchases, Lean Six Sigma. Safety, Health & Environment (SHE) applied to Logistic: Transport Distribution Incidents, Warehousing, Dangerous Goods, cGMP.

Transcript of Triptico Consulting

Page 1: Triptico Consulting

OptimaIntegra

Operational Excellence

Solid experience in Industrial consumption (B2B), and Massive consumption (B2C):

Luis Thayer Ojeda 0180, Of. 1702,

Providencia, Santiago, Chile.

www.optimaintegra.cl

[email protected]

Procurement Implementation: • Category Analysis • Supplier Assessment & Tenders. • Negotiation & Selection. • Contracting and Implementation. • Purchases to Pay flow. • Triple Match.

Lean Six Sigma projects for Efficiencies: • Business Case. • Pre-Feasibility. • Feasibility. • Implementation.

Preparation &

Maintenance

Order

Intake

Prepare

DeliveryBillingDistribute Cash In

Customer/ MaterialMaster Data

Pricing

Planning

CreditManagement

CaptureOrders

ProcessOrders

Changes

Back Orders

Delivery DueList processing

Picking

TransportCall Off

Loading

BillingMethod

Create aBilling document

MonitorBilling

Rebates &Commissions

PaymentMethods

BankingStructure

Payments

Dunning

CUSTOMERS

Delivery

Customer Service Centre (CSC) Logistic units at Sites Finance

1 2 3 4 5 6

CSC

Consultancy Services for Processes Optimization and Integration.

Cost Reduction on Transport, Fuel Consumption, Warehousing, Cost to Serve.

Inventory Management & Policies. The Right Inventory. SLOBs reduction. ABC and Cycle Counting.

Analysis on Logistic Foot Prints: Localization, Infrastructure, Savings.

Diagnosis on Supply Chain: Processes, Organization, Technology. Change Management.

Project Management: Pre-Feasibility, Feasibility, Implementation. Lean Six Sigma methodologies.

Training & Implementation of Best Practices: S&OP, Order to Cash, Inventory Management, Warehousing, Purchases, Lean Six Sigma.

Safety, Health & Environment (SHE) applied to Logistic: Transport Distribution Incidents, Warehousing, Dangerous Goods, cGMP.

Page 2: Triptico Consulting

PLAN SOURCE MAKE DELIVER COST

Sales & OperationalPlanningprocess:

•DemandPlanning.

• SupplyPlanning.

• InventoryPlanning.

• ShipmentPlanning.

Purchases toPay process:

•CategoryManagement

•Tenders & Negotiation.

•Contracting.

•OrderCreation.

•Receipts & Invoice.

ProductionSchedulingprocess:

•Repetitive vs Discreteproduction.

• Lead Times.

•MTO, MTS, ATO.

•MRP II

Order to Cash process:

•OrderCreationConfirmation.

• Follow Up .

•Distribution Planning & Call list.

•Goods Issue & Invoice.

Cost & Capital

•Cost of Inventory.

•TransportCost.

•WarehousingCost.

•Cost to Serve.

More than 22 years of experience in the areas of Supply Chain and Procurement, including Customer Segmentation and Services, Sales & Operations Planning process, Purchases of Raw Materials, Spare Parts and Logistic Services, Maritime Transport, Land Transport, Warehousing cost, Inventory Management, and Cost to Serve reduction.

Setup

Project Roadmap

7

TH

E P

LA

N

Prepare

Business Cases

6

TH

E V

ALU

E

Execute!

8

DO

EVALUATE

Measure!

9

CH

EC

K

ACT

Define

Routes

towards Solution

5

TH

E C

UR

E

Define

Root Causes

4

DIA

GN

OS

E

Prepare

SCA Project Plan

1

CO

NT

EX

T

VA

LU

E P

RO

P

Understand

Gaps Business

Position

2Understand

Supply Chain

Position

3

EX

EC

UT

ION X

-RA

YC

UR

E

Diagnosis on Supply Chain & Operations: Business position: • Are your Customers rightly

segmented? • Which services are they requesting:

Speed, Flexibility, Costs? • What is your Customer Satisfaction? • Is your Customer Strategy alligned

with Manufacturing Strategy?

Supply Chain position: • How your Supply Chain is configured? • Is it matching your customers

requirements? • How Lean is your Supply Chain? • How Agile is? • How big are the Gaps to be solved ?

Are you executing the Right Projects to increase Value to your Customers and Shareholders?

The Supply Chain process flow are the critical ones based on SCOR model. The most used KPIs to control operations are:

Forecast accuracy (F2S – F2F)

Delivery in Full On Time (DIFOT)

Source in Full On Time (SIFOT)

Days Sales of Inventory (DSI)

Sales Orders Changes

Transport Cost

Inventory & Carrying Cost

Total Cost to Serve

Several Efficiency Projects (LSS) implemented in Latin America, Europe and Asia, leading to more than 60 Millons USD savings, and sustainable changes.