TRILLIUM HOSPITAL ADMINISTRATION BUILDING...CONTACT: SDFASD ALSDFKS SHEET INDEX: Sheet Number Sheet...
Transcript of TRILLIUM HOSPITAL ADMINISTRATION BUILDING...CONTACT: SDFASD ALSDFKS SHEET INDEX: Sheet Number Sheet...
101
Room name101
1A101
SIM
DOOR TAG
ROOM TAG
SECTION
www.gregerseninteriors.com
Scale
Date
Drawn By
Checked By
Project Number
1/4" = 1'-0"
5/20
/201
1 9:
30:2
7 AM
A0.0
Cover Sheet
Trillium Hospital
AdministrationBuilding
CheckerAuthor
Issue Date12
TRILLIUM HOSPITALADMINISTRATION BUILDING
1518 DIVISADERO AVESAN FRANCISCO, CA 95114
No. Description Date
GENERAL NOTES:1. PRIOR TO COMMENCING THE WORK, THE CONTRACTOR SHALL EXAMINE ALL CONTRACTDOCUMENTS, FIELD CONDITIONS, DIMENSIONS, ETC. FOR ACCURACY AND TO CONFIRMTHAT THE WORK IS BUILDABLE AS SHOWN. THE CONTRACTOR SHALL PROMPTLY INFORMTHE ARCHITECT, IN WRITING, OF ANY DISCREPANCIES AND SHALL OBTAIN CLARIFICATIONFROM THE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK IN QUESTION OR WITH ANYRELATED WORK.
2. THE CONTRACTOR SHALL VERIFY AND COORDINATE WALLS AND FRAMING THATREQUIRE A NON-TYPICAL THICKNESS DUE TO STRUCTURAL, ELECTRICAL, MECHANICAL,EQUIPMENT, OR OTHER REQUIREMENTS.
3. ALL STUD WALLS AND PARTITION FRAMING SHALL MEET STRUCTURAL REQUIREMENTS OFTHE LATEST EDITION OF THE UBC AND THE CALIFORNIA ADMENDMENTS.
5. VERIFY MOUNTING HEIGHTS OF BACKING PLATES AND SPECIAL STRUCTURAL SUPPORTREQUIREMENTS WITH EQUIPMENT MANUFACTURERS BEFORE INSTALLING BACKINGPLATES AND SUPPORT.
6. ALL THROUGH-PENETRATION FIRE STOPS SHALL COMPLY WITH UBC SECTION 714.
7. WHEN INSTALLING DRILLED-IN ANCHORS AND/OR POWDER-DRIVEN PINS IN NON-PRESTRESSED REINFORCED CONCRETE, USE CARE AND CAUTION TO AVOID CUTTING ORDAMAGING THE EXISTING REINFORCING BARS.
8. ALL DOORS AND PENETRATIONS IN WALLS AND PARTITIONS SHALL MAINTAIN THEREQUIRED FIRE PROTECTION RATING OF THAT WALL OR PARTITION. WHERE A CONFLICTBETWEEN PARTITION RATING AND DOOR/FRAME RATING OCCURS NOTIFY ARCHITECTPRIOR TO PROCEEDING.
9. ALL INTERIOR FINISHES IN ONE-HOUR RATED AREAS SHALL BE CONSTRUCTED WITHCLASS 2 MATERIALS. ALL OTHER MATERIALS SHALL BE CLASS 3 FIRE-RESISTANTMATERIALS, PER THE LATEST CODES AND STATUTES.
10. TYPICAL DOOR LEG IS 4" OFF WALL ADJACENT PERPENDICULAR WALL OR PARTITION.
11. ALL DOOR HARDWARE SHALL COMPLY WITH THE CURRENT REQUIREMENTS ANDGUIDELINES FOR ACCESS BY THE PHYSICALLY DISABLED (TITLE-24).
12. PROVIDE WEATHER STRIPPING FOR DOORS SEPARATING CONDITIONED ANDUNCONDITIONED SPACES PER TITLE 24.
13. ALL EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF ASPECIAL KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT, EXCEPTION PER UBC.PROVIDE READILY VISIBLE DURABLE SIGN ON OR ADJACENT TO THE DOOR, STATING "THISDOOR TO REMAIN UNLOCKED DURING BUSINESS HOURS." LETTERS SHALL BE 1" HIGH ONA CONTRASTING BACKGROUND.
14. PROVIDE EXIT SIGNS PER UBC AND CALIFORNIA ADMENDMENTS
15. A FLOOR PLAN PROVIDING EMERGENCY PROCEDURAL INFORMATION SHALL BEPOSTED AT EVERY STAIRWAY AND ELEVATOR LANDING, AND IMMEDIATELY INSIDE ALLPUBLIC ENTRANCES TO THE BUILDING. INFORMATION SHALL INCLUDE BUT NOT LIMITED TOTHE FOLLOWING:
A. LOCATION OF EXITS AND FIRE ALARM INITIATING STATIONS.B. DESCRIPTION OF FIRE ALARM HORN AND STROBE.C. FIRE DEPARTMENT EMERGENCY TELEPHONE NUMBER 9-1-1.D. THE PROHIBITION OF THE USE OF ELEVATORS DURING EMERGENCIES.E. INSTRUCTIONS TO BE FOLLOWED BY AMBULATORY, NON-AMBULATORY, ANDPHYSICALLY DISABLED PERSONS IN THE EVENT OF AN EMERGENCY.
SIGN SHALL BE PRINTED WITH A MIN. OF 3/16 INCH HIGH NON-DECORATIVE LETTERINGPROVIDING A SHARP CONTRAST TO THE BACKGROUND. THE INFORMATION SHALLINCLUDE THE FLOOR LEVEL AND BE POSTED SO THAT THE BOTTOM EDGE OF SUCHSIGNAGE IS LOCATED NOT MORE THAN 4' ABOVE THE FLOOR. (TITLE 19, CCR, SECTION 3.09).
16. FIRE EXTINGUISHERS ARE TO BE LOCATED AS REQUIRED BY THE GOVERNINGREGULATORY AGENCIES.
17. FIRE SPRINKLERS SHALL COMPLY WITH UBC CHAPTER 9 AND UBC STD 9-1. FIRESPRINKLER PLANS SHALL BE SUBMITTED FOR REVIEW TO THE PROPER REVIEWINGAGENCY PRIOR TO CONSTRUCTION. CONCEALED SPACES SHOULD BE SPRINKLERED.
18. A COMPLEMENT OF FIRE EXTINGUISHERS WITH A MIN. CLASSIFICATION OF 2A10BC SHALLBE MOUNTED SO THAT THE MAX. TRAVEL DISTANCE TO AN EXTINGUISHER, ON A FLOOR BYFLOOR BASIS, IS 75 FEET. IN ACCORDANCE WITH THE UFC STANDARD, THE TOP OF THE FIREEXTINGUISHERS SHALL BE MOUNTED NO HIGHER THAN FIVE FEET FROM THE FLOOR.EXTINGUISHERS WHICH ARE NOT READILY VISIBLE FROM ALL DIRECTIONS SHALL BEPROVIDED WITH SIGNAGE TO INDICATE THEIR LOCATION. (UFC 1002)
19. APPROVED STAIRWAY IDENTIFICATION SIGNS SHALL BE LOCATED AT EACH FLOORLEVEL WITHIN ALL ENCLOSED STAIRWELLS. THE SIGN SHALL IDENTIFY THE STAIRWAY,INDICATE WHETHER THERE IS ROOF ACCESS, THE FLOOR LEVEL, AND THE LOWER ANDUPPER TERMINUS OF THE STAIRWAY. THE SIGN SHALL BE PLACED APPROXIMATELY 5'ABOVE THE FLOOR LANDING IN A POSITION WHICH IS READILY VISIBLE WHEN THE DOORIS IN THE OPEN OR CLOSED POSITION. SEE APPENDIX C OF THE UNIFORM FIRE CODE.(UFC SECTION 1210.4)
20. AS MUCH AS PRACTICAL, RE-USE ITEMS FROM ELSEWHERE IN THE BUILDING. VERIFYWITH OWNER WHICH ITEMS WILL BE RE-USED.
21. CONTRACTOR TO MAINTAIN CODE COMPLYING EXITING AND SPRINKLERS DURINGCONSTRUCTION.
22. THE AUTOMATIC FIRE SPRINKLER SYSTEM IS REQUIRED TO BE MODIFIED IN THISBUILDING. THE DESIGNER/INSTALLER SHALL SUBMIT PERMIT DRAWINGS, COMPLYING WITHTHE REQUIREMENTS OF NFPA 13, INCLUDING HYDRAULIC CALCULATIONS, EARTHQUAKEBRACING AND HANGER FASTENER CALCULATIONS, TO THE DISTRICT FOR REVIEW ANDPERMIT. (CFC 1001.3/1003)
23. COMPLIANCE WITH CFC ARTICLE 87 "FIRESAFETY DURING CONSTRUCTION, ALTERATIONOR DEMOLITION OF A BUILDING" IS MANDATORY.
24. (E) BUILDING ENVELOPE COMPLIES WITH TITLE24 UNDER PREVIOUS SUBMITTAL.PROPOSED CHANGES DO NOT DECREASE ENVELOPE PERFORMANCE.
SYMBOL LEGEND: PROJECT DATA:
PROJECT TEAM:
SCOPE OF WORK: DEFERRED SUBMITTALS:
VICINITY MAP:
BUILDING CODES:2001 CALIFORNIA BUILDING CODE BASED ON THE 1997 EDITION OF THE UBC2001 CALIFORNIA PLUMBING CODE, BASED ON 2000 UPC2001 CALIFORNIA MECHANICAL CODE, BASED ON 2000 UMC2004 CALIFORNIA ELECTRIC CODE BASED ON 2002 NEC2005 BUILDING ENERGY EFFICIENCY STANDARDS2001 CALIFORNIA FIRE CODE
LEGAL JURISDICTION: CITY OF SAN JOSE, CASAN JOSE FIRE DISTRICT, CA
APN: 678-16-8
PLANNING ZONE: IP-B
CONSTRUCTION TYPE: V-N
BUILDING OCCUPANCY:B, F-1, S-2
FIRE PROTECTION: BUILDING IS PROVIDED WITH AUTOMATIC FIRE SPRINKLER SYSTEMTHROUGHOUT
SITE AREA: 29.88 ACRES
BUILDING AREA: 125,000 SF
AREA OF IMPROVEMENT: 125,000 SF
PARKING PROVIDED: SEE SHEET G0.04 FOR PARKING ANALYSIS
DEFERRED SUBMITTAL ITEMS SHALL BE REVIEWED AND APPROVED BY THEARCHITECT OR THE ENGINEER OF RECORD PRIOR TO SUBMITTAL FOR THEBUILDING OFFICIAL FOR APPROVAL.DEFERRAL OF ANY ITEM SHALL HAVE APPROVAL OF THE BUILDING OFFICIAL OFTHEIR DESIGN AND SUBMITTAL DOCUMENTS PRIOR TO ANY INSTALLATION.
1/ FIRE SPRINKLER SYSTEM2/ HIGH LEVEL STOCK RACK3/ BURN-IN CHAMBER SEISMIC ATTACHMENT4/ TOOLS INSTALLATIONS ARE TO BE UNDER SEPARATE PERMIT.
NEW WORK:
TENANT IMPROVEMENT OF OFFICE, STORAGE, ANDMANUFACTURING AREA. NEW TRASH ENCLOSURE, AND NEWEXTERIOR DOORS WILL BE INSTALLED.
DEMOLITION:
1. INTERIOR NON-STRUCTURAL PARTITIONS,FINISHES, FIXTURES, EQUIPMENT AS INDICATED ARETO BE REMOVED.
PROJECT LOCATION
CLIENT : JDFHALEFHLAEU LAIEHLAIWUEHFLWE1901 SDF;S ROADSAN FRANCISCO, CA.PHONE: (415) 165-7234FAX: (415) 165-7210CONTACT: DJFA ALKJSHFLAW
STRUCTURAL ENGINEER:IRELAND ENGINEERING43551 MISSION BLVD., STE. 110FREMONT, CA. 94539PHONE: 510.438.9632FAX: 510.438.0689CONTACT: ASDF ASDFHAJS
FACILITIES DEVELOPMENT:SIGMATECH FACILITIES DEVELOPMENT3333 BOWERS AVE., STE. 130SANTA CLARA, CA 95050PHONE: (408) 988-4345FAX: (408) 748-1826CONTACT: ASDF IOUF WU
MECHANICAL ENGINEER:SILICON VALLEY MECHANICAL980 N. 11TH ST.SAN JOSE, CA. 95112PHONE: 408.885.0500FAX: 408.885.0505CONTACT: ERAE ADFHALWF
ARCHITECT:ACADEMY OF ART UNITVERSITY2900 STOCKTON STREETSAN FRANCISCO, CA. 94102PHONE: 415.681.6453FAX: 415.68.2632CONTACT: UOIU NAO;NFN
ELECTRICAL ENGINEER:MIDSTATE ELECTRIC, INC.1855 KIRKMONT DR.SAN JOSE, CA. 95124PHONE: 408.374.9077FAX: 408.266.0565CONTACT: ASD ALSDFA
GENERAL CONTRACTOR:DEVCON CONSTRUCTION, INC.690 GILBRALTAR DR.MILPITAS, CA 95035PHONE: (408) 942-8200FAX: (408) 262-2342CONTACT: MARK JOHNSON
PLUMBING ENGINEER:METRO PLUMBING834 LENZEN AVE.SAN JOSE, CA. 95126PHONE: 408.287.7551FAX: 408.287.0831CONTACT: SDFASD ALSDFKS
SHEET INDEX:Sheet Number Sheet Name
A0.0 Cover SheetA1.0 Demolition PlansA2.1 Floor Plan Level 1A2.2 Floor Plan Level 2A3.1 Ceiling Plan Level 1A3.2 Ceiling Plan Level 2A4.0 Exterior Elevations and Building SectionsA5.1 Interior Elevations - 1A5.2 Interior Elevations - 2A6.1 Finishes Plan Level 1A6.2 Finishes Plan Level 2A7.1 Furniture Plan Level 1A7.2 Furniture Plan Level 2A8.0 Door and Room/ Finishes SchedulesA9.0 Interior Details
DN DN
DN
UP UP
UP
21 3 4 5 6 7 98 1110
B
C
A
D
E
FA4.0
6
A4.04
A4.0 5
A5.2
13
14
15
16
21 3 4 5 6 7 98 11
11
10
B
C
A
D
E
FA4.0
6
A4.04
A4.0 5
50' - 9 3/4"
29' -
0 1
/2"
A5.13
2
4
1
A5.1
5
8
7
6
A5.1
9
11
1012
A5.1 13
14
15
16
A5.21
2
3
4
A5.2 5
6
7
8A5.2
9
10
11
12
www.gregerseninteriors.com
Scale
Date
Drawn By
Checked By
Project Number
1/16" = 1'-0"
5/20
/201
1 9:
30:2
8 AM
A1.0
Demolition Plans
Trillium Hospital
AdministrationBuilding
CheckerAuthor
Issue Date12
No. Description Date
1/16" = 1'-0"2 Demolition Plan Level 2
1/16" = 1'-0"1 Demolition Plan Level 1
UP UP
UP
30' - 4 3/8" 5' - 0 1/2"
13' - 5 5/8" 61' - 3 3/8" 15' - 3 5/16" 98' - 11 3/16"
15' -
0 1
/2"
4' - 0 11/16" 11' - 3" 4' - 2 13/16"
5' -
5"
5' -
3"5'
- 0
21/3
2"
28' - 6 3/8"
10' -
9 7
/16"
2' -
2"9'
- 4"
2' -
0"
20' -
11
11/1
6"
1' - 4"
28' - 11 3/8" 6' - 11 3/4" 6' - 10"
11' - 3 1/8"
24' -
8"
24' -
5"
16' -
6 1
/4"
22' -
0 1
/16"
22' -
4 1
1/16
"
7' - 10 1/4"
6' -
7 3/
16"
82' - 8 7/16"
1' -
6"12
' - 9
"
11' - 0 7/8"
6' - 10" 2' - 5 1/4" 6' - 3"
8' -
5 1/
2"
17' -
11
1/8"
10' -
2"
21' -
6 7
/32"
3' -
2 15
/32"
9' -
6 1/
2"
28' -
0"
1' -
10 3
1/32
"
17' - 5"
9' - 7 7/8"5' - 10"
24' - 6" 36' - 1 1/2"
10' - 5 3/4"
16' -
10
13/1
6"7'
- 2
3/4"
10' -
1"
15' - 0 5/8" 5' - 2 1/8" 17' - 1 25/32" 5' - 0 23/32" 11' - 11 1/2" 12' - 0"
14' - 7 1/8"
1' - 1 1/8" 7' - 8 1/16" 5' - 0 1/8" 13' - 8 1/16"
13' -
6 5
/8"
14' -
1 1
5/16
"
1' -
11"
12' -
5 9
/16"
11' -
9 9
/16"
10' -
0"
10' -
0"
7' - 3 15/16" 12' - 4 5/8" 11' - 11" 25' - 11 5/16"17
' - 1
1 5/
16"
11' - 3 5/8" 11' - 5 1/8" 12' - 4 5/8"
6' - 0 5/8"
12' - 2 3/8" 13' -
7 1
5/32
"0'
- 8"
13' -
8 9
/32"
7' - 1 15/16" 14' - 11 9/16" 12' - 3 1/8" 12' - 2 1/4" 10' - 0 15/16" 10' - 0 1/8" 10' - 0 1/8" 9' - 11 1/2" 7' - 9 3/8"
10' -
2 7
/16"
36' -
2 7
/32"
5' -
8 5/
32"
4' -
11 1
5/16
"
8' - 0 1/2"
A4.0
6
A4.04
A4.0 5
A5.13
2
4
1
A5.1
5
8
7
6
A5.1
9
11
1012
A5.1 13
14
15
16
A5.21
2
3
4
A5.2 5
6
7
8A5.2
9
10
11
12
A9.02
Sim
A9.03
Sim
Entrance87
Staircase88
Staircase89
Entrance90
FUTURE1
FUTURE1
WOMEN'S RR3
COMP4
STOR5
CONF6
PO7
PO8
PO9
CONF10
CORRIDOR11
OPEN OFFICE12
CONF13
CONF14
PO15
CONF16
MEN'S RR2
CONF18
CONF19
CONF20
MAIL21
CONF22
STOR23
PRESENTATION24
CLASSROOM25
RR26
TRAINING27
TRAINING28
CONF29
COPY30
BREAK31
CLASSROOM32
HALLWAY34
LOBBY35
DEMO36
HALLWAY38
PRESENTATION40
ELEC41
MECH42
RR43
RR44
ELEV174
www.gregerseninteriors.com
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
5/20
/201
1 9:
30:2
8 AM
A2.1
Floor Plan Level 1
Trillium Hospital
AdministrationBuilding
CheckerAuthor
Issue Date12
No. Description Date
1/8" = 1'-0"1 Level 1 Floor Plan
DNDN
DN
A4.0
6
A4.04
A4.0 5
1A4.0
2A4.0
42' - 9 1/8"17
' - 2
19/
32"
12' -
2 1
/2"
13' -
3 1
5/32
"
18' - 9 13/16" 23' - 6 5/16"
10' - 1 1/4" 12' - 11 13/16"
10' - 0" 12' - 1 5/8" 10' - 0" 9' - 5"
12' - 1 5/8" 10' - 0" 10' - 0" 9' - 5"
12' -
0"
12' -
0"
12' - 3 3/4" 12' - 1 1/8" 8' - 0 1/8" 17' - 6 13/16"
7' - 8 1/2" 30' - 4 9/16"
12' -
9 1
/8"
16' -
6 5
/16"
12' -
6 2
7/32
"10
' - 1
1/4
"
15' -
1 1
5/32
"8'
- 11
1/4
"17
' - 9
1/1
6"10
' - 1
1/4
"
12' - 3 7/8"3' - 8 3/8"4' - 7 3/4"1' - 11 1/2"4' - 11 1/2" 8' - 6 3/8"
1' -
11"4' -
2 1/
4"2' -
3 1/
2"
12' -
0"
12' -
0"
9' - 6" 10' - 0" 12' - 1 5/8" 9' - 10 3/8"
22' - 0 5/8" 10' - 0" 9' - 10 3/8"
31' - 9 5/8" 10' - 2 1/4"
43' -
10
19/3
2"
12' -
0 1
/2"
31' -
5 3
/32"
A5.2
13
14
15
16
APP LAB46
STOR47
CONF48
OFFICE49
CONF50
PO51
CONF52
CONF53
CONF54
STOR55
PO56
PO57
PO58
MEN'S RR59
WOMEN'S RR60
SOFTWARE LAB61
HARDWARE LAB62
PO63
MAC64
PO65
PO66
PO67
PO68
PO69
PO70
CONF71
BOARDROOM72
PAN73
CONF74
ELEC75
COPY76
CONF77
CONF79
PO80
BREAK81
MEN'S RR59
IDF83
STOR84
STOR85
CONF86
CLOSET97
SHOWER98
SHOWER99
CLOSET100
SHOWER101
SHOWER102
ELEV173
www.gregerseninteriors.com
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
5/20
/201
1 9:
30:2
9 AM
A2.2
Floor Plan Level 2
Trillium Hospital
AdministrationBuilding
CheckerAuthor
Issue Date12
No. Description Date
1/8" = 1'-0"1 Level 2 Floor Plan
21 3 4 5 6 7 98 1110
B
C
A
D
E
F
A4.0
6
A4.04
A4.0 5
1A4.0
2A4.0
A5.13
2
4
1
A5.1
5
8
7
6
A5.1
9
11
1012
A5.1 13
14
15
16
A5.21
2
3
4
A5.2 5
6
7
8A5.2
9
10
11
12
A5.2
13
14
15
16
A9.01
Sim
2' x 4' Parabolic Troffer Light
2' x 2' Parabolic Troffer Light
8" Incandescent Can Light
100W Hemispheric Pendant Light
www.gregerseninteriors.com
Scale
Date
Drawn By
Checked By
Project Number
As indicated
5/20
/201
1 9:
30:3
2 AM
A3.1
Ceiling Plan Level 1
Trillium Hospital
AdministrationBuilding
CheckerAuthor
Issue Date12
No. Description Date
1/8" = 1'-0"1 Level 1
1/4" = 1'-0"Ceiling Symbols
21 3 4 5 6 7 98 1110
B
C
A
D
E
F
A4.0
6
A4.04
A4.0 5
1A4.0
2A4.0
A5.2
13
14
15
16
A9.05
Sim
2' x 4' Parabolic Troffer Light
2' x 2' Parabolic Troffer Light
8" Incandescent Can Light
100W Hemispheric Pendant Light
www.gregerseninteriors.com
Scale
Date
Drawn By
Checked By
Project Number
As indicated
5/20
/201
1 9:
30:3
5 AM
A3.2
Ceiling Plan Level 2
Trillium Hospital
AdministrationBuilding
CheckerAuthor
Issue Date12
No. Description Date
1/8" = 1'-0"1 Level 2
1/4" = 1'-0"Ceiling Symbols
Level 10' - 0"
Level 218' - 0"
Roof Level36' - 0"
21 3 4 5 6 7 98 1110
Level 10' - 0"
Level 218' - 0"
Roof Level36' - 0"
BC ADEF
Level 10' - 0"
Level 218' - 0"
Roof Level36' - 0"
BC ADEF
Level 10' - 0"
Level 218' - 0"
Roof Level36' - 0"
B CA D E F
Level 10' - 0"
Level 218' - 0"
Roof Level36' - 0"
21 3 4 5 6 7 98 1110
www.gregerseninteriors.com
Scale
Date
Drawn By
Checked By
Project Number
3/32" = 1'-0"
5/20
/201
1 9:
30:5
6 AM
A4.0
Exterior Elevationsand Building
Sections
Trillium Hospital
AdministrationBuilding
CheckerAuthor
Issue Date12
No. Description Date
3/32" = 1'-0"1 Longitudinal Section
3/32" = 1'-0"2 Section 1
3/32" = 1'-0"4 East Elevation 3/32" = 1'-0"5 West Elevation
3/32" = 1'-0"6 South Elevation
Level 10' - 0"
E1
A4.0
Level 10' - 0"
Level 10' - 0"
E 1A4.0
Level 10' - 0"
3
77
A9.04
Sim
A9.06
Sim
66 B
Level 10' - 0"
B
Level 10' - 0"
D
Level 10' - 0"
A9.010
Sim
Level 10' - 0"
D
Level 10' - 0"
www.gregerseninteriors.com
Scale
Date
Drawn By
Checked By
Project Number
1/4" = 1'-0"
5/20
/201
1 9:
31:0
0 AM
A5.1
Interior Elevations -1
Trillium Hospital
AdministrationBuilding
CheckerAuthor
Issue Date12
No. Description Date
1/4" = 1'-0"1 Presentation room - East 1/4" = 1'-0"2 Presentation Room - South
1/4" = 1'-0"3 Presentation room - West 1/4" = 1'-0"4 Presentation Room - North
1/4" = 1'-0"5 Conference Room - South 1/4" = 1'-0"6 Conference Room - West
1/4" = 1'-0"7 Conference Room - North 1/4" = 1'-0"8 Conference Room - East
1/4" = 1'-0"9 Typ. Multi-Stall Bath - South 1/4" = 1'-0"11 Typ. Multi-Stall Bath - North
1/4" = 1'-0"10 Typ. Multi-Stall Bath - East 1/4" = 1'-0"12 Typ. Multi-Stall Bath - West
1/4" = 1'-0"13 Typ. Single Bath - East 1/4" = 1'-0"14 Typ. Single Bath - South
1/4" = 1'-0"15 Typ. Single Bath - West 1/4" = 1'-0"16 Typ. Single Bath - North
E 56
Level 10' - 0"
Level 10' - 0"
5 6
Level 10' - 0"
A9.011
Sim
A9.012
Sim
A9.013
Sim
A9.014
Sim
A9.015
SimLevel 1
0' - 0"Level 1
0' - 0"
4
Level 10' - 0"
6 7 E1
A4.0 6 E1
A4.0
www.gregerseninteriors.com
Scale
Date
Drawn By
Checked By
Project Number
1/4" = 1'-0"
5/20
/201
1 9:
31:0
4 AM
A5.2
Interior Elevations -2
Trillium Hospital
AdministrationBuilding
CheckerAuthor
Issue Date12
No. Description Date
1/4" = 1'-0"1 Typ. Private Office - West 1/4" = 1'-0"2 Typ. Private Office - North
1/4" = 1'-0"3 Typ. Private Office - East 1/4" = 1'-0"4 Typ. Private Office - South
1/4" = 1'-0"5 Lobby - East 1/4" = 1'-0"6 Lobby - South
1/4" = 1'-0"7 Lobby - West 1/4" = 1'-0"8 Lobby - North
1/4" = 1'-0"9 Break Room - North 1/4" = 1'-0"10 Break Room - East
1/4" = 1'-0"11 Break Room - South 1/4" = 1'-0"12 Break Room - West
1/4" = 1'-0"13 Boardroom - North 1/4" = 1'-0"14 Boardroom - East
1/4" = 1'-0"15 Boardroom - South 1/4" = 1'-0"16 Boardroom - West
UP UP
UP
1 2
34
7
9 13
15
29
30
31
32
33
34
353637
38
39
40
41
42
4344
4647
48 49
50
51 52 53 54 55 56 57
58
59
12
14
63
64
115
Entrance87
Staircase88
Staircase89
118
119
Entrance90
FUTURE1
FUTURE1
MEN'S RR2
WOMEN'S RR3
COMP4
STOR5
CONF6
PO7
PO8
PO9
CONF10
CORRIDOR11
OPEN OFFICE12
CONF13
CONF14
PO15
CONF16
SERVER17
CONF18
CONF19
CONF20
MAIL21
CONF22
STOR23
PRESENTATION24
CLASSROOM25
RR26
TRAINING27
TRAINING28
CONF29
COPY30
BREAK31
CLASSROOM32
HALLWAY34
LOBBY35
DEMO36
HALLWAY38
PRESENTATION40
ELEC41
MECH42
RR43
RR44
ELEV174
126
127
128
138
A9.07
Sim
A9.08
Sim
A9.013
Sim
Finish Legend
Carpet
Concrete
Hardwood
Heavy Duty Carpet
Linoleum
Polished Concrete
www.gregerseninteriors.com
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
5/20
/201
1 9:
31:1
2 AM
A6.1
Finishes Plan Level1
Trillium Hospital
AdministrationBuilding
CheckerAuthor
Issue Date12
No. Description Date
1/8" = 1'-0"1 Finishes Plan Level 1
DNDN
DN
17
18
23
24
71
72
73
74 75 76 77 78 79 80 81
82
83
84
85868788
89 90 91929394
95
96
97
98 99
100101102103
104 105 106 107
108
109
APP LAB46
STOR47
CONF48
OFFICE49
CONF50
PO51
CONF52
CONF53
CONF54
STOR55
PO56
PO57
PO58
MEN'S RR59
WOMEN'S RR60
SOFTWARE LAB61
HARDWARE LAB62
PO63
MAC64
PO65
PO66
PO67
PO68
PO69
PO70
CONF71
BOARDROOM72
PAN73
CONF74
ELEC75
COPY76
CONF77
CONF79
PO80
BREAK81
MAC ROOM82
IDF83
STOR84
STOR85
CONF86
CLOSET97
SHOWER98
SHOWER99
CLOSET100
SHOWER101
SHOWER102
ELEV173
120
121
122
123
124
125
136
Finish Legend
Carpet
Hardwood
Heavy Duty Carpet
Linoleum
Polished Concrete
www.gregerseninteriors.com
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
5/20
/201
1 9:
31:1
8 AM
A6.2
Finishes Plan Level2
Trillium Hospital
AdministrationBuilding
CheckerAuthor
Issue Date12
No. Description Date
1/8" = 1'-0"1 Finishes Plan Level 2
UP UP
UP
21 3 4 5 6 7 98 11
11
10
B
C
A
D
E
F
A4.0
6
A4.04
A4.0 5
1A4.0
2A4.0
A5.13
2
4
1
A5.1
5
8
7
6
A5.1
9
11
1012
A5.1 13
14
15
16
A5.21
2
3
4
A5.2 5
6
7
8A5.2
9
10
11
12
www.gregerseninteriors.com
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
5/20
/201
1 9:
31:3
3 AM
A7.1
Furniture Plan Level1
Trillium Hospital
AdministrationBuilding
CheckerAuthor
Issue Date12
No. Description Date
1/8" = 1'-0"1 Furniture Plan Level 1
DNDN
DN
21 3 4 5 6 7 98 1110
B
C
A
D
E
F
A4.0
6
A4.04
A4.0 5
1A4.0
2A4.0
A5.2
13
14
15
16
www.gregerseninteriors.com
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
5/20
/201
1 9:
32:0
6 AM
A7.2
Furniture Plan Level2
Trillium Hospital
AdministrationBuilding
CheckerAuthor
Issue Date12
No. Description Date
1/8" = 1'-0"1 Furniture Plan Level 2
www.gregerseninteriors.com
Scale
Date
Drawn By
Checked By
Project Number
5/20
/201
1 9:
32:0
6 AM
A8.0
Door and Room/Finishes Schedules
Trillium Hospital
AdministrationBuilding
CheckerAuthor
Issue Date12
No. Description Date
Door Schedule
Family Height Level Mark Fire RatingFrame
Material Frame Type FinishConstructio
n Type
Single-Flush 7' - 0" Level 1 1Single-Flush 7' - 0" Level 1 2Single-Flush 7' - 0" Level 1 3Single-Flush 7' - 0" Level 1 4Single-Flush 7' - 0" Level 1 7Single-Flush 7' - 0" Level 1 9Single-Flush 7' - 0" Level 1 13Single-Flush 7' - 0" Level 1 15Single-Flush 7' - 0" Level 2 17Single-Flush 7' - 0" Level 2 18Single-Flush 7' - 0" Level 2 23Single-Flush 7' - 0" Level 2 24Single-Flush 7' - 0" Level 1 29Single-Flush 7' - 0" Level 1 30Single-Flush 7' - 0" Level 1 31Single-Flush 7' - 0" Level 1 32Single-Flush 7' - 0" Level 1 33Single-Flush 7' - 0" Level 1 34Single-Flush 7' - 0" Level 1 35Single-Flush 7' - 0" Level 1 36Single-Flush 7' - 0" Level 1 37Single-Flush 7' - 0" Level 1 38Single-Flush 7' - 0" Level 1 39Single-Flush 7' - 0" Level 1 40Single-Flush 7' - 0" Level 1 41Single-Flush 7' - 0" Level 1 42Single-Flush 7' - 0" Level 1 43Single-Flush 7' - 0" Level 1 44Single-Flush 7' - 0" Level 1 46Single-Flush 7' - 0" Level 1 47Single-Flush 7' - 0" Level 1 48Single-Flush 7' - 0" Level 1 49Single-Flush 7' - 0" Level 1 50Single-Flush 7' - 0" Level 1 51Single-Flush 7' - 0" Level 1 52Single-Flush 7' - 0" Level 1 53Single-Flush 7' - 0" Level 1 54Single-Flush 7' - 0" Level 1 55Single-Flush 7' - 0" Level 1 56Single-Flush 7' - 0" Level 1 57Single-Flush 7' - 0" Level 1 58Single-Flush 7' - 0" Level 1 59Single-Flush 7' - 0" Level 1 12Single-Flush 7' - 0" Level 1 14Single-Flush 7' - 0" Level 1 63Single-Flush 7' - 0" Level 1 64Single-Flush 7' - 0" Level 2 71Single-Flush 7' - 0" Level 2 72Single-Flush 7' - 0" Level 2 73Single-Flush 7' - 0" Level 2 74Single-Flush 7' - 0" Level 2 75Single-Flush 7' - 0" Level 2 76Single-Flush 7' - 0" Level 2 77Single-Flush 7' - 0" Level 2 78Single-Flush 7' - 0" Level 2 79Single-Flush 7' - 0" Level 2 80Single-Flush 7' - 0" Level 2 81Single-Flush 7' - 0" Level 2 82Single-Flush 7' - 0" Level 2 83Single-Flush 7' - 0" Level 2 84Single-Flush 7' - 0" Level 2 85Single-Flush 7' - 0" Level 2 86Single-Flush 7' - 0" Level 2 87Single-Flush 7' - 0" Level 2 88Single-Flush 7' - 0" Level 2 89Single-Flush 7' - 0" Level 2 90Single-Flush 7' - 0" Level 2 91Single-Flush 7' - 0" Level 2 92Single-Flush 7' - 0" Level 2 93Single-Flush 7' - 0" Level 2 94Single-Flush 7' - 0" Level 2 95Single-Flush 7' - 0" Level 2 96Single-Flush 7' - 0" Level 2 97Single-Flush 7' - 0" Level 2 98Single-Flush 7' - 0" Level 2 99Single-Flush 7' - 0" Level 2 100Single-Flush 7' - 0" Level 2 101Single-Flush 7' - 0" Level 2 102Single-Flush 7' - 0" Level 2 103Single-Flush 7' - 0" Level 2 104Single-Flush 7' - 0" Level 2 105Single-Flush 7' - 0" Level 2 106Single-Flush 7' - 0" Level 2 107Single-Flush 7' - 0" Level 2 108Single-Flush 7' - 0" Level 2 109Single-Flush 7' - 0" Level 1 115Single-Flush 7' - 0" Level 1 118Single-Flush 7' - 0" Level 1 119Single-Flush 7' - 0" Level 2 120Single-Flush 7' - 0" Level 2 121Single-Flush 7' - 0" Level 2 122Single-Flush 7' - 0" Level 2 123Single-Flush 7' - 0" Level 2 124Single-Flush 7' - 0" Level 2 125Single-Flush 7' - 0" Level 1 126Single-Flush 7' - 0" Level 1 127Single-Flush 7' - 0" Level 1 128Curtain Wall Sgl Glass 7' - 8 1/4" Level 1Curtain Wall-Store Front-Dbl 7' - 8 1/4" Level 1Curtain Wall-Store Front-Dbl 7' - 8 1/4" Level 1Curtain Wall Sgl Glass 7' - 8 1/4" Level 1 130Curtain Wall-Store Front-Dbl 7' - 8 1/4" Level 1 131Single-Flush 7' - 0" Level 2 136Single-Flush 7' - 0" Level 1 137Single-Flush 7' - 0" Level 1 138
Finish Schedule
Name NumberCeilingFinish Base Finish Wall Finish Comments Floor Finish
Room 155Room 156Room 157Room 158HALLWAY 159HALLWAY 160HALLWAY 161 Polished ConcreteStaircase 162Staircase 163STOR 164ELEC 165OPEN OFFICE 166OPEN OFFICE 167HALLWAY 168OPEN OFFICE 169OPEN OFFICE 170HALLWAY 171OPEN OFFICE 172ELEV 173ELEV 174Room 175 LinoleumRoom 176 Linoleum
Finish Schedule
Name NumberCeilingFinish Base Finish Wall Finish Comments Floor Finish
HALLWAY 105 Polished ConcreteHALLWAY 106 Polished ConcreteHALLWAY 107 Polished ConcreteHALLWAY 108 Polished ConcreteOPEN OFFICE 109 Heavy Duty CarpetHALLWAY 110HALLWAY 111HALLWAY 112HALLWAY 113HALLWAY 114HALLWAY 115HALLWAY 116HALLWAY 117HALLWAY 118HALLWAY 119HALLWAY 120 Heavy Duty CarpetHALLWAY 121 Polished ConcreteHALLWAY 122 Polished ConcreteHALLWAY 123 Polished ConcreteHALLWAY 124 Polished ConcreteHALLWAY 125HALLWAY 126HALLWAY 127OPEN OFFICE 128OPEN OFFICE 129 Heavy Duty CarpetOPEN OFFICE 130OPEN OFFICE 131HALLWAY 132Room 133HALLWAY 134HALLWAY 135HALLWAY 136HALLWAY 137HALLWAY 138OPEN OFFICE 139OPEN OFFICE 140OPEN OFFICE 141OPEN OFFICE 142OPEN OFFICE 143OPEN OFFICE 144HALLWAY 145OPEN OFFICE 146OPEN OFFICE 147OPEN OFFICE 148OPEN OFFICE 149OPEN OFFICE 150OPEN OFFICE 151HALLWAY 152HALLWAY 153Room 154
Finish Schedule
Name NumberCeilingFinish Base Finish Wall Finish Comments Floor Finish
FUTURE 1MEN'S RR 2WOMEN'S RR 3 LinoleumCOMP 4 LinoleumSTOR 5 LinoleumCONF 6 CarpetPO 7 CarpetPO 8 CarpetPO 9 CarpetCONF 10 CarpetCORRIDOR 11 Polished ConcreteOPEN OFFICE 12 Heavy Duty CarpetCONF 13 CarpetCONF 14 CarpetPO 15 CarpetCONF 16 CarpetSERVER 17 LinoleumCONF 18 CarpetCONF 19 CarpetCONF 20 CarpetMAIL 21 LinoleumCONF 22 CarpetSTOR 23 LinoleumPRESENTATION 24 HardwoodCLASSROOM 25 CarpetRR 26TRAINING 27 CarpetTRAINING 28 CarpetCONF 29 LinoleumCOPY 30 LinoleumBREAK 31 LinoleumCLASSROOM 32 Carpet
33HALLWAY 34 Polished ConcreteLOBBY 35 Polished ConcreteDEMO 36 CarpetRoom 37HALLWAY 38 Polished ConcreteRoom 39PRESENTATION 40 HardwoodELEC 41 LinoleumMECH 42 LinoleumRR 43RR 44HALLWAY 45APP LAB 46 LinoleumSTOR 47 LinoleumCONF 48 CarpetOFFICE 49 HardwoodCONF 50 HardwoodPO 51 CarpetCONF 52 CarpetCONF 53 CarpetCONF 54 CarpetSTOR 55 LinoleumPO 56 CarpetPO 57 CarpetPO 58 CarpetMEN'S RR 59WOMEN'S RR 60 LinoleumSOFTWARE LAB 61 LinoleumHARDWARE LAB 62 LinoleumPO 63 CarpetMAC 64 LinoleumPO 65 CarpetPO 66 CarpetPO 67 CarpetPO 68 CarpetPO 69 CarpetPO 70 CarpetCONF 71 CarpetBOARDROOM 72 HardwoodPAN 73 LinoleumCONF 74 CarpetELEC 75 LinoleumCOPY 76 LinoleumCONF 77 CarpetHALLWAY 78CONF 79 CarpetPO 80 CarpetBREAK 81 LinoleumMAC ROOM 82 LinoleumIDF 83 LinoleumSTOR 84 LinoleumSTOR 85 LinoleumCONF 86 CarpetEntrance 87 Polished ConcreteStaircase 88 ConcreteStaircase 89 ConcreteEntrance 90 Polished ConcreteSHOWER 91 LinoleumCLOSET 92 LinoleumSHOWER 93 LinoleumSHOWER 94 LinoleumSHOWER 95 LinoleumCLOSET 96 LinoleumCLOSET 97 LinoleumSHOWER 98 LinoleumSHOWER 99 LinoleumCLOSET 100 LinoleumSHOWER 101 LinoleumSHOWER 102 LinoleumHALLWAY 103 Polished ConcreteHALLWAY 104 Polished Concrete
45° ± 10°
METAL STUD BRACE SCHEDULEBRACE LENGTH 3-5/8" STUD 6" STUDUP TO 7'-11" 20 GA. 20 GA.
8'-0" TO 9'-11" 18 GA. 20 GA.
10'-0" TO 11'-11" 16 GA. 20 GA.
12'-0" TO 13'-11" 14 GA. 20 GA.
14'-0" TO 15'-11" - 18 GA.
16'-0" TO 17'-11" - 18 GA.
18 AND 20 GA. (8'-0" O.C.); 14 GA. (12'-0"
O.C.)ALTERNATE DIRECTION, EVERY OTHER BRACE.
6"
(3) #10 S.M.S.
METAL STUD BRACE PERSCHEDULEBELOW. (8' O.C. FOR 20 GA.12 GA. CLIP W/(3) #10 S.M.S. TO TOPTRACKGYPSUM BD.
IF INTERSECTING WALLS ARE LESSTHAN 12'-0" O.C. AND TOPTRACKIS CONTINUOUS BETWEEN WALLS,BRACING MAY BE OMITTED.
METAL STUDS
ACOUSTICAL BLANKET, SEERCPWHERE OCCURS
CEILING HEIGHTSEE RCP
3/4" GAP
3/4"
2 1/2" M
IN.
EMBED
INSULATION (WHERE OCCURS)
GYPSUM BOARD
METAL STUDS
(2) #10 S.M.S. @ 24" O.C.
CONT. 16 GA. METAL DEEP LEGTRACK ANCHORED TO DECKABOVE.
FRICTION FIT TOP RUNNER INTODEEP LEG TRACK (LEAVE 3/4"GAP)
12 GA. X 3" WIDE PLATE
(2) 3/8" HILTI-III EXP. ANCHORS
CONCRETE / METAL DECK
3/4" GAP
3/4"
INSULATION (WHERE OCCURS)
GYPSUM BOARD
METAL STUDS
POWDER DRIVEN FASTENERS@ 24" O.C. MAX. (RAMSET #3348)
CONT. 16 GA. METAL DEEP LEGTRACK ANCHORED TO DECKABOVE.
FRICTION FIT TOP RUNNER INTODEEP LEG TRACK (LEAVE 3/4"GAP)
CONCRETE / METAL DECK
GYPSUM BOARD
METAL STUDS
POWDER DRIVENFASTENERS@24" O.C.. RAMSET #3348
FINISHED FLOOR ANDBASE(PER FINISH PLANS)0'-0"TOP OF CONC. SLAB
ACOUSTICINSULATION(WHERE OCCURS)
ACOUSTICSEALANT(WHERE OCCURS)
45° ± 10°
(E) WOOD ROOF ASSEMBLY
(E) PURLIN BEYOND
(E) GLULAM
(3) 10d x 2-1/2" MIN.
METAL STUD BRACING
D SIDELIGHT JAMB AT DOOR
C SIDELIGHT HEAD (JAMB SIM.)
E SIDELITE SILL
A JAMB (HEAD SIM.) AT DOOR
B SILL AT DOOR
ALIGN W/ DOOR FRAME
VIEWLIGHT
ALUM. FRAME
GYP. BOARD
METAL STUD FRAMING
ALUM. FRAME
FINISH FLOOR
ALUM. FRAME
VIEWLIGHT
DOOR
3/8" DOOR UNDERCUT
FINISH FLOOR
GYP. BOARD
ALUM. DOOR FRAME
WOOD DOOR
METAL STUD FRAMING
METAL RUNNERSEALANT
OR MATCH EXISTING
FINISH TO MATCH EXISTING
VIEWLIGHT
CARPET TO CONCRETEB
CARPET TO RESILIENT FLOORINGA
CARPET
VINYL TRA NSITIONSTRIPTO MA TCH WALL BA SE
CONC.
CARPET
VINYL TRA NSITIONSTRIPTO MA TCH WALL BA SE
RESI LIEN T F LOORING
NOTE : MA X. 1/2" HE IGHT FOR TRANSITION SILL
1/2"
MAX.
1/2"
MAX.
CERAMIC TI LE OR SLA TETHINSETMORTAR. SEE FI NISH PLAN
CONT' S.STL . SCREED
CARPET
(E) CONC. SLAB
FIN. FLR.
SEA LED CONC.
VINYL TRA NSITI ON STRIP
VCT
FIN. FLR.
1/4" MAX. TYP.
MIRROR
SENSOROPERATEDELECTRONIC HANDWASHING FAUCET
2 1/2" X 21/2"X 1/4" AT 3'-0"MAX. (CENTERBETWEEN EACHLAVATORY, TYP.)
TYPICALANGLE TOANGLE
ANGLES TOMTL. STUD
PROVIDE16 GA.STUD ATEVERYSUPORTANGLE
INSULATEUNDERSINKH.W. PIPES &DRAIN, TYP.
METAL STUD
SCHEDULEDFLOOR,SEE FINISH PLANAND SCHEDULE
2" WELD,TYP.
S S SUPPORT ANGLESILICONE CAULK (CLEAR)
CLEARKNEESPACE
SOLID SURFACECOUNTERTOP WITHEASED EDGES OVER 3/4"SUBSTRATE
SS-1
SOLID SURFACE SPLASH
1'-0"
1/8
2'-10"MAX
6"
2'-0"
4"
F.F.
2"
2'-3" M
IN
8" MIN
6" MAX
9" M
IN
1_2"
STUD BACKING ANDSUPPORT.TOP AND BOTTOMADJUSTABLE SHELVING
3/4" PLYWOODCONSTRUCTIONTHROUGHOUTP. LAM. ON ALL EXPOSED SURFACES
WHITE MELAMINE LAMINATE ONALLEXPOSED INTERIOR SURFACESSCHEDULED HARDWAREPERSPECIFICATIONS
PRE LAMINATE ON UNDERSIDEOFCABINET
1'-4"
4"4"
BLOCKING AS REQ'D
SCHEDULED SINK AND FAUCET
MELAMINE BACK PANEL
DOOR
1/8" STEEL BRACKET CONTINUOUSACROSS BACK OF DOOR -FASTENTO TOE KICK WITH WOOD SCREWS
SCHEDULED BASEANDFLOOR COVERING
4"
1 1/2"
1/2"
2"
2'-3" M
IN
8" MIN
6" MAX
9" M
IN
ONE ADJUSTABLE SHELF
DOOR
BASE AS SCHEDULED
DRAWER
WHITE MELAMINEINTERIOR
3/4" MDFCONSTRUCTIONTHROUGHOUT
P. LAM. ON ALL EXPOSED SURFACES
HARDWARE AS SCHEDULED
2'-10"
T.O.
COU
NTER
TOP
4"
3"
TYP.
TYP.
6"3"
3"
1/4"
2'-0"
1 1/2"
1/4"
5"
P. LAM. COUNTERTOP WITH 4"HIGH SPLASH OVER 3/4" MDFSCRIBE TO FIT, PL-2
3_4"
3/4" THICK PLYWOODCOUNTERTOP IN P.LAM.FINISH WITH DRIPLESSEDGE TO MATCH (E)
DRAWER FACE IN P.LAM.FINISH, TYP.3/4" THICK CABINETANDDOOR FACELINE OF DRAWER GUIDE, TYP.
WHITE MELAMINEINTERIORFINISH
BASE AS SCHEDULED
1/2" GAP, TYP.
3"
4"EQ.
EQ.
EQ.
11 __ 2"
2'-0"U.O.N.
3/4"
2'-10"
4"
EQ.
0'-0"TOP OF CONC. SLAB
WEDGES CUT FROM 2X'S.INSTALL @ 12" O.C. (2) #8F.H.WOOD SCREWS TOP ANDBOTTOM
PLYWOOD CASEWORK
(2) #8 F.H. WOOD SCREWSTOP AND BOTTOM (12" O.C.HORIZ.)
2X CONT. FIRE TREATED NAILERS
3/8" HILTI KB-III EXPANSION ANCHORS@ 12" O.C. WITH 2" DIA. WASHERS(TEST TO 1350 LBS.) 2 1/2" EMBED.
#8 X 2-1/2" F.H. WOODSCREW@ 6" O.C. (TYP. ALL AROUND)
www.gregerseninteriors.com
Scale
Date
Drawn By
Checked By
Project Number
As indicated
5/20
/201
1 9:
32:1
2 AM
A9.0
Interior Details
Trillium Hospital
AdministrationBuilding
CheckerAuthor
Issue Date12
No. Description Date
3" = 1'-0"1
1 - TYPICAL PARTION 6" ABOVE LAY-INCEILING
3" = 1'-0"2
2 - TYPICAL PARTION PERPENDICULARTO METAL DECK ABOVE
3" = 1'-0"3
3 - TYPICAL PARTION PARALLEL TOMETAL DECK ABOVE
3" = 1'-0"4 4 - TYPICAL PARTION BASE
3" = 1'-0"5
5 - DIAGONAL BRACE PERPENDICULARTO (E) WOOD ROOF PURLIN
3" = 1'-0"6 7 - ALUMINUM DOOR FRAME DETAILS
12" = 1'-0"7
8 - THRESHOLD AND TRANSITIONDETAILS
12" = 1'-0"8
9 - FLOOR FINISH TRANSITIONS: STONETILES TO CARPET
12" = 1'-0"9
10 - FLOOR FINISH TRANSITIONS: CONC.TO VCT
1 1/2" = 1'-0"10
11 - ACCESSIBLE COUNTERTOPLAVATORY
1 1/2" = 1'-0"11 12 - UPPER CABINET, TYP.
1 1/2" = 1'-0"12 13 - LOWER CABINET WITH SINK, TYP.
1 1/2" = 1'-0"13
14 - LOWER CABINET WITH 1 DRAWER,TYP.
1 1/2" = 1'-0"14
15 - LOWER CABINET WITH 4 DRAWERS,TYP.
3" = 1'-0"15 16 - BASE CABINET - FRONT