TRIAL PIT & BOREHOLE
![Page 2: Trial pit n borehole](https://reader035.fdocuments.us/reader035/viewer/2022062312/5562b2f2d8b42a7c4a8b56d0/html5/thumbnails/2.jpg)
TRIAL PIT AND BOREHOLE
• Excavation of ground in order to study or sample the composition and structure of the subsurface, usually dug during a site investigation, a soil survey or a geological survey.
• To identify whether the site is suitable for the proposed work.
![Page 3: Trial pit n borehole](https://reader035.fdocuments.us/reader035/viewer/2022062312/5562b2f2d8b42a7c4a8b56d0/html5/thumbnails/3.jpg)
TRIAL PITTRIAL PIT• Shallow excavations to a depth no greater
6m.
• Support use are timbering, steel frames with hydraulic jack, battered or tapered side.
• Suitable for most low rise developments. • Suitable for the investigation of all types of
land.
Depth Excavation Method
0-2m By Hand
2-4m Wheeled Back Hoe
4-6m Hydraulic Excavator
![Page 4: Trial pit n borehole](https://reader035.fdocuments.us/reader035/viewer/2022062312/5562b2f2d8b42a7c4a8b56d0/html5/thumbnails/4.jpg)
ADVANTAGES DISADVANTAGES
•Preferred for
cohesive soil and soft
rock.
•Easy dug / excavated
using diggers.
•Showing clear land
strata to facilitate
rough inspections.
•Depth is limited.
•Deeper excavation will
require the human
energy.
![Page 5: Trial pit n borehole](https://reader035.fdocuments.us/reader035/viewer/2022062312/5562b2f2d8b42a7c4a8b56d0/html5/thumbnails/5.jpg)
HYDRAULIC EXCAVATOR
WHEELED BACK HOE
![Page 6: Trial pit n borehole](https://reader035.fdocuments.us/reader035/viewer/2022062312/5562b2f2d8b42a7c4a8b56d0/html5/thumbnails/6.jpg)
![Page 7: Trial pit n borehole](https://reader035.fdocuments.us/reader035/viewer/2022062312/5562b2f2d8b42a7c4a8b56d0/html5/thumbnails/7.jpg)
BOREHOLEBOREHOLE
• Excavations to a depth above 6m depth.
• Excavation method using drilling rig machine.
• Common method of site investigation.
![Page 8: Trial pit n borehole](https://reader035.fdocuments.us/reader035/viewer/2022062312/5562b2f2d8b42a7c4a8b56d0/html5/thumbnails/8.jpg)
ADVANTAGES DISADVANTAGES
•Can extract mineral
resources.
•Work becomes easier
and faster.
•Can excavated soils
to a depth above 6m.
• Require skilled
workers to do the work
of drilling.
•Labor cost expensive.
•Noise that interferes
with public.
![Page 9: Trial pit n borehole](https://reader035.fdocuments.us/reader035/viewer/2022062312/5562b2f2d8b42a7c4a8b56d0/html5/thumbnails/9.jpg)
Drilling rig machine
![Page 10: Trial pit n borehole](https://reader035.fdocuments.us/reader035/viewer/2022062312/5562b2f2d8b42a7c4a8b56d0/html5/thumbnails/10.jpg)