TRI-1486-01 - Stockport

8

Transcript of TRI-1486-01 - Stockport

Page 1: TRI-1486-01 - Stockport
Page 2: TRI-1486-01 - Stockport

SVP

RWP

WV

WV

TP

LP

TP

RWP

75.29

CONCRETE FLAGS

75.3

7

75.3

9

75.34 75.38

75.4

1

75.4

5

75.62

75.34

75.3

0

CO

NC

RE

TE

75.42

GRASS

75.42

75.43

75.29

75.37

75.37

75.31

75.5875.38

75.4

4

75.4

3

75.4

275.28

75.24

75.35

75.3

5

75.6

5

75.3

175.2

9

75.6

5

75.36

75.7

2

75.42

75.4675.45

75.84 75.6

4

75.35 75.45

75.36

75.59

75.32

75.4475.36

75.40

75.49

75.5

0

75.73

75.3

975.4

875.4

2

75.82

EH80.38

RH81.90

TF77.17

TF77.31

EH80.44

TF

76.5

4

TF

76.9

9

76.3

4

TF

76.9

4

TF

76.6

0

TF76.69

TF

77.4

6

TF77.16

EH81.52

RH

84.0

6

75.44

75.3

8

75.38

75.33

75.40

75.37

75.39

CONCRETE FLAGS

75.3

0

75.3

775.3

9

75.3

4

75.3375.38

CO

NC

RE

TE

FLA

GS

75.4

6

75.49

75.5

575.6

0

75.7

8

75.46

75.35

TF

76.7

8

RH82.44

75.27

75.29CO

NCRETE FLAGS

TA

RM

AC

CONC.75.2

2

75.2

7

75.3

3

75.3

075.3

0

GRASS

75.3

7C

ON

CR

ETE

FLA

GS

CO

NC

RE

TE

FLA

GS

75.3

9

75.4

2

75.4

475.3

9

75.3

7

75.3

0 75.3

4

75.3

8

75.4

6

75.60

75.29

75.31

75.3

7

75.33

75.29

75.3475.32

75.3

4

75.35

CONCRETE

75.3

6

75.3

7

75.45

75.4

5

75.3

4EH80.44

75.3

975.3

7

75.37

75.29

75.28

75.26

75.3

1

75.3

2

75.30

75.33

75.32

75.33

GRASS

75.3

2S

OIL

75.09 75.14

75.1

4

75.25

75.14

75.1

7

75.2

7

75.29

TL75.50

TW

75.8

3

75.35

75.38

75.36

75.4

2

75.3

1

75.4

7 75.3

6

75.37

75.5

0

75.4

0

75.3

175.2

4

75.2775.3

2

75.4

875.4

5

75.34

75.3

4

75.2

9

75.33

75.6

2

75.37

TF

77.8

3

TF

77.1

0

CH82.47

CH

81.1

7

TF77.78

TA

RM

AC

75.37

75.30

75.29

75.1

7

75.2

2

75.2

4

75.2

3

CO

NC

RE

TE

FLA

GS

75.2

6

75.2

1

75.2

4

75.2

0

75.1

6

75.1

5

75.18

FFL75.31

CO

NC

RE

TE

FLA

GS

75.2

3

75.2

1

75.3

0

75.3

1

75.2

8

75.3

3

75.38

75.29

75.31

75.3

7

75.28

75.4

5

75.4

0

75.4

3

75.3

8

75.3

875.4

2

CO

NC

RE

TE

TARMAC

75.3

9

75.4

2

75.3

3

75.3

3

75.3

575

.43

75.5

2

75.4

3

75.38

75.5

1

75.4

0

75.3

2

75.3

6

75.3

575.3

8

75.4

8

75.3

375.3

7

75.4

475.4

2

75.41

75.5575.39

75.3

775.4

975.4

9

75.53

75.46 75.32

75.29

75.54

RH

78.4

2

EH

77.6

8

CH80.99

CH81.09

CH81.12

CH

81.2

8

CH82

.45

TW

77.1

4

TF

77.2

1

RH

79.4

1

EH

78.6

4

EH

78.0

2

75.4

2

75.31

75.39

75.4

3

75.4

7

75.4

975.4

9

75.3

2

75.4

2

75.32

75.31

75.3175.24

75.2

7

75.2

0

75.1

8

75.2

2

75.14

75.24

75.19

75.1975.21

75.18

75.28

75.33

75.30

75.28

EH

81.7

0

EH

81.6

3

RH

83.4

7

EH78.16

RH79.10

RH

81.1

3

EH

79.0

6

RH

77.6

7

CH

79.0

8

CH

82.7

5

CH82.37

CH82.87

CH

77.9

8

TF

77.6

7

75.11

75.1

4

74.9

874.9

1

75.0

9

75.55

75.45

75.27

75.2

3

75.2

3

74.9

1

75.28

75.32

75.25

FFL75.30

75.2075.21

75.1

6

75.1

675.20

75.14

75.2

3CONC. FLAG

75.56

75.44

75.41

75.45

TF77.2

7

TF77.65

TF77.22

75.2

0

EH79.58

RH80.56

TF

76.5

5

71.18

71.02

72.00m

73.00m

74.00m

75.00m

76.00m

76.00m

CATV

MHCL75.29

GU

WP

GU

SOIL

RUBBLE

GRASS

GRASS

SOIL

BROKEN TARMAC

MHCL75.36

MHCL75.49

TP

GU

MHCL75.27

GU

GU

GU

Ste

el P

alisa

de F

ence

Tim

ber P

alisa

de F

ence

Tim

ber / M

esh

Fence

Chain

link F

ence

NO

AC

CE

SS

NO

AC

CE

SS

Ste

el P

alis

ade F

ence

Concre

te P

ost &

Panel F

ence

Clo

sed B

oard

Fence

Closed Board Fence

Closed Board Fence

Clo

sed B

oard

Fence

Tim

ber

Pic

ket F

ence

Rope F

ence

Chainlink Fence

DENSE SHRUBS

TARMAC

Site Address

Project Description

Drawing Title

Scale Date Drawn By

Drawing Number

Rev. Description.

Notes

All Dimensions to be checked on site. Walls shown on

plans are not to be assumed to be solid & should be

checked for thickness, construction, load bearing capacity

& stability.

Reuben StreetStockport

Existing Site Survey

Existing Site Survey

1:200@A1 26/06/2015 AD

TRI-1486-01

0 Issued

North

ABBREVIATIONS

Top of Wall

Rain Water Pipe

Waste PipeTW

RWP

WP

Man Hole

Telegraph Pole

Gully

Cover Level

MH

TP

GU

CL

Ridge/Roof HeightRH

Eves HeightEH

Cable TV CoverCATV

Lamp PostLP

Finished Floor LevelFFL

Parapet HeightPH

Water ValveWV

Soil Vent PipeSVP

Threshold LevelTL

Cable HeightCH

NOTEAll levels and coordinates relate to OSGB36 using GNSS data.

Levels defining edge of carriageway are observed at channel (bottom

of kerb).

Top of FenceTF

Drop KerbDK

1

2

Page 3: TRI-1486-01 - Stockport

RWP

RWP

RWP

RWP

75.5

5

75.62

75.8

8

75.9

0

75.74

75.5

4

75.5

2

75.50

75.5

3

75.5

3

75.7

075.5

6

75.4

8

75.58

75.58

75.55

75.45

75.27

75.2

3

75.2

3

74.9

1

75.56

75.7

4

75.7

3C

ON

CR

ETE

RH

80.4

4

EH

78.6

5

TF79.91

75.62

75.6

4

75.6

7

75.5

9

75.5

4

75.52

75.46

75.5575.58

76.02

75.5

7

75.5

4

75.4

3

75.3

7

75.2

0

75.40

75.48

TW

75.9

9

TW

76.1

6

76.15

76.06

75.75

75.61

75.45

75.47

75.53

75.4

9

75.47

75.48

75.42

CONCRETE

75.51

75.93

75.9

2

75.8

7

75.9

2

75.90

CONCRETE

76.0

076.0

675.8

8

75.8

5

75.8

5

75.7

5

75.7

4

TF

77.0

8

TF77.03

75.69

75.6

5

75.68

75.6

9

75.6

2

75.72

75.6

2

75.5

6

75.5

6

75.5

8

75.5

4

76.1

976.1

976.1

8

76.15

76.25

76.1

9

76.2

0

76.20

CO

NC

RE

TE

CO

NC

RE

TE

75.7

4

75.7

6

75.6

2

75.4775.6

2

75.5

1

75.5

8

75.6

3

75.78

75.70

75.8

2

75.8

5

75.78

75.82

75.80

75.95 75.95

76.0

475.6

9

75.5

8

75.53

75.97

TF79.2

1

TF78.2

4

TF78.8

5

RH

81.1

8

EH

79.0

5

PH81.65

PH

82.4

3

75.65

75.76

75.7475.85

75.8

1

75.8

3

75.79

75.7

8

75.7

8

75.7

8

75.7

6

75.71

75.7

9

75.65

75.74

75.7

5

75.7

1

75.6

9

75.7

2

75.5

9

75.8

4

PH85.69

TF79.54

CO

NC

RE

TE

75.7

6

75.80

75.73

75.7

5

75.74

75.67

75.5

775.59

75.63

75.5

6

75.57

75.64

75.62

75.66

75.7

0

75.67

75.71

75.75

75.64

75.76

75.78

TF79.3

9

TF80.07

75.6

0

TARMAC

75.9675.92

75.80

TF

76.5

5

71.18

72.0

0m

73.0

0m

74.0

0m

75.0

0m

MHCL75.74

RU

BB

LE

Covered Area

Covered Area

CONCRETE

CO

MP

AC

TE

D H

AR

DC

OR

E

TIMBER

CO

MP

AC

TE

D H

AR

DC

OR

E

GR

AS

S/R

UB

BLE

GR

AS

S/R

UB

BLE

RU

BB

LE

Corrugated Sheet F

ence

Corru

gate

d S

heet F

ence

Corru

gate

d S

heet F

ence

Corru

gate

d S

heet F

ence

Ste

el P

alisa

de F

ence

Tim

ber P

alisa

de F

ence

Conta

iner

Conta

iner

Conta

iner

Conta

iner

Container

Site Address

Project Description

Drawing Title

Scale Date Drawn By

Drawing Number

Rev. Description.

Notes

All Dimensions to be checked on site. Walls shown on

plans are not to be assumed to be solid & should be

checked for thickness, construction, load bearing capacity

& stability.

Reuben StreetStockport

Existing Site Survey

Existing Site Survey

1:200@A1 26/06/2015 AD

TRI-1486-02

0 Issued

North

ABBREVIATIONS

Top of Wall

Rain Water Pipe

Waste PipeTW

RWP

WP

Man Hole

Telegraph Pole

Gully

Cover Level

MH

TP

GU

CL

Ridge/Roof HeightRH

Eves HeightEH

Cable TV CoverCATV

Lamp PostLP

Finished Floor LevelFFL

Parapet HeightPH

Water ValveWV

Soil Vent PipeSVP

Threshold LevelTL

Cable HeightCH

NOTEAll levels and coordinates relate to OSGB36 using GNSS data.

Levels defining edge of carriageway are observed at channel (bottom

of kerb).

Top of FenceTF

Drop KerbDK

1

2

Page 4: TRI-1486-01 - Stockport
Page 5: TRI-1486-01 - Stockport
Page 6: TRI-1486-01 - Stockport
Page 7: TRI-1486-01 - Stockport
Page 8: TRI-1486-01 - Stockport