    Risk Register and Action Tracking Sheet for E&P Projects

    This workbook is the property of BP Exploration. It has been designed to fulfil the minimum specifica

    Quick Start

    Enter data in: 1. SETUP Enter risk categories & personnel. Customise the Probability-Impact G

    2. REGISTER Describe and analyse project risks and opportunities3. ACTIONS Define and track actions in response to risks

    The grey-tabbed worksheets contain output only

    Cells like this are for typing in free text

    Cells like this are also for free text, but contain useful default values

    Cells like this have pull-down menus (which you can customise)

    Cells like this are protected because they contain calculations

    Initial Workbook SetupUse this workbook for tracking your project risks (threats and opportunities) and the actions which result.To prepare the workbook for use in your project, complete the following steps:

    1. Clear the example entries from the REGISTER and ACTIONS sheets (only clear columns with yellow a2. Fill in the Project Name at the top of the REGISTER sheet.3. Customize the SETUP sheet as follows:

    (a) Decide which quantifiable measures of project impact (eg Cost, Schedule, Reserves) you are going(b) In cells C14 to C20, input the total Project Cost, Duration etc.(c) In cells D14 to D20, enter the percentage of Project Cost, Duration etc. above which the impact of a(d) In cells G5 to G22, enter the "Categories" you will use to classify your risks. Give each one a short

    (e) In cells M5 to M54, list the project personnel (or job positions) who will play a formal role in the risk(f) For each person, indicate whether they can: (i) Own, Accept or Update risks in the Register, (ii) be(g) If you wish, you can change the titles and definitions in the olive cells to match your lo

    Inputs and OutputsEnter and analyse your risks in the REGISTER sheet. The "Data Check" column will show "Error!" when t

    Tip: When analysing risks as a team, it may be useful to give each team member a print out of the ReferTo enter an action, type the risk number into column A in the ACTIONS sheet, then enter the action detail

    Outputs are as follows:

    (a) "Pre-PIG" and "Post-PIG" matrices show the Probability-Impact grid before and after risk response.(b) "Boston Square" or "Risk Manageability Matrix".

    Each matrix can be toggled between 9 and 20/30 risks-per-cell using the "Expand" and "Shrink" maIf a matrix cell has more risks than spaces, the number of risks not shown will appear in the bottomThe matrices will show only risks from categories for which "Show?" is set to "yes" in column I on th

    (c) Charts - a simple breakdown of risks and actions(d) "Print" Summary. This is a fixed-format summary of the full Register worksheet, suitable for printing

    ProtectionThe workbook is protected against inadvertent changes, but can be unprotected using Tools->Protection-The AutoFilter buttons at the top of the columns in the REGISTER and ACTIONS sheets won't work wh

    Simplifying & Customizing the RegisterMost risk management processes don't require an entry in every column of the REGISTER and A

    You can hide optional columns using the Group (-) buttons at the top of each sheet. Clear the conteYou can also hide sheets you are not using (eg. the "Boston" or "Post-PIG" sheets).

    You can enlarge matrix cells as follows: Tools->Protection->Unprotect Sheet, select cell columns, Format

    To avoid empty columns on the "Print" report, use the Tools-Protection-Unprotect Sheet command, and h

    Importing data from Common Process on-Line (CPoL)If you prefer to manage you risks within CPoL, you can still use this workbook to produce Risk Matrix out

  • 7/28/2019 TREX-45036

    2/48

    Feedback on this workbook and requests for enhancements are always welcome

    Facilitating a Risk Management Meeting

    Initiate

    Get familiar with the tool (eg. Risk Register) you are going to use to record the session. Plan the session by dividing it into distinct sections (Identification; Analysis; Response) Consider adding a section on Opportunities.At the start of the session, explain to the team:

    o The deliverable (eg. a Register populated with identified and analysed risks)o The scope of the risks (eg. drilling, D&C, wells, project, technical, HSE etc.)o How much time youve got, and how it will be sub-divided

    Consider appointing a time-keeper.Identify If you have written inputs (eg. a risk register from a similar project), choose your moment Use a combination of techniques, eg:

    o Start with five minutes for individuals to write down riskso Brainstorm risk headings (eg. rig, personnel, well planning, operations, security etc).o Work through headings in turn.

    Help the team define events, not outcomeso Risk event template: Event X may happen, causing an impact on Y.o Bad risk: Completion cost overruno Good risk: Inadequate completion cost estimate causes cost overrun

    Dont let the team get sidetracked into analysis or response.Assess

    If you havent done it already, agree cost and schedule impact levels with the team Clarify the risk acceptability criteria with the team (eg. Risks rated or

  • 7/28/2019 TREX-45036

    3/48

    Are you planning to reduce the probability, the impact, or both ?

    Will the reduction be a little (one square) or a lot (two squares) ?

    ControlAgree how the team will keep the risk register up-to-date between meetings.Agree the date, subject and attendance for your next meeting. Make the risks visible put them on a poster and put it on the wall.Learn Make a note of:

    o what worked and what didnto what were the sticking pointso people who should have been present and werent, and vice versao things you could have done before the session to better prepare yourself or the team.

    If youve got something to share about your process, share it with Hugh Williamson, D&C

    For a synopsis of Risk Management best practice as it applies to wells projects, go to the

  • 7/28/2019 TREX-45036

    4/48

    Version 8.04

    ions of the Risk Management Guidelines for Major Projects

    id

    nd blue headers)

    to use, and enter these in cells A14 to A20.

    risk will be defined as "Very High".bbreviation and indicate whether you want to show these risks on the matrices.

    anagement process. Put their initials in the "Abbrev." column.esponsible for carrying out or providing assurance on actions.al definitions.

    he REGISTER entries don't correspond to the entries in the SETUP sheet.

    nce Sheets.

    cro buttons.right space.e SETUP sheet.

    .

    >Unprotect Sheet. Be sure to re-protect the sheet when you have finished your edits.ile the sheets are protected : unprotect, then filter, then re-protect.

    TIONS sheets.

    nts of each column before you hide it.

    ->Column->Width. The default column width is 10.

    ide any unused columns.

    uts. Instructions are on the "From CPoL" worksheet.

    http://global.bpweb.bp.com/http://global.bpweb.bp.com/
  • 7/28/2019 TREX-45036

    5/48

    : Hugh Williamson, EPTG Sunbury

    for introducing them carefully you want to stimulate, not stifle, the discussion.

    after response cannot be accepted by the team and must be escalated).

    works.

    ulting in a given impact

    hich reduce the risk in different ways (probability, impact, contingency etc)

    mailto:[email protected]?subject=Generic%20Risk%20Registermailto:[email protected]?subject=Generic%20Risk%20Register
  • 7/28/2019 TREX-45036

    6/48

    Risk Management Specialist.

    D&C Risk Management website

    http://upstream.bpweb.bp.com/ept/content/page.asp?id=1836http://upstream.bpweb.bp.com/ept/content/page.asp?id=1836
  • 7/28/2019 TREX-45036

    7/48

    Risk Register for Project: Macondo

    R/O

    no.

    Data

    Check

    Risk

    orO .

    Category Risk/Opportunity Name Event Descriptio

    1 OK T NDS Well ControlPotential well control problem: ris

    2 OK T NDS Complex overburden Multiple shallow water flow units

    3 OK T NDS PP/FG uncertainty

    Drilling into pressure ramps unexproper mud weight or shoe test closs, and stuck pipe which lead

    4 OK T NDS Wellbore stabilityDrilling through any salt/sedimenencounter problems with shales the well bore

    5 OK T NDS Tight hole, stuck pipeOffset well (Rigel) encountered pat 8900'.

    6 OK T NDSMass Transport Deposits(MTD)

    Can be shallow water flow units wabout 500 ft in deepwater settingpressured. May have quite variaideal strata to set casing shoe. depth of csg shoes with respect identified geophysically and in of

    7 OK T NDS Reduced wireline programLoss of data or limited data colle

    8 OK T NDS Lost CirculationLost circulation indentified in thecost.

    9 OK T NDS Narrow PPFG window

    Isabela had a narrow PPFG windweight and hole conditions are nwell may begin to experience suformation or the well may flow ba

    11 OK T NDS HurricaneHurricanes and storms often excrig must unlatch and move to saf

    General

  • 7/28/2019 TREX-45036

    8/48

    Risk Action Tracking for Project: Macondo

    R/O

    no.

    Risk

    or

    Opp.

    Category Risk Name Description

    Risk / Opportunity

  • 7/28/2019 TREX-45036

    9/48

    Pre-Response Probability-Impact Grid for: Macondo

    NDS.14 Shallow

    water/gas flows

    NDS.15 Lost drill

    center/respud

    Plan.18 BOP

    Issue

    Plan.21 Annular

    Pressure Build-up

    NDS.2 Complex

    overburden

    NDS.5 Tight hole,

    stuck pipe

    Plan.20 Shock &

    Vibration

    NDS.1 Well

    Control

    NDS.3 PP/FG

    uncertainty

    NDS.7 Reduced

    wireline program

    NDS.17 Shallow

    depletion

    Plan.23

    Expandable

    Issues

    NDS.9 Narrow

    PPFG windowNDS.11 Hurrican

    Plan.22

    Compaction

    NDS.4 Wellbore

    stability

    NDS.6 Mass

    Transport

    Deposits (MTD)

    NDS.8 Lost

    Circulation

    NDS.16 Gumbo

    Attack

    NDS.13 Hydrate

    buildup on

    wellhead /

    connector

    S Very Low Low Moderate

    Frequency / Probability

    V. High Risk must be reduced or eliminated. High

    Mod. ALARP: Reduce risk where cost-beneficial. V. Low

    VeryHig

    High

    Medium

    Low

    ImpactLevel

  • 7/28/2019 TREX-45036

    10/48

    Boston Square: Macondo Date

    NDS.11 HurricaneNDS.12 Loop and

    Eddy currents

    Plan.18 BOP

    Issue

    Plan.21 Annular

    Pressure Build-upNDS.1 Well

    Control

    NDS.3 PP/FG

    uncertainty

    NDS.9 Narrow

    PPFG window

    NDS.14 Shallow

    water/gas flows

    NDS.2 Complex

    overburden

    NDS.5 Tight hole,

    stuck pipe

    Plan.23

    Expandable

    Issues

    NDS.7 Reduced

    wireline program

    NDS.16 Gumbo

    Attack

    NDS.8 Lost

    Circulation

    NDS.17 Shallow

    depletion

    Plan.20 Shock &

    Vibration

    Plan.22

    Compaction

    NDS.4 Wellbore

    stability

    NDS.6 Mass

    Transport

    Deposits (MTD)

    NDS.13 Hydratebuildup on

    wellhead /

    connector

    S Low Medium High

    Manageability

    V.Low

    .

    Low

    Mod.

    H

    igh

    (Pre-Response)RiskRating

  • 7/28/2019 TREX-45036

    11/48

    Post-Response Probability-Impact Grid for: Macondo

    NDS.15 Lost drill

    center/respud

    NDS.14 Shallow

    water/gas flows

    Plan.18 BOP

    Issue

    Plan.21 Annular

    Pressure Build-up

    NDS.2 Complex

    overburden

    Plan.20 Shock &

    Vibration

    NDS.3 PP/FG

    uncertainty

    NDS.5 Tight hole,

    stuck pipe

    Plan.23

    Expandable

    Issues

    NDS.1 Well

    Control

    NDS.9 Narrow

    PPFG window

    NDS.12 Loop and

    Eddy currents

    NDS.17 Shallow

    depletion

    NDS.11

    Hurricane

    NDS.6 Mass

    Transport

    Deposits (MTD)

    NDS.13 Hydrate

    buildup on

    wellhead /

    connector

    NDS.16 Gumbo

    Attack

    S Very Low Low Moderate

    Frequency / Probability

    V. High Work cannot proceed. High Obta

    Mod. Review within team before proceeding. V. Low Man

    VeryHig

    High

    Medium

    Low

    ImpactLevel

  • 7/28/2019 TREX-45036

    12/48

    Risk* Summary for: Macondo Date 12-Apr-13

    * includes opportunties

    4

    7

    6

    0

    0

    4

    8

    10

    0

    0

    0 5 10 15

    V. Low

    Low

    Mod.

    High

    V. High

    No. of Risks* by RatingPre-Response

    Post-Response

    0 2 4 6 8 10 12 14

    Chuck Bondurant

    Donald Charles

    Binh Van Nguyen

    Chris Casler

    Tomieka Searcy

    Pierre Depret

    Mark Hafle

    Jonathan Bellow

    Bobby Bodek

    Jasper Peijs

    David Sims

    George Gray

    Craig Scherschel

    Team

    Marty Albertin

    Trent Fleece

    Gabe Wilson

    Risk* Ownership and ActionsRisks Owned

    Actions

    0 5 10 15 20

    Active

    Dormant

    Accepted

    Closed

    No. of Risks* by Status

    0 5 10 15 20

    HSSEPlanning

    SidetrackingSalt Interval

    Salt ExitSub Salt

    CoringEvaluation

    PPFGWeather/Loop

    Csg & CmtngWell Control

    Rig EquipmentDWOP

    BHA/DH EquipInitial Ops

    Well Exit OpsNDS

    No. of Risks* by Category

    0 0.5 1

    Country & Reg.

    Market & Comm.

    H, S & E

    Tech. Challenge

    Defn. & Complexity

    Oper'ty & Ramp-up

    No. of Risks* by Category

  • 7/28/2019 TREX-45036

    13/48

  • 7/28/2019 TREX-45036

    14/48

    Risk Register for Project: Macondo Date: 20-Jun-09

    Risk#

    Risk/Opport.

    Category Risk Name Event Description / Impact

    Owner

    RiskStatus

    Actions

    1 T NDS Well ControlPotential well control problem: risk of losing the wellbore inan uncontrolled situation

    MH Accptd 0

    2 T NDS Complex overburden Multiple shallow water flow units, faults & potential gas. CS Accptd 0

    3 T NDS PP/FG uncertainty

    Drilling into pressure ramps unexpectedly or without propermud weight or shoe test can cause a kick, fluid loss, andstuck pipe which lead to possible loss of hole section and/orwell. Kicks identified in the offsets.

    MA Accptd 0

    4 T NDS Wellbore stabilityDrilling through any salt/sediment interface may encounterproblems with shales sloughing/slumping into the well bore

    MH Dorm. 0

    5 T NDS Tight hole, stuck pipeOffset well (Rigel) encountered problems with stuck pipe at8900'.

    MH Accptd 0

    6 T NDS Mass Transport Deposits (MTD)

    Can be shallow water flow units when buried deeper thanabout 500 ft in deepwater settings, may be over pressured.May have quite variable soil properties. Not ideal strata to

    set casing shoe. Evaluate the setting depth of csg shoeswith respect to the depth of MTDs identified geophysicallyand in offset wells. Have pump and dump mud ready to killSWF while drilling riserless.

    BVN Accptd 0

    7 T NDS Reduced wireline programLoss of data or limited data collection as a result of wellproblems or borehole environmental conditions.

    T Accptd 0

    8 T NDS Lost CirculationLost circulation indentified in the offsets. Risk to time andcost.

    MH Active 0

    9 T NDS Narrow PPFG window

    Isabela had a narrow PPFG windows (Miocene): if mudweight and hole conditions are not monitored carefully thewell may begin to experience substantial losses to theformation or the well may flow back

    MA Accptd 0

    10

    11 T NDS HurricaneHurricanes and storms often exceed tolerances, and the rigmust unlatch and move to safer conditions.

    T Accptd 0

    12 T NDS Loop and Eddy currentsLoop and eddy conditions occur almost throughout the yearin many GoM deep water areas. Delays caused by highcurrent velocities can be very costly.

    T Accptd 0

    13 T NDSHydrate buildup on wellhead /connector

    Potential for hydrate buildup around connectors preventingunlatching.

    MH Accptd 0

    14 T NDS Shallow water/gas flowsUncontrolled shallow water and gas flows prior to riserinstallation could undermine and crater the drill center. Seecomplex overburden

    MH Accptd 0

    15 T NDS Lost drill center/respudWellhead Subsidence, stuck pipe, surface fracture, TOSrubble zone: potential risk for collapse/squeezing of allconductors

    MH Accptd 0

    16 T NDS Gumbo Attack Gumbo due to pump and dump. MH Accptd 0

    17 T NDS Shallow depletion Evaluate potential for depleted zones. MA Accptd 0

    18 T Planning BOP Issue Potential for the BOP stack to cause NPT on the well. TF Accptd 0

    19 T Planning Zonal Isolation Risk of a good cement job on the 9-7/8 Production String MH Active 0

    20 T Planning Shock & Vibration Risk of down hole tool failures due to shock and vibration. MH Accptd 0

    Risk Description

  • 7/28/2019 TREX-45036

    15/48

    21 T PlanningAnnular Pressure Build-up

    Risk of casing failure during the production phase of the well. MH Accptd 0

    22 T Planning Compaction Casing failure late in life due to reservoir compaction. MH Active 0

    23 T Planning Expandable Issues Risk of tubular exspansion failure. MH Accptd 0

    24

    25

    26

    27

    2829

    30

    31

    32

    33

    34

    35

    36

    37

    38

    39

    40

    4142

    43

    44

    45

    46

    47

    48

    49

    50

    51

    52

    53

    5455

    56

    57

    58

    59

    60

    61

    62

    63

    64

    65

    66

    6768

  • 7/28/2019 TREX-45036

    16/48

    69

    70

    71

    72

    73

    74

    75

    76

    7778

    79

    80

    81

    82

    83

    84

    85

    86

    87

    88

    89

    9091

    92

    93

    94

    95

    96

    97

    98

    99

    100

    101

    102

    103104

    105

    106

    107

    108

    109

    110

    111

    112

    113

    114

    115

    116117

    118

  • 7/28/2019 TREX-45036

    17/48

    119

    120

    121

    122

    123

    124

    125

    126

    127128

    129

    130

    131

    132

    133

    134

    135

    136

    137

    138

    139

    140141

    142

    143

    144

    145

    146

    147

    148

    149

    150

    151

    152

    153154

    155

    156

    157

    158

    159

    160

    161

    162

    163

    164

    165

    166167

    168

  • 7/28/2019 TREX-45036

    18/48

    169

    170

    171

    172

    173

    174

    175

    176

    177178

    179

    180

    181

    182

    183

    184

    185

    186

    187

    188

    189

    190191

    192

    193

    194

    195

    196

    197

    198

    199

    200

  • 7/28/2019 TREX-45036

    19/48

    Instructions for Importing Risk Data from CPoL1.Create Excel risk report from CPoL2. Copy all the data from the CPoL report and paste into the bordered box below (us3. Ensure that the "Data Check" column shows "OK" for all imported risks

    If the Data Check shows "Error!", the entry in one of the orange columns does not a

    4. Click on the green macro button (left). The matrices should now be plotted.

    Note: The "Data Check" on the REGISTER sheet may still show Error!s. Further edits to thProject n/a Risk Name Owner Risk Event Status

    Risk Data Check

    1 OK2 OK

    3 OK4 OK5 OK6 OK7 OK8 OK

    9 OK10 OK11 OK

    12 OK13 OK14 OK15 OK16 OK

    17 OK18 OK19 OK20 OK21 OK22 OK23 OK

    24 OK

    25 OK26 OK27 OK28 OK29 OK30 OK31 OK

    32 OK33 OK34 OK35 OK36 OK37 OK

    38 OK

    39 OK40 OK41 OK42 OK43 OK44 OK45 OK

    46 OK

    ReplaceRegisterData with

    CPoL Data

  • 7/28/2019 TREX-45036

    20/48

    47 OK48 OK49 OK50 OK51 OK52 OK

    53 OK54 OK55 OK56 OK57 OK58 OK59 OK60 OK

    61 OK62 OK63 OK64 OK65 OK66 OK

    67 OK68 OK69 OK70 OK71 OK72 OK73 OK74 OK

    75 OK76 OK77 OK78 OK79 OK80 OK

    81 OK82 OK83 OK84 OK85 OK86 OK87 OK88 OK89 OK

    90 OK91 OK92 OK93 OK

    94 OK95 OK

    96 OK97 OK98 OK99 OK

    100 OK101 OK102 OK

  • 7/28/2019 TREX-45036

    21/48

    103 OK104 OK105 OK106 OK107 OK108 OK

    109 OK110 OK111 OK112 OK113 OK114 OK115 OK116 OK

    117 OK118 OK119 OK120 OK121 OK122 OK

    123 OK124 OK125 OK126 OK127 OK128 OK129 OK130 OK

    131 OK132 OK133 OK134 OK135 OK136 OK

    137 OK138 OK139 OK140 OK141 OK142 OK143 OK144 OK145 OK

    146 OK147 OK148 OK149 OK

    150 OK151 OK

    152 OK153 OK154 OK155 OK156 OK157 OK158 OK

  • 7/28/2019 TREX-45036

    22/48

    159 OK160 OK161 OK162 OK163 OK164 OK

    165 OK166 OK167 OK168 OK169 OK170 OK171 OK172 OK

    173 OK174 OK175 OK176 OK177 OK178 OK

    179 OK180 OK181 OK182 OK183 OK184 OK185 OK186 OK

    187 OK188 OK189 OK190 OK191 OK192 OK

    193 OK194 OK195 OK196 OK197 OK198 OK199 OK200 OK

  • 7/28/2019 TREX-45036

    23/48

    Paste Special-Values to preserve the formatting).

    ppear in the SETUP sheet. Edit the SETUP sheet accordingly.

    e SETUP sheet will fix these.Category n/a Impact Type Impact level Probability n/a

    KEY:

    Pre-Mitigation

    Data is copied but

    not checked

    Data is copied and

    checked vs SETUPData is not copied

  • 7/28/2019 TREX-45036

    24/48

  • 7/28/2019 TREX-45036

    25/48

  • 7/28/2019 TREX-45036

    26/48

  • 7/28/2019 TREX-45036

    27/48

    Impact Type Impact Level Probability n/a ByAccepPost-Mitigation

  • 7/28/2019 TREX-45036

    28/48

  • 7/28/2019 TREX-45036

    29/48

  • 7/28/2019 TREX-45036

    30/48

  • 7/28/2019 TREX-45036

    31/48

    Date Manageabilitytance

  • 7/28/2019 TREX-45036

    32/48

  • 7/28/2019 TREX-45036

    33/48

  • 7/28/2019 TREX-45036

    34/48

  • 7/28/2019 TREX-45036

    35/48

    Risk Rating Matrix - customize the matrix in the SETUP worksheet

    One or morefatalities

    Damage long-term and/orextensive

    _Outrage.

    Prosecution.Possible loss of

    operating license

    Commended byNGO at

    internationallevel. Globalrecognition

    > 10 $M > 12.75 days> 0.1 oProjec

    Productio

    Serious injury orDAFWC.

    HiPo

    Short-termdamage within

    facility boundary

    Long-term and/orextensive

    improvement

    Involvement ofregulator

    Commended byNGO at national

    level.Recognition

    within country

    3 - 10 $M3.4 - 12.75

    days

    0.03 - 0.1Projec

    Productio

    Recordableinjury, first aid,

    seriousoccurrence

    Rapid on-siteclean-up

    Short-termimprovementwithin facility

    boundary

    Complaints fromlocal community

    Commended byNGO at local

    level.Recognitionwithin area

    1 - 3 $M 0.85 - 3.4 days0.01 - 0.0

    ProjecProductio

    No impact No impact Minorenhancement

    Minimal impact

    recognised

    positivecontributionwithin BP

    < 1 $M < 0.85 days < 0.01 oProjecProductio

    Probability

    Very Low

    Low

    Moderate

    High

    ManageabilityLow

    MediumHigh

    Could only occur as the result of multiple, independent system or control failures.Future occurrence is thought most unlikely.No comparable occurrence is known.

    Prob-

    Project Management Team can control probability and / or impact. Risk reduction measures will be highly cost-effect

    Reputation:

    OpportunitiesSchedule Producti

    Project Management Team can only influence impact. Risk reduction measures are unlikely to be cost-effective.

    Project Management Team can influence probability and / or impact. Risk reduction measures will be roughly cost-n

    ImpactLeve

    lCould result from a plausible combination of system or control failures.

    Would probably occur if the system were to be operated for long enough. Comparableevents are known to have occurred in the past.

    Could result from the failure of a single system or control.Could be expected to occur if this operation were repeated regularly.Comparable events are within the team's direct experience.

    Uncontrolled.Will occur whenever circumstances are unfavorable.Comparable events are frequent.

    ImpactLevel

    Type of Impact

    Health & SafetyEnvironment:

    ThreatsCost

    Environment:

    Opportunities

    Reputation:

    Threats

  • 7/28/2019 TREX-45036

    36/48

    Risk Register Set-Up Sheet

    Probability Abbrev Categories

    Very Low VL AbbrevLow L HSSE HSSE

    Moderate M Planning PlanHigh H Sidetracking ST

    Impact Type Salt Interval SIHealth & Safety Saf. Salt Exit Sext

    Environment: Threats Env (T) Sub Salt SsubEnvironment: Opportunities Env (O) Coring Core

    Reputation: Threats Rep (T) Proj. Top Evaluation EvalReputation: Opportunities Rep (O) Value Level Unit PPFG PPFG

    Cost Cost 100 10% $M Weather/Loop Currents WeaSchedule Sch. 85 15% days Csg & Cmtng Csg

    Production Prod. 10% mbd Well Control WCntrlReserves Res. 15% MMbbl Rig Equipment REquip

    NPV NPV 10% $M DWOP DWOPBHA/DH Equip BHA/EqInitial Ops IOps

    Impact Level Well Exit Ops WEOpsLow L NDS NDS

    Medium MHigh H Abbrev

    Very High VH Class #1 (threats) T

    Risk Rating Pre Post Class #2 (opportunities) OV. Low VL 4 4

    Low L 8 7Mod. M 10 6 Cost 10High H 0 0 3

    V. High VH 0 0 1

    Manageability Schedule 12.75

    Low L 3.4Medium M 0.85

    High H Production 0

    Risk Status 0

    Active Active 3 0Dormant Dorm. 1 Reserves 0

    Accepted Accptd 18 0Closed Closed 0 0

    NPV 0

    Action Status 0

    Pending 0Under Review 0 0

    Completed 00

    0 0

    0

    0

  • 7/28/2019 TREX-45036

    37/48

  • 7/28/2019 TREX-45036

    38/48

  • 7/28/2019 TREX-45036

    39/48

    yes

    People

    Show ? Count Abbrev

    yes 0 1 Chuck Bondurant CB yes 0 yes 0 yes 0 yes

    yes 6 2 Donald Charles DC yes 0 yes 0 yes 0 yesyes 0 3 Binh Van Nguyen BVN yes 1 yes 0 yes 0 yesyes 0 4 Chris Casler CC yes 0 yes 0 yes 0 yesyes 0 5 Tomieka Searcy TS yes 0 yes 0 yes 0 yesyes 0 6 Pierre Depret PD yes 0 yes 0 yes 0 yesyes 0 7 Mark Hafle MH yes 13 yes 0 yes 0 yesyes 0 8 Jonathan Bellow JB yes 0 yes 0 yes 0 yesyes 0 9 Bobby Bodek BB yes 0 yes 0 yes 0 yes

    yes 0 10 Jasper Peijs JP yes 0 yes 0 yes 0 yesyes 0 11 David Sims DS yes 0 yes 0 yes 0 yesyes 0 12 George Gray GG yes 0 yes 0 yes 0 yesyes 0 13 Craig Scherschel CS yes 1 yes 0 yes 0 yes

    yes 0 14 Team T yes 3 yes 0 yes 0 yesyes 0 15 Marty Albertin MA yes 3 yes 0 yes 0 yesyes 0 16 Trent Fleece TF yes 1 yes 0 yes 0 yesyes 0 17 Gabe Wilson GW yes 0 yes 0 yes 0 yesyes 16 18

    19

    20

    21

    22

    23

    24

    10% 25

    3% 26

    1% 27

    15% 28

    4% 29

    1% 30

    10% 31

    3% 32

    1% 33

    15% 34

    4% 35

    1% 36

    10% 37

    3% 38

    1% 390% 40

    0% 41

    1% 42

    0% 43

    0% 44

    1% 45

    46

    47

    Risk

    AcceptaRisk Owner?

    Responsible for

    Actions?

    Assurance on

    Actions?

  • 7/28/2019 TREX-45036

    40/48

    48

    49

    50

  • 7/28/2019 TREX-45036

    41/48

  • 7/28/2019 TREX-45036

    42/48

    Register

    Updates?

    0 yes 1 1 1 1 1 1 1 1 1 1

    0 yes 2 2 2 2 2 2 2 2 2 20 yes 3 3 3 3 3 3 3 3 3 30 yes 4 4 4 4 4 4 4 4 4 40 yes 5 5 5 5 5 5 5 5 5 50 yes 6 6 6 6 6 6 6 6 6 60 yes 7 7 7 7 7 7 7 7 7 70 yes 8 8 8 8 8 8 8 8 8 8

    0 yes 9 9 9 9 9 9 9 9 9 90 yes 10 10 10 10 10 10 10 10 10 100 yes 11 11 11 11 11 11 11 11 11 110 yes 12 12 12 12 12 12 12 12 12 120 yes 13 13 13 13 13 13 13 13 13 13

    0 yes 14 14 14 14 14 14 14 14 14 140 yes 15 15 15 15 15 15 15 15 15 150 yes 16 16 16 16 16 16 16 16 16 160 yes 17 17 17 17 17 17 17 17 17 17

    ce?

  • 7/28/2019 TREX-45036

    43/48

    17 17 17 17 17

    Chuck Bondurant Chuck Bondurant Chuck Bondurant Chuck Bondurant Chuck Bondurant

    Donald Charles Donald Charles Donald Charles Donald Charles Donald Charles

    Binh Van Nguyen Binh Van Nguyen Binh Van Nguyen Binh Van Nguyen Binh Van Nguyen

    Chris Casler Chris Casler Chris Casler Chris Casler Chris Casler

    Tomieka Searcy Tomieka Searcy Tomieka Searcy Tomieka Searcy Tomieka Searcy

    Pierre Depret Pierre Depret Pierre Depret Pierre Depret Pierre Depret

    Mark Hafle Mark Hafle Mark Hafle Mark Hafle Mark Hafle

    Jonathan Bellow Jonathan Bellow Jonathan Bellow Jonathan Bellow Jonathan Bellow

    Bobby Bodek Bobby Bodek Bobby Bodek Bobby Bodek Bobby Bodek

    Jasper Peijs Jasper Peijs Jasper Peijs Jasper Peijs Jasper Peijs

    David Sims David Sims David Sims David Sims David Sims

    George Gray George Gray George Gray George Gray George Gray

    Craig Scherschel Craig Scherschel Craig Scherschel Craig Scherschel Craig Scherschel

    Team Team Team Team Team

    Marty Albertin Marty Albertin Marty Albertin Marty Albertin Marty AlbertinTrent Fleece Trent Fleece Trent Fleece Trent Fleece Trent Fleece

    Gabe Wilson Gabe Wilson Gabe Wilson Gabe Wilson Gabe Wilson

  • 7/28/2019 TREX-45036

    44/48

  • 7/28/2019 TREX-45036

    45/48

    AlertLite E&P Risk Categories

    Count

    C Country and Regulatory 0 C Country and Regulatory

    C01 Experience of Operating in Province 0 E Market/Commercial ContextC02 Political Stability 0 H Health, Safety & EnvironmentC03 Security of Proprietary Information 0 T Technical ChallengeC04 Currency Risk (versus US $) 0 X Project Definition & Execution ComplexityC05 Fiscal Policy/Tax etc. 0 Y Operability/Production Ramp-upC06 Safety & Security of Personnel 0C07 Regulatory Environment(Federal & local) 0C08 Local Culture 0C09 Employment/Local Sourcing Expectations 0C10 Infrastructure 0C11 Group Reputation 0C12 Ethical Conduct 0

    C13 Expropriation/Revenue security 0E Market/Commercial Context 0E01 Partner Alignment 0E02 Partner Funding Constraints 0E03 Development of Product Markets 0E04 Sources of Value Complexity 0E05 Feedstock & Product Values 0E06 Product Differentials 0E07 Managing Exec. Mgmt. Perf. Expectations 0E08 Brand Issues 0E09 Competitor Threats to Economic Success 0E10 Feedstock Source/Product Offtake Agmts. 0E11 Terms Uncertainty 0

    H Health, Safety & Environment 0H01 Safety of Design 0

    H02 Emmisions/Spills 0H03 Environmental Sensitivities 0H04 Waste Management 0H05 Differing Partner Standards 0H06 Health Sensitivities 0H07 Construction Safety 0T Technical Challenge 0T01 Subsurface Delineation/Complexity 0T02 Recovery Factor 0

    T03 GOR/GCR/Water Prodn/Fluids Injection 0

    T04 Reservoir Fluids Characteristics 0T05 Well Productivity 0T06 Terrain/Topography/Water Depth 0T07 Seismology/Soil/Met-Ocean Conditions 0T08 Facilities Concept (Choice/Knowhow/Stretch) 0T09 Drilling Complexity 0T10 Completions Complexity 0T11 Mid-Stream/Export 0X Project Definition & Execution Complexity 0

  • 7/28/2019 TREX-45036

    46/48

    X01 Availability of Key Skills 0X02 Early Team Alignment (incl. Partner Staff) 0X03 Modification/Revamp content 0

    X04 Scheduling Basis Risk (to First Production) 0X05 Estimating Basis Risk 0X06 Work Fronts / Key Interfaces 0

    X07 Quality of Design Basis/Definition 0X08 Remoteness/Access/Logistics Complexity 0X09 Climatic Weather Windows 0X10 Contractor / Vendor Sourcing 0X11 Rig/Instln. Vessels Availability 0X12 Labour Market 0X13 Project Strategy Development 0Y Operability/Production Ramp-up 0

    Y01 Availability of Experienced Operations Staff 0Y02 Operating Cost Risk 0Y03 Systems Availability(eg Plant/Export/Wells) 0Y04 Level of New Technology Equipment Items 0

    Y05 Sparing Philosophy (Critical Items) 0Y06 Operability of Design 0Y07 Tech.Integrity (incl.QA/QC) 0Y08 Decommissioning Philosophy 0Y09 Planned Rate of Ramp-up 0

  • 7/28/2019 TREX-45036

    47/48

  • 7/28/2019 TREX-45036

    48/48

    Country & Reg. 0

    Market & Comm. 0H, S & E 0Tech. Challenge 0Defn. & Complexity 0Oper'ty & Ramp-up 0